This presentation provides an overview of AVEVA’s Enterprise Resource Management system, ERM.
AVEVA ERM effectively and efficiently manages materials and project resources from design
through Construction in both the plant and shipbuilding industries.
Presented by: Dan Stephenson – AVEVA
Ricardo Rabelo – AVEVA
Discover how AVEVA can transform your business today
www.aveva.com
NORTH AMERICA USER MEETING 2017
TIME
AVEVA ERM
Efficient Planning and Management of Project Resources
Copyright © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Copyright © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Enterprices Resource Management Solutions
Enterprise Resource Management
EPC and Marine Markets
Engineering ConstructionProcurementFEED Handover
Catalogue & SpecificationManagement
ConstructionManagement
Supply Chain Management
Engineering Material Control
Site Material Control
Copyright © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Catalogue & SpecificationManagement
ConstructionManagement
Supply Chain Management
Engineering Material Control
Site Material Control
Piping
Cables
Structural
Cable Trays
Copyright © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Catalogue & SpecificationManagement
ConstructionManagement
Supply Chain Management
Engineering Material Control
Site Material Control
Ensuring consistency
across all systems
including ERP / Client
Allows rapid spec generation
for multiple design tools
Specifications
are under full revision control
OLD
Rev 1
A = A
A = A
A = A
30%
Rev 2
Copyright © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Catalogue & SpecificationManagement
ConstructionManagement
Supply Chain Management
Engineering Material Control
Site Material Control
Catalogue
Specifications
MTOs
Copyright © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Catalogue & SpecificationManagement
ConstructionManagement
Supply Chain Management
Engineering Material Control
Site Material Control
Buyers Queue
RFQEnquiry Requisition
Bid Analysis Award/Recommendation
Expediting
MMT
Warehouse 1
MMT MMT
Warehouse 2
Copyright © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Catalogue & SpecificationManagement
ConstructionManagement
Supply Chain Management
Engineering Material Control
Site Material Control
• Certification / Shelf Life
• QA / Non-Conformance• Mobility Solution
• Movement Internal/ External Project
ReceiptWork Order
/ IWP
• Job Card
• Material Requirement• Planned Construction
Requirement
• Material Availability
Issue Material
Copyright © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Catalogue & SpecificationManagement
ConstructionManagement
Supply Chain Management
Engineering Material Control
Site Material Control
Schedule
Man PowerMaterial
IsometricsDrawings
Vendor Manuals
3D
Copyright © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Catalogue & SpecificationManagement
ConstructionManagement
Supply Chain Management
Engineering Material Control
Site Material Control
Project Timeline
Detail Planing Timeline
Project Status
Project Performance
TIME
Thank you
NORTH AMERICA USER MEETING 2017
Do you want to explore how AVEVA ERM can help you manage your materials better? Click here to contact the team today!