Ba art s a rk ar Government of India kond`Iy a iv aVut …wrpc.gov.in/pcm/110pcm_minute.pdfS.E....
Transcript of Ba art s a rk ar Government of India kond`Iy a iv aVut …wrpc.gov.in/pcm/110pcm_minute.pdfS.E....
Ba art s a rk ar Government of India
kond`Iy a iv aV ut p`ai Q ak rN a Central Electricity Authority
p i S c am a x ao~ Iy a iv aV ut s aim ai t p i S c am a x ao~ Iy a iv aV ut s aim ai t p i S c am a x ao~ Iy a iv aV ut s aim ai t p i S c am a x ao~ Iy a iv aV ut s aim ai t Western Regional Power Committee
e f -3, e ma Aa ya D I sa I xa o~, A MQ a or I (p Uva -), ma uM ba [- - 400 093 F-3, MIDC Area, Andheri (East), Mumbai - 400 093
Aa [- esa Aa o : 9 0 0 1-2 000 IS/ISO : 9001-2008
dUr BaaYa Phone: 022- 28221681; 28200194/195/196; fO@s a Fax : 022 – 28370193
Website : www.wrpc.nic.in E-mail : [email protected]
¬¸¿‰¡¸¸: £®¸µ¸ / 110 œ¸ú¬¸ú‡Ÿ¸ / 2010 / œ¸® ½̧¹¨¸¬¸¢Ÿ¸¢÷¸- ¹™›¸ ¿̧ˆÅ :21.10.2010 No. : Prot./ 110 PCM / 2010 / WRPC-9626 Date: 21.10.2010
¬¸½¨¸¸ Ÿ¸½¿ /To,
As per mailing list ¹¨¸«¸¡¸:- ¢™›¸ ¿̧ˆÅ 29 ev a 30 is a tb a r 2010 kao -irl aay an s a en aj a I- il a. Dha NaU Ÿ¸½¿ A ay a aoij at kI g a[ - £®¸µ¸
¬¸¹Ÿ¸¹÷¸ ˆÅú 110 ¨¸ì 9¸¾“ˆÅ ˆÅ¸ ˆÅ¸¡¸Ä¨¸¼î¸— Sub :- Minutes of 110th Protection sub-Committee Meeting held on 29th & 30th September 2010
at Reliance Energy Ltd. Dahanu.
Ÿ¸−¸½™¡¸ / Sir,
ƒ¬¸ œ¸°¸ ˆ½Å ¬¸¸˜¸ ¢™›¸ ¿̧ˆÅ 29 ev a 30 isatb a r 2010 kao -i rla ay ans a en aja I- ila. Dha NaU - Ÿ¸½¿ ‚¸¡¸ ½̧¢P¸÷¸ ˆÅú Š¸ƒÄ œ¸¢©S¸Ÿ¸ ® ½̧°¸ú¡¸ ¢¨¸Ô º̧÷¸ ¬¸¢Ÿ¸¢÷¸ Ÿ¸º¿¤¸ƒÄ, ˆÅú £®¸µ¸ ¬¸¹Ÿ¸¹÷¸ ˆÅú 110 ¨¸ì 9¸¾“ˆÅ ˆÅa ˆÅ¸¡¸Ä¨¸¼î¸ ‚¸œ¸ˆÅú ¬ »̧S¸›¸¸ ‡¨ ¿̧ ‚¸¨¸©¡¸ˆÅ ˆÅ¸£Ä¨¸¸ƒÄ í½÷¸º ¬¸¿¥¸Š›¸ í¾ —
Please find enclosed herewith the minutes of 110th Protection sub-Committee Meeting of Western Regional Power Committee, held on 29th & 30th September 2010 at Reliance Energy Ltd. Dahanu for your information and necessary action.
¤ ¾̧“ˆÅ ˆÅ¸ ˆÅ¸¡¸Ä¨¸¼î¸ œ¸®¸½¢¨¸ ¬¸¢Ÿ¸¢÷¸ ˆÅú ¨¸½¤¸¬¸¸ƒ’ www.wrpc.nic.in œ¸£ ž¸ú „œ¸¥¸¤š¸ í¾ — Minutes are also available at WRP Committee website www.wrpc.nic.in
š¸›¡¸¨¸¸™ /Thanking you
ž¸¨¸™ú¡¸/Yours faithfully,
sd (‡m a.A ar.isM ah /M.R. Singh)
‚š¸ú. ‚¹ž¸.(£.)/Suptdg. Engr.(P.) ¬¸¿¥¸Š›¸ /Encl. :- „œ¸£¸½Æ÷¸¸›¸º¬¸¸£ /As above
MINUTES OF THE 110th
PROTECTION COMMITTEE MEETING
The 110th
Protection Committee Meeting of WRPC was held on 29th
and 30th
September 2010 at
Reliance Dahanu TPS. The list of participants is placed at Annex -I.
Shri A.K.Ghosh Head (O&M), Dahanu TPS, welcomed the participants for the meeting. He further
expressed that the various grid protection related issues of Western Region would be discussed during this two
day meeting and resolved amicably.
Shri Manjit Singh, Member Secretary, WRPC, welcomed all the members and the participants of the
110th
Protection sub-Committee Meeting. He hoped that various protection related issues would be resolved
through active deliberations in the meeting. Further he thanked Reliance Dahanu TPS officers for making
excellent arrangements and hospitality extended to the participants of the meeting.
He requested Shri Satyanarayan S. Superintending Engineer (O&S), WRPC to take up Agenda items
for discussions.
Item No.1: Confirmation of Minutes of 109th Protection Committee Meeting.
S.E. (O&S), WRPC, stated that Minutes of 109th
PCM, held on 29th
and 30th
June 2010 at WRPC
Mumbai, were circulated vide WRPC letter no. Prot./109 PCM/2010/WRPC-6784 dated 19th
July 2010. In respect
of recordings of Item 2.2 (iv) of the above minutes, GETCO representative clarified that the CTs of 220kV
Haldarwa-IPCL no.-I are connected on Bus side and therefore the fault was fed from the remote end, further the
DPS was subsequently tested and found in order. Hence the last two lines of last para of the Item 2.2 (iv) be
changed as “GETCO representative informed that the DPS of the 220kV Haldarwa-IPCL no.-I was
subsequently tested and was found in order”. Committee deliberated and the minutes of 109th
PCM circulated
vide above referred letter were confirmed, with the above changes.
Item No.2: System disturbances
2.1: System disturbances in GETCO/GSECL system.
2.1 (i) System disturbance at 400kV Kansari S/S in GETCO system on 03-07- 10.
GETCO representative informed that on 03.07.10 at 00:15hrs., 400kV Soja-Kansari line and other lines
connected to 400kV Bus 1 & 2 tripped due to operation of Bus Bar protection (ABB make RADSS type) at
400kV Kansari S/S.
He further told that Hot spots were observed on the top and bottom side of 400kV R phase Bus Coupler
CT. There were heavy rains at the time of the occurrence. The tan-delta and capacitance of the CT was
measured and was found in order. The the fault was “In Zone” fault for both the Buses, the tripping of Bus-1 &
Bus-2 was in order.
All the tripped elements were taken into service by 07:50hrs., except the 400kV Bus Coupler which
was taken into service at 20:50hrs.
Committee felt that the fault was “In Zone” fault for both the Buses, and hence the tripping of
Bus-1 & Bus-2 was in order.
2.1 (ii) : System disturbance at 220kV Chhatral S/S in GETCO system on 03-07-
2010.
GETCO representative informed that on 03.07.2010 at 09:15 Hrs, B Phase LV Bushing of 220/66kV
100MVAT/F No.3 failed with heavy blast (the T/F tripped on Diff. high speed trip, REF and Buccolz trip) and
caught fire at 220kV Chhatral S/S. The broken insulators of bushing fell on the OLTC tank and oil came out of
the Bushing turret. The T/F is of TRA make, commissioned in Feb-10. The results of SFRA Tan-delta and DGA
were found in order.
He further told that as a precautionary measure all the elements were switched off manually and S/S
was isolated from all sources.
The 66kV Santej S/S was interrupted from 09:15hrs to 13:45hrs. All the 11kV feeders emanating from
Chhatral S/S were interrupted from 09:15hrs to 16:15hrs. All the elements were restored by 15:10hrs except
220kV Gandhinagar-2 line which was charged at 19:45hrs and 220kV Gandhinagar -1 (which was kept off due
to DC leakage).
Detail report received from GETCO is enclosed at Annex.-2.1 (ii).
Committee felt that the tripping was in order.
2.1 (iii) System disturbance at 220kV Gavasad S/S in GETCO system on 08-04-
2010.
GETCO representative informed that on 08.04.2010, the R-ph CT (BHEL make) of 220kV Gavasad –
Kasor line failed at 220kV Gavasad S/S. The CT was connected on Line side. All the feeders connected to the
Bus tripped on 96 LBB relay along with Bus Coupler breaker. The Line also tripped with relay indications R-ph,
Z1 and from remote end on R-ph, Z2. The T/F –I tripped on over current. Tan delta values of the failed CT and
the newly commissioned CT were as follows.
Committee felt that the operation of LBB was undesirable, since the 220kV Gavasad – Kasor line
tripped in Z-1 which would have cleared the fault before the operation of LBB. The breaker needs to be
checked for timings/stuck breaker condition. Also tripping of line in Zone-2 from remote end was also
undesirable, since it should have tripped on PLCC carrier aided trip in Z-1 timings. The carrier aided
tripping needs to be checked.
2.1 (iv) System disturbance at 220 kV KLTPS S/S in GETCO system on 07-04-10.
GETCO representative informed that on 07.04.2010 at 11:00hrs the 220 kV Adani-Tappar line no.2
tripped on R-Ph., Zone-1 from both ends due to snapping R-phase conductor at loc. no. 112-113. The line was
declared P.F from 11.00 hrs.
He further informed that following changes occurred in the system
(i) The generation of Adani Power was of the order of 540 MW. Due to tripping of the 220 kV Adani-
Tappar line no.2, the power outlet available from Adani was 220 kV Adani- Nanikhakhar line no. 1 & 2, 315
MVA, 220/400 kV ICT & 220 kV Adani-Tappar line no.1.
(ii) At 14:17hrs. M/s Adani switched off the 220 kV Adani-Tappar line no.1 with out informing to
SLDC Gotri, due to melting of Y-Ph isolator jaws and hot spot observed. This line was carrying about 167 MW
power to Tappar.
(iii) Due to loss of both the lines Adani –Tappar line no. 1& 2 from the system, the power outlets
available from Adani were 220 kV Adani- Nanikhakhar line no. 1 & 2, & 315 MVA, 220/400 kV ICT.
Subsequently, 315 MVA 220 /400 KV ICT tripped at 14.38 hrs., on overload from 220 KV side at Adani end.
Due to these trippings, Akrimota & Panandhro units tripped on under frequency and got islanded. The Adani
power units tripped on over speed.
(iv) The 220 kV KLTPS-Kukma line no.2 was under shut down for maintenance work since 8.00
hrs.At 14.20 hrs., 220 kV KLTPS-Kukma line no.1 tripped from both ends on B-Ph, zone-1 which was carrying
a load about 183 MW, The load demand at Nakhatrana & Nanikhakhar was about 20 MW & 65 MW
respectively. Due to tripping of 220 kV KLTPS-Kukma line no.1, there was a power evacuation of 183 MW
from 220 kV Nakhatrana to Nanikhakhar to Tappar. Hence power flow on double circuit lines from
Nanikhakhar to Tappar increased from 316 MW to 500 MW.
(v) The 220 kV Nanikhakhar –Tappar line no.1 & 2, both the lines tripped on B-Ph. Zone-1 from both
ends at 14.29 hrs. & 14.31 hrs. respectively. Hence the 220 kV Tappar S/s was isolated from the grid as 220 kV
Adani- Tappar line no.1 & 2 was already out from the system.
From the DR it is observed that 220 kV Nanikhakhar –Tappar line no.1 tripped due to transient fault &
the fault current IB recorded was 2.68 kA, whereas line no.2 loading increased above 1200 Amp on each phase
and subsequently tripped due to transient fault (fault current recorded was 3.08 kA). .
SLD received is enclosed at Annex.-2.1 (iv).
Committee felt that switching off the 220 kV Adani-Tappar line no.1 with out informing to SLDC
Gotri, aggravated the problem, thereby stressing the system (due to melting of Y-Ph isolator jaws and hot
spot observed at Adani end). Further Committee felt that the area controller of the Adani System is SLDC
Gotri, hence SLDC should be informed for taking such outages.
2.1 (v): System disturbance at 220 kV Gandhinagar TPS Switchyard in
GSECL system on 12-06-10.
GETCO representative informed that on 12.06.10, at 01:35 hrs, Bus Bar protection operated
for Bus B, with indication ‘U’ on Bus Bar panel (ABB –RADSS) due to which all lines, transformers and
generators connected to Bus B tripped. The Unit No.2 connected to Bus-A also tripped on Unit Flame Failure
due to tripping of auxiliaries supplied from ST-1, which was connected to Bus-B.
He further informed that a bird nest was found at the Bus-A gentry near Soja-II feeder, black
spots were also observed on B Phase conductor of the bus near it. It is suspected that, a piece of wire from bird
nest might have fallen and caused the fault.
All the tripped elements were restored by 05:04hrs except GT-1, which was restored at
08:30hrs.
Committee felt that the tripping was in order.
2.2: System disturbance in MSETCL/MAHAGENCO system.
2.2 (i) System disturbance at 400kV GCR Chandrapur S/S in MSETCL system
on 15-04-2010.
MSETCL representative informed that on 15.04.2010 at 17:42 hrs heavy bursting sound was heard
from the switch yard followed by tripping of 400/220kV 3x105MVA ICT 2 (Diff. Protn. Optd) and all breakers
(BB Protn.Optd.) connected to 400kV Main Bus 2 including Bus Coupler also tripped at 400kV Chandrapur
S/S.
He further told that during yard inspection, the HV side Y phase CT (BHEL make, YoM 2007 & YoC
2009) of ICT 2 was found burst with smokes and fumes coming out of it. The 400kV GTR 5 which was
connected to Main Bus 1 also tripped during the incidence. The tan-delta of the CT measured prior to
commissioning was 0.0032 and the same deteriorated to 0.0064 during the measurement carried out on
08.08.2009. The tripping of GT5 connected to Main Bus 1 was due to failure of its auxiliaries due to tripping of
its Stn. T/F 3 which was connected to Main Bus 2. The concerned authorities (MAHAGENCO) has been
requested to ensure that the associated Stn. T/F of the Generator unit and the respective Generator Unit be kept
on the same Bus.
Normalcy of Main Bus 2 bays was restored by 18:31hrs on 15.04.10. The GT 5 was synchronized by
01:19hrs on date 16.01.10 and ICT 2 was restored by 08:39 hrs of 16.04.10.
Committee felt that the failure of CTs has been a concern and opined that sharing of utility
experiences on the condition monitoring of CTs is required to bring out best practices for condition
monitoring of CTs. Committee further felt that the trippings were in order. However MAHAGENCO
may ensure that the associated Stn. T/F of the Generator unit and the respective Generator Unit be kept
on the same Bus as has been requested by MSETCL.
2.2 (ii) : System disturbance at 400kV Padghe S/S in MSETCL system on 21-
04-2010.
MSETCL representative informed that on 21.04.2010 at 21:58hrs, the ABB make RADSS bus-bar
protection of 220kV Zone – II bus operated with trip ‘U’ indication without any phase indication at 400kV
Padghe S/S. This resulted in tripping of all equipments connected to 220kV Main Bus – II. Simultaneously 220kV
Kamba feeder & 100kV Bhiwandi 1 & 2 also tripped at Padghe S/S.
He further told that due to tripping of ICT-II connected to Bus B, the other two 315 MVA ICTs got
overloaded. This overloading of ICT had initiated the load trimming scheme & tripped 100 kV Bhivandi 1&2
due to which load relief of about 126 MW was obtained & system remained healthy. This resulted in total
supply failure at 100 kV Bhivandi S/S.
Due to tripping of 220 kV Wada feeder connected to Bus B, the 220 kV Kamba feeder got overloaded
& tripped eventually on Over current protection (PS-125%, CTR-800/1). This resulted into total failure of
supply to 220 kV Wada, Kamba & Kolshet S/Ss & partially to100 kV Vasai S/S.
Due to tripping of 220 kV Jambhul-II feeder connected on B-bus, the total supply failure occurred at 220
kV Jambhul, Anand Nagar, Dombivali-Pal & 100 kV Ambernath & MIDC – Dombivali.
During switchyard inspection, no fault was observed on the B-Bus. None of the protection of the
feeders/equipments connected to the bus had operated. Further there was no recording by the DRs which
confirmed that there was no through fault.
The Bus bar might have operated through direct DC Trip actuating circuit, bypassing Bus-Bar Trip
logic. The 220 kV ABB make RADSS Bus-Bar scheme was last tested in detail on 19/03/2010. To avoid such
problems, the modification in Bus bar trip circuitry was carried out. The matter was also referred to M/s ABB
however no reply was received from M/s ABB.
All the tripped elements were restored by 23:02 hrs.
Committee felt that the operation of the Bus Bar protection was unwarranted and deliberated on
the modification suggested by MSETCL. It was felt that though the modifications do not affect the internal
functioning of the relay, a proper recording of such modifications be recorded in the records maintained by
Testing Engineers and the S/S staff. Further it was felt that a close monitoring of such modifications be
done and follow up be done with the OEM for incorporating the practical experiences of field engineers in
the relays to avoid such mal operations.
2.3 (iii) : System disturbance at 400kV Khaparkheda S/S in MSETCL system on 25-
04-2010.
MSETCL representative informed that on 25.04.10 at 03:58 hrs, there was a total black out at 400kV
Khaparkheda S/S, due to tripping of 400kV Chandrapur and Koradi lines from remote ends.
On enquiry with the MAGENCO authorities, it was informed that the 70MVA Station T/F (stn 5B)
caught fire and its HV side bushing got completely damaged. Also several 11.5kV and 6.6kV switchgear panels
and breakers were found completely burnt at MAHAGENCOs PCR switch yard.
The 400kV Akola, Bhilai, GT 5(hand tripped on failure of its DCB, ID & FD Fans) and GT 7 (Loss of
forward power/detection of Neg.Seg.Component & tripping of ID fans) tripped at 400kV Koradi S/S. The
400kV Koradi-Bhilai line tripped from Bhilai end in Zone 2 and tripped at Koradi end on L/O trip for remote
fault on receipt of DT signal.
There was neither any event logged nor any disturbance recorded by the relays at MAHAGENCO end
indicating that none of the protections at MAGENCOs PCR operated and no tripping signal was sent to
MSETCL end for the above fault in MAGENCOs system.
He further told that the fault was sensed in reverse zone (time delay of 800 ms) by the 400kV lines at
Khaparkheda S/S, however the lines tripped from remote ends in Zone 2 (time delay 300ms).
The 400kV Koradi Khaparkheda is a very short line (6.39kM). Hence the the Bhilai-Koradi line tripped
in Zone 2.The Main-I & 2 ralays installed on 400kV Koradi-Akola line are ABB make REL 521 relays which
falsly operated for O/V, though the disturbance recorder had not indicated over voltages at that the time of this
occurrence (O/V stage 2 setting is 150% instantaneous). However during subsequent testing of the relay for O/V
the results were satisfactory. The matter has been taken up with M/s ABB.
MAHAGENCO representative told that the DC fuse was found blown. Also the alarm/indication for
DC supervision is taken before the fuse. Hence there was no alarm/indication of the DC fail.
PGCIL representative told that carrier sent from 400kV Bhilai end was spurious since the PLCC panel
ABB make NSD-60 was a very old panel. The same has been replaced.
After isolation of the burnt station T/F (5B), normalcy was restored by 06:25hrs, except Unit Nos 7 & 5
which were synchronized by 08:20hrs & 13:56hrs respectively.
Committee observed that the occurrence occurred due to failure of the DC fuse. As per the
protection philosophy there should be two separate DC supply system for protection circuits to have
redundancy. Also DC supervision alarm/indications should be provided at appropriate points. Hence
MAHAGENCO should review the DC supply system for the protection system and provide two separate
DC source for protection system. Also the DC supervision should be provided at appropriate point. Further
committee felt that though the DPS settings for short lines is not comprehensive, the zone -2 setting of the
400kV Bhilai-Kordi line may be reviewed (in view of the recent LILO of the 400kV Koradi-Chandrapur
line at Khaperkheda has not been considered while making of Zone -2 settings)
2.1 (iv) System disturbance at 400 kV Giravali S/S in MSETCL system on
13.05.2010.
MSETCL representative informed that on 13.05.2010 at 07:59 hrs, the 400kV Girawali-Lonikand-1
was hand tripped for isolation of the line reactor for overhauling at 400kV Girawali S/S. After isolation of the
reactor the line was charged from Lonikand end and while synchronizing at Girawali end, the B-ph CVT of
400kV Lonikand Ckt.-1 got burst and caught fire along with the wave trap. The BB protection operated and
tripped all the elements connected to Bus-I.
He further told that the jumper of the B ph CVT was dislocated and was hanging in air, which came in
the induction zone/contact of the B phase of the Bus-I, resulting in operation of the BB protection
400kV Girawali-Solapur restored at 11:57hrs, 400kV Parli-Chandrapur-I restored at 11:35hrs, 400kV
Parli-Chandrapur-II restored at 12:05hrs and 400/220/33kV 315MVA T/F restored at 09:50hrs of 13.05.10.
400kV Parli-Lonikand I restored at 14:46hrs and 400kV Bus Coupler restored at 11:13hrs. of 15.05.10.
Committee felt that the tripping was in order.
2.2 (v) System disturbance at 400kV Bableshwar S/S in MSETCL system on 11-06-
2010.
MSETCL representative informed that on 11.06.2010 at 18:04hrs, the Main Bus I R-ph isolator of
400kV Dhule Ckt.I collapsed and fell on the gantry along with IPS tube due to heavy storm at 400kV
Bableshwar S/S. This resulted in operation of the Main-II Bus Bar Protection and all the elements connected to
Main Bus-II tripped. The lines also tripped from remote ends on receipt of DT from Bableshwar.
The CVT clamps of 400kV Aurangabad and Padghe lines broke due to movement of the wave
trap resulting in the jumper movement in stormy condition.
He further told that the restoration got delayed due to failure of 11kV station supply from the
Distribution Company, since the CBs went into lock out due to low air pressure. It was felt that the arrangement
of CVT shifiting has been proposed to their corporate office.
All the affected elements were restored by 03:43hrs, except 400kV Padghe-II line which was
restored at 07:46hrs and 400kV Aurangabad line at 13:06hrs.
Committee felt that proper clearance must be maintained while placing the EHV equipments in
S/S yard and any modification felt appropriate in view of the practical conditions may be carried out.
Committee further felt that the tripping was in order.
2.1 (vi) System disturbance at 400 kV Waluj S/S in MSETCL system on
18.06.2010.
MSETCL representative informed that on 18.06.2010 at 17:23hrs, while trying (accidentally) to close the
Y-Ph earth isolator of Main Bus-II, instead of opening the earth isolator of the Main Bus-I as was directed to the
operation staff, the 400kV Zone-II BB protection operated resulting in tripping of all elements connected to Main
Bus-II at 400kV Waluj S/S. He further told that the earth switches at this S/S are not motorized. The earth switch,
which was being operated, was a bus side earth switch, hence there was no mechanical interlock.
All the tripped elements were restored by 17:53hrs.
Committee felt that any operations in the switchyard should be carried out with caution and
proper supervision. This would not only avoid such occurrences, but also would not endanger the personnel
working in switchyard.
2.2 (vii) System disturbance at 400kV Chandrapur S/S in MSETCL system
on 25-06-2010.
MSETCL representative informed that on 25.06.2010 21:24Hrs., all the elements connected to 220kV
Main Bus- I along with Bus Coupler tripped due to operation of the Bus Bar protection of Main Bus-I at 400kV
Chandrapur S/S and Station T/F 2 and Unit 2 at MAHAGENCO end. The Generating units of M/s Wardha Power
Co.(WPC-IPP) which was connected to 220kV Warora S/S tripped at WPC end on operation of Zero sequence
protection. However the Y-pole did not trip due to burnt trip coil and the line tripped at Warora end on Back up
E/F.
During yard inspection it was found that the Y-ph CT of 220kV SICOM Ckt.1 got burst and caught fire.
Dense smoke was also observed around the burnt CT and around the RYB bus conductors of the adjacent bay of
SICOM Ckt.-2.
There was a total failure of supply at 220kV SICOM, Gadchandur, Virur and Gadchiroli S/Ss
(@57 MVA).
He further told that the tripping of 220kV MIDC Chandrapur feeder at Gadchandur S/S was
undesirable and subsequently the old DPS ER-THR4PE24 was replaced with Micom DPS. The tripping of 220kV
SICOM ckt-2 on DPS Z-1 might have been due to the smoke spreading out of the burnt CT to this near by line.
The 220kV SICOM ckt.-1 tripped at SICOM end on z-1 and 61N.
Normalcy was restored after replacing the faulty string at 22:39hrs except 220kV SICOM 1 Ckt., which
was restored at 19:57hrs of 26.06.2010.
.
Committee felt that the tripping of the WPC generating units was undesirable since the fault at
220kV Chandrapur GCR was cleared by the BB protection. The operation of E/F protection at Warora end
indicates that there might be other fault coinciding with the above occurrence. However the relays of WPC
and 220kV Warora S/S needs to be checked. The operation of B/U E/F of 220kV SICOM ckt.1 was also
undesirable and hence should be tested. Committee further observed that similar mal operation of the DPS
of 220kV MIDC Chandrapur at Gadchandur was observed during earlier occurrence reported to
Proetction sub-Committee and replacement of the DPS would resolve the issue.
2.2 (viii) : System disturbance at 220 kV Girawali S/S in MSETCL system on
21.08.2010.
MSETCL representative informed that on 21.08.2010 at 19:01hrs, while connecting the jumper of Main
II bus B-ph jumper, flashover between Bus T and jumper pad occurred at 220kV Girawali S/S and the elements
connected to Main bus-I and Main II bus tripped on operation of the respective unit protections from remote ends
in Zone-2.
The work of hot line replacement of isolators of Main Bus-II and Auxiliary Bus of TBC was being
carried out.
The Bus Bar protection Zone A & B operated. However the check zone did not operate and hence there
was no tripping on BB protection. The BB protection scheme is of EE make high impedance scheme and is under
replacement. The CT wirings for check zone were found to be wrongly connected, the same were corrected.
All the tripped elements were restored by 22:30hrs of 21.08.2010, except Unit III which was restored at
07:25hrs and 220kV Osmanabad line which was restored at 10:10hrs of 22.08.2010.
Committee felt that the trippings of lines from remote end in Zone-2 was in order because of non-
clearance of the fault by the BB protection scheme. The non-operation of the check zone of the BB
protection scheme needs to be investigated.
2.3: System disturbance in MPPTCL/MPPGCL system.
2.3 (i) System disturbance at 220 kV Damoh S/S in MPPTCL system on 03-04-2010.
MPPTCL representative informed that on 03.04.10 at 17:58 Hrs R Ph polycon of main bus isolator of
220 kV PGCIL II feeder broke resulting in to bus fault at 220 kV Damoh S/S. The 220 and 132 kV feeders
tripped from remote ends. All the elements were hand tripped at 220kV Damoh S/S.
He further told that BB protection scheme has not been provided at 220kV Damoh S/S, the same has
been ordered and would be commissioned within two months.
All the tripped elements were restored by 22:05hrs.
Committee felt that tripping of lines from remote ends in Zone-2 in absence of BB protection is in
order. However the BB protection would have cleared the fault instantaneously. Hence BB protection
scheme should be provided at important S/Ss, irrespective of the voltage level.
2.4: System disturbance in PGCIL system.
2.4 (i) System disturbance at 400kV Seoni S/S in PGCIL system on 28-04-
2010.
MPPGCL representative informed that on 28.04.2010, at 02:35Hrs, Unit No.9 tripped on R-ph overall
differential protection at Satpura TPS along with the 400kV Seoni-Bina & 400kV Seoni-Bhilai lines. The R Ph
start appeared on Main –I relay of 400kV Sarni-Seoni feeder and the fault location registered was 111%
(164kM), however the line did not trip.
The overall differential protection installed on the 210 MW Gen Unit 9 is a ABB make REG-670 type
numerical relay. The matter has been taken up with M/s ABB for the mal operation of the relay.
PGCIL representative informed that that the trippings occurred due to bursting of R-ph CT of 400kV
Seoni-Bina line at 400kV Seoni(PGCIL) S/S. The CT was Areva make and failed within 28 days of
commissioning. The Bus-2 BB protection operated at Seoni S/S. However due to one and half breaker scheme
arrangement there was no interruption at 400kV Seoni S/S. 400kV Seoni-Bhilai tripped in Zone-1, due to weak
infeed.
Committee observed that the operation of BB protection at Seoni S/S was in order. The tripping of
Unit No.9 on R-ph overall differential protection at Satpura TPS was undesirable and needs to be tested in
the presence of the manufacturer.
2.4 (ii) System disturbance at 400kV Bina S/S in PGCIL system on 07-05-
2010.
PGCIL representative informed that on 07.05.2010, at 15:47 Hrs. (O/V were prevailing and were
around 430kV, Also Bus reactor was in service) following cascade trippings occurred:
a. At 15.47.54.311, Over Voltage stage – I protection of Satna – I Line operated and tripped the
Line. Over Voltage measured through DR was 440.7 kV.
b. At 15.47.58.145 Bus bar protection operated for 400 kV Bus – 1. Main Bus-1 was isolated
immediately. As per the details taken from Bus-bar relay, bus fault was predominantly phase to
phase (in Y Phase and B phase) along with small portion in earth.
c. At 15.48.02.293, Satna – 3 Overvoltage stage – I (graded setting of 4sec to 7sec at 110%)
operated and the line tripped.
d. At 15.48.02.943, Satna – 4 Over-Voltage stage – I operated and the line tripped.
e. At 15.48.03.257 Seoni – I line tripped on DT received from Seoni end due to operation of over
voltage protection at Seoni end.
f. At 15.48.04.281 Nagda -2 line tripped on DT received from Nagda end due to operation of over
voltage protection at Nagda end.
All the other lines, namely, Satna – 2, Gwalior – 1,2 , Nagda -1, Bina (MPPTCL) – 1,2 and Bus
Reactor remained in service through Bus – II.
He further told that, due to charging of 765kV Seoni-Bina (Quad conductor ) line on 400kV, the over
voltages are being observed in the system around Seoni and Bina area. O/V trippings occurred within a short
time of Bus-fault (before as well as after the Bus-fault). However, no visible fault on 400 kV Bus-I was found,
though a flashover was observed in the switchyard. A sound was also heard in control room. Bus – I and
associated bays were thoroughly checked for healthiness by meggering and Tan delta measurement, but no
abnormality was found. The weather was very hot (temperature was around 45 deg) and hot summer winds were
blowing. A piece of conductor might have fallen and came within the arcing zone of the Y-B conductors
resulting in the Bus fault.
The total fault current in phase to phase was around 8kA and earth fault current was around 1kA. The
trippings of lines was due to operation of over voltage protection and not due to operation of Bus-bar
protections.
Satna – 3 was taken into service at 1634 Hrs, Nagda – 2 was taken into service at 1700 Hrs, Satna – 1
line was taken into service at 1744 Hrs Satna – 4 line was taken into service at 2046 Hrs and 400 kV Bina –
Seoni – 1 Line could be taken into service till the next day due to higher system voltage.
Committee felt that the Bus fault might have taken place due to falling of piece of conductor/metal
on the Bus, carried by a bird/wind. Further Committee observed that the O/V around Bina and Seoni area,
needs to be addressed by identifying locations for installing reactors through proper system studies.
2.4 (iii) System disturbance at 400kV Dehgam S/S in PGCIL system on 07-06-
2010.
PGCIL representative informed that on 07.06.2010 at 06:05 Hrs, 400kV Bus-I & Bus-II of Dehgam S/S
got tripped. At that time, out of 10 feeders connected to Dehgam S/S, 5 feeders, namely Ranchodpiuar-1&2,
Sami -1&2 and Nagda-2 were out of service due to system constraints. There were heavy rains along with
severe lightening at Dehgam S/S. Total 4 occurrences of External flashovers took place between a span of one
minute, which were responsible for tripping of 400kV Bus-I & Bus-II at Dehgam S/S.
At 06;05;39 Hrs, external flashover took place across the Y phase CT of Bus Reactor Main Bay, thus
creating a Bus fault, because of which Bus-Bar-II Protection Operated and isolated main Bus-II immediately, by
tripping of Main CBs of ICT-2, Sugen, Nagda-1, Wanakbori, Bus reactor-R&B phase only. The Main CB -Y
phase of Bus Reactor did not opened immediately resulting in continuation of Flashover in Y Phase CT of Bus
Reactor due to which TEED#1 Protection of Bus-Reactor operated and because of this, the fault got cleared with
the opening of Tie CB of Bus Rector Bay. Later on, the Y phase-Main CB of Bus Reactor also got opened after
260ms(approximately) from the beginning of incidence. By this time, the LBB protection of Main CB of Bus
Reactor had already operated due to delayed-opening of its Y Pole. The Fault persisted for about 250ms.
LA’s counters were checked and it was found that Y-Pole counter of Gandhar#1 Line, which is in the
same dia as Bus reactor, had increased by one and rest of counters were unchanged.
At 06;05;51 Hrs, external flashover took place across the Main Bay-R phase CT of Gandhar-1 Line,
thus creating a Bus fault, because of which Bus-Bar-I Protection Operated and isolated main Bus-I immediately,
by tripping of CBs connected to Bus-I, i.e. Tie CB of ICT-2 and Main CB of Gandhar-1, ICT-1, Soja feeders.
Hence the fault got cleared within 70ms from inception. With this, total power disruption took place at Dehgam
S/S, as 400kV Bus-2 was already in tripped condition. However, all 4 nos of 220 KV lines viz Khanpur- 1&2
and Ranasan- 1&2 remained intact during the incident.
At 06:06:07 Hrs, Lightening/ voltage surge also caused external flashover across B phase Line CT of
Wanakbori feeder and B-Phase Tie CT of Wanakbori-Nagda-2 feeder resulting in operation of TEED protection
of Wanakbori feeder and tripping of Tie CB and remote end tripping.
Similarly, at 06:06:21 Hrs. Lightening/ voltage surge caused external flashover across R phase CT of
ICT-1 Main Bay, resulting in operation of TEED protection of ICT-1 and tripping of ICT#1, Tie CB(552) and
220kV side CB at 06:06:21:604 Hrs.
He further told that the weather was cloudy till 06:00 Hrs and heavy rain started at 06:04 Hrs. At
around 06:06 Hrs four to five severe lightening flashes were observed at Dehgam S/s, almost coinciding with
the tripping occurrences. It was suspected that Lightening induced Voltage surges caused external flashover
across BHEL make CTs, This may have been indirectly caused due to deposition of pollution on the insulator
petticoats because of on-going construction activities resulting in less creepage. The particular design of BHEL
make CTs (with huge Corona Rings) might have been an enabling factor in this external flashover. As a
preventive measure, it has been instructed to clear the insulator petticoats at the earliest after construction
activities. The mechanism of Y phase-Main CB of Bus Reactor was overhauled.
400 kV Nagda-1 was restored at 7:12 Hrs, 315 MVA ICT-1 was restored at 7:17 Hrs, 315 MVA ICT-II
was restored at 7:18 Hrs, 400 kV Soja restored at 7:26 Hrs, 400 kV Wanakbori was restored at 7:50 Hrs, 400
KV Suzen was restored at 08:05 Hrs and 63 MVAR bus reactor was restored at 12:52 Hrs.
Committee observed that the flash over occurring within such small span of time around the
BHEL make CTs may be taken up with manufacturer.
ITEM NO. 3: Tripping of lines / ICTs:
The incidences of tripping of lines and ICTs during the period 01-04-2010 to 31-08-2010 were discussed
during the meeting.
Observations of the committee are enclosed at Annexure –3 and Annexure-3A.
ITEM NO. 4: Protection related recommendations on Grid Disturbances in Western
Regional Grid on 25.2.2007 at 1634 hours and 28.2.2007 at 13:11 hours:
Protection related recommendations of the Enquiry Committee on Grid Disturbances in Western
Regional Grid on 25.2.2007 at 1634 hours and 28.2.2007 at 13:11 hours were reviewed during the meeting and
the present status regarding implementation of recommendations is placed at Annexure-4.
ITEM NO. 5: Other points:
5.1: Non-availability of Event Logger at 400kV state owned sub-stations at
Nagda, Indore, Bina Padghe, Kolhapur, Koradi, Chandrapur, Dhule and
Bhilai.
S.E. (O&S), WRPC informed that during the 104th
PCM, PGCIL had informed that Event Loggers at
some of the 400kV state owned Sub stations, namely Nagda, Indore, Bina of MPPTCL, Padghe, Dhule, Kolhapur,
Koradi, Chandrapur of MSETCL and Bhilai of CSPTCL are not provided. PGCIL have requested for early
installation of Event Loggers at these stations.
He further told that during the 106th
PCM, MPPTCL representative clarified that event loggers available
in the numerical relays as a built in feature, and GPS synchronized clock are being used for logging the events at
all the above S/S’s, hence they are not initiating the procurement process for separate event loggers for the above
S/Ss. However members of PCM felt that a separate event logger is required to be installed so that all the events
occurring required for post fault analysis of an occurrence in the S/S can be recorded. During the 107th
PCM
MPPTCL desired to have a list of events that are required to be logged. As desired by MPPTCL the list of events
that are required to logged was enclosed at Annex. 5.3 of the 107th PCM minutes. In the 109th PCM, MPPTCL
representative informed that the proposal has been moved to the management and decision is awaited.
MPPTCL representative informed that the event loggers for Nagda, Indore, Bina and Bhopal were in
tendering process and would be commissioned within 3-4 months.
S.E. (O&S), WRPC told that in the 107th
PCM, MSETCL representative informed that event logger for
Padghe and Kolhapur and Dhule has been commissioned. Further the event loggers at Koradi, Chandrapur and
Khaparkheda have been provided, but unit outages from the generating stations are awaited for incorporating the
events of generating units. MSETCL and MSPGCL representatives agreed to co ordinate for the same.
He further told that in the 108th PCM, MSETCL representative informed that necessary coordination with
MSPGCL was done, however during commissioning of the scheme problems in the scheme were reported and the
same would be sorted out and the event loggers would be put in service shortly. In the 109th
PCM, MSETCL
representative informed that the provision of event loggers at 400kV Dhule S/S is pending and will be
commissioned by the last week of July 2010.
MSETCL representative informed that event loggers have been commissioned at 400kV Dhule S/S in
July 2010. The event loggers at Koradi, Chandrapur and Khaparkheda S/Ss have been installed and were kept
under observation for 15-20days and they would be commissioned within a month.
In the 109th
PCM, CSPTCL representative informed that the event logger for Bhilai is under procurement
stage and would be commissioned within 6 months. CSPTCL representative informed that the event logger was
under procurement stage and would be commissioned within 3-4months.
5.2: Pending SOE connections and erroneous data in SCADA.
S.E. (O&S), WRPC informed that the matter was first discussed in the 102nd
PCM, with reference to the
pending SOE connections it was opined that the constituents should confirm the availability of hardware at RTU’s
for incorporating the extension of MTR contacts to the SOE inputs of the RTU, in addition to the CB contacts
which are also required to be transmitted.
During 105th
PCM, committee felt that, WRLDC may circulate the list of those locations from where
erroneous data is received and the locations where SOE connections are yet to be established at the earliest so
that corrective actions could be taken up by constituents and the progress of the same could be monitored.
In the 106th
PCM WRLDC representative told that the list had already been circulated to the respective
State LDCs. He further told that in view of MTR contacts being used by some of the constituents as inputs for
the SOE connections, all the constituents may incorporate MTR contacts only for SOE connections. During the
107th PCM members expressed that the list was not made available to them hence the list of locations from
where erroneous data is received and locations where SOE connections are yet to be established was enclosed at
Annex.-5.4 of the 107th
PCM minutes.
In the 108th
PCM, PGCIL representative told that they have rectified the problems as per the list.
GETCO representative informed that work is in progress and 90% problems have been rectified. MPPTCL
representative informed that work is in progress and 80-90% of the problems have been attended. MSETCL
representative informed that work is in progress.
The list of status of SOE and erroneous data points was reviewed in the meeting and the remedial
actions suggested by Utilities were as follows:
(i) 220kV Kawas (NTPC)- NTPC representative informed that the SOE points connected to CB
would be configured through Master Trip within 10-15 days.
(ii) 220kV Vindhyachal (NTPC)- NTPC representative informed that the SOE points connected
to CB would be configured through Master Trip within 10-15 days.
(iii) 400kV Mapusa (PGCIL)- PGCIL representative informed that the SOE points connected to
CB would be configured through Master Trip within 10-15 days.
(iv) 400kV Wardha (MSETCL)- MSETCL representative informed that the SOE points
connected to CB would be configured through Master Trip within 10-15 days.
(v) 400kV Sipat and 220kV Jhanor- Committee felt that the matter may be taken up with
PGCIL and NTPC separately, since representatives were not present.
Committee felt that Utilities should take corrective actions as above and further observed that the
status which is not getting updated at WRLDC through SCADA may be taken up by WRLDC in the
SCADA committee meetings for its rectifications.
5.3: Problem in Bus bar protection scheme at Korba (W) CSPGCL S/S.
S.E. (O&S), WRPC informed that NTPC vide their letter KS/EM/ETL/2405/615109/285 Dtd.05.05.09
have informed that NTPC Korba and CSPGCL Korba(W) substations are connected with a 400kV line of line
length 14Km. On 04.05.09 at 02:51hrs bus fault occurred (one of the CT of inter connecting transformer blasted)
at CSPTCL end. The NTPC Korba- CSPGCL Korba (W) line tripped in zone-2 from NTPC Korba end, thus
feeding the fault current of around 14KA for the timing of zone-2. Inter trip or direct trip signal was also not
received from Korba (W) S/S. Similar fault had occurred at CSPGCL Korba (W) S/S on 09.09.08 at 11:48 hrs
also and was fed for zone-2 timing from NTPC Korba S/S.
In the 107th
PCM, CSPTCL representative informed that the Bus Bar scheme is out of service since last
one year, due to faulty Bus Bar scheme and burnt control cables at Korba (W) S/S and have initiated the process
for procurement of the same. Committee felt that the commissioning of Bus Bar protection scheme at the above
S/S may be expedited.
In the 108th PCM, CSPGCL representative informed that the Bus Bar protection scheme for Korba (W)
has been included in their business proposal submitted to the Chhattisgarh State Electricity Regulation Committee
(CSERC) and after approval from CSERC the scheme process for procurement of the scheme would be taken up.
However Committee felt that in view of the criticality of the matter and importance of the Korba (W) S/S from the
WR system protection point of view, the Bus Bar protection scheme at Korba (W) S/S, might be taken up as a
special case to CSERC and necessary approval may be obtained on priority.
He further told that follow up was made by WRPC vide letter No WRPC/Prot./PCM/2010-11/1013Dtd.
13th
Aug 2010. Also the matter was put up before the 14th
WRPC Board Meeting and CSPGCL was requested to
expedite the matter.
CSPGCL representative informed that the earlier proposal of BB protection scheme was for 8 bays and
in view of commissioning of 6 new bays at this S/S, the proposal has been modified for 14bays. It is expected that
approval of CSERC would be received in one month and the procurement process would be initiated immediately.
Committee felt that the matter should be expedited as has been suggested in the 108th PCM.
5.4: Delayed trippings of 220kV Vapi-Kharadpada#1&2 and Vapi-Magarwada#1&2
lines:
S.E. (O&S), WRPC informed that PGCIL vide their letter WR-II/VDR/O&M/RL/270/1580 Dtd.10th
September 2009 and WR-II/VDR/O&M/252/RL Dtd.29th
October 2009 have informed that,
(i) The faults on Vapi-Karadpada#1 on 04.09.2009 at 03:15 hrs and 05.09.2009, were cleared with
a delay from Kharadpada end, though the faults were in Zone-I for both the ends and was
cleared from Vapi end instantaneously. This has resulted in tripping of Vapi-Kharadpada#2 in
Zone-II from Vapi end.
(ii) Similarly for a B Ph to ground fault on Vapi-Magarwada #2 (Zone-I fault for both ends) line on
08.08.09 at 09:53hrs., Vapi-Magarwada#1 tripped in Zone-II from Vapi end, due to delayed
clearence of the fault from Magarwada end.
During the 107th meeting representative from Electricity Department Daman was not present hence the
issue could not be resolved.
He further told that Electricity Department Daman has submitted the compliance of commissioning of
the DPS on 220kV Ambeti (Vapi)-Magarwada line. The letter received from Daman Electricity Department was
enclosed as annexure in the minutes of the 108th
PCM.
Electricity Department DNH vide their letter No.11-8(23)/ELE/2010/1011 Dtd. 01.09.2010 (copy
enclosed at Annex.-5.4) have informed that the order for erection & commissioning of ABB make relay has
been placed and the work would be completed by Oct.2010.
5.5 : Testing of Distance Protection Schemes for lines emanating from Kawas to
GETCO.
S.E. (O&S), WRPC informed that in the 107th
PCM, the matter of testing of the Distance Protection
Schemes along with the PLCC feature for the lines emanating from Kawas S/S to GETCO system was discussed.
PGCIL representative informed that the issue would be resolved through meeting with GETCO to facilitate testing
the Distance protecting scheme jointly with GETCO, as the PLCC panels are imported ones and the spares are not
available.
GETCO vide their letter No. CE(TR)/SE(Testing)/Bharuch-2/493 Dtd.16.03.10, have intimated that, in
view of the importance of the issue the same needs to be resolved at the earliest.
As decided in the 108th PCM, a meeting was held at NTPC Kawas on 22.06.2010.
In the 109th
PCM the Committee went through the recommendations of the group. It was decided that
the cost of PLCC and installation at NTPC end would be done by NTPC and the remote ends by PGCIL, in line
with common specifications as per the existing practice being followed at old stations. Other points of above
minutes of meeting were also accepted by the Protection sub-Committee.
He further told that the matter was put up to the WRPC Board in the 14th
WRPC Board meeting,
and the same was approved.
GETCO representative requested that the DPS at PGCIL end is faulty and corrective actions are
required to be taken by PGCIL.
PGCIL representative told that LOA was awarded for replacement of the DPS and the relays
would be replaced within 1-2 months at Haldarva, Vav and Navasari ends. NTPC representative told that
the DPS at 220kV Kawas has been replaced by Areva Micom make DPS.
5.6 : Carrier aided inter trip protection for 220kV line of JGGPP:
S.E. (O&S), WRPC informed that NTPC vide their letter No QSR/OS/WRPC/F17 Dtd. 08.04.10, have
informed that the existing distance relay provided are zone operated and there is no provision for carrier aided
inter trip. In case of end zone faults at Haldarva end, the relays at Haldarva end senses the fault in zone-I and
operates instantaneously, where as the relays at JGGPP senses the fault in zone-II and clear the fault after 300ms
in the absence of the carrier aided inter trip protection. This results in dip in the Bus voltage and high vibration in
the ST generator bearings.
In view of the above NTPC has requested to incorporate the carrier aided inter trip protection scheme for
the 220kV Jhanor-Haldarwa D/C lines.
In the 109th PCM, PGCIL representative told that the carrier inter-trip protection is available in the
distance relay at Haldarva end. The same was recently checked and the same is in working condition. However
some cards of the PLCC scheme are missing at JGGPP end and requested NTPC to check up the same.
Committee requested NTPC to check up the PLCC scheme at their end.
NTPC representative told that permissive trip testing has been done at both ends. DT testing
would be done during the next opportunistic shut down.
5.7 : Grid Incidences and Grid Disturbances classification as per the Grid Standards
notified by CEA.
S.E. (O&S), WRPC informed that POSOCO WRLDC vide their letter No. WRLDC/OS/2010/1658/982
Dtd. 08/13.09.2010 have informed that CEA has recently notified the Grid Standards Regulations 2010 on 26th
June 2010. These regulation 15 (6) requires the RLDC to classify the grid incidents and Grid Disturbances,
analyze them and furnish periodic reports of the same to RPCs, which shall recommend remedial measures to
prevent recurrences of such occurrences. All the constituents are required to forward details of each tripping in
their respective system to WRLDC in the formats prescribed in the IEGC. The Grid Incidents and Grid
Disturbance categorized by POSOCO WRLDC for the period April-July 2010.
S.E. (O&S), WRPC gave a presentation on the above regulation for information.
Committee felt that Utilities may report the trippings to the respective SLDCs and SLDC may
report the trippings to WRPC and a copy be given to WRLDC.
5.8 : A/R scheme of 400kV Tarapur – Boisar ckt. 1 & 2 and 400kV Tarapur –Padghe
ckt 1 & 2 at Tarapur NPCIL end.
S.E. (O&S), WRPC informed that PGCIL vide their letter No WRTS/O&M/R/141/132 Dtd. 23.08.2010
have informed that the matter of keeping the A/R scheme in auto mode for 400kV Tarapur – Boisar ckt. 1 & 2 and
400kV Tarapur –Padghe ckt 1 & 2 lines at Tarapur NPCIL was discussed in the 98th
PCM and recorded at item
No. 6.01. NPCIL had informed the matter was taken up with BHEL. No communication in this matter was
received from NPCIL TAPS.
Further PGCIL had informed that Autoreclosing of Tie breakers at Bhilai substation is also in non-auto
mode for POWERGRID lines even after replacement of the old ABCBs .
PGCIL represented requested that A/R be kept in auto mode at Padghe end, since A/R has been kept in
auto mode at Boisar end. MSETCL representative agreed to keep the A/R in auto mode.
CSPTCL representative told that when main breaker is kept out the Tie breaker is put in auto mode
manually. PGCIL represented requested to keep the main and tie breaker A/R in auto mode with different time
settings. This practice is being followed at PGCIL S/Ss.
Committee deliberated on providing different A/R time settings for main and tie breakers. It was
felt that the dead timing of main and tie breakers be kept within the pole discrepancy trip timings. Further
the same should be monitored closely.
CSPTCL representative agreed to look into the possibility of keeping the A/R for main & tie
breaker in auto mode and revert back.
ITEM NO. 6 : Presentation on Dynamic Power System Stability Monitoring
System (DPSSMS) :
S.E. (O&S), WRPC informed that in the 108th
PCM, REL representative gave a presentation on case
studies based on the inputs made available by the DPSSMS/CPR installed in their system, during the scenario of
stressed grid operation upon loss of important lines in their system. M/s A-Eberle System representative gave a
detailed presentation on the DPSSMS/CPR, which measures the voltage and computes parameters for predicting
stability based on modal analysis, Lyapunov stability and other such tools and gave a detailed insight of the
system. Both the presentation were enclosed as an annexure in the minutes of the 108th
PCM.
The sub-Committee observed that the outputs obtained from the DPSSMS/CPR would act as support
system to WAMS in ascertaining the system behavior by synthesizing local/global measurements obtained
through DPSSMS(CPR)/WAMS systems.
As desired by the members of the sub-Committee the technical details of the above system was
circulated along with the Agenda notes of the 109th
PCM. In the 109th
PCM, Committee felt that the members
could not study the proposal since some more time was required to go through the proposal. Hence the matter
may be deliberated in the next PCM.
Committee deliberated on the pros and cons of the product in view of upcoming WAMS project
for WR, and it was felt that product could give indications of the ensuing threats on the stability of the
grid. Hence it was generally agreed to install 5 nos of this product at strategic locations at Jetpur, Bhilai,
Aurangabad, Indore and Ponda may give a good idea of voltage stability problems as these S/Ss caters
different type of loads . The product may be funded from the PSDF fund and may be taken up in the
forthcoming meeting of the expert group on PSDF .
ITEM NO. 7: Any other issues.
ITEM NO. 8: Date and Venue of the next meeting.
It was decided that the next Protection sub-Committee meeting (111th
) will be held in
January/February 2011, wherein system disturbances for the period 01/09/2010 to 31/12/2010 will be
discussed. Exact date and venue will be communicated separately.
ANNEX-I
LIST OF PARTICIPANTS
110th Protection Committee Meeting held on 29th & 30th September 2010 at Reliance Dahanu TPS
GETCO (Gujarat Energy Transmission Corporation Limited)
Shri J.N.Pancholi Superintending Engineer (Testing)
MAHAGENCO (Maharashtra State Power Generation Company Limited)
Shri A.K.Patil Superintending Engineer (T/F)
MSETCL (Maharashtra State Electricity Transmission Company Limited)
Shri S.J.Patil Superintending Engineer (Testing) Nagpur
Shri B.L Pasarate Executive Engineer (T) Vashi
Shri S.P.Vasekar Executive Engineer (T) Aurangabad
Shri D.P.Nandanwar Dy.EE(T) Vashi
MPPTCL (Madhya Pradesh Power Transmission Corporation Limited)
Shri R.K. Malviya Executive Engineer (TCC), Bhopal
MPPGCL (Madhya Pradesh Power Generation Corporation Limited)
Shri Naresh Panjabi Superintending Engineer (Elect) Satpura
CSPTCL (Chattisgarh State Power Transmission Co. Ltd.)
Shri M.K.Rai Executive Engineer (MRT), Bhilai
CSPGCL (Chattisgarh State Power Generation Co. Ltd.)
Shri N.K.Bizora Superintending Engineer (Elect) Korba
NPCIL (Nuclear Power Corporation of India Limited)
Shri A.N.Thakur SME (E) TAPS-3&4, Tarapur
Shri M.M.Rai TAPS-1&2, Tarapur.
NTPC
Shri Jitendra Tewari D.G.M. (EMD-I/c) Vindhyachal STPS
Shri Pravin Verma Sr.Engineer, Kawas
PGCIL (Power Grid Corporation of India Limited)
Shri Anand Dubey Sr. Manager, Vadodara
Shri Ravi Wadyalkar Manager, Nagpur
TPC (Tata Power Company)
Shri T. Murali Krishna Chief Manager, Trombay, Mumbai
REL (Reliance Infra Ltd.)
Shri M. S. Bhadoria AVP (Head CES) Dahanu TPS
Shri Atul S. Joshi GM(CTS) Dahanu TPS
Shri K.R.Nerkar GM(Elect.) Dahanu TPS
Shri S.S. Vaidya DGM Dahanu TPS
Shri Mohan Waigankar Manager, Mumbai.
WRLDC (Western Regional Load Dispatch Centre)
ShriU.K.Verma AGM (GM &SS)
Shri P.Biswas Manager(OS), WRLDC Mumbai
WRPC (Western Regional Power Committee)
Shri Manjit Singh Member Secretary
Shri Satyanarayan S. Superintending Engineer (O&S)
Shri P.D.Lone Assist.Dir.-I(P)
ANNEXURE-3
TRIPPINGS OF LINES / ICTS
Sr.
No.
NAME OF
S/S
Name of
line/ICT
SYSTEM
/Provision
of A/R
(Yes/No)
Tripping Restoration REASON
Date Time Date Time
1 220kV Kawas 220kV Kawas-
Navsari#1 PGCIL
(Y)
03.04.10 02:45 03.04.10 17:11 A/T on Y-N fault (Insulator Flashover)
2 220kV Kawas 220kV Kawas-
Navsari#2 PGCIL
(Y)
03.04.10 04:18 03.04.10 15:23 A/T on Y-B fault (Insulator Flashover)
3 220kV Kawas 220kV Kawas-
Halderwa#1 PGCIL
(Y)
03.04.10 05:37 03.04.10 21:33 A/T on R-N fault (Insulator Flashover)
4 220kV Kawas 220kV Kawas-
Halderwa#2 PGCIL
(Y)
03.04.10 06:10 03.04.10 21:35 A/T on R-N fault (Insulator Flashover)
5 400 kV Kasor 400 kV Kasor -
GPEC line
GETCO 03.04.10 6:59 03.04.10 18:15 Loc. 222 R-ph st. flash over & cond. Snap
6 400kV Indore 400kV Indore-
Asoj#2 PGCIL
(Y)
06.04.10 12:45 06.04.10 13:35 A/T on persisting B-N fault
7 400kV Indore 400kV Indore-
Asoj#2 PGCIL
(Y)
07.04.10 11:45 08.04.10 6:34 Line charged at 12:22hrs again tripped.
Line patrolling done by PGCIL.
8
400kV
Bhatapara
400kV Bhatapara
- Korba
PGCIL
(Y)
09.04.10 09:28 09.04.10 10:00 Line tripped on B - E fault .Successfully
A/R at Bhatapara and tripped due to fire at
Korba end.
9
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#2
PGCIL
(Y)
09.04.10 19:42 10.04.10 18:20 A/T on persisting B-N fault due to blasting
of B ph LA(causing damaged to Line CVT
as well) at Jabalpur end
10
400kV
Jabalpur
400kV Jabalpur-
Itarsi#1 PGCIL
(Y)
10.04.10 14:40 10.04.10 15:23 A/T on persisting B-N fault(Fire created in
field by farmers below line for cleaning
crop waste)
11 400kV
Ranchi
400kV Ranchi -
Sipat # 1
PGCIL
(Y)
11.04.10 01:45 12.04.10 00:16 Line tripped due to Y-Ph LA burst at
Ranchi (ERTS-1) end.
12
400kV
Jabalpur
400kV Jabalpur-
Itarsi#1 PGCIL
(Y)
11.04.10 11:05 12.04.10 04:50 A/T on R-B fault(Fire created in field by
farmers below line for cleaning crop
waste)
13
400kV
Jabalpur
400kV Jabalpur-
Itarsi#2 PGCIL
(Y)
11.04.10 11:05 12.04.10 16:27 A/T on R-B fault(Fire created in field by
farmers below line for cleaning crop
waste)
14
400kV Korba 400kV Korba -
Bhilai # 1
PGCIL
(Y)
12.04.10 17:09 12.04.10 19:15 Line tripped due to operation of Busbar
protection at Korba end. NTPC may give
details
15
400kV Korba 400kV Korba -
Korba (W)
PGCIL
(Y)
12.04.10 17:09 12.04.10 18:22 Line tripped due to operation of Busbar
protection at Korba end. NTPC may give
details
16
400kV Korba 400kV Korba -
Khedamara
CSPTCL 12.04.10 17:10 12.04.10 18:23 Line tripped due to operation of Busbar
protection at Korba end. NTPC may give
details
17 400kV
Ranchi
400kV Ranchi -
Sipat # 1
PGCIL
(Y)
13.04.10 04:23 13.04.10 13:10 Line tripped due to operation of shunt
Reactor OTI at Ranchi (ERTS-1) end.
18
400kV
Bhadrawati
400kV
Bhadrawati -
Chandrapur # 2
PGCIL
(Y)
15.04.10 17:42 15.04.10 18:42 Line tripped due to direct trip received at
Bhadrawati, because of failure of 'Y' phase
CT of ICT # 2 (400kv side) at chandrapur
end (MSETCL).
19
400kV
Bhadrawati
400kVBhadrawati
- Chandrapur # 4
PGCIL
(Y)
15.04.10 17:42 15.04.10 18:51 Line tripped due to direct trip received at
Bhadrawati, because of failure of 'Y' phase
CT of ICT # 2 (400kv side) at chandrapur
end (MSETCL).
20 400kV
Bina(PG)
400kV Bina(PG)-
Bina(MP)#2 PGCIL
(Y)
16.04.10 00:17 16.04.10 21:30 A/T on operation of OV stg-I protection at
Bina(MP) end( CVT failure)
21 400kV Sugen 400kV Sugen-
Gandhar#1 PGCIL
(Y)
16.04.10 04:20 16.04.10 17:19 A/T on Y-N fault(Insulator flashover)
22 400kV Koradi 400kV Koradi-
Bhusawal
MSETCL
(Y)
16.04.10 6:32 16.04.10 7:14 Transient B-N fault
23
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#1
PGCIL
(Y)
16.04.10 14:28 16.04.10 16:39 A/T on persisting R-N fault(Fire near LA
at VSTPP end)
24 HVDC
Bhadrawati
HVDC Pole # 1 at
Bhadrawati
PGCIL
(Y)
17.04.10 08:35 17.04.10 08:44 Pole tripped due to maloperation of
Thyrister junction temparature control.
25 400kV Korba 400kV Korba-
Vindhyachal #1
PGCIL
(Y)
19.04.10 13:05 19.04.10 13:15 Line tripped due to Rph to earth fault at
F/L 16% from Vindhyachal end.
26
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#1
PGCIL
(Y)
19.04.10 13:05 19.04.10 15:02 A/T on persisting R-N fault
27 400kV Asoj 400kV Asoj-Ukai GETCO 19.04.10 17:15 19.04.10 17:15 Transient fault. A/R Successful.
28
400kV Indore 400kV Indore-
Asoj#2 PGCIL
(Y)
19.04.10 17:35 19.04.10 17:35 A/T and A/R only at Indore end for Y-N
for fault on 400kV Asoj-Ukai
line(GETCO)
29 400kV C'pur 400kV C'pur-
Parli#3
MSETCL
(Y)
21.04.10 9:08 21.04.10 9:08 Transient R-N fault. A/R successful.
30
400kV
Vindhyachal
400kV
Vindhyachal-
Satna#3
PGCIL
(Y)
21.04.10 12:53 22.04.10 23:27 A/T on receipt of DT from VSTPP
end(NTPC)
31 400kV C'pur 400kV C'pur-
K'kheda
MSETCL
(Y)
23.04.10 10:16 23.04.10 10:16 Transient R-N fault. A/R successful.
32
400kV C'pur 400/220kV,
3x105MVA
ICT#2
MSETCL
(Y)
24.04.10 4:26 ??? ??? 220kV side bushing of Y-ph unit of ICT#2
burst. ICT tripped on differential & BT.
The replacement work is in progress.
33 400kV Nagda 400kV Nagda-
Dehgam#1 PGCIL
(Y)
24.04.10 15:53 24.04.10 15:53 A/R on transient Y-N fault
34
400kV Bhilai 400kV Bhilai-
Koradi
PGCIL
(Y)
25.04.10 03:59 25.04.10 05:32 Line tripped due to fire caught in
transformer at Khaparkheda (MSETCL)
S/S.
35 Deleted
36
400kV Korba 400kV Korba-
Korba (w)
PGCIL
(Y)
25.04.10 04:05 25.04.10 06:04 Line tripped due to bus bar protection
opearated at Korba End. Bus dead at korba
end.
37
400kV Korba 400kV Korba-
Vindhyachal #1
PGCIL
(Y)
25.04.10 04:05 25.04.10 06:12 Line tripped due to bus bar protection
opearated at Korba End. Bus dead at korba
end.
38
400kV
Bhadrawati
400kV
Bhadrawati-
Chandrapur # 2
PGCIL
(Y)
26.04.10 18:00 26.04.10 18:47 Line tripped on direct trip received .
39 Deleted
40 220kV KAPP 220kV KAPP-
Vapi
NPCIL 28.04.10 11:38 28.04.10 12:18 Zone-I phase-C fault.
41
400kV Korba 400kV Korba -
Vindhyachal # 1
PGCIL
(Y)
29.04.10 17:01 29.04.10 17:01 Line auto reclosed succesfully at both ends
on B-E fault, F.L 37% from Vindhyachal
end.
42
400kV
Vindhyachal
400kV
Vindhyachal-
Satna#4
PGCIL
(Y)
29.04.10 02:18 29.04.10 02:18 A/R on transient B-N fault
43 400 kV
Raipur
400 kV Raipur -
Bhadrawati # 2
PGCIL
(Y)
01.05.10 00:23 01.05.10 01:18 Line tripped on over voltage protection
stage-1 at Bhadrawati
44 400 kV
Raipur
400 kV Raipur -
Bhadrawati # 3
PGCIL
(Y)
01.05.10 00:23 01.05.10 00:33 Line tripped on over voltage protection
stage-1 at Bhadrawati
45 400 kV
Raipur
400 kV Raipur -
Bhadrawati # 2
PGCIL
(Y)
01.05.10 06:45 01.05.10 10:01 Line tripped on over voltage protection
stage-1 at Bhadrawati
46 400 kV
Raipur
400 kV Raipur-
Sipat # 3
PGCIL
(Y)
03.05.10 09:08 03.05.10 09:08 Lne autoreclosed successfully on Y-E fault
at 104Km from Raipur
47 400kV Raipur 400kV Raipur-
Sipat # 3
PGCIL
(Y)
05.05.10 11:36 05.05.10 11:36 Line auto reclosed sucsessfully at both
ends on B-E fault, F.L 21km from Raipur
48 400kV
Jabalpur
400kV Jabalpur-
Itarsi#2 PGCIL
(Y)
05.05.10 18:00 05.05.10 18:53 A/T on R-Y fault
49
400kV Korba 400kV Korba -
Bhilai # 2
PGCIL
(Y)
06.05.10 01:16 06.05.10 01:59 Line auto reclosed successfully at Korba
end on B - E fault. A/R did not successful
at Bhilai and line tripped at Bhlai end .
F.L 230km from Bhilai.
50 400kV Korba 400kV Korba -
Khedamara
CSPTCL 06.05.10 1:16 06.05.10 1:59 M-I Ph-C. Dist.Trip Z2 aided F/L-230km.
A/R L/O. NTPC end B-Ph. F/L 6.4km.
51 400kV Seoni 400kV Seoni-
Bina#1 PGCIL
(Y)
06.05.10 17:07 06.05.10 19:44 A/T due to operation of OV stg-I
protection at Seoni end
52
400kV Korba 400kV Korba-
Bhilai #1
PGCIL
(Y)
07.05.10 18:08 07.05.10 1825 Line tripped due to R-E fault F.L 187
KM from Korba, Auto Reclosure not
successful at Bhilai end.
53
400kV Raipur 400kV Raipur-
sipat #3
PGCIL
(Y)
08.05.10 14:54 08.05.10 14:54 Line successfully Auto Reclosed on Y-E
fault at both ends, F.L 88.3 Km from
Raipur.
54
400kV Raipur 400kV Raipur-
Bhatapara
PGCIL
(Y)
08.05.10 17:57 08.05.10 18:23 Line successfully Auto Reclosed on R-E
fault at both ends but due to reoccurence
of fault during the reclaim time the line
tripped., F. L 13.4Km from Raipur.
55 400kV Boisar 400kV Boisar-
Vapi
PGCIL
(Y)
10.05.10 12:47 10.05.10 12:47 Line successfully Auto reclosed at both
ends on R-E fault ,F.L 34Km from Boisar.
56 400kV Boisar 400kV Boisar-
Vapi
PGCIL
(Y)
10.05.10 14:17 10.05.10 1726 Line tripped on R-Y Phase fault F.L 31.3
Km from Boisar
57 400kV
Kolhapur
400kV Kolhapur-
Mapusa #2
PGCIL
(Y)
12.05.10 04:33 12.05.10 07:10 Line tripped only at kolhapur end.
58
400kV C'pur 400kV C'pur-
K'kheda
MSETCL
(Y)
13.05.10 23:12 14.05.10 12:42 O/V stage-I operated at C'pur(110%-5sec.)
and L/O trip for remote fault at K'kheda
59 400kV Koradi 400kV Koradi-
Bhusawal
MSETCL
(Y)
14.05.10 10:26 14.05.10 11:00 Transient R-N fault. A/R successful.
60 400kV Itarsi 400kV Itarsi-
Indore#2 PGCIL
(Y)
14.05.10 16:55 14.05.10 17:16 A/T on persisting R-N fault
61 400kV Seoni 400kV Seoni-
Wardha
PGCIL
(Y)
16.05.10 13:43 16.05.10 15:20 Line tripped on overvoltage protection
stage -1 at Seoni end
62 400kV Korba
(W)
400kV Korba
(W)-Khedamara
CSPTCL 17.05.10 0:43 17.05.10 2:13 M-1, Z-II F/L-208km. Y-Ph B/C bay CT
burst at Korba (W).
63
400kV
K'Kheda
400kV K'Kheda-
C'pur
MSETCL
(Y)
17.05.10 0:54 17.05.10 5:47 O/V stage-I operated at K'Kheda(110%-
7sec.) and L/O trip for remote fault at
C'Pur.
64
400kV
K'Kheda
400kV K'Kheda-
Koradi
MSETCL
(Y)
17.05.10 0:54 17.05.10 5:47 O/V stage-I operated at K'Kheda(110%-
5sec.) and L/O trip for remote fault at
Koradi.
65
400kV
Bhadrawati
400kV
Bhadrawati-
Chandrapur # 1
PGCIL
(Y)
17.05.10 01:25 17.05.10 02:08 Line tripped on overvoltage protection
stage -1 at Chandrapur end. But DT was
not transmitted, due to non
configuration of the DT, hence no
tripping at C'pur end.
66
400kV
Bhadrawati
400kV
Bhadrawati-
Chandrapur # 2
PGCIL
(Y)
17.05.10 12:37 17.05.10 13:32 Line tripped due to the DC earth leakage
at Chandrapur end.The line was holding
from Bhadrawati end. But DT was not
transmitted, hence no tripping at
Bhadravati end.
67
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#3
PGCIL
(Y)
17.05.10 14:05 17.05.10 14:22 A/T on persisting B-N fault
68 220kV Kawas 220kV Kawas-
Navasari#2
PGCIL
(Y)
18.05.10 5:23 18.05.10 12:50 Suspension insulator flashover at tower
No.12 due to bad weather.
69
400kV C'Pur 400kV C'pur-
K'kheda
MSETCL
(Y)
18.05.10 5:56 19.05.10 0:45 O/V stage I operated at C'pur (110%-
5sec.) & L/O trip for remote fault at
K'Kheda. Line recharged at 08:25hrs on
18.05.10 but tripped on O/V. R-ph CVT
replaced.
70
220kV
Korba(E)
220kV Korba(E)-
Buddipadar # 3
PGCIL
(Y)
18.05.10 19:00 19.05.10 1158 Line tripped at Buddipadar end only on
Y-E fault at 180.8Km from Buddipadar
End
71
400kV C'Pur 400kV C'Pur-
Parli#1
MSETCL
(Y)
19.05.10 15:09 19.05.10 15:09 Transient Y-N fault. A/R successful.
72
400kV C'Pur 400kV C'Pur-
Parli#1
MSETCL
(Y)
19.05.10 15:18 20.05.10 3:15 Transient Y-N fault. Nothing abnormal
found during patrolling.
73
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#1
PGCIL
(Y)
19.05.10 18:01 19.05.10 18:32 A/T on persisting R-N fault
74 400kV Indore 400kV Indore-
Asoj#1 PGCIL
(Y)
19.05.10 18:55 19.05.10 19:22 A/T on persisting B-N fault
75
400kV C'Pur 400kV C'Pur-
Parli#1
MSETCL
(Y)
20.05.10 8:21 20.05.10 8:50 Line tripped at Parli end and L/O trip for
remote fault at C'pur end on receipt of DT
signal.
76 400kV Raipur 400kV Raipur-
Bhadrawati # 3
PGCIL
(Y)
21.05.10 06:08 21.05.10 0819 Line tripped on overvoltage stage-1 at
Bhadrawati
77
400kV Boisar 400kV Boisar-
Padghe
PGCIL
(Y)
22.05.10 11:21 22.05.10 12:10 Line tripped on Direct trip received from
Padghe end. Due to DC earth leakage
reactor tripped at Padghe end.
78
400kV C'Pur 400/220kV
3x105MVA
ICT#2
MSETCL
(Y)
22.05.10 18:21 22.05.10 19:13 Buccolz of B-ph unit operated. BT due to
air circulation during oil pump start. No
abnormal currents & voltages seen from
HV B/U relay data ( @247A&427kV).
79
400kV Satna 400kV Satna-
Bina#2 PGCIL
(Y)
23.05.10 13:27 23.05.10 14:54 A/T on persisting Y-N fault(Fire created in
field by farmers below line for cleaning
crop waste)
80
400kV Satna 400kV Satna-
Bina#1 PGCIL
(Y)
23.05.10 13:32 23.05.10 15:27 A/T on persisting Y-N fault(Fire created in
field by farmers below line for cleaning
crop waste)
81
220kV
Korba(E)
220kV Korba(E)-
Buddipadar # 3
PGCIL
(Y)
24.05.10 17:12 24.05.10 1843 Line tripped at Korba end but was hanging
from Buddipadar end. The line tripped on
zone-2 because of fault in other CSEB line
.
82
400kV Korba 400kV Korba-
Bhatapara
PGCIL
(Y)
26.05.10 14:47 26.05.10 1529 Line successfully autoreclosed on B-E
fault and subsequently tripped on
overvoltage at Bhatapara end
83
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#2
PGCIL
(Y)
26.05.10 13:33 26.05.10 21:45 A/T on R-N fault(Blasting of R ph LA at
Jabalpur end)
84
400kV Raipur 400kV Raipur-
Sipat # 2
PGCIL
(Y)
27.05.10 13:34 28.05.10 07:50 Line autoreclosed successfully on R-E
fault but tripped due to persistent
fault.Earth wire suspension clamp broke
due to heavy wind at location no. 135
85 400kV Korba 400kV Korba-
Korba(W)
PGCIL
(Y)
28.05.10 17:45 30.05.10 0253 Line tripped due to collapse of B phase
LA at Korba end due to heavy wind
86 400kV Indore 400kV Indore-
Asoj#1 PGCIL
(Y)
28.05.10 14:44 28.05.10 15:30 A/T on persisting Y-N fault
87 400kV Raipur 400kV Raipur-
Sipat # 3
PGCIL
(Y)
29.05.10 15:54 29.05.10 16:52 Line tripped due to Direct trip received
from sipat end.
88 Deleted
89 400kV
Jabalpur
400kV Jabalpur-
Itarsi#3 PGCIL
(Y)
29.05.10 06:21 02.06.10 18:13 A/T due to operation of OV stg-I
protection at Jabalpur end
90
400kV
Bhadrawati
400kV
Bhadrawati -
Raipur # 3
PGCIL
(Y)
30.05.10 1908 30.05.10 1948 Line tripped due to Over voltage Stg-I
Operated at Bhadrawati.
91 400kV C'Pur 400kV C'Pur-
Parli#2
MSETCL
(Y)
31.05.10 19:25 01.06.10 4:41 O/V stage-I operated at C'pur and L/O trip
for remote fault at Parli end.
92
400kV Bhilai 400kV Bhilai -
Bhadrawati
PGCIL
(Y)
02.06.10 01:10 02.06.10 02:10 Line tripped on over voltage stage-I
operated at Bhilai(CSEB) and DT received
at Bhadrawati(PGCIL) end.
93
400kV Bhilai 400kV Bhilai -
Bhadrawati
PGCIL
(Y)
02.06.10 03:39 02.06.10 04:40 Line tripped on Over volatge stg-I
operated at Bhilai(CSEB) and DT
Received at Bhadrawati(PGCIL) end
94 400kV Soja 400/220/33kV
500MVA ICT#2
GETCO 02.06.10 15:24 03.06.10 08:20 400kV side B ph LA failed.
95 400kV Soja 400kV Soja-
Kansari
GETCO 02.06.10 15:29 02.06.10 15:29 Transient tripping. Patrolling done nothing
abnormal observed.
96
400 kV
Tarapur
400 kV Tarapur -
Padghe # 1
PGCIL
(Y)
03.06.10 14:33 03.06.10 15:03 Line tripped due to D.C earth leakage at
Padghe end(MSETCL) which caused the
tripping of Y pole CB resulting in tripping
of other CB poles on pole discrepancy.
97 HVDC
Bhadrawati
HVDC Pole # 1 at
Bhadrawati
PGCIL
(Y)
05.06.10 07:50 05.06.10 08:20 Pole # 1 tripped due to failure of 33KV
auxiliary supply provided by MSEDCL.
98 HVDC
Bhadrawati
HVDC Pole # 2 at
Bhadrawati
PGCIL
(Y)
05.06.10 07:50 05.06.10 08:20 Pole # 2 tripped due to failure of 33KV
auxiliary supply provided by MSEDCL.
99 400kV
Hadala
400kV Hadala-
Jetpur
GETCO 07.06.10 02:10 07.06.10 19:17 At 400kV Jetpur S/S Bus 2 tripped. Windy
weather with rain fall.
100 400kV Kasor 400kV Kasor-
SSP
GETCO 07.06.10 17:17 08.06.10 16:00 At Loc.No 171, B ph flashover.
101
400kV
Raigarh
400kV Raigarh-
Rourkela # 1
PGCIL
(Y)
10.06.10 15:44 10.06.10 19:02 Line auto reclosed successfully on R-E
fault but tripped immediately on Y-E fault
at 5.5km from Raigarh,
102
400kV
Tarapur
400kV Tarapur -
Boisar # 2
PGCIL
(Y)
11.06.10 00:54 11.06.10 02:18 Line tripped on B-E fault(Heavy
rain/thundering at Boiser), F/L= 0.3km
from Boisar.
103
400 kV
Aurangabad
400 kV
Aurangabad -
Akola # 2
PGCIL
(Y)
11.06.10 16:48 12.06.10 12:09 Line autoreclosed but tripped immediately
at 184km from Akola on R-E fault,
104
400kV Raipur 400kV Raipur -
Raigarh # 1
PGCIL
(Y)
12.06.10 18:23 12.06.10 18:23 Line Autoreclosed Successfully on both
ends due to B-E Fault at 11KM from
Raigarh..
105 400kV Raipur 400kV Raipur -
Raigarh # 1
PGCIL
(Y)
12.06.10 18:23 12.06.10 1906 Line tripped due to operation of Over
Voltage Stage -II protection at Raipur.
106 400kV Nagda 400kV Nagda-
Dehgam#2 PGCIL
(Y)
13.06.10 10:10 13.06.10 19:20 A/T on persisting B-N fault
107 400kV
Birsinghpur
400kV B'pur-
Damoh
MPPTCL
(Y)
13.06.10 12:16 13.06.10 13:35 RYB-E fault. 86 M1 A, 86M1B, 86M2C
R/I.
108
400kV Itarsi 400kV Itarsi-
Indore#1 PGCIL
(Y)
14.06.10 22:11 14.06.10 22:41 A/T on operation of Reactor protection at
Indore end (operation of all body
protections due to rain in Reactor MB)
109 HVDC
Bhadrawati
HVDC Pole # 1 at
Bhadrawati
PGCIL
(Y)
16.06.10 08:52 16.06.10 908 Pole tripped due to failure of 33kV
Auxillary Supply provided by MSEDCL.
110
400kV Raipur 400/220kV ICT #
1at Raipur
PGCIL
(Y)
18.06.10 14:38 18.06.10 21:22 ICT tripped on Directional Earth fault
relay operated due to fault in 220Kv
system.
111 400kV Akola 400kV Akola -
Aurangabad # 1
PGCIL
(Y)
18.06.10 17:22 19.06.10 11:28 Line tripped due to Busbar Protection
operated at Aurangabad end (MSETCL).
112 400kV Itarsi 400kV Itarsi-
Khandwa#1 PGCIL
(Y)
18.06.10 15:25 18.06.10 15:33 A/T on receipt of DT from Itarsi end
113 400kV Itarsi 400kV Itarsi-
Indore#2 PGCIL
(Y)
20.06.10 17:44 20.06.10 18:23 A/T on persisting R-N fault
114
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#1
PGCIL
(Y)
20.06.10 17:50 20.06.10 17:50 A/R on transient R-N fault
115 400kV
Birsinghpur
400kV B'pur-
Damoh
MPPTCL
(Y)
21.06.10 16:27 21.06.10 16:53 RYB-E fault. 86 M2 A, 86M2B, 86M2C
R/I.
116 400kV Bina 400kV Bina-
Nagda#2 PGCIL
(Y)
21.06.10 18:46 21.06.10 18:46 A/R on transient Y-N fault
117 400kV Raipur 400kV Raipur-
Bhadrawati # 1
PGCIL
(Y)
22.06.10 01:04 22.06.10 01:19 Line tripped on over voltage stage # 1
protection.
118 400kV Korba 400kV Korba -
Bhatapara
PGCIL
(Y)
22.06.10 10:12 22.06.10 10:23 Line tripped due to DT receipt from
NTPC,Korba.
119 400kV
Wardha
ICT # 1 at
Wardha
PGCIL
(Y)
22.06.10 13:09 22.06.10 14:27 ICT tripped due to R- Earth fault on
220Kv system..
120 400kV Sarni 400kV Sarni-
Koradi
MPPTCL
(Y)
22.06.10 13:10 22.06.10 15:28 Tripped at Sarni end on PDR. Koradi end
hand tripped.
121 400kV Raipur 400kV Raipur -
Bhadrawati # 2
PGCIL
(Y)
23.06.10 06:06 23.06.10 07:00 Line tripped on over voltage operated at
Bhadrawati S/S.
122
400kV Korba 400kV Korba -
Korba(W)
PGCIL
(Y)
23.06.10 16:33 23.06.10 17:44 Line tripped at Korba(W) end only due to
cascade tripping of Station
transformer,Unit # 4 at Korba(W).
123
400kV
Ranchi
400kV Ranchi-
Sipat # 2
PGCIL
(Y)
23.06.10 18:20 23.06.10 21:42 Line successfully Autoreclosed at Ranchi
end only due to B-E at 133 km from
Ranchi, but tripped on DT from
NTPC,Sipat.
124 400kV Agra 400kV Agra-
Gwalior#1 PGCIL
(Y)
24.06.10 17:39 24.06.10 20:36 A/T on B-N fault
125
400kV
Raigarh
400kV Raigarh -
Rourkela #1
PGCIL
(Y)
25.06.10 15:04 25.06.10 15:04 Line autoreclosed at both ends
successfully on Y-E fault, F L 130km
from Raigarh.
126 400kV Agra 400kV Agra-
Gwalior#1 PGCIL
(Y)
25.06.10 04:02 25.06.10 06:31 A/T on operation of OV stg-I protection at
Gwalior end
127 400 kV
Wardha
400 kV Wardha -
Akola # 1
PGCIL
(Y)
26.06.10 15:28 26.06.10 16:12 Line tripped on B - E Fault at 94 Km from
Wardha end.
128 400kV
Jabalpur
400kV Jabalpur-
Itarsi#3 PGCIL
(Y)
27.06.10 18:44 27.06.10 23:30 A/T on persisting Y-N fault
129 400kV Agra 400kV Agra-
Gwalior#1 PGCIL
(Y)
27.06.10 18:22 27.06.10 21:50 A/T on operation of OV stg-I protection at
Gwalior end
130 400kV Soja 400kV Soja-
Kansari
GETCO 28.06.10 16:45 28.06.10 17:27 Transient tripping.
131
400kV
Wardha
400kV Wardha-
Akola-1
PGCIL
(Y)
02.07.10 14:48 02.07.10 15:28 Line successfully Autoreclosed on B-E
fault at 71 Km from Akola end but tripped
at wardha end .
132 400kV Agra 400kV Agra-
Gwalior#2 PGCIL
(Y)
03.07.10 10:56 03.07.10 11:23 A/T on persisting B-N fault
133 400kV Agra 400kV Agra-
Gwalior#1 PGCIL
(Y)
05.07.10 01:46 05.07.10 13:49 A/T on operation of OV stg-I protection at
Gwalior end
134 400kV Satna 400kV Satna-
Bina#1 PGCIL
(Y)
05.07.10 03:19 06.07.10 23:35 A/T on operation of OV stg-I protection at
Bina end
135 400kV Satna 400kV Satna-
Bina#4 PGCIL
(Y)
05.07.10 04:01 05.07.10 04:51 A/T on operation of OV stg-I protection at
Bina end
136
400kV Koradi 400kV Koradi-
Satpura
PGCIL
(Y)
07.07.10 21:30 07.07.10 21:53 Line tripped at satpura end only due to
DC earth leakage.Line remain chardged
from Koradi end.
137
400kV Koradi 400kV Koradi-
satpura
PGCIL
(Y)
08.07.10 01:25 08.07.10 01:33 Line tripped at Satpura end only due to
DC earth leakage. Line remain charged
from Koradi End.
138 400kV
Kolhapur
400kV Kolhapur -
Mapusa # 1
PGCIL
(Y)
09.07.10 10:52 10.07.10 09:43 Line tripped due to Busbar protection
operation at kolhapur end .
139
400kV
Ranchi
400kV Ranchi-
Sipat # 2
PGCIL
(Y)
10.07.10 20:04 10.07.10 21:57 Line tripped on R-B phase fault, 234.9KM
from Ranchi end and 158.4KM from sipat
end .
140
400kV
Dehgam
400/220kV, 315
MVA ICT#1 at
Dehgam S/S
PGCIL
(Y)
10.07.10 21:11 Still out rvice A/T on operation of REF, Differential,
Buchhloz & PRD protection
141
HVDC
Bhadrawati
POLE-2 at
HVDC
Bhadrawati
PGCIL
(Y)
11.07.10 04:46 11.07.10 05:04 Pole-2 tripped due to thyristor junction
over temperature.
142 400kV Agra 400kV Agra-
Gwalior#1 PGCIL
(Y)
12.07.10 04:16 12.07.10 05:11 A/T on operation of OV stg-I protection at
Gwalior end
143 400kV
Bina(PG)
400kV Bina(PG)-
Bina(MP)#1 PGCIL
(Y)
12.07.10 04:28 12.07.10 06:35 A/T on operation of OV stg-I protection at
Bina(MP) end
144 400kV
Bina(PG)
400kV Bina(PG)-
Bina(MP)#1 PGCIL
(Y)
13.07.10 00:27 13.07.10 17:07 A/T on operation of OV stg-I protection at
Bina(MP) end
145 400kV Satna 400kV Satna-
Bina#1 PGCIL
(Y)
13.07.10 19:19 14.07.10 00:05 A/T on persisting R-N fault (LA failure at
Bina end)
146 400kV Korba 400kV Korba -
Vindhyachal # 1
PGCIL
(Y)
14.07.10 04:09 14.07.10 09:31 Line tripped due to Line reactor NGR
PRV operated in NTPC,Korba.
147
400kV
Aurangabad
400kV
Aurangabad -
Akola # 2
PGCIL
(Y)
15.07.10 10:13 15.07.10 12:40 Line tripped due to DC earth leakage
which caused the DT sent from Akola end.
148 220kV
Kakrapar
220kV Kakrapar-
Vapi#1
PGCIL
(Y)
15.07.10 14:59 15.07.10 14:14 Tripped in Zone-1, Phase C
149 400kV
Khandwa
400kV Khandwa-
Dhule#1 PGCIL
(Y)
18.07.10 03:14 18.07.10 03:14 A/R on transient B-N fault
150
400kV
Satpura
400/220kV ICT MPPTCL
(Y)
19.07.10 12:15 19.07.10 17:00 220kV BB diff. Zone-1/2 operated. The Y
ph PT of Main Bus-I failed. ICT was taken
in service on Main Bus-II
151
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#4
PGCIL
(Y)
19.07.10 18:03 20.07.10 11:08 A/R successful at Jabalpur end only on B-
N fault and A/T at VSTPP end. Line
finally tripped on OV stg-I protection
operation at VSTPP end
152 400kV Indore 400kV Indore-
Itarsi#2 PGCIL
(Y)
21.07.10 14:04 21.07.10 17:48 A/T on operation of OV stg-I protection at
Itarsi end (CVT failure)
153
400kV
Vindhyachal
400kV
Vindhyachal-
Satna#3
PGCIL
(Y)
22.07.10 06:35 22.07.10 06:59 A/T on receipt of DT from VSTPP(NTPC)
end due to ingress of moisture in PLCC
panel
154
400kV
Vindhyachal
400kV
Vindhyachal-
Satna#3
PGCIL
(Y)
22.07.10 07:29 22.07.10 13:38 A/T on receipt of DT from VSTPP(NTPC)
end due to ingress of moisture in PLCC
panel
155 400kV
Jabalpur
400kV Jabalpur-
Itarsi#2 PGCIL
(Y)
25.07.10 11:00 25.07.10 11:00 A/R on transient R-N fault
156
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#4
PGCIL
(Y)
25.07.10 11:00 25.07.10 11:40 A/T on receipt of DT from VSTPP(NTPC)
end due to relay maloperation
157
400kV
Satpura
400/220kV ICT MPPTCL
(Y)
26.07.10 7:40 26.07.10 16:40 220kV BB diff. Zone-2 operated. The
220kV side Y ph CT jumpers of GT#3
found melted.
158 400kV Itarsi 400kV Itarsi-
Khandwa#1 PGCIL
(Y)
26.07.10 15:57 26.07.10 16:04 A/T at Khandwa end only due to BPL
PLCC maloperation
159 400kV Raipur 400kV Raipur -
Raigarh # 2
PGCIL
(Y)
27.07.10 00:40 27.07.10 00:50 Line tripped due to Earth fault in TCSC-
FSC Platform at Raipur.
160
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#4
PGCIL
(Y)
27.07.10 23:34 27.07.10 23:58 A/T at VSTPP end on B-N fault due to
relay maloperation at VSTPP end(Over
reach of relay)
161 400kV
Jabalpur
400kV Jabalpur-
Itarsi#3 PGCIL
(Y)
27.07.10 23:34 27.07.10 23:49 A/R successful at Jabalpur end only on B-
N fault & A/T at Itarsi end
162 400kV Satna 400kV Satna-
Bina#4 PGCIL
(Y)
30.07.10 14:10 30.07.10 14:10 A/R on transient Y-N fault
163
400kV
Vindhyachal
400kV
Vindhyachal-
Satna#3
PGCIL
(Y)
30.07.10 18:55 30.07.10 19:46 A/R successful at Satna end only on R-N
fault and A/T at VSTPP end
164
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#1
PGCIL
(Y)
30.07.10 20:43 30.07.10 20:43 A/R on transient Y-N fault
165
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#2
PGCIL
(Y)
30.07.10 20:43 30.07.10 20:43 A/R on transient Y-N fault
166
400 kV
Wardha
400 kV Wardha -
Akola # 1
PGCIL
(Y)
31.07.10 17:57 31.07.10 18:07 Line tripped on Over Voltage stage - 1
operated at Wardha end.
167
400kV Bina 400kV Bina-
Nagda#1 PGCIL
(Y)
31.07.10 14:24 31.07.10 14:24 A/R on transient R-N fault
168
400kV Sarni 400kV Sarni-
Satpura
MPPTCL
(Y)
01.08.10 9:37 01.08.10 15:45 Line tripped from Sarni end only on
reactor PRD operated. Seoni end CB did
not trip due to carrier equipment problem.
The B ph. PRD micro switch was found
faulty. Replaced the same.
169
400kV Koradi 400kV Koradi -
Satpura
PGCIL
(Y)
02.08.10 11:55 02.08.10 12:33 Line tripped at satpura end only due to DC
earth leakage . Line remain charged from
Koradi End.
170
400kV Koradi 400kV Koradi -
Satpura
PGCIL
(Y)
02.08.10 15:05 02.08.10 20:25 Line tripped at satpura end only due to DC
earth leakage . Line remain charged from
Koradi End. IR value of R ph Breaker
contact wire found low.
171
400kV Koradi 400kV Koradi -
Satpura
PGCIL
(Y)
02.08.10 20:50 02.08.10 20:55 Line tripped at satpura end only due to DC
earth leakage . Line remain charged from
Koradi End
172 HVDC
Bhadrawati
HVDC Pole #1at
-Bhadrawati
PGCIL
(Y)
04.08.10 09:23 04.08.10 09:40 Pole tripped due to failure of auxillary
power supply provided by MSEDCL.
173 HVDC
Bhadrawati
HVDC Pole #1 at
-Bhadrawati
PGCIL
(Y)
04.08.10 09:53 04.08.10 10:05 Pole tripped due to failure of auxillary
power supply provided by MSEDCL.
174 400kV Agra 400kV Agra-
Gwalior#1 PGCIL
(Y)
05.08.10 21:40 05.08.10 21:40 A/R on transient R-N fault
175
400kV Koradi 400kV Koradi-
Satpura
PGCIL
(Y)
07.08.10 05:20 07.08.10 06:15 Line tripped at satpura end only due DC
earth leakage . Line remain charged from
Koradi End.
176
HVDC
Bhadrawati
Pole # 2 at HVDC
-Bhadrawati
PGCIL
(Y)
11.08.10 15:24 11.08.10 15:46 Pole -2 tripped due to thyristor junction
over temparature.
177 400kV Itarsi 400kV Itarsi-
Khandwa#2 PGCIL
(Y)
11.08.10 06:04 15.08.10 19:49 A/T on operation of OV stg-I protection at
Khandwa end
178 400kV
Khandwa
400kV Khandwa-
Dhule#2 PGCIL
(Y)
11.08.10 06:04 11.08.10 08:45 A/T on operation of OV stg-I protection at
Khandwa end
179
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#1
PGCIL
(Y)
13.08.10 00:22 13.08.10 00:22 A/R on transient B-N fault
180
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#4
PGCIL
(Y)
13.08.10 16:02 13.08.10 16:31 A/R successful at Jabalpur end only on
transient B-N fault & A/T at VSTPP end
181
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#1
PGCIL
(Y)
13.08.10 17:55 13.08.10 18:08 A/T on R-B fault
182
400kV
Vindhyachal
400kV
Vindhyachal-
Jabalpur#2
PGCIL
(Y)
13.08.10 17:55 13.08.10 17:55 A/R on transient B-N fault
183 400kV Satna 400kV Satna-
Bina#1 PGCIL
(Y)
14.08.10 20:40 14.08.10 20:40 A/R on transient R-N fault
184 400kV
Wardha
400kV Wardha -
Akola # 1
PGCIL
(Y)
15.08.10 16:00 15.08.10 16:15 Line tripped Due to Over voltage at Akola.
185 400kV Itarsi 400kV Itarsi-
Khandwa#1 PGCIL
(Y)
15.08.10 18:10 30.08.10 13:01 A/T on persisting B-N fault
186
400kV
Aurangabad
400kV
Aurangabad -
Akola # 1
PGCIL
(Y)
21.08.10 06:05 21.08.10 06:15 Line tripped due to overvoltage at Akola
end.
187 400kV Itarsi 400kV Itarsi-
Indore#2 PGCIL
(Y)
24.08.10 11:02 26.08.10 07:43 A/T on operation of OV stg-I protection at
Itarsi end
188
400kV Raipur 400kV Raipur-
Sipat # 1
PGCIL
(Y)
27.08.10 14:28 27.08.10 14:28 Line Autoreclosed successfully on Rph-E
fault, Z1 distance 4.7km from Raipur end.
189 400kV Seoni 400kV Seoni-
Khandwa#2 PGCIL
(Y)
27.08.10 18:43 27.08.10 19:12 A/R on transient B-N fault but tripped due
to maloperation of RAKZB relay
190
400kV
Raigarh
400kV Raigarh -
Rourkela # 1
PGCIL
(Y)
28.08.10 15:47 28.08.10 15:47 Line Autoreclosed successfully at both
ends on Bph-E fault,F/L distance 153 km
from Raigarh, and 64.73 km from
Rourkela end.
ANNEXURE-3A
TRIPPINGS OF LINES / ICTS
Sr.
No.
NAME OF
S/S
Name of
line/ICT
SYSTEM
/Provision
of A/R
(Yes/No)
Tripping Restoration REASON
Date Time Date Time
1 400kV
Birsinghpur
400kV Bir'pur-
Katni
MPPGCL
(Y)
01.05.10 16:59 01.05.10 16:59 D/T on O/V from remote end.
2 400kV
Birsinghpur
400kV Bir'pur-
Katni
MPPGCL
(Y)
02.05.10 16:02 02.05.10 17:22 D/T on O/V from remote end.
3 400kV
Birsinghpur
400kV Bir'pur-
Katni
MPPGCL
(Y)
09.05.10 6:58 10.05.10 20:23 D/T on O/V from remote end.
4 400kV
Birsinghpur
400kV Bir'pur-
Katni
MPPGCL
(Y)
22.05.10 10:13 22.05.10 18:10 D/T on O/V from remote end.
5
400kV
Birsinghpur
400kV Bir'pur-
Damoh
MPPGCL
(Y)
13.06.10 12:16 13.06.10 13:35 E/F on RYBph. Main-I (116.5km) optd.,
86A, 86B A/R L/O optd.. Tripped from
remote end also
6
400kV
Birsinghpur
400kV Bir'pur-
Damoh
MPPGCL
(Y)
21.06.10 16:27 21.06.10 16:53 E/F on Rph. Main-I (112.8km) optd.,
86A, 86B A/R L/O optd.. Tripped from
remote end also on Diff A Ph., 86A L/O.
7 400 kV Sarni 400kV Sarni-
Koradi 22.06.10 13:10 22.06.10 15:28 CB pole discripancy. Handtripped at
remote end.
8 400 kV Sarni 400kV Sarni-Seoni 01.08.10 9:37 02.08.10 15:45 Reactor PRD Bph. Optd., Group A/B L/O
9 400 kV Sarni 400kV Sarni-
Koradi 02.08.10 11:55 02.08.10 12:33 CB pole discripancy.
10 400 kV Sarni 400kV Sarni-
Koradi 02.08.10 15:50 02.08.10 20:25 CB pole discripancy. Handtripped at
remote end.
11 400 kV Sarni 400kV Sarni-
Koradi 02.08.10 20:50 02.08.10 20:55 CB pole discripancy.
12 400 kV Sarni 400kV Sarni-
Koradi 07.08.10 5:20 07.08.10 6:15 CB pole discripancy.
13 400 kV Sarni 400kV Sarni-Indira
Sagar 17.08.10 2:05 17.08.10 4:20 O/V, ist stage prot. Optd., Gr.A L/O. B ph.
D/T at Remote trip.
14 400 kV Sarni 400kV Sarni-Indira
Sagar 17.08.10 5:12 17.08.10 5:23 O/V, ist stage prot. Optd., Gr.A L/O. B ph.
D/T at Remote trip.
15
220kV ATPS
Chachai
220kV ATPS
Chachai-
Kotmikala-II
MPPGCL
(N)
15.04.10 13:42 15.04.10 14:02 Aph, Z1, CB L/O, 186A,B. Remote end A
Ph, Z1 DPS Optd.
16
220kV ATPS
Chachai
220kV ATPS
Chachai-
Kotmikala-II
MPPGCL
(N)
16.04.10 12:17 15.04.10 12:39 Aph, Z1, CB L/O, 186A,B. Remote end
Z1 DPS Optd.
17
220kV ATPS
Chachai
220kV ATPS
Chachai-
Kotmikala-II
MPPGCL
(N)
16.04.10 12:52 16.04.10 13:35 Aph, Z1, CB L/O, 186A,B. Remote end
Z1 DPS Optd.
18
220kV ATPS
Chachai
220kV ATPS
Chachai-
Kotmikala-I
MPPGCL
(N)
28.05.10 19:53 28.05.10 20:28 Remote end-86,67R, E/F Gas pressure
low. Local end no indication
19
220kV ATPS
Chachai
220kV ATPS
Chachai-
Kotmikala-II
MPPGCL
(N)
28.05.10 20:05 28.05.10 20:30 Remote end-86 Local end no indication
20
220kV ATPS
Chachai
220kV ATPS
Chachai-
Kotmikala-I
MPPGCL
(N)
28.05.10 20:05 28.05.10 21:18 Remote end-86, Gas pressure low. Local
end no indication
21
220kV ATPS
Chachai
220kV ATPS
Chachai-
Kotmikala-II
MPPGCL
(N)
28.05.10 21:13 28.05.10 22:05 Remote end-86, Gas pressure low. Local
end no indication
22
220kV ATPS
Chachai
220kV ATPS
Chachai-
Kotmikala-II
MPPGCL
(N)
30.07.10 20:57 30.07.10 21:40 C ph, Z1, 186A,B. Remote end- DPR
optd, SF6 low, CBTCZ failure 21xB
Annexure –4
Present status on recommendations pertaining to Protection of Inquiry
Committee on grid disturbances of 25.02.2007 and 28.02.2007
Sr
no Recommendations
I
Decisions and Suggestions of
PC for implementing the
recommendations II
Status
III
v) The simulation studies indicate
that the distance protection
scheme provided on some lines
are under-reaching due to in-
feed effect. Protection
Committee of WRPC may
look into this aspect and
review the settings of 400 kV
lines considering in-feed.
In 98th
PCM it was agreed that
Zone –III settings considering in-
feed effect is to be arrived after
due study and on case to case
basis. It was suggested that each
state should initiate studies
starting with any one station in
their system results of the study
may be put up to Committee for
further discussions.
During 104th
PCM Constituents
were requested to carryout
study for one of the 400kV S/S
in their system and put up to committee for further review.
MSETCL was requested to
pursue with the protection
review group to take up the
issue for Padghe S/S.
Since PGCIL & MSETCL lines
have multi-feed problem, a group
from PGCIL, MSETCL,
WRLDC & WRPC will study the
problem & suggest solution.
vii) With the tripping of ± 500 kV
Chandrapur-Padghe HVDC
link, large quantum of power
gets suddenly diverted to other
alternative A.C. networks and
usually results in tripping of a
number of lines on power
swings. The Committee
recommends that with the
tripping of the both poles of
HVDC link, generation level at
Chandrapur thermal power
station of MSPGCL may be
brought down automatically to
prevent spread of the
disturbance. WRPC may
work out a suitable scheme in
consultation with MSETCL
MAHAGENCO &
MAHATRANSCO were
requested to expedite action to
formulate the scheme.
Committee requested MSETCL
to carry out preliminary
analytical studies for further