LEGEND€¦ · b. future nokia mpr-9500 radio shelf c. nokia 7705 sar-18 router d. dsx jackfield...
Transcript of LEGEND€¦ · b. future nokia mpr-9500 radio shelf c. nokia 7705 sar-18 router d. dsx jackfield...
Nokia 7705
T1 Aggregation
S-1
SHEET NO.
SR6 NETWORK DIAGRAMS
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICN
SITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\3-Spur Sites\S-Spur Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
SR6 – AS-BUILT
Microwave
Radio A
Falmouth
DVM6-45 Repeater
28-T1 TDM
Multiplex A
M12
1
A
M23
16
1
8
9
21 3 4 21 3 4 21 3 4
5
4 12
13
A 21 3 4
P11
3 4 5 6 7
Access 60
Channel Bank
Nortel ASN
Router
BPS 2000Nortel BayStack 106 12-
Port 10BaseT Hub
Site Equipment
P12
Microwave
Radio A
Falmouth
DVM6-45 Repeater
28-T1 TDM
Multiplex A
M12
1
A
M23
16
1
8
9
21 3 4 21 3 4 21 3 4
5
4 12
13
A 21 3 4
P11
3 4 5 6 7
Access 60
Channel Bank
P12
Site Equipment
SR6 – PROPOSED
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
NOTES:
1. INSTALL NOKIA 7705 SAR-18, SEE SHEET S-2.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT
INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC
7705 CONFIGURATION PARAMETERS.
M12
2
M12
2
(6) T1 to Falmouth
Attachment 1 50
S-2
SHEET NO.
SR6 SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICN
SITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\3-Spur Sites\S-Spur Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
District
Fiber
Channel
Bank
Rack
DVM6-45
RACK
Reserved
Rack
-48 VDC
Distributi
on
Rack
DS-1 CABLE
NOTE 1
-48VDC CABLES A/B
NOTE 3
NOTE 2
SR6 - RESERVED RACKSR6 – SHELTER FLOOR PLAN
PENSACOLA 7705 RACK:
A. FUSE PANEL WITH
APPROPRIATELY SIZED
FUSES
B. FUTURE NOKIA MPR-9500
RADIO SHELF
C. NOKIA 7705 SAR-18
ROUTER
D. DSX JACKFIELD – 28 CKTS
E. DIN RAIL WITH T-1 SPDS –
28 CKTS
A
B
C
9500 MPT-HLC
9500 MPT-HLC
9500-
MPT
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Sta
t
Pw
r
Act
CS
M-2
Co
mp
act F
lash
#1
Co
mp
act F
lash
#2
Mg
mt P
ort
Co
nso
leU
SB
2D
CL
EI
Sta
t
Pw
r
Act
CS
M-2
Co
mp
act F
lash
#1
Co
mp
act F
lash
#2
Mg
mt P
ort
Co
nso
leU
SB
2D
CL
EI
Fan
Batt A
Batt B
Critical
Major
Minor
BIT S1
BIT S2
Alarm
Module
External
Alarms
ACO
Alarms
7705 DSX-1 PANEL D
E
EQUIPMENT TO BE INSTALLED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
NOTES:
1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1
PANELS, AND SPDS IN RESERVED RACK.
2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45
DSX-1 PANEL LOCATED IN DVM6-45 RACK.
3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND
WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL
BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.
4. AFTER FINAL CUT-OVER, REMOVE THE NORTEL ASN ROUTER,
NORTEL BPS2000 AND BAYSTACK HUB LOCATED IN THE
CHANNEL BANK RACK.
NOTE 3
Attachment 1 51
S-3
SHEET NO.YULEE NETWORK
DIAGRAMS
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICN
SITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\3-Spur Sites\S-Spur Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
Microwave Radio
DVM6-45
Jacksonville
A
M12
1M12
2M12
3M12
4M12
5
1
21 3 44 8
21 3 4
5 9
21 3 412 16
21 3 4
13 17
20
21 3 4
21
21 3 424 28
21 3 4
25
M12
6M12
7
A
M23
28-T1 TDM
Multiplex A
P12
Access 60
Channel Bank
Nortel ASN
Router
BPS 2000Nortel BayStack 106 12-
Port 10BaseT Hub
Site Equipment
YULEE – AS-BUILT
Microwave Radio
DVM6-45
Jacksonville
A
M12
1M12
2M12
3M12
4M12
5
1
21 3 44 8
21 3 4
5 9
21 3 412 16
21 3 4
13 17
20
21 3 4
21
21 3 424 28
21 3 4
25
M12
6M12
7
A
M23
28-T1 TDM
Multiplex A
Nokia 7705
T1 Aggregation
Site Equipment
P12
Access 60
Channel Bank
(27) T1 to
Jacksonville
YULEE – PROPOSED
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
NOTES:
1. INSTALL NOKIA 7705 SAR-18, SEE SHEET S-4.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT
INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC
7705 CONFIGURATION PARAMETERS.
Attachment 1 52
S-4
SHEET NO.YULEE SHELTER FLOOR
PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICN
SITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\3-Spur Sites\S-Spur Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
DVM6-45
Radio
Channel
Bank Rack
MAS
Call Box
United Water
-48 VDC
Distribution
Rack
Reserved
Rack
A
B
C
9500 MPT-HLC
9500 MPT-HLC
9500-
MPT
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Sta
t
Pw
r
Act
CS
M-2
Co
mp
act F
lash
#1
Co
mp
act F
lash
#2
Mg
mt P
ort
Co
nso
leU
SB
2D
CL
EI
Sta
t
Pw
r
Act
CS
M-2
Co
mp
act F
lash
#1
Co
mp
act F
lash
#2
Mg
mt P
ort
Co
nso
leU
SB
2D
CL
EI
Fan
Batt A
Batt B
Critical
Major
Minor
BIT S1
BIT S2
Alarm
Module
External
Alarms
ACO
Alarms
7705 DSX-1 PANEL D
E
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Mgmt
Con
A B C D E F G H J K L M
A B C D E F G H J K L M
YULEE RESERVED RACK:
A. FUSE PANEL WITH
APPROPRIATELY SIZED
FUSES
B. FUTURE NOKIA MPR-9500
RADIO SHELF
C. NOKIA 7705 SAR-18 ROUTER
D. DSX JACKFIELD – 28 CKTS
E. DIN RAIL WITH T-1 SPDS –
28 CKTS
YULEE – SHELTER FLOOR PLAN
YULEE – RESERVED RACK
DS-1 CABLE
NOTE 1
-48VDC CABLES A/B
NOTE 3
NOTE 2
EQUIPMENT TO BE INSTALLED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
NOTES:
1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1
PANELS, AND SPDS IN RESERVED RACK.
2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45
DSX-1 PANEL LOCATED IN DVM6-45 RACK.
3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND
WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL
BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.
4. AFTER FINAL CUT-OVER, REMOVE THE NORTEL ASN ROUTER,
NORTEL BPS2000 AND BAYSTACK HUB LOCATED IN THE
CHANNEL BANK RACK.
NOTE 4
Attachment 1 53
S-5
SHEET NO.TAMPA DOT/FHP
NETWORK DIAGRAMS
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICN
SITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\3-Spur Sites\S-Spur Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
Microwave Radio
DVM10-8T
Tampa Maintenance
C
M12
1M12
2
1
21 3 44 8
21 3 4
5 9
21 3 412 16
21 3 4
13 17
20
21 3 4
21
21 3 424 28
21 3 4
25
A
M23
28-T1 TDM
Multiplex A
P12
Access 60
Channel Bank
Nortel ASN
Router
BPS 2000Nortel BayStack 106 12-
Port 10BaseT Hub
Site Equipment
Nokia 7705
T1 Aggregation
Site Equipment
Access 60
Channel Bank
(7) T1 to Tampa
Maintenance
Microwave Radio
DVM10-8T
Tampa Maintenance
C
M12
1M12
2
1
21 3 44 8
21 3 4
5 9
21 3 412 16
21 3 4
13 17
20
21 3 4
21
21 3 424 28
21 3 4
25
A
M23
28-T1 TDM
Multiplex A
P12
TAMPA DOT/FHP – AS-BUILTTAMPA DOT/FHP – PROPOSED
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
NOTES:
1. INSTALL NOKIA 7705 SAR-18, SEE SHEET S-6.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT
INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC
7705 CONFIGURATION PARAMETERS.
Attachment 1 54
S-6
SHEET NO.TAMPA DOT/FHP
SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICN
SITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\3-Spur Sites\S-Spur Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
7705
RACK
Desk
FDOT 47 MHz
Simplex Base
Station -48 VDC
Distribution
Rack
DVM10-8T
Rack
F/O Patch
Panel Rack
Channel Bank
Rack
Suncoast
MAS
Rack
NOTE 3
NOTE 1
-48VDC CABLES A/B
DS-1 CABLENOTE 2
TAMPA DOT/FHP
7705 RACK:
A. FUSE PANEL WITH
APPROPRIATELY SIZED
FUSES
B. FUTURE NOKIA MPR-9500
RADIO SHELF
C. NOKIA 7705 SAR-18
ROUTER
D. DSX JACKFIELD – 28 CKTS
E. DIN RAIL WITH T-1 SPDS –
28 CKTS
F. 19 INCH RELAY RACK
A
B
C
F
9500 MPT-HLC
9500 MPT-HLC
9500-
MPT
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Sta
t
Pw
r
Act
CS
M-2
Co
mp
act F
lash
#1
Co
mp
act F
lash
#2
Mg
mt P
ort
Co
nso
leU
SB
2D
CL
EI
Sta
t
Pw
r
Act
CS
M-2
Co
mp
act F
lash
#1
Co
mp
act F
lash
#2
Mg
mt P
ort
Co
nso
leU
SB
2D
CL
EI
Fan
Batt A
Batt B
Critical
Major
Minor
BIT S1
BIT S2
Alarm
Module
External
Alarms
ACO
Alarms
7705 DSX-1 PANEL D
E
TAMPA DOT/FHP – 7705 RACK
TAMPA DOT/FHP – SHELTER FLOOR PLAN
EQUIPMENT TO BE INSTALLED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
NOTES:
1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1
PANELS, AND SPDS IN NEW RACK.
2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM10-8T
DSX-1 PANEL LOCATED IN DVM10-8T RACK.
3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND
WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL
BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.
4. AFTER FINAL CUT-OVER, REMOVE THE NORTEL ASN ROUTER,
NORTEL BPS2000 AND BAYSTACK HUB LOCATED IN THE
CHANNEL BANK RACK.
NOTE 4
Attachment 1 55