¬œ¸ú” œ¸¸½¬’ SPEED POST Baart sarkar Government of India kond`Iya ivaVut p`aiQakrNa Central Electricity Authority piScama xao~Iya ivaVut saimait Western Regional Power Committee ef -3, emaAayaDIsaI xao~, AMQaorI (pUva- ), mauMba[- - 400 093 F-3, MIDC Area, Andheri (East), Mumbai - 400 093 Aa[- esa Aao : 9001-2000 ISO : 9001-2000 dUrBaaYa Phone: 022- 28221636; 28200194/95/96; fO@sa Fax : 022 – 28370193 Website : www.wrpc.nic.in E-mail : [email protected] ¬¸¿.: ¬¸í¸.¬¸¢¸./ˆÅ¸¡¸Ä¬¸» ¸ú/œ¸®¸½¢¨¸¬¸/2007/12012 ¢™›¸¸¿ˆÅ: 20.12.2007 No.: A.S./Agenda/WRPC/2007/ Date: ¬¸½¨¸¸ Ÿ¸½¿ / To, (¬¸¿¥¸Š›¸ ¬¸» ¸ú ˆ½Å ‚›¸º¬¸¸£) (As per enclosed list) ¢¨¸«¸¡¸: 11 ¸›¸¨¸£ú 2008 ˆÅ¸½ œ¸¸½’Ä ¤¥¸½¡¸£ Ÿ¸½¿ ‚¸¡¸¸½¢¸÷¸ í¸½›¸½ ¨¸¸¥¸ú œ¸¢©¸Ÿ¸ ®¸½°¸ú¡¸ ¢¨¸Ô¸º÷¸ ¬¸¢Ÿ¸¢÷¸ ˆÅú 6 “ú ¤¸¾“ˆÅ ˆÅú ˆÅ¸¡¸Ä¬¸» ¸ú— Sub.: Agenda Notes of the 6 th meeting of Western Regional Power Committee to be held on 11 th January 2008 at Port Blair. ¬¸¿™ž¸Ä: ƒ¬¸ ˆÅ¸¡¸¸Ä¥¸¡¸ ˆÅ¸ œ¸°¸ ÇÅ. ¬¸í¸.¬¸./¤¸¾“ˆÅ-¬¸» ¸›¸¸/œ¸®¸½¢¨¸¬¸/2007/10537 ¢™. 29 ‚Æ÷¸»¤¸£ 2007 Ref.: Our office letter No. A.S./Meeting-Notice/WRPC/2007/10537 dated 29 th October, 2007 Ÿ¸í¸½™¡¸ / Sir, ƒ¬¸ ˆÅ¸¡¸¸Ä¥¸¡¸ ˆ½Å ¬¸¿™¢ž¸Ä÷¸ œ¸°¸ ˆÅú ¢›¸£›÷¸£÷¸¸ Ÿ¸½¿ ¢™›¸¸¿ˆÅ 11 ¸›¸¨¸£ú 2008 ˆÅ¸½ œ¸¸½’Ä ¤¥¸½¡¸£ Ÿ¸½¿ í¸½›¸½ ¨¸¸¥¸ú œ¸¢©¸Ÿ¸ ®¸½°¸ú¡¸ ¢¨¸Ô¸º÷¸ ¬¸¢Ÿ¸¢÷¸ ˆÅú 6 “ú ¤¸¾“ˆÅ ˆÅú ˆÅ¸¡¸Ä¬¸» ¸ú ƒ¬¸ œ¸°¸ ˆ½Å ¬¸¸˜¸ ¬¸¿¥¸Š›¸ í¾ — In continuation of the above referred letter please find enclosed herewith the Agenda notes of 6 th meeting of Western Regional Power Committee to be held at Port Blair on 11 th January 2008. ˆ¼Åœ¸¡¸¸ ¤¸¾“ˆÅ Ÿ¸½¿ ž¸¸Š¸ ¥¸½¿ — Kindly make it convenient to attend the meeting. ž¸¨¸™ú¡¸ / Yours faithfully, (œ¸ú. œ¸’½¥¸ / P. Patel) ¬¸™¬¡¸ ¬¸¢¸¨¸ / Member Secretary ¬¸¿¥¸Š›¸ /Encl.: „œ¸£¸½Æ÷¸¸›¸º¬¸¸£ / AS Above

Transcript of Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to...

Page 1: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

¬œ¸ú” œ¸¸½¬’ SPEED POST

Baart sarkar

Government of India kond`Iya ivaVut p`aiQakrNa

Central Electricity Authority piScama xao~Iya ivaVut saimait

Western Regional Power Committee ef -3, emaAayaDIsaI xao~, AMQaorI (pUva-), mauMba[- - 400 093

F-3, MIDC Area, Andheri (East), Mumbai - 400 093

Aa[- esa Aao : 9001-2000 ISO : 9001-2000

dUrBaaYa Phone: 022- 28221636; 28200194/95/96; fO@sa Fax : 022 – 28370193 Website : www.wrpc.nic.in E-mail : [email protected]

¬¸¿.: ¬¸í¸.¬¸¢�¸./ˆÅ¸¡¸Ä¬¸»�¸ú/œ¸®¸½¢¨¸¬¸/2007/12012 ¢™›¸¸¿ˆÅ: 20.12.2007 No.: A.S./Agenda/WRPC/2007/ Date: ¬¸½¨¸¸ Ÿ¸½¿ / To,

(¬¸¿¥¸Š›¸ ¬¸»�¸ú ˆ½Å ‚›¸º¬¸¸£) (As per enclosed list) ¢¨¸«¸¡¸: 11 �¸›¸¨¸£ú 2008 ˆÅ¸½ œ¸¸½’Ä ¤¥¸½¡¸£ Ÿ¸½¿ ‚¸¡¸¸½¢�¸÷¸ í¸½›¸½ ¨¸¸¥¸ú œ¸¢©�¸Ÿ¸ ®¸½°¸ú¡¸ ¢¨¸Ô¸º÷¸ ¬¸¢Ÿ¸¢÷¸ ˆÅú 6 “ú ¤¸¾“ˆÅ

ˆÅú ˆÅ¸¡¸Ä¬¸»�¸ú— Sub.: Agenda Notes of the 6th meeting of Western Regional Power Committee to be held on 11th

January 2008 at Port Blair.

¬¸¿™ž¸Ä: ƒ¬¸ ˆÅ¸¡¸¸Ä¥¸¡¸ ˆÅ¸ œ¸°¸ ÇÅ. ¬¸í¸.¬¸./¤¸¾“ˆÅ-¬¸»�¸›¸¸/œ¸®¸½¢¨¸¬¸/2007/10537 ¢™. 29 ‚Æ÷¸»¤¸£ 2007 Ref.: Our office letter No. A.S./Meeting-Notice/WRPC/2007/10537 dated 29th October, 2007 Ÿ¸í¸½™¡¸ / Sir,

ƒ¬¸ ˆÅ¸¡¸¸Ä¥¸¡¸ ˆ½Å ¬¸¿™¢ž¸Ä÷¸ œ¸°¸ ˆÅú ¢›¸£›÷¸£÷¸¸ Ÿ¸½¿ ¢™›¸¸¿ˆÅ 11 �¸›¸¨¸£ú 2008 ˆÅ¸½ œ¸¸½’Ä ¤¥¸½¡¸£ Ÿ¸½¿ í¸½›¸½ ¨¸¸¥¸ú œ¸¢©�¸Ÿ¸ ®¸½°¸ú¡¸ ¢¨¸Ô¸º÷¸ ¬¸¢Ÿ¸¢÷¸ ˆÅú 6 “ú ¤¸¾“ˆÅ ˆÅú ˆÅ¸¡¸Ä¬¸»�¸ú ƒ¬¸ œ¸°¸ ˆ½Å ¬¸¸˜¸ ¬¸¿¥¸Š›¸ í¾ —

In continuation of the above referred letter please find enclosed herewith the Agenda notes of 6th meeting of Western Regional Power Committee to be held at Port Blair on 11th January 2008.

ˆ¼Åœ¸¡¸¸ ¤¸¾“ˆÅ Ÿ¸½¿ ž¸¸Š¸ ¥¸½¿ — Kindly make it convenient to attend the meeting. ž¸¨¸™ú¡¸ / Yours faithfully,

(œ¸ú. œ¸’½¥¸ / P. Patel) ¬¸™¬¡¸ ¬¸¢�¸¨¸ / Member Secretary ¬¸¿¥¸Š›¸ /Encl.: „œ¸£¸½Æ÷¸¸›¸º¬¸¸£ / AS Above

Page 2: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Mailing List Member of WRPC

1. Chairman, WRPC / CSEB, Raipur

2. Member (GO & D), CEA, New Delhi

3. Managing Director, GETCO, Vadodara

4. Managing Director, GSECL, Vadodara

5. Managing Director, Dakshin Gujarat Vij Company Ltd., Surat

6. Chairman & Managing Director, MPPTCL, Jabalpur

7. Chairman & Managing Director, MPPGCL, Jabalpur

8. CMD, M.P. Madhya Kshetra Vidyut Vitaran Co. Ltd., Bhopal

9. Managing Director, MSETCL, Mumbai

10. Managing Director, MSEDCL, Mumbai

11. Managing Director, MSEGCL, Mumbai

12. Chief Engineer (T & C), CSEB, Raipur

13. Chief Engineer (LD), GETCO, Vadodara

14. Chief Engineer (LD), MPPTCL, Jabalpur

15. Chief Engineer (LD), MSETCL, Kalwa

16. Chief Electrical Engineer, Goa Electricity Department, Goa

17. Director (Comml), NTPC Ltd., New Delhi/ Executive Director (WR), NTPC Ltd., Mumbai

18. Director (Operation), PGCIL, Gurgaon / Executive Director (WR), PGCIL, Nagpur

19. Director (Operation), NPCIL, Mumbai

20. Secretary (Power), UT of Daman & Diu, Sachivalaya, Moti Daman

21. Secretary (Power), UT of Dadar Nagar Haveli, Silwasa

22. Executive Director, Tata Power Company Ltd., Mumbai

23. Chief Executive Officer, Tata Power Trading Company Ltd., Mumbai

Special Invitees

1. Chairman, GUVNL, Vadodara

2. Chairman & Managing Director, MP Power Trading Company Ltd., Jabalpur

3. Managing Director, MSEB holding Company Ltd., Mumbai

4. Member (Power System), CEA, New Delhi

5. Member (Power), NCA, Indore

Page 3: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Copy to

1. Member (T & D), CSEB, Raipur

2. Member (Gen.), CSEB, Raipur

3. Chief Engineer (T & C), CSEB, Bhilai

4. Chief Engineer (Comml.), CSEB, Raipur

5. General Manager (Comml.), GUVNL, Vadodara

6. Addl. Chief Engineer (R & C), GETCO, Vadodara

7. Executive Director, GSECL / Chief Engineer (Gen.), GSECL, Vadodara

8. Addl. Chief Engineer (O & M), Dakshin Gujarat Vij Company Ltd., Surat

9. Executive Director (Comml.), MP Power Trading Company Ltd., Jabalpur

10. Chief Engineer (O & M-Gen.), MPPGCL, Jabalpur

11. Director (Operation), MSETCL, Mumbai

12. Director (Operation), MSEDCL, Mumbai

13. Director (Operation), MSPGCL, Mumbai

14. Executive Director (Trans. Proj.), MSETCL, Mumbai

15. Chief Engineer (P & P), MSEDCL, Mumbai

16. Chief Engineer (Trans.), NPCIL, 9th Floor, Anushakti Nagar, Mumbai

17. Chief Engineer (GM), G.M. Division, CEA, New Delhi

18. General Manager (O & M), WRTS, PGCIL, Nagpur

19. General Manager, WRLDC, Mumbai

20. Superintending Engineer (Comml.), Goa

21. Executive Engineer, DD

22. Executive Engineer, DNH

23. Dy. General Manager, Tata Power Company, Ltd., Mumbai

24. Member Secretary, NRPC, New Delhi

25. Member Secretary, ERPC, Kolkata

26. Member Secretary, SRPC, Banglore

27. Member Secretary, NERPC, Shillong

28. Shri Anil Nautiyal, DGM (Comml.), NTPC Ltd., WRHQ, Mumbai

29. Shri K.M.K. Prusty, Sr. Manager (Comml.), NTPC Ltd., WRHQ, Mumbai

Page 4: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Baart sarkar Government of India kond`Iya ivaVut p`aiQakrNa

Central Electricity Authority piScama xao~Iya ivaVut saimait

Western Regional Power Committee

œ¸®¸½¢¨¸¬¸¢Ÿ¸¢÷¸ ˆÅú ¢™›¸¸¿ˆÅ 11 �¸›¸¨¸£ú 2008 ˆÅ¸½ œ¸¸½’Ä ¤¥¸½¡¸£ Ÿ¸½¿ í¸½›¸½ ¨¸¸¥¸ú 6 “ú ¤¸¾“ˆÅ ˆÅú ˆÅ¸¡¸Ä¬¸»�¸ú

AGENDA NOTES OF 6TH MEETING OF WRPC

TO BE HELD ON 11TH JANUARY 2008 AT PORT BLAIR

Ÿ¸º¿¤¸ƒÄ MUMBAI

Page 5: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes for 6th WRPC meeting to be held on 11th January 08

C O N T E N T S Item No. Particulars

Page No.

ITEMS FOR DISCUSSION

ITEM No.1 CONFIRMATION OF THE MINUTES OF THE 5th MEETING OF WRP COMMITTEE

1

ITEM No.2 SCHEDULING OF UNREQUISITIONED POWER OF KAWAS & GANDHAR GPS OF WR IN JUNE 2007

2

ITEM No.3 SCHEDULING AND COMMERCIAL METERING LOCATIONS FOR RGPPL

4

ITEM No.4 REPLACEMENT OF PISON MODEL DCDs 5

ITEM No.5 BACKUP COMMUNICATION LINKS FROM SLDCs & STRATEGIC LOCATIONS IN THE NETWORKS OF ULDC SCHEME

5

ITEM No.6 RETROFITTING /REPLACEMENT OF OLD PROTECTION SCHEMES/EQUIPMENTS BY PGCIL

7

ITEM No.7 UTILISATION OF 25 % SHORT TERM OPEN ACCESS CHARGES BY PGCIL

8

ITEM No.8 PERFORMANCE OF WR GRID DURING OCTOBER 2007 TO DECEMBER 2007

9

ITEM No.9 REVISION OF SETTINGS OF THE df/dt UFLS RELAYS IN THE WR

12

ITEM No.10 ANTICIPATED POWER SUPPLY POSITION FOR THE PERIOD JANUARY 2008 TO MARCH 2008

14

ITEMS FOR INFORMATION

ITEM No.11 PAYMENTS OF UI AND REACTIVE ENERGY CHARGES 15

ITEM No.12 TESTING OF SPECIAL ENERGY METERS 16

ITEM No.13 COMMISSIONING OF TRANSMISSION LINES AND GENRATING UNITS

17

ITEM No.14 ONGOING TRANSMISSION SCHEMES IN WESTERN REGION 18

ITEM No.15 ONGOING GENERATION SCHEMES IN WR 18

ITEM No.16 ANY OTHER ITEM WITH PERMISSION OF CHAIR 19

ITEM No.17 DATE AND VENUE OF NEXT WRPC MEETING 19

Page 6: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes for 6th WRPC meeting to be held on 11th January 08

ANNEXURES

Annexure

Particulars

Annexure-1.2 CSEB letter dated 19th November 2007

Annexure-1.3 GETCO letter dated 24th October 2007

Annexure-2.2

WRPC letter dated 16th November 2007

Annexure-3.2

WRLDC letter No.WRLDC/OS/1510/2007 dated 18.10.2007

Annexure-5.3

Record notes of discussions for back-up communication scheme meeting held on 17.12.2007

Annexure-8.1 (a)

Details of frequency profile during October 2007 to December 2007

Annexure-8.1 (b)

Details relating to registered demand/unrestricted demand, energy availability and energy requirement

Annexure-8.1 (c)

Details and record of discussions of the meeting taken by Chairman, CEA with NR & WR constituents on 04.12.2007

Annexure-8.2

Detail of voltages at important 400 kV substations during October, 2007 to December, 2007

Annexure-10.1 Anticipated power supply position for the period January 2008 to March 2008

Annexure-14

The details of ongoing transmission schemes in WR

Annexure-15

The details of ongoing generation schemes in WR

Page 7: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes for 6th WRPC meeting to be held on 11th January 08

Annexure-15

The details of ongoing generation schemes in WR

Annexure-6.3

Record Notes of discussions of meeting held on 17.12.2007

Annexure-7.1 (a) Frequency particulars of Western Region for the period October, 2007 to December, 2007

Annexure-7.1 (b) Power Position for period from October, 2007 to December, 2007

Annexure-7.1 (c) Annexure 7.2 Annexure-9 Anticipated power supply position in the region for the period from

January 2008 to March 2008

Annexure-11 Status of construction of transmission lines in WR during 2007-08

Annexure-12 New generation schemes envisaged during 11th Plan in WR

Page 8: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 1

AGENDA NOTES FOR 6th MEETING OF WESTERN REGIONAL POWER COMMITTEE TO BE

HELD ON 11th JANUARY 2008 AT PORT BLAIR

ITEMS FOR DISCUSSIONS

ITEM No.1: CONFIRMATION OF THE MINUTES OF THE 5th MEETING OF WRP

COMMITTEE

1.1 The minutes of 5th meeting of WRP Committee held on 6th October 2007 at

Panjim, Goa were sent to the Members vide letter No. A.S./Min./WRPC/2007-

08/10135 dated 19th October 2007.

1.2 CSEB vide letter dated 19th November 2007 (copy enclosed at Annexure-1.2)

have proposed the following amendment in Para 4.2.4 of the minutes regarding

proposed 765 kV Ranchi - Sipat line:

As recorded in the minutes:

“The matter was discussed and WRP Committee gave their concurrence for the

above transmission scheme.”

As proposed by CSEB:

“The matter was discussed and WRPC gave in principle concurrence subject to

the condition that all the WR constituents have confirmed the minutes and have

agreed for the proposed scheme.”

1.3 Managing Director, GETCO vide his letter dated 24th October 2007 (copy

enclosed at Annexure-1.3) has proposed the following amendments in Para 16.1.4

and 16.1.5 of the minutes.

As recorded in the minutes:

16.1.4 – “Regarding wheeling charges payable to GETCO for wheeling of Central

Sector power to DD and DNH, GUVNL representative stated that if the rate is to

be decided by CERC, DD and DNH should withdraw their petition from GERC.

Chairman, WRPC stated that the matter is already before GERC and Hon’ble

Page 9: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 2

State Commission may themselves direct the petitioners suitably. At the same

time, DD and DNH should consider the views expressed by GUVNL.”

16.1.5- “DNH representative stated that they will take necessary action after

obtaining legal opinion. He also requested that their system should be fully

connected to CTU network, so that they can draw their full requirement through

CTU network. He was advised to take up the matter at appropriate forum.”

As proposed by GETCO

16.1.4 – “It was finally decided after considering various options and views

expressed by constituents that DD & DNH shall withdraw the petition from GERC

and approach CERC for deciding the wheeling of Central Sector Power.”

16.1.5- “Executive Engineer, DD & DNH requested that their system should be

fully connected to CTU network so that they can draw their full requirement

through CTU network.”

The Committee may discuss and confirm the minutes of the meeting.

ITEM No. 2: SCHEDULING OF UNREQUISITIONED POWER OF KAWAS & GANDHAR GPS OF WR IN JUNE 2007

2.1 On 7th, 10th & 11th June 2007, un-requisitioned power of Kawas and Gandhar

GPS was scheduled by WRLDC to Northern Region, as NR was overdrawing from

the grid. Since, the constituents of NR to whom the above un-requisitioned power

has been scheduled could not be identified; NTPC took up this matter in the 4th

meeting of WRPC held on 29th June 2007. It was decided that the matter should be

taken up with NRPC. Accordingly, Member Secretary, WRPC took up the matter

with Member Secretary, NRPC to identify the NR constituents to whom this power

should be booked. Member Secretary, NRPC intimated that since this power was

scheduled by WRLDC unilaterally, NR constituents did not agree to accept the

power. The matter subsequently came up for discussion during the 6th meeting of

NRPC held on 25th October 2007 wherein, Chairman, WRPC/CSEB suggested that

the above unrequisitioned surplus power from Kawas & Gandhar GPS on 7th, 10th &

11th June 2007 may be booked to the constituents of both, the Western Region and

Page 10: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 3

the Northern Region who had overdrawn power from the grid so as to resolve the

issue.

2.2 In this context, on the basis of 15 minutes time block SEM data furnished by

WRLDC, WRPC secretariat have identified the constituents of WR & NR who have

overdrawn power from the grid during the period when the above mentioned

unrequisitioned power was scheduled to NR by WRLDC. On the basis of above, it is

proposed to book the unrequisitioned power to the constituents of WR and NR.

Accordingly WRPC vide letter dated 16th Nov. 2007 (enclosed at Annexure-2.2) sent

the proposal to Member Secretary, NRPC for their examination and concurrence.

Out of total 1.7884 MUs of unrequisitioned power during the above three days, the

booking to WR and NR will be as follows:

(All fig. in MUs)

Un requisitioned power scheduled from

Proposed scheduling of un-requisitioned power

Date

Kawas Gandhar WR NR

Total

07.06.07 0.3579 0.4920 0.0744 0.7756 0.8500 10.06.07 0.0000 0.1125 0.0221 0.0904 0.1125 11.06.07 0.3580 0.4680 0.1816 0.6444 0.8260

Details of booking to the individual constituents are given in Annexure- 2.2.

2.3 It is intimated that Commercial Sub-Committee of NRPC discussed this

proposal in its 6th meeting held on 11th December 2007 and NR constituents

concurred to it as a special case and subject to the condition that NR states would

pay only variable charges of the energy booked post facto from Kawas and Gandhar

GPS on 7th, 10th and 11th June 2007. Other charges like capacity charges,

incentives, etc. would not be borne by NR states. The UI accounts for the aforesaid

days would be revised taking into account the post facto booking of energy from

Kawas & Gandhar GPS.

2.4 The matter was also discussed in 48th Commercial Committee meeting of WR

held on 13th Dec. 2007 and the committee agreed to the following:

(a) The WR overdrawing States, to whom the above energy is scheduled, will

pay only variable charges to NTPC Kawas & Gandhar GPS as applicable.

Page 11: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 4

(b) No incentive will be paid to Kawas & Gandhar GPS for post facto

scheduling of un-requisitioned powder from Kawas and Gandhar GPS on

7th, 10th and 11th June 2007.

(c) This proposal has been accepted as a special case.

(d) UI accounts for the concerned week shall be revised to account the above

scheduled energy.

(e) The recommendation of the Commercial Committee shall be put up to

WRP Committee for its approval.

WRP Committee may discuss and approve. ITEM No. 3: SCHEDULING AND COMMERCIAL METERING LOCATIONS FOR

RGPPL 3.1 It is understood from RGPPL that out of three blocks, two blocks are in

operation and the third block is expected to be put in operation shortly. RGPPL has

been declared ISGS by Ministry of Power. MSEDCL has been tentatively allocated

95 % of power and the remaining 5 % is to be allocated to other states within or

outside the region, which is under active consideration of MoP. However, in the

absence of allocation for 5% from MoP, entire RGPPL generation at present is sold

to MSEDCL.

3.2 In order to facilitate all necessary activities related with scheduling, energy

accounting etc. RGPPL requested WRLDC to specify (i) Specification of the Energy

Meters to be installed, Make and Source, (ii) Location of the meters to be installed

and (iii) System of Energy accounting, scheduling etc. to be followed. Accordingly,

WRLDC vide letter No.WRLDC/OS/1510/2007 dated 18th October 2007(copy

enclosed at Annexure- 3.2) have detailed out the specification of SEMs to be

installed, location of the SEMs, system of energy accounting, scheduling procedure

etc.

3.3 In view of above, the Commercial Committee in its 48th meeting held on 13th

Dec. 2007, discussed the matter. Since RGPPL has been declared as ISGS, its

scheduling and energy accounting shall be done as per IEGC. As such, estimation of

Page 12: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 5

requirement/installation of SEMs etc. for accounting of its energy is required to be

done by RLDC/CTU. Considering this, the Committee approved the estimated

requirement of SEMs & DCDs i.e. 20 Nos. SEMs and 2 Nos. DCDs, cost of which

will be reimbursed by the beneficiaries of WR to PGCIL in lump-sum in line with the

earlier decisions of WRE Board / WRP Committee. RGPPL was also requested to

take up the matter with MoP to expedite allocation of power.

WRP Committee may discuss and accord approval for the requirement of 20 Nos. SEMs and 2 Nos. DCDs for RGPPL the cost of which will be reimbursed by the beneficiaries of WR to PGCIL in lump sum in line with the earlier decisions of WRP Committee. ITEM No. 4: REPLACEMENT OF PISON MODEL DCDs

WRLDC vide letter No. WRLDC/OS/1510/1207 dated 13th December 2007 intimated

that presently WR is having around 115 Nos. of DCDs for down loading SEMs data.

Out of these 65 Nos. are of PISON model, which has became obsolete. WRLDC

intimated that M/s Secure Meters is not accepting AMC for the above model due to

lack of internal parts and this model is getting faulty frequently. In view of this,

WRLDC proposed to replace the PISON model DCDs with Analogic Model DCDs in

a phased manner. The matter was discussed in the 48th Commercial Committee

meeting held on 13th Dec. 2007 and the proposal of WRLDC to replace 65 Nos.

PISON model DCDs with Analogic Model DCDs in a phased manner was agreed to.

WRP Committee may like to discuss and accord approval for the same. ITEM No.5: BACKUP COMMUNICATION LINKS FROM SLDCs & STRATEGIC

LOCATIONS IN THE NETWORKS OF ULDC SCHEME

5.1 In order to improve the data reliability from SLDCs to RLDC and vice versa

the following proposal of WRLDC for backup communication links from SLDCs and

strategic locations in the network of ULDC scheme of WR was discussed during the

5th meeting of WRP Committee:

(i) Stand by arrangement from SLDCs at Jabalpur, Gotri, Bhilai, Kalwa and at

strategic locations at Vindhyachal, Bhadravati and Raipur by availing

Page 13: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 6

bandwidth from Telecom Deptt. of PGCIL through 7 Nos. E-1 and radio link

from Kalwa to WRLDC

(ii) Recurring expenditure of approx. Rs. 23.10 Lakhs per year for the above-

proposed standby arrangement and one time expenditure of approx. Rs.

4.00 Lakhs towards cost for radio links from Kalwa to WRLDC, Mumbai.

The WRP Committee directed that the above proposal of WRLDC may first be

discussed in the ULDC Project Coordination Committee and thereafter it may be put-

up to TCC/WRPC.

5.2 Accordingly, the matter was discussed in the 3rd meeting of SCADA / EMS

issues held on 6th November 2007 at WRLDC office, Mumbai. In order to arrive at a

comprehensive solution, it was decided that the matter be looked into detail by a

committee of Regional Constituents having one member each from the constituents,

member from WRLDC and with a member from WRPC Secretariat as convener.

5.3 A meeting was convened on 17th Dec. 2007 by WRPC Secretariat with the

members from the constituents wherein the proposal of PGCIL for back up

communication scheme was discussed in detail. The record notes of discussions are

enclosed at Annexure-5.3.

The constituents agreed to the need for back-up communication links between

SLDCs/Strategic locations and WRLDC. At the same time need for back-up links

between Sub-LDCs to SLDCs was also felt. However, instead of providing the stand

by arrangement through bandwidth provided by PGCIL Telecom network, it was

proposed to have these links through VSAT/Radio link. The constituents agreed to

the following VSAT/Radio Back up links:

(i) SLDC Gotri to WRLDC

(ii) SLDC Jabalpur to WRLDC

(iii) SLDC Bhilai to WRLDC

(iv) SLDC Kalwa to WRLDC

(v) Sub-LDC Indore to SLDC Jabalpur

(vi) Sub-LDC Bhopal to SLDC Jabalpur

Page 14: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 7

(vii) Strategic location Viz. Vindhyachal, Bhadravati, Raipur and Gwalior to

WRLDC

It was further agreed that since setting of VSATs may take some time, 2 Nos. E1

may be provided at Jabalpur and Bhilai to ensure availability of important data from

these areas. Necessity for continuation of these two E1 switching may be

reviewed after commissioning of VSATs/Radio back-up link. In addition OPGW link

between Gotri to Jambuva & Gotri to Asoj was also agreed to.

PGCIL were requested to revise their proposal for back-up communication scheme

in line with the above.

WRP Committee may discuss and decide. ITEM No.6: RETROFITTING /REPLACEMENT OF OLD PROTECTIION

SCHEMES/EQUIPMENTS BY PGCIL

6.1 PGCIL vide letter No. WRTS/O&M/R/141/ 2202 Dated 26.09.2007 proposed

retrofitting of old protection schemes, replacement of obsolete Protection & PLCC

system, replacement of obsolete ABCBs and replacement of Gapped LAs with

Gapless LAs at their various sub stations. The proposal includes the following works:

(i) Replacement of old and obsolete relays (172 nos.) at various sub-stations

- Rs. 6.10 Crores

(ii) Replacement of 16 nos. ABCBs at Bhilai, Indore & Asoj

- Rs. 6.54 Crores

(iii) Replacement of obsolete Protection and PLCC System under 220 kV Kawas Transmission System

- Rs. 2.53 Crores

(iv) Replacement of obsolete Protection and PLCC System at 220 kV Vapi Sub-station

- Rs. 0.39 Crores

(v) Replacement of Gapped Las with Gapless LAs at various Sub-station

- Rs. 2.71 Crores

This matter was discussed in 98th Protection Committee meeting of WRPC held on

23rd & 24th Oct. 2007. PGCIL in the meeting informed that the consent of

beneficiaries is required for filing of petition for additional capitalization on account of

Page 15: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 8

these works. They have also intimated that whenever new equipment / system

replaces the old equipment / system, the original value of the equipment / system will

be deducted from the gross block.

6.2 The Protection Committee discussed the technical aspects of the proposal. It

was observed that the proposal was in line with the protection philosophy discussed

in various meetings of Protection Committee and in the interest of secure and stable

grid operation. The committee therefore recommended acceptance of the proposal.

WRP Committee may like to discuss and decide. ITEM No.7: UTILISATION OF 25 % SHORT TERM OPEN ACCESS CHARGES BY PGCIL

7.1 Under the provisions of CERC (Open Access in Inter-state Transmission)

Regulations, the transmission licensee, CTU or STU as the case may be, shall retain

25% of the charges collected from the Short Term Customer for use of its intra-

regional Transmission system and 12.5% of the charges collected from the short-

term customers for use of its inter-regional system and balance is to be adjusted

towards reduction in the transmission charges payable by the Long-Term customers.

Further, the Commission in its order dated 30.01.04 in petition No. 48/2003 (Suo

moto), have directed that the short term open access revenue retained by the

transmission licensee, is expected to be utilised in the core activity of building new

transmission system.

7.2 In view of these provisions, CSEB vide letter dated 29.10.2007 desired to

discuss the issue and know from PGCIL the following:

(i) Year wise amount of STOA charges (25% component) collected by PGCIL

after introduction of Open Access.

(ii) Year wise utilization of above amount by PGCIL against specified /

identified works.

7.3 The matter was discussed in 48th Commercial Committee meeting held on

13th Dec. 2007 wherein PGCIL stated the details of STOA charges collected from all

the regions viz. region wise payment received, payment made and amount retained

Page 16: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 9

and calculations thereof towards reduction in transmission charges payable by long-

term customers are furnished to all the constituents on monthly basis alongwith the

monthly transmission charges bill. PGCIL intimated that in the absence of clear

guideline from the regulator, the money so collected are put into transmission

business as income which is their core activity and utilizing the same for

transmission schemes.

7.4 PGCIL was requested to furnish the details of the amount collected from Short

Term Open Access customers for use of intra-regional Transmission system and

inter-regional system in respect of Western Region, amount adjusted towards

reduction in the transmission charges payable by the Long-Term customers and the

balance amount retained/utilized by PGCIL for the core activity of building new

transmission system since the introduction of CERC (Open Access in Inter-state

Transmission), Regulation. PGCIL agreed to do the needful so as to appraise the

WRP Committee. PGCIL may kindly intimate the status. WRP Committee may like to discuss. ITEM No.8: PERFORMANCE OF WR GRID DURING OCTOBER 2007 TO

DECEMBER 2007 8.1 System Performance

During the period October 2007 to December 2007, the grid operated in the

frequency range 49.0 Hz and 50.5 Hz for 88.62% of time. The percentage time,

when the frequency was within this range varied between 83.46% and 91.99%.

During November 2007, frequency remained below 49.0 Hz. for 16.54% of time. The

details of frequency profile during the above period is enclosed at Annexure-8.1 (a).

The details relating to registered demand/unrestricted demand, energy availability

and energy requirement during the above period are at Annexure-8.1 (b). The

maximum unrestricted demand of the region was 39449 MW as recorded during

October 2007. The maximum demand met during this period was 30835 MW, which

was registered during November 2007. The peak shortfall of the Western Region

ranged from 7726 MW to 10104 MW. Capacity shortage during this period was of the

Page 17: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 10

order of 20.04 % to 25.61 % and energy shortage was in the range of 14.53% to

15.08 %.

During the 5th WRPC meeting held on 6th October 2007, constituents of WR had

expressed serious concern on sustained low frequency operations in the system

since October 2007 and overdrawal by NR utilities and had requested CEA to

arrange a joint meeting of WR & NR to address these issues, as WR demand was

likely to be picking up with the onset of Rabi season. In this connection, Chairman,

WRPC / CSEB attended 6th meeting of NRPC held on 25th October 2007 and drew

attention of constituents of NR on the above issues and had requested them to

regulate their drawal so as to maintain the system frequency above 49.0 Hz and to

ensure grid security. Despite the same, as situation did not improve subsequently,

he requested Chairman, CEA to intervene and take joint meeting with the NR and

WR constituents to address the problem so that prevailing situation is not allowed to

persist, which otherwise might lead to a major grid disturbance. Upon above request,

a meeting was taken by Chairman, CEA with NR and WR constituents on

4th December 2007 at New Delhi. In the meeting, the issue of low frequency

operation and large overdrawal by some of the Northern states was discussed. To

improve the power supply in NR & WR, NTPC were requested to pursue immediate

procurement of RLNG with the gas companies to fully utilise the capacity of gas

based power stations of NTPC. However, till such time, as a contingency measure, it

was decided to schedule the above unutilized capacity of around 800 MW in NR and

WR on liquid fuel. WRLDC/NRLDC were authorized to schedule the above un-

requisitioned liquid power to the overdrawing utilities, which were identified for the

purpose. The details and record of discussions are at Annexure-8.1(c). It is however

seen that the capacity at Kawas still continues to remain unutilized. WRLDC may

furnish further details.

The Committee may like to discuss.

8.2 Voltage Profile The month-wise detail of voltages at important 400 kV substations during the month

of October 2007 to December 2007 is at Annexure-8.2. During this period, low

voltages were recorded at 400 kV Gwalior, Jetpur and Indore substations ranging

Page 18: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 11

between 369 kV, 354-360 kV and 356-378 kV respectively. The high voltages were

recorded at Bina and Dhule ranging between 429-436 kV and 435-440 kV

respectively.

The low voltage was encountered at Indore for short periods in October 2007 when

400 kV lines in the vicinity were taken out for shut down to attend maintenance work

and due to forced outage of 100 MVAR capacitor bank at Indore. The voltage profile

at Indore improved after the capacitor bank was taken into service and 400 kV Bina-

Nagda d/c line commissioned. The voltage at 400 kV Gwalior substation had

improved from October 2007 onwards with loading on 400 kV Agra-Gwalior

remaining within the permissible range. The low voltage profile around Jetpur has

also improved, with maximization of generation availability and appropriate load

regulatory measures taken in the vicinity.

Other actions taken to ensure smooth voltage profile in the grid are as follows:

i) Two 50 MVAR reactors, one each on both the circuits of 400 kV Indore-

Asoj line were removed at Indore end.

ii) Two 50 MVAR line reactors one each on 400 kV Bhusawal-Koradi ckt I

and 400 kV Parli-Lonikand ckt I at Bhusawal and Parli ends were removed

respectively.

iii) RBPH machines at SSP were operated in synchronous condenser mode

upon advise by WRLDC in the real-time as per the methodology approved

in 5th WRPC meeting.

Further, as reported / agreed to in the earlier WRPC meetings, following actions

have been initiated to control high voltages during the low load periods:

i) The installation by PGCIL of 63 MVAr reactor at 400 kV Damoh sub-

station is expected to take place in March 2008 whereas the installation

and commissioning of 125 MVAr bus reactors each at 400 kV Khandwa

and Dehgam sub-stations is expected to complete by June/July 2008.

ii) Shunt Controllable reactor at 400 kV Padghe s/s in Maharashtra is likely to

be commissioned by MSETCL in October 2008.

Page 19: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 12

iii) The installation of 125 MVAr bus reactor each at Dhule, Indore, Kasor sub-

stations by MSETCL, MPPTCL and GETCO and 80 MVAr bus reactor

each at Karad and Nardipur substations by MSETCL and GETCO as was

agreed and later noted in the 4th WRPC meeting is yet to take place.

During 5th WRPC meeting MSETCL had intimated that orders for 2x50

MVAR line reactors at Dhule end for 400 kV SSP-Dhule D/c line were

placed and were expected to be commissioned December 2007.

PGCIL, MSETCL, MPPTCL and GETCO may indicate further progress made and expected date of installation and commissioning of reactors at the above locations, as an early commissioning of these reactors would help in smoothening of high voltage profile in Western regional grid.

Members may kindly discuss. ITEM No.9 : REVISION OF SETTINGS OF THE df/dt UFLS RELAYS IN THE WR The settings of UFRs and df/dt UFLS relays were upgraded after interconnection of

the NR, ER/NER and WR grids in August 2006. However, the settings of df/dt relays

are dependent upon the dynamic behaviour of the interconnected grid upon sudden

loss of large quantum of generation/load in a particular area. A detailed study based

on the experience of interconnected operation and analytical data was therefore

required to be done to adjudge the rate of change of system frequency at important

locations prone to initiating an uneventual major grid disturbance for deciding most

appropriate settings of the df/dt relays. Since in the interconnected grid, disturbance in

a particular region may affect all other regions, a joint meeting was held between

RPCs and RLDCs of NR, WR and ER on 27.11.2007 at Kolkata to discuss the df/dt

settings. After deliberations in that meeting the following settings of df/dt relays were

recommended: -

Stage-I - df/dt to protect the combined NEW grid from loss of generation of a large

power station.

Stage-II - df/dt to protect the split grid from loss of generation of a large power station.

Page 20: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 13

Setting of df/dt Relay

Northern Region Western Region Eastern Region

Stage-I 2000 MW at 0.1 Hz/sec at 49.9 Hz

2000 MW at 0.1 Hz/ sec at 49.9 Hz

800 MW (600 MW ER + 200 MW SR) at 0.125 Hz /sec at 49.9 Hz

Stage-II 2000 MW at 0.2 Hz/sec at 49.9 Hz

2000 MW at 0.2 Hz/ sec 49.9 Hz

Stage-III - df/dt to protect the individual regional grid/state grid from loss of generation

in the event of isolation.

As against above, the df/dt load shedding scheme already agreed to and implemented in WR is as under:

Settings Recommended Load Relief

Implemented Load Relief

Hz/(Hz./Sec) Region Region GETCO MPPTCL MSETCL TPC CSEB (MW) (MW) (MW) (MW) (MW) (MW) (MW)

49.2/0.4(St-III) 2472 2390 972 392 686 273 67 49.0/0.2(St-II) 2212 2211 972 393 687 91 68 48.8/0.1(St-I) 3023 3064 1537 546 825 91 65

Total 7707 7665 3481 1331 2198 455 200

In order to upgrade these settings to the settings decided in the Joint meeting, the cut-

off frequencies for df/dt relays in Stage-I and Stage-II are required to be raised to 49.9

Hz from 48.8 Hz and 49.0 Hz respectively.

The subject was discussed in the 382nd OCCM of WRPC held on 12.12.2007. The

members of the sub-Committee opined that the rate of drop of frequency of 0.1 Hz/s is

likely to take place in case of sudden large disturbance of loss of generation of the

order of 2000 MW when the N-E-W grid is interconnected. Under such circumstances

an instantaneous load shedding of 2000 MW at 49.9 Hz with df/dt relays might result in

rise in system frequency of the interconnected grid to unsafe levels. Therefore, it would

be appropriate if the recommended initiating levels of operating system frequency of

49.9 Hz for df/dt relays for Stage-I and Stage-II are instead set at 49.5 Hz.

In view of above and after deliberations the OC sub-Committee of WRPC

recommended that the initiating levels for load shedding at 0.1 Hz/s and 0.2 Hz/ s for

Stage-I & Stage-II by the df/dt relays may be set at 49.5 Hz instead of at 49.9 Hz, with

the existing levels of load relief at each stage.

Members may kindly discuss and approve the recommended df/dt settings.

Page 21: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 14

ITEM No.10: ANTICIPATED POWER SUPPLY POSITION FOR THE PERIOD JANUARY 2008 TO MARCH 2008 The anticipated power supply position in the region for the period from January 2008

to March 2008 is furnished at Annexure-10.1 for information of the members. The

regional demand is likely to remain high during this period. The peak demand deficit

is likely to be of the order of 8500-9200 MW, whereas energy deficit of the order of

127-145 MUs per day. The anticipated regional peak demand is in the range of

38000-39000 MW. The anticipated demand shortages for Gujarat, Chhattisgarh,

M.P., Maharashtra, Goa, DD & DNH would be in the range of 2200-2400 MW, 650-

750 MW, 800-1400 MW, 4850-5250 MW, 60-115 MW, 140-160 MW respectively

during the above period.

In view of the above, the regional grid would continue to face high shortfall during the

above period. Therefore, all the utilities shall require to ensure that system

frequency, voltage profile and transmission system loadings are maintained within

the permissible limits in the interest of security of the interconnected grid. All the

utilities are, therefore, requested to take advance action to arrange maximum power

availability to overcome overdrawals at low frequency. All generating utilities may

ensure that the entire generating capacity is fully available. Also no capacity should

be left unrequisitioned from all ISGS stations. NTPC should ensure availability of

adequate quantity of Gas/LNG to enable full utilization of their gas based plants.

To meet any contingent conditions, it shall however have to be ensured that the

existing UFR and df/dt relays under the AUFLS scheme are operative at the

recommended settings and the desired load relief is obtainable.

The voltages profile of the grid may tend to drop below lower permissible-levels.

Therefore it shall have to be ensured that all HT capacitor banks at EHV sub-stations

in the region are in service. SSP may follow real-time operational instructions by

SLDCs/RLDC by operating RBPH machine(s) in synchronous condenser mode for

providing adequate reactive power support and all thermal generating units in the

vicinity of lower voltage profile shall require to maximize generation of reactive power

within their capability limits so as to help in controlling low voltage in the grid.

Members may like to discuss.

Page 22: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 15

ITEMS FOR INFORMATION

ITEM No. 11: PAYMENTS OF UI AND REACTIVE ENERGY CHARGES

As per the information received from WRLDC, the status of payment to UI pool

account and Reactive Energy Pool account as on 18.12.2007 of the current financial

year is given below: -

UI Pool Account Reactive Energy Pool Account

Constituents Dues in Rs. Constituents Dues in Rs.

GUJARAT (278,651,285) GUJARAT 4,369,311

MADHYA PRADESH 708,211,133 MADHYA PRADESH 3,917,641

CHHATTISGARH (348,216,009) CHHATTISGARH (3,267,009)

MAHARASHTRA (271,506,624) MAHARASHTRA (2,098,410)

GOA (53,542,186) GOA (1,995,576)

DD 256,606,096

DNH (1,186,844)

NTPC (55,967,892)

NR Exchange 799,499,224

SR Exchange (676,873,541)

ER Exchange (75,509,873)

HVDC Vindhyachal (480,111)

HVDC Bhadravati (2,174,815)

Total 207,273 925,957

Figures in bracket ( ) are receivables from pool

WRPC members may like to note.

ITEM No.12: TESTING OF SPECIAL ENERGY METERS

12.1 Central Electricity Authority under the provisions of Electricity Act 2003 has

notified regulation called “Central Electricity Authority (installation & operation of

meters) regulation, 2006 which came into force on the date of their publication in the

gazette of India i.e. w.e.f. 17th March 2006. In the above context CSEB vide letter

No.CSEB/MIC/322 dated 29.10.2007 pointed out that the interface meters are to be

tested and calibrated at list once in five years. Further, section 2 (p) of the aforesaid

Page 23: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 16

regulations defines “Meter” as a device suitable for measuring, indicating and

recording consumption of electricity or any other quantity related with electrical

system and shall include, wherever applicable, other equipment such as Current

Transformer (CT), Voltage transformer (VT) or Capacitor Voltage Transformer (CVT)

necessary for such purpose. As such, it is imperative that testing of SEMs should

include testing of associated CTs & VT / CVTs also. Earlier WRE Board in its 125th

Meeting held on 7th October 2004 gave their approval for reimbursement of

expenditure to PGCIL on account of calibration & testing of Special Energy Meters

on actual basis.

12.2 The matter regarding testing of SEMs alongwith associated CT/VT/CVTs was

discussed in the 48th meeting of Commercial Committee held on 13th December

2007 wherein PGCIL were requested to intimate programme of testing of SEMs and

their preparedness for testing of associated CT/VT/CVTs etc. Addl. GM (Comml.),

WRTS, PGCIL stated that in the Western Region, testing of Special Energy Meters

was carried out in the year 2004 and next round of testing will be due in the year

2009. PGCIL pointed out that testing of CTs, VTs and CVTs requires its

disconnection and shutdown on the lines. Regular checking of CT, PT and CVT etc.

in their premises are being carried out by PGCIL and hoped that constituents would

also be carrying out routine maintenance of their equipment. So far as testing of

meters along with CT, PT, and CVT etc. in the premises of other utilities is

concerned, it involves close coordination with them. Also testing of CTs, PTs and

CVTs is time consuming process and requires shutdown of lines. PGCIL intimated

that they are exploring the possibility of arranging mobile laboratory for testing of

CTs, PTs, CVTs etc. As the testing of SEMs is due in the year 2009, PGCIL will get

geared up in this regard.

12.3 PGCIL was requested to to make a detailed programme for testing of SEMs

along with associated CTs, PTs and CVTs. PGCIL was also requested to explore

the possibility of planning the above programme considering the requirement of all

the regions as a whole as testing & calibration cost may come down if the quantity of

meters to be tested is large. PGCIL agreed to the same.

WRPC Members may like to note.

Page 24: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 17

ITEM No.13 : COMMISSIONING OF TRANSMISSION LINES AND GENRATING UNITS 13.1 Commissioning of transmission elements by PGCIL WRTS, PGCIL have reported commissioning and commercial operation of the

following elements of transmission system:

(a) 400 kV Bina-Nagda D/C has been successfully commissioned and put

under commercial operation w.e.f 1st November 2007.

(b) Ckt.-I of 765 kV Sipat-Seoni, 765/400 kV ICT-I at Seoni (New S/s) and

LILO pf 400 kV Bhilai-Satpura line at Seoni has been successfully

commissioned and put under commercial operation w.e.f 1st November

2007.

(c) 400/220 kV kV ICT-I at Seoni S/s alongwith two 220 kV lines bays has

been put in regular operation in WR and is under commercial operation

w.e.f. 1st December 2007.

(d) Bhatapara S/s with LILO of Raipur-Korba S/C line and ICT-I has been put

in regular operation in WR and is under commercial operation w.e.f. 1st

December 2007.

Members may like to note.

13.2 Generating unit commissioned

(i) Unit Nos. 5,6,7 & 8 (4x 65 MW) at Omkareshwar hydro project in Madhya

Pradesh were commissioned on 29.9.2007, 18.10.2007, 27.10.2007 &

5.11.2007 respectively.

(ii) Ratnagiri PGCL CCPP (joint venture) GTs+STs Block -III of 740 MW put

on commercial operation on 21.11. 2007

ITEM No.14: ONGOING TRANSMISSION SCHEMES IN WESTERN REGION

The details of ongoing transmission schemes in WR is enclosed at Annexure-14.

Page 25: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 18

The important EHV lines, which are expected to be commissioned during the current

year, are as below:

765 kV lines No. of Ckt. Likely DOC 1 Sipat -Seoni Line –2 S/C Dec 2007

400 kV lines 2 Seoni- Khandwa (Quad) D/C Jan 2008 3 Nagda-Dehgam D/C Jan 2008 4 LILO of both ckt. of SSP-Nagda at Rajgarh D/C Mar 2008 5 Khandwa-Rajgarh D/C Jan 2008 6 315 MVA 400/220 kV ICT-II at Gwalior s/s Mar 2008 7 LILO of Rourkela- Raipur at Raigarh D/C Dec 2007 8 Sipat-Raipur D/C Feb 2008 9 Ranch-Sipat (under ATS of Kahalgaon Ph II with

40% compensation at Ranchi end) D/C Feb/Mar 08

220 kV lines 10 Boisar(PG)- Nalasopara S/C Dec 2007 11 Bhilad-Vapi (PG) D/C Feb 2008 12 Vapi(PG)-Kharadpada D/C Jan 2008 13 Vapi(PG)-Magarwada D/C Jan 2008

Present status of these lines may please be intimated.

ITEM No. 15: ONGOING GENERATION SCHEMES IN WR

The details of on going generation schemes in WR both under State as well as

Central Sector are enclosed at Annexure-15. The generating units expected to be

commissioned during the next one year are as follows:

Name of the Power Projects Unit No. Capacity (MW)

Schedule Date of Commissioning

GUJARAT (i) Kutch Lignite TPS 4 75 Jan 2008 (ii) Sugen CCPP- Torrent Power Block -1 370 Apr 2008 Block-2 370 Jun 2008 Block-3 370 Aug 2008 (iii) Surat Llignite expansion-GIPCL 1 125 Nov. 2008

MADHYA PRADESH (i) Amarkantak TPS

5 210 Jun 2008

CHHATTISGARH (i) Korba TPS (E) Extn. Stage-V 2 250 Dec 2007

Page 26: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes of 6th WRPC meeting to be held on 11th Jan 08 19

Name of the Power Projects Unit No. Capacity (MW)

Schedule Date of Commissioning

(ii) Raigarh TPP Ph-I &II – Jindal (Pvt) 1 250 Comm. on 2.9.2007

2 250 2007-08 3 250 2007-08 4 250 2007-08 (iii) Pathadi TPP (Lanco) 1 300 Sept. 2008

MAHARASHTRA (i) Ghatghar HPS (Hydro) 1 250 2007-08 2 250 2007-08 (ii) Trombay TPP- TPC 1 250 Oct. 2008

CENTRAL SECTOR – NTPC (i) Sipat-II TPP 4 500 Comm. on 27.5.2007 5 500 Mar. 2008 (ii) Bhilai TPP (Joint venture with SAIL) 1 250 Feb. 2008

2 250 May 2008

Members may like to note/intimate the current status. ITEM No.16: ANY OTHER ITEM WITH PERMISSION OF CHAIR ITEM No.17: DATE AND VENUE OF NEXT WRPC MEETING

* * * * *

Page 27: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes for 6th WRPC meeting to be held on 11th January 08

ANNEXURE

Page 28: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 29: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 30: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 31: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 32: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 33: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 34: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 35: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 36: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 37: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 38: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 39: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 40: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 41: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 42: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 43: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Annexure-8.1(a)

FREQUENCY PARTICULARS OF WESTERN REGION FOR THE PERIOD OCTOBER 2007 TO DECEMBER 2007*

Sr.No. PARTICULARS Oct-07 Nov-07 Dec-07

1 MAXIMUM FREQUENCY(Hz) 1.1 Integrated over an hour 50.08 50.11 50.47 1.2 Instantaneous 50.86 50.34 -

2 MINIMUM FREQUENCY(Hz)

2.1 Integrated over an hour 48.97 48.90 48.78 2.2 Instantaneous 48.76 48.70 -

3 AVERAGE FREQUENCY(Hz) 49.37 48.29 49.38

4 NUMBER OF TIMES FREQUENCY TOUCHED

4.1 48.6 Hz 0 0 - 4.2 48.8 Hz 242 278 NA 4.3 51.0 Hz 0 0 -

5 PERCENTAGE TIME WHEN FREQUENCY WAS

5.1 Above 50.2 Hz 0.24 0.15 - 5.2 Above 50.5 Hz 0.01 0.00 0.07 5.3 Between 50.2 Hz & 49.5 Hz 28.46 21.10 - 5.4 Between 50.2 Hz & 49.0 Hz 91.76 83.31 - 5.5 Below 49.0 Hz 8.00 16.54 9.59 5.6 Below 49.8 Hz 92.35 94.64 - 5.7 Between 49.0 Hz & 50.5 Hz 91.99 83.46 90.41 5.8 Between 50.5 Hz & 48.5 Hz 99.99 100.00 -

* Position for December 2007 is upto 13.12.2007

Page 44: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes for 6th WRPC meeting to be held on 11th January 08

Annexure-8.1(b) (1/2)

POWER SUPPLY POSITION IN WR FOR PERIOD FROM OCTOBER 2007 TO DECEMBER 2007* (IN MW)

Details Chhatisgarh Gujarat Madhya Pradesh Maharashtra

Oct Nov Dec Oct Nov Dec Oct Nov Dec Oct Nov Dec

Availability (MW) 1954 1911 1889 8714 8309 8441 5687 6651 5650 14059 14099 13095

Unrestricted demand (MW) 2263 2242 2042 11825 11466 11601 6006 6983 7122 18922 18013 17525

Deficit(-)/Surplus(+) (i) MW -309 -331 -153 -3111 -3157 -3160 -319 -332 -1472 -4863 -3914 -4430

(ii) % -13.65 -14.76 -7.49 -26.31 -27.53 -27.24 -5.31 -4.75 -20.7 -25.70 -21.73 -25.28

Details Goa Daman & Diu Dadra & Nagar Haveli Western Region

Oct Nov Dec Oct Nov Dec Oct Nov Dec Oct Nov Dec

Availability (MW) 407 406 309 215 192 197 406 399 398 29345 30835 29474 Unrestricted demand (MW) 446 451 369 240 217 197 432 416 398 39449 38561 38675

Deficit(-)/Surplus(+) (i) MW -39 -45 -60 -25 -25 0 -26 -17 0 -10104 -7726 -9201

(ii) % -8.74 -9.98 -16.26 -10.42 -11.52 0 -6.02 -4.09 0 -25.61 -20.04 -23.79 * Position for December 2007 is upto 13.12.2007

Page 45: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes for 6th WRPC meeting to be held on 11th January 08

Annexure-8.1(b) (2/2)

ENERGY POSITION IN WR FOR PERIOD FROM OCTOBER 2007 TO DECEMBER 2007 * (IN MUs)

Details Chhatisgarh Gujarat Madhya Pradesh Maharashtra

Oct Nov Dec Oct Nov Dec Oct Nov Dec Oct Nov Dec

Availability (MUs) 1088 1068 1173 5707 5275 5585 3193 3797 3997 8705 8488 8701

Unrestricted requirement (MUs) 1148 1114 1188 6723 6356 6751 3592 4447 4609 10646 10105 10204

Deficit(-)/Surplus(+)

(i) MUs -60 -46 -14 -1016 -1081 -1166 -399 -650 -613 -1942 -1617 -1502

(ii) % -5.24 -4.11 -1.2 -15.11 -17.0 -17.27 -11.12 -14.6 -13.3 -18.24 -16.00 -14.72

Details Goa Daman & Diu Dadra & Nagar Haveli Western Region

Oct Nov Dec Oct Nov Dec Oct Nov Dec Oct Nov Dec

Availability (MUs) 234 219 190 137 126 134 289 272 274 19352 19246 19959 Unrestricted requirement (MUs) 235 221 193 156 144 134 289 273 274 22789 22660 23353

Deficit(-)/Surplus(+) (i) MUs -1.01 -2 -3 -18.60 -18 0 -0.23 -0.36 0.0 -3437 -3414 -3393

(ii) % -0.43 -0.87 -1.39 -11.92 -12.53 0.0 -0.08 -0.13 0.0 -15.08 -15.0 -14.53 * Position for December 2007 is upto 13.12.2007

Page 46: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 47: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter
Page 48: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Agenda Notes for 6th WRPC meeting to be held on 11th January 2008

Annexure-8.2

Voltages at the important 400 kV substations during the period Oct 07 to Dec* 07

Month Indore Itarsi Karad Dhule Asoj

Max Min Max Min Max Min Max Min Max Min

Oct-07 425 356 429 368 425 386 440 380 424 385

Nov-07 426 378 426 389 424 392 435 390 424 395

Dec-07 426 392 428 396 422 392 436 404 423 399

Month Kasor Bhilai Jetpur Bina Gwalior

Max Min Max Min Max Min Max Min Max Min

Oct-07 422 396 415 386 414 354 436 390 428

369

Nov-07 422 400 422 399 417 358 429 372 428 382

Dec-07 421 403 421 399 416 360 435 397 431

385

* Position for Dec 2007 is for period upto 18.12.2007

Page 49: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Annexure-10.1 (1/2)

ANTICIPATED POWER SCENARIO IN WR FOR PERIOD FROM JANUARY 2008 TO MARCH 2008 (IN MW)

Chhatisgarh Gujarat Madhya Pradesh Maharashtra Details

Jan Feb Mar Jan Feb Mar Jan Feb Mar Jan Feb Mar

Availability (MW) 1823 1991 2028 7858 7662 7918 6009 5745 5610 13578 14147 14384 Unrestricted demand (MW) 2566 2643 2715 10038 10067 10187 7172 7160 6402 18830 18990 19487 Deficit(-)/Surplus(+)

(i) MW -743 -652 -687 -2180 -2405 -2269 -1163 -1415 -792 -5252 -4843 -5103 (ii) % -28.96 -24.67 -25.30 -21.72 -23.89 -22.27 -16.22 -19.76 -12.37 -27.89 -25.50 -26.19

Goa DD&DNH Western Region Details

Jan Feb Mar Jan Feb Mar Jan Feb Mar

Availability (MW) 361 356 356 512 501 501 28898 29149 29527

Unrestricted demand (MW) 421 463 469 653 654 659 38044 38329 38273 Deficit(-)/Surplus(+)

(i) MW -60 -107 -113 -141 -153 -158 -9146 -9180 -8746 (ii) % -14.25 -23.11 -24.09 -21.59 -23.39 -23.98 -24.04 -23.95 -22.85

Page 50: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Annexure-10.1 (2/2)

ANTICIPATED ENERGY POSITION IN WR FOR PERIOD FROM JANUARY 2008 TO MARCH 2008 (IN MUs)

Chhatisgarh Gujarat Madhya Pradesh Maharashtra Details

Jan Feb Mar Jan Feb Mar Jan Feb Mar Jan Feb Mar

Availability (MUs) 1358 1414 1532 5637 5336 5929 3611 3323 3492 8668 8704 9153 Unrestricted Requirement (MUs) 1412 1397 1475 6140 5786 6392 4498 4018 3889 11590 11211 12724 Deficit(-)/Surplus(+)

(i) MUs -54 17 57 -503 -450 -463 -887 -695 -397 -2922 -2507 -3571 (ii) % -3.82 1.22 3.86 -8.19 -7.78 -7.24 -19.72 -17.30 -10.21 -25.21 -22.36 -28.07

Goa DD&DNH Western Region Details

Jan Feb Mar Jan Feb Mar Jan Feb Mar

Availability (MUs) 238 227 239 383 363 383 19895 19367 20728 Unrestricted Requirement (MUs) 260 230 274 455 418 470 24355 23060 25224 Deficit(-)/Surplus(+)

(i) MUs -22 -3 -35 -72 -55 -87 -4460 -3693 -4496 (ii) % -8.46 -1.30 -12.77 -15.82 -13.16 -18.51 -18.31 -16.01 -17.82

Page 51: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

PROGRESS OF TRANSMISSION LINES UNDER CONSTRUCTION IN WESTERN REGIONSr.No.

Name of transmission line Length in Ckt. Km

Anticipated Completion

REMARKS

Target

A gaujarat GUJARAT (as on 30.11.2007)

I. 400 kovaI laa[-na 400 kV Lines 1 400 kV Dehgam (PGCIL)-Ran'Pura(Vadavi) D/C 130.00 Jul-07 Line commissioned on 27/06/072 LILO of 400 kV Asoj-Amreli line at 400 kV Chorania 21.10 Dec-07

II. 220 kovaI laa[-na 220 kV Lines3 220 kV Bardoli-Chikhali D/C 96.00 Jan-08 Erection of gentry is pending4 200 kV Vapi (PGCIL) - Bhilad D/C 46.00 Dec-07 Erection of gentry at Bhilad is pending5 200 kV LILO at Mota (Bardoli) S/S from 2nd Ckt. of Ukai (T)-Vav 9.60 Dec-07

6 200 kV LILO at Kosamba S/S from Vav-Zagadia line 20.00 Mar-09 Line survey work is under progress7 220 KV D/C Adasar - Bala 20.00 Mar-088 220 KV D/C Chorania - Bala 59.12 Mar-08 Profile approved9 220 KV D/C Bala-Rajpur 10.58 Mar-08

10 220 KV D/C Rajpur-Dudhrej 19.16 Mar-0811 200 kV LILO at Lakhani S/S from both Ckt. of Kansari-Tharad 8.00 Mar-08 Profile approved12 200 kV Rajkot-Morbi D/C & LILO at 400KV Hadala S/S 146.00 Jul-07 Ckt. 1 charged on 31/05/07 upto Morbi

S/S, Ckt. 2 Charged on 26/05/07 & Haldia- Rajkot D/C line charged on 16.08.07

13 200 kV LILO at Botad S/S from Kasor-Vartej line 90.00 Tender for Preparation of Profile wok opened

14 200 kV LILO at Chitrod from Deodar-Anjar 2.10 Work order to be placed.15 200 kV LILO of Shivlakha-Nanikhakhar at Varsana both Ckts. 7.23 Dec-0716 200 kV LILO at Kukma S/S from one ckt. of Anjar-Panandhro 5.19 Dec-0717 200 kV LILO at Kukma S/s from one ckt. of Shivlaktha- Nanikhakhar 34.00 - Route & profile approved.

B maGya p`doSa MADHYA PRADESH (as on 30.10.2007)

I. 400 kovaI laa[-na 400 kV Lines 1 Extention of 400 kV Birsingpur-Katni-Damoh for PGCIL Damoh 26.04 2007-2008

2 Diversion of 400 kV Birsingpur-Katni-Damoh at Katni 1.94 2007-2008

3 Interconnector arrangement at 400 kV Birsingpur-Katni-Damoh at Birsingpur

0.66 2007-2008

4 LILO of 220 kV Birsinghpur-Rewa one Ckt. At Sidhi 117.50 2007-20085 LILO of both Ckt of 220 kV Bhopal-Itarsi for 400 kV PGCIL Itarsi S/S 2.05 2007-2008

6 200 kV Birsingpur-Jabalpur Ckt-I 134.11 2006-2007 Line charged on 20/05/077 200 kV Birsingpur-Jabalpur Ckt-II 138.15 2006-2007 Line charged on 20/05/078 LILO of 1st Ckt. DCDS 200 kV Gwalior- Malanpur at 400KV Gwalior

PGCIL S/S16.90 2007-2008

8 LILO of both Ckt of 220 kV Barwaha-Nepanagar, 2 Nos DCDS for Omkareshwar HEP

90.96 2007-2008

9 LILO of first Ckt of 220 kV Indore-Dewas for 200 kV Indore S/S 0.39 2007-2008 Line charged on 20/07/0710 LILO of 200 kV Birsingpur TPS- Birsingpur hydel II Ckt. 11.62 2007-2008 Line charged on 16/05/0711 LILO of both Ckt of 200 kV Birsinghpur TPS Nowrozabad traction

feeder23.06 2007-2008

Line charged on 30/06/0712 200 kV Satna-Chhatarpur 140.00 2007-200813 200 kV Amarkantak-Jabalpur DCDS 300.00 2007-2008 Forest proposal Subitted on 08.08.0714 220 kV Chhindwara-400 kV PGCIL Seoni D/C 140.00 2007-200815 LILO of both Ckts.of 200 kV Pithampura-Rajgarh for 400kV PGCIL

Rajgarh23.53 2007-2008

16 LILO of first Ckt.of 200 kV Pithampur-Rajgarh for 400kV PGCIL Rajgarh

22.55 2007-2008

17 LILO of one Ckt of 200 kV Jabalpur-Itarsi at Piparia S/S 7.20 2007-200818 LILO of 200 kV Damoh-Tikamgarh for 400 kV Damoh 1.66 2007-200819 LILO of one Ckt of 200 kV Itarsi-Bhopal for 220kV Mandideep 11.23 2007-200820 200 kV Shivpuri-Sabalgarh DCDS 210.00 2007-200821 LILO of one Ckt 200 kV Damoh-Bina for 400 kV Damoh 1.05 2007-200822 Second Ckt. Of 200 kV Pithampura-Rajgarh 68.65 2007-200823 LILO of second Ckt of 220 kV Jabalpur-Itarsi for 220 kV Narsingpur 6.00 2007-2008

24 220 kV Bhopal (400 kV) -Ashta for Ashta S/S 194.00 2007-200825 LILO of 200 kV Birsingpur-Satna one Ckt. at ATPS Chachai 87.41 2007-200826 LILO of second circuit of 200 kV Nagda-Ratlam for 400kV Nagda 43.32 2007-200827 SujalpurPGCIL (400kV)-220kV Rajgarh Biaora line 134.40 2008-200928 Interconnector arrangement at 400kV Sujalpur-220kV Sujalpur 10.00 2008-2009

Annexure- 14 (1/3)

Page 52: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Annexure- 14 (2/3)Sr.No.

Name of transmission line Length in Km

Anticipated Completion

REMARKS

Target

C C%tIsa gaZ CHHATTISGARH (as on 30.11.2007)I. 400 kovaI laa[-na 400 kV Lines

1 LILO of 400 kV Korba (West)-Bhilai to Raipur DCDS 50.00 2007-20082 400 kV Korba(West)- Khedamara DCDS 220.00 2007-2008

II. 220 kovaI laa[-na 220 kV Lines1 200 kV for Pendra S/s (Korba-Amarkantak) Kotmikala DCDS 23.20 2007-2008 Testing & commissioning work U/P

2 200 kV Korba -Bishrampur DCSS 153.00 2007-2008 Case is submitted to AIG(FC) Min. of Env& Forest, New Delhi by Secy(F)

3 200 kV Suhela (Bhatapara)-Bemetara DCDS 44.58 2007-2008 Ckt-I & II charged on 01/09/07 & 03/09/07 respectively

4 200 kV Suhela (Bhatapara)-Mahasamund DCDS 62.01 2007-2008 Ckt-I & II charged on 01/09/07 & 03/09/07 respectively

5 200 kV LILO of Bhilai-Barsoor second Ckt. to Gurur S/S DCDS 7.09 2007-2008 Line charged on 25/07/076 200 kV Korba(E) -Suhela (Bhatapara) DCDS 142.04 2007-2008 Line cherged through diverted route.Ckt-I

& II charged on 18/11/07 & 21/11/07 respectively

7 220 kV line from PGCIL Kumhari to 220 kV Doma S/S DCDS 40.00 2007-20088 LILO of 200 kV Korba-Bhatapara Ckt. -II at Champa S/S DCDS 0.84 2007-2008 Work completed. Ready for charging.9 220kV DCDS Suhela-PGCIL DCDS 15.00 2007-2008 Work under Progress10 220 kV Bhatapara-Kumhari LILO at PGCIL DCDS 6.00 2007-2008 Work under Progress11 I/C 220 kV Raigarh-PGCIL Raigarh DCDS 10.39 2007-2008 ROW problem in entire route

12 220 kV Raigarh-Ms Jindal Power Ltd. DCDS 52.002007-2008 Work under Progress. 0.058km profile

submitted for clarification 13 220kV Double Ckt of existing Bhatapara-Suhela DCDS 17.45 2007-2008 2nd Ckt. completed. One Ckt. charged

on 23.08.07 from Loc. 1 to 5714 LILO of 200 kV Siltara-Bhilai to Doma DCDS at Mopka 30.00 2007-2008 New line for Doma s/s15 LILO of 200 kV Korba-Siltara at Mopka 12.14 2007-2008 Work under Progress

New works planned (70% work to be completed during 2007-08)16 220 kV DCDS Chhuri-Mopka(Bilaspur) 90.00 2007-2008 Approved by Board.17 220 kV DCSS line between 400 kV kV s/s Bhilai & Ranjangaon 55.00 2007-2008 P.B. opened.18 220 kV DCSS Khedamara-220 kV Bematara S/S 60.00 2007-2008 T.C. bid opened.19 220 kV I/C New Power House at Korba(E) to prposed 220 kV Chhuri 30.00 2007-200820 Diversion of 200 kV Korba(E)-Bhilai line and 200 kV I/C in between

Korba(E) PH-II DCSS 30.00 2007-2008

21 Diversion of 200 kV line from and 200 kV I/C in between Korba(W) and proposed 200 kV Chhuri S/S using section of Korba-Amarkantak - I & II DCSS

14.00 2007-2008

22 Diversion of 200 kV Korba-Amarkantak Ckt.I&II to proposed 200/132KV Chhuri S/S DCSS

4.00 2007-2008

D maharaYT/ (MAHARASHTRA) (as on 30.11.2007)Sr.No.

Name of transmission line Length in Ckt. Km

Anticipated Completion

REMARKS

Target

I. 400 kovaI laa[-na 400 kV Lines 1 400 kV Dabhol- Nagothane Ckt II 135.56 Jan-082 LILO on 400 kV Bhusawal-Koradi Ckt.-I for Akola S/S 77.00 Jun-063 400 kV Lonikand-Padghe line - Diversion at MIDC Chakan 4.06 - Commissioned on 26.04.07

II. 220 kovaI laa[-na 220 kV Lines1 200 kV Kanhan-Umred S/C 50.11 - Line commissioned on 25/05/072 LILO on 200 kV Khaparkheda- Bhandaraat Kanhan D/C line 20.00 Mar-073 LILO on 200 kV Dhule-Dondaicha D/c line for Amalner S/S 64.00 Oct-074 LILO on 200 kV Tarapur-Borivali for 200 kV Boisar-II S/S 8.00 2007-085 200 kV line from PGCIL to 200 kV kV Wada S/S 57.00 2007-086 200 kV Theur-Jejuri (Holkarwadi) D/C line 38.00 - Line commissioned on 25/05/077 Interconnection between 200 kV Kolhapur II-Kolhapur III S/S 18.40 Mar-078 LILO on 200 kV Apta-Chinchwad fot URSE S/S 22.00 Mar-07

Page 53: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Annexure- 14 (3/3)Sr.No.

Name of transmission line Length in Ckt. Km

Anticipated Completion

REMARKS

Target

E pavarg`aID POWERGRID (as on 31.11.2007)

I.765 kovaI & 400 kovaI laa[-na 765 kV & 400 kV Lines 1 SIPAT-I Trans. System

1.1 765 KV Sipat-Seoni line I 351.0 Oct-07 Line commissioned in Oct' 071.2 765 KV Sipat-Seoni line 2 354.0 Dec-07 Completion delayed due to delay in

award of tower package (A4) on a/c of change of funding & consequently award.

1.3 400 KV D/C Seoni - Khandwa (Quad) 703.0 Dec-071.4 400 KV D/C Nagda - Dehgam 664.0 Dec-07 Completion delayed due to delay in

award on a/c of CERC issue.1.5 LILO of 400 KV S/C Bhilai-Satpura at Seoni 4.0 Oct-07 Line commissioned in Oct' 071.6 LILO of both Ckt. of 400 KV D/C Sardar Sarovar - Nagda at Rajgarh 16.0 Dec-07 Completion of line re-scheduled

matching with completion of Rajgarh S/S anticipated by Dec'07.

2 400 kV S/C Vindhyachal - Korba Tr. Line2.1 400 KV S/C Vindhyachal - Pratabpur 140.0 May-07 Line commissioned in May-072.2 400 KV S/C Pratabpur - Korba 151.0 May-07 Line commissioned in May-073 Vindhyachal III Trans. System

3.1 400 KV D/C Satna - Bina 545.0 Aug-07 Ckt.-II commissioned in end of June 07. Ckt.-I commissioned on 28/08/07

3.2 LILO of 400 KV D/C Rourkela-Raipur at Raigarh 37.0 Dec-07 Completion matching with Raigarh S/S4 SIPAT-II Trans. System

4.1400 KV D/C Khandwa - Rajgarh 440.0 Dec-07 Matching with Raigarh S/s schedule

anticipated by Dec'07.

4.2LILO of 400 KV S/C Korba - Raipur at Bhatpara (PG) 5.0 Nov-07 Commissining expected by end Nov' 07

5 400 KV D/C Bina - Nagda Tran. Line 662.0 Oct-07 Line commissioned on 31.10.076 Western Region Strengthening Scheme-I

6.1 400 KV D/C Sipat - Raipur 298.0 Feb-08 2 nos. location held up due to litigation7 Sipat-II Supplimemtary Trans. System

7.1 765 S/C Seoni-wardha (to be operated at 400kV) 269.0 Jun-087.2 400 kV D/C Wardha-Akola 368.0 Jun-087.3 400 kV D/C Akola-Aurangabad 530.0 Jun-088 Western Region Strengthening Scheme-III

8.1 220 kV Vapi (PG)-Magarwada (DD) D/C line & 7 Kms. MultI-Ckt portion 31 Aug-08

8.2 220 kV Vapi (PG)-Kharadpada(DNH) D/C line 36 Aug-08 Stringing commenced from Nov' 079 Western Region Stregthening Scheme-II

9.1 SET-A: For absorbing import in eastern&central part of WR9.1.1 765 KV 2nd S/C Seoni-wardha (initially to be operated at 400kV) 268 - Tendering under Process9.1.2 400 kV D/C Wardha-Parli(Quad.) 726 - Tendering under Process9.1.3 400 kV D/C Raipur-Wardha 726 -9.1.4 400 kV D/C Bhadravati-Parli 760 -9.1.5 400 kV D/C Parli(MSEB)-Parli 14 -9.2 SET-B: For Regional strengthening in southern Maharashtra (to be

implemented through IPTC route)-

9.2.1 400 kV D/C Parli(PG)-Pune 616 -9.2.2 400 kV D/C Pune(PG)-Aurangabad(MSEB) 450 -9.2.3 400 kV D/C Parli(PG)-Pandharpur/Solapur 392 -9.2.4 400 kV D/C Pandharpur/Solapur(PG)-Kolhapur(MSEB) 378 -9.2.5 LILO of Lonikhand(MSEB)-Kalwa(MSEB)400 kV D/C at Pune(PG) 48 -9.2.6 LILO of Solapur(MSEB)-Karad(MSEB)400 kV D/C at

Pandharpur/Solapur(PG) 52-

9.3 SET-C: For Regional strengthening in Gujarat -9.3.1 400 kV D/C Rajgarh(PG)-Karamsad(GEB) 480 -9.3.2 400 kV D/C Limbdi(Chorania)(GEB)-Ramchandrapura(GEB) 190 -9.3.3 400 kV D/C Ramchandrapura(GEB)-Zerda(GEB) 310 -9.4 SET-D: For Regional strengthening in Northern Madhaya Pradesh

9.4.1 Bina(PG)-Gwalior(PG) 765 kV 2nd Ckt.to be operated at 400kV 235 - Tower erection commenced from Nov' 07

9.4.2 400 kV D/C Korba(NTPC)-Birsighpur(MPGENCO) 454 - Award placed in May-07. Survew& Engg Works in Progress

9.4.3 400 kV D/C Birsighpur(MPGENCO)-Damoh(PG) 508 - Award placed in May-07. Survew& Engg Works in Progress

9.4.4 400 kV D/C Damoh(PG)-Bhopal(MPSEB) 468 - Award placed in May-07. Survew& Engg Works in Progress

10 Trans. Sy. Associated with Gandhar-II (GBPP) -10.1 400 kV D/C Gandhar-Kawas 190 -10.2 400 kV D/C Gandhar-Rajkot 600 -10.3 LILO of 400 kV D/C Bina-Nagda at Shujalpur 60 -

11 Inter-regional lines11.1 WR-ER/NER

11.1.1 400 kV D/C Ranchi - Rourkela340 Award under hold due to non-resolution

of funding issue

11.1.2 400 kV D/C Rourkela - Raigarh440 Award placed in July 07. Engg. & survey

under Progess

11.1.3 400 kV D/C Raigarh - Raipur450 Award placed in July 07. Engg. & survey

under Progess 11.1.4 400 kV D/C Ranchi - Sipat Lines 816 Mar-08 Work held up due to forest clearance11.1.5 765 kV S/C Seoni - Bina line to be charged at 400kV 293 Sep-0911.2 WR-NR

11.2.1 765 kV Agra - Gwalior 2nd S/C line (initially to be operated at 400kV 130 Jan-09

11.3 WR-SR11.3.1 Nil

Page 54: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Annexure-15 (1/2)

Sr. No. Name of the Power Projects Unit No. Capacity (MW)

Schedule Date of Commissioning

A GUJARATProjects under constructions:

1 Dhuvaran CCGT St.II ST 40 Commd. on 13/08/072 Kutch Lignite TPS 4 75 Jan. 20083 Sugen CCPP- Torrent Power Block -1 370 Apr. 2008

Block-2 370 Jun. 2008Block-3 370 Aug. 2008

4 Surat Lignite expansion- GIPCL 1 125 Nov. 20082 125 Mar. 2009

New Projects for which LOA yet to be placed:5 Utran GPP 360 Jul. 20096 Sikka TPP Extn. 3 250 Feb. 2010

4 250 Jun. 20107 Ukkai TPS Extn. 1 490 Jun. 20118 Gujarat Lignite-NLC & GPCL joint venture Stage-I 1500 2011-12

Stage-II 500 2012-139 Pipavav CCPP- GPCL & GSPC joint venture 1 350 Mar. 2010

2 350 Jun. 201010 Hazira CCPP Expansion GSEG 350 Feb. 201011 Dhuvaran CCPP GSECL Stage-III 360 Mar. 201012 Pipavav TPP- Torrent Power 1000 2011-1213 Bhavnagar Lignite TPP-joint venture 500 Apr. 2011B MADHYA PRADESH

Projects under constructions:1 Birsinghpur TPP Extn. 1 500 Commissioned in Jun. 20072 Amarkantak TPS 5 210 Jun. 20083 Omkareshwar HEP- NHDC 1 65 Commd. on 21/07/07

2 65 Commd. on 09/08/07 3 65 Commd. on 29/08/074 65 Commd. on 12/09/075 65 Commd. on 29/09/076 65 Commd. on 18/10/077 65 Commd. on 27/10/078 65 Commd. on 05/11/07

5 Madikheda HEP 3 20 Commnd. On 18/08/074 Maheshwar HEP - 400 2010-11

Projects for which LOA yet to be placed 5 Malwa TPP 1 500 Dec. 2010

2 500 Apr. 20116 Satpura TPS Extn. 10 250 Mar. 2011

11 250 Sept.20117 Sahpura TPP 1 500 Dec.2012

2 500 Mar. 20133 500 Jun. 2013

NEW GENERATION SCHEMES TO BE ADDED IN 2007-08(end of Xth Year Plan) & DURING XIth PLAN IN WESTERN REGION

Page 55: Government of India kond`Iya ivaVut p`aiQakrNa Central ... · Agenda Notes for 6 th WRPC meeting to be held on 11 January 08 ANNEXURES Annexure Particulars Annexure-1.2 CSEB letter

Annexure-15 (2/2)Sr. No. Name of the Power Projects Unit No. Capacity

(MW)Schedule Date of Commissioning

C CHHATTISGARHProjects under constructions:

1 Korba TPS (E) Extn. Stage-V 2 250 Dec. 20072 Raigarh TPP Ph-I - Jindal (Pvt) 1 250 Commnd.on 02.09.2007

Raigarh TPP Ph-I & II - Jindal (Pvt) 2 250 2007-083 250 2007-084 250 2007-08

3 Pathadi TPP (Lanco) 1 300 Sept. 20082 300 Jul. 2009

Projects for which LOA yet to be placed 4 Bhaiyathan TPP Phase-I 1 500 Apr. 2011

2 500 Oct. 20115 Marwa TPP 1 500 Nov. 2010

2 500 Feb. 20116 Korba South TPP 1 500 Apr. 2011

2 500 Oct. 20117 Premnagar TPP Surguja joint venutre of CSEB & IFFC 1 Oct. 2010

2 Mar. 2011D MAHARASHTRA

Projects under implementation:1 New Parli TPS Extn. 2 250 Feb. 20092 Paras TPS Extn. 2 250 Apr. 20093 Khaperkheda TPP 1 500 Mar. 20104 Bhusawal Extn. TPP 1 500 Jun. 2010

2 500 Oct. 20105 Trombay TPP- TPC 1 250 Oct. 20086 Ghatghar HPS (Hydro) 1&2 2 x 125 2007-08

Projects for which LOA yet to be placed:7 Koradi TPS Extn. 1 800 Oct. 20128 Chandrapur TPS Extn. 1 800 Apr. 20129 Dhopawe TPP 1 800 Nov. 2011

2 800 May 201210 Uran CCPP Block-1 700 Feb. 2010

Block-2 340 May. 2010Projects proposed under Replacement Programme:

11 Koradi TPS Extn. (Replacemet of 4 x 120) 1 800 Apr 201212 Parli TPS (Replacement of 2x30) 1 250 May. 201013 Paras TPS (Replacement of 1x62.5) 1 250 May. 201014 Bhusawal TPS (Replacement of 1x62.5) 1 250 May. 2010E CENTRAL SECTOR - NTPC

Projects under implementation:1 Sipat-II TPP 4 500 Commnd.on 27.05.2007

5 500 Mar. 20082 Sipat-I TPP 1 600 2008-09

2 600 2008-093 600 Mar. 2009

3 Bhilai TPP (Joint venture with SAIL) 1 250 Feb. 20082 250 May-08

4 Korba STPS-III 7 500 Feb. 20105 Mauda TPP 1 500 2011

2 500 20126 Ratnagiri PGCL (Dabhol) CCPP-III joint venture GTs+STs 740 Declared commercial on 21.11.2007