AUGUST 26, 2019 THE COUNCIL ON …The Tokyo 2020 Olympic and Paralympic Games will be held in 2020....
Transcript of AUGUST 26, 2019 THE COUNCIL ON …The Tokyo 2020 Olympic and Paralympic Games will be held in 2020....
AUGUST 26, 2019
THE COUNCIL ON METROPOLITAN WATER RESOURCES MANAGEMENT
FOR TOKYO 2020 OLYMPIC AND PARALYMPIC GAMES
THE COUNCIL MEMBERSKANTO REGIONAL DEVELOPMENT BUREAU (MLIT), KANTO BUREAU OF ECONOMY, TRADE AND INDUSTRY (METI), KANTO REGIONAL AGRICULTURAL ADMINISTRATION OFFICE (MAFF), JAPAN
WATER AGENCY, TOKYO METROPOLIS, CHIBA PREFECTURE, SAITAMA PREFECTURE, IBARAKI
PREFECTURE, GUNMA PREFECTURE, TOCHIGI PREFECTURE
BACKGROUND AND OUTLINE OF THE ACTION PLAN
OUTLINE OF THE ACTION PLAN Regarding countermeasures to secure water resources, the effect is expected to increase by about 20% in the
flood season and the non-flood season to the maximum of the total water use capacity of dams of the Tone River.
Regarding countermeasures to ensure continuous water supply, each prefecture will provide publicity on water conservation, request cooperation for water conservation, and each prefecture will receive water from water supply companies nationwide when water outages occur.
The implementation status of the action plan will be confirmed, and this action plan will be reviewed as necessary. In addition, appropriate management of facilities such as dams will be implemented appropriately, and thorough countermeasures against terrorism will be implemented.
BACKGROUND
The Tokyo 2020 Olympic and Paralympic Games will be held in 2020. In the summer of 1964, just before the last Tokyo Olympic Games, the water supply was limited to a maximum of 50%, and water was cut off in the daytime.At present, in addition to the Tama River as a water resource of Tokyo, 2 river basins, the Tone River and the Arakawa River, are added, and Yamba Dam will be completed in 2020.The total water capacity of reservoirs in the metropolitan area is 4.5 times that of the time during the flood season, 1,245 million m3, and is 5.1 times that of the non-flood season, which was 1,691 million m3. However, due to the extreme heat and light rain in recent years, water shortages with restrictions on water intake had occurred in the Tone River and the Arakawa River, which are the main water resources in the Tokyo metropolitan area.
To promote more effective and systematic use of limited water resources and to ensure a stable supply of water even when there is a danger of water shortage, The Council on Metropolitan Water Resources Management for Tokyo 2020 Olympic and Paralympic Games was established, and the Metropolitan Water Resources Management Action Plan for Tokyo 2020 Olympic and Paralympic Games was formulated.
2
THE METROPOLITAN WATER RESOURCES MANAGEMENT ACTION PLAN
FOR TOKYO 2020 OLYMPIC AND PARALYMPIC GAMES
Countermeasures before
Olympic game
(Before June 2020)
Countermeasures to be taken if there is a risk of water shortage or water shortage occurs
(July 2020 - September 2020)
Phase Phase I Phase II Phase III Phase IV Phase V
Water Resources
Condition
Implementation /
preparation stage before
the Games
Water shortage is
foreseenWater shortage
Serious water
shortage
Very serious water
shortage
Water resourcesSecurityActions
Wide area cooperation
Tone River
&Arakawa
River
TamaRiver
Sagami River
TIMELINE OF WATER RESOURCES SECURITY ACTIONS
Operation of Yamba Dam started
Prepare for flexible dam management during flood season
Request for utilization of power generation capacity
for city water
(Yagisawa Dam)
Operational enhancement of downstream water transfer facilities of the Tone River
Operational enhancement of water utilization advanced facilities of the Arakawa River
Commissioning of artificial rainfall equipment
Operation of raw water in the Tama River using raw water connection pipe according to water shortage situation
Operation of artificial rainfall equipment according to water shortage conditions
Cooperation between the Sagami River water and the Sakawa River utilizing raw water connection pipe
Postponement of maintenance and repair work for dams with construction restriction water levels
Raw water operation to secure water storage
3
Olympic game July 22, 2020-August 9, 2020Paralympic game August 25,2020 – September 6, 2020
Change of drying time at WataraseReservoir
Postponement of maintenance and repair work for dams with construction restriction water levels
Postponement of maintenance and repair work for dams with construction restriction water levels
Flexible dam management during flood season
Prepare for flexible dam management during flood season
Flexible dam management during flood season
Information sharing and review / coordination of countermeasures in the framework of the council
THE METROPOLITAN WATER RESOURCES MANAGEMENT ACTION PLAN
FOR TOKYO 2020 OLYMPIC AND PARALYMPIC GAMES
Countermeasures before
Olympic game
(Before June 2020)
Countermeasures to be taken if there is a risk of water shortage or water shortage occurs
(July 2020 - September 2020)
Phase Phase I Phase II Phase III Phase IV Phase V
Water Resources
Condition
Implementation / preparation
stage before the GamesWater shortage is foreseen Water shortage Serious water shortage Very serious water shortage
Continuouswater supply securityActions
Wide area cooperation
Tokyo
Chiba
Saitama
Information sharing and review / coordination of countermeasures in the framework of the council
Observe dam water storage, collect and share information
Preparation and implementation of decompression water supply for tap water (* as necessary)
Establishment of water shortage prevention task force
Sharing information with the Japan Water Works Association / water supply support from water utilities across the country as needed (cooperation with the Japan Water Works Association)
Public relations about water saving
Request for water-saving cooperation
Request for water supply restriction to fountains, etc.
Request to stop fountains, etc.
Observe dam water storage, collect and share information
Establishment of water shortage prevention task force
Public relations about water saving
Request for water-saving cooperation
Preparation and implementation of decompression water supply for tap water (* as necessary)
Agricultural water use in rotation (* as necessary)
Observe dam water storage, collect and share information
Establishment of water shortage prevention task force
Public relations about water saving
Request for water-saving cooperation
Preparation and implementation of decompression water supply for tap water (* as necessary)
Agricultural water use in rotation (* as necessary)
Request for self-restraint or cancellation of fountains, etc.
TIMELINE OF CONTINUOUS WATER SUPPLY SECURITY ACTIONS (1/2)
Request for restriction or suspension of fountains, etc.
4
THE METROPOLITAN WATER RESOURCES MANAGEMENT ACTION PLAN
FOR TOKYO 2020 OLYMPIC AND PARALYMPIC GAMES
Countermeasures before
Olympic game
(Before June 2020)
Countermeasures to be taken if there is a risk of water shortage or water shortage occurs
(July 2020 - September 2020)
Phase Phase I Phase II Phase III Phase IV Phase V
Water Resources
Condition
Implementation / preparation stage
before the GamesWater shortage is foreseen Water shortage Serious water shortage Very serious water shortage
Continuouswater supply securityactions
Kanagawa
Ibaraki
Gunma
Tochigi
Observe dam water storage, collect and share information
Preparation and implementation of decompression water supply for tap water (* as necessary)
Establishment of water shortage prevention task force
Public relations about water saving
Request for water-saving cooperation
Observe dam water storage, collect and share information
Establishment of water shortage prevention task force
Public relations about water saving
Request for water-saving cooperation
Observe dam water storage, collect and share information
Establishment of water shortage prevention task force
Public relations about water saving
Request for water-saving cooperation
Request for restriction or suspension of fountains, etc.
Observe dam water storage, collect and share information
Preparation and implementation of decompression water supply for tap water (* as
necessary)
Establishment of water shortage prevention task force
Public relations about water saving
Agricultural water use in rotation (* as necessary)
Agricultural water use in rotation (* as necessary)
* The action plan of each prefecture summarizes the measures to be implemented according to the status of the water resources owned by each prefecture.* In addition, necessary measures are considered and implemented according to the water source and water intake status.
TIMELINE OF CONTINUOUS WATER SUPPLY SECURITY ACTIONS (2/2)
Request for water-saving cooperation
5
THE METROPOLITAN WATER RESOURCES MANAGEMENT ACTION PLAN
FOR TOKYO 2020 OLYMPIC AND PARALYMPIC GAMES
FLEXIBLE DAM MANAGEMENT DURING FLOOD SEASON For flood control dams, the flood control capacity is emptied in advance during the flood season. At the flood
season, flood control is carried out using this empty capacity. In flexible dam management, water is stored in a part of the flood control capacity, which is normally empty,
to the extent that flood control is not hindered. As a result, it can be used for preserving the river environment and replenishing the flow rate for maintaining the normal function of flowing water at the time of abnormal water shortage.
The additional water stored by this flexible dam management will be used for water supply.
WATER RESOURCES SECURITY ACTION (1)
Flexible dam operation
Flood seasonNon-flood season Non-flood season
Water use
capacity
▼Full water level
Flood season
control level
Flood control
capacity
Sediment storage capacity
Flexible operation
Water use capacity
Sediment storage capacity
Additional water use capacity
▼ Full water level
Flood season
control level
Flood control
capacity
6
Dam location map(as of August 26, 2019)
Kawamata damKawaji dam
Ikari dam
Kusaki dam
Sonohara dam
Shimokubo dam
Takizawa damArakawa reservoir
Miyagase dam
THE METROPOLITAN WATER RESOURCES MANAGEMENT ACTION PLAN
FOR TOKYO 2020 OLYMPIC AND PARALYMPIC GAMES
OPERATION OF YAMBA DAM STARTED Yamba Dam, currently under construction, is expected to be completed by the end of March 2020. After completion, the newly stored water can be utilized for 90 million m3 during the non-flood season
(October 6 to June 30) and 25 million m3 for the flooding season (July 1 to October 5).
WATER RESOURCES SECURITY ACTION (2)
7
Photos of Yamba damPhoto above taken on July 1, 2019
Photo below taken on June 27, 2019
Yamba dam storage capacity allocation
*Water use capacity is the capacity to store water used for domestic water, industrial
water, agricultural water, power generation, etc.
Flood seasonNon-flood season
Water use capacity
Sediment storage capacity
▼常時満水位
Flood season
control level
Flood control capacity
65,000,000m3 90,000,000m3
25,000,000m3
90,000,000m3
(Feb.1 – June 30) (July 1 – Oct.5) (Oct.6 – Dec.31)
Non-flood season
▼Full water level
THE METROPOLITAN WATER RESOURCES MANAGEMENT ACTION PLAN
FOR TOKYO 2020 OLYMPIC AND PARALYMPIC GAMES
OPERATIONAL ENHANCEMENT OF DOWNSTREAM WATER TRANSFER FACILITIES OF TONE RIVER Prior to the water supply from the dams upstream of the Tone River, the water transfer facilities downstream of the
Tone River, such as the Kita-Chiba water transfer channel, will be utilized. In this way, water collected at Lake Kasumigaura and the lower part of the Tone River will be supplied to the Edo River, thereby preserving the water storage capacity of the upstream dams
In 2020, by increasing the number of operating days and the amount of water supply, the supply from dams will be reduced and the amount of reservoir water will be preserved.
WATER RESOURCES SECURITY ACTION (3)
8
Without operation of Kita-Chiba water transfer channel
Reduction of water storage Secure water storage
Water level drops significantlyWater supply
Limit water supply
Small drop in water level
With operation of Kita-Chiba water transfer channel
Dams of upstream Dams of upstream
THE METROPOLITAN WATER RESOURCES MANAGEMENT ACTION PLAN
FOR TOKYO 2020 OLYMPIC AND PARALYMPIC GAMES
OPERATIONAL ENHANCEMENT OF WATER UTILIZATION ADVANCED FACILITY OF ARAKAWA RIVER
By using purified water from sewage treatment water as part of the maintenance flow of the Arakawa River, the amount of supply from dams will be reduced.
In 2020, by increasing the number of facility operation days, the supply from dams will be reduced and the amount of dam water stored will be secured.
WATER RESOURCES SECURITY ACTION (4)
9
Without operation of the water utilization
advanced facility
maintenance flow
5m3/s
Summer:3m3/sWinter:2m3/s
The river maintenance flow (5m3/s) that needs to be supplied from the dam is reduced to 2m3/s in summer and 3m3/s in winter
Summer:2m3/sWinter :3m3/s
Water intake Water intakeSupply as part of maintenance flow
* River maintenance flow is the flow required for animals and plants to live.
With operation of the water utilization advanced
facility
Reduction of water storage Secure water storage
Water supply Limit water supply
Water level drops significantly
Small drop in water level
Dam Dam
maintenance flow
5m3/sSewage treatment water
Purification facilityLake Saiko
(Arakawa reservoir)Lake Saiko(Arakawa reservoir)
THE METROPOLITAN WATER RESOURCES MANAGEMENT ACTION PLAN
FOR TOKYO 2020 OLYMPIC AND PARALYMPIC GAMES
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1/1 1/11 1/21 1/31 2/10 2/20 3/1 3/11 3/21 3/31 4/10 4/20 4/30 5/10 5/20 5/30 6/9 6/19 6/29
貯水位
(Y.P.m)
▼Maximum water level Y.P.+15.0m
▼Y.P.+8.5m (Minimum water level)
Water levelWater level in 2020
Secure water storage even when snow melting is early
Drying time
Winter of 2020
Dring time
CHANGE OF DRYING TIME AT WATARASE RESERVOIR At Watarase Reservoir, as a measure to preserve the quality of tap water, the water level has been lowered
since January, and the water level has been further lowered until March to dry the bottom of the lake. In 2020, water storage capacity will be secured by making the drying period earlier and extending the storage
period.
WATER RESOURCES SECURITY ACTION (5)
Watarase reservoir
[Purpose of drying]Water from Watarase Reservoir is used for water supply in the Tokyo metropolitan area.
The bottom of the lake is dried up to control the mold odor of tap water.
Securing water sources by changing the drying time (image)
| | | | | |
Storage time in 2020
Storage time
10
ull
wate
r level
wa
ter le
ve
l
In 2020, the drying
period will be accelerated and the
storage period will be
long.
Storage when the Tone River
flow condition is sufficient
Long storage period
to secure water usage capacity
Jan. Feb. March April May
THE METROPOLITAN WATER RESOURCES MANAGEMENT ACTION PLAN
FOR TOKYO 2020 OLYMPIC AND PARALYMPIC GAMES
POSTPONEMENT OF MAINTENANCE AND REPAIR WORK FOR DAMS WITH CONSTRUCTION RESTRICTION WATER LEVELS
For maintenance work on the dam facilities, the water level in the reservoir needs to be lowered. By postponing the construction scheduled to be implemented in 2020, the water level of the dam will not
lowered and the water usage capacity will be secured.
WATER RESOURCES SECURITY ACTION (6)
Full Water level:564.0m
Water level for maintenance work:540.0m
24.0m
Securing water resources by postponing works
Water level down due to works
Flood season control level
Flood season control level
Full water level
Full water level
When water storage recovery is small
Postponement of works
Postponement of works before the Olympic game
Winter season before the Olympic game
The Olympic year
Sonohara Dam Incline maintenance work will be carried out after the Tokyo 2020 Olympic and Paralympic Games
Water level for
maintenance
work
Sediment
Dambody
Full water level
The capacity not restored
Secure water storage capacity
11
Water storage capacity
:540.0m
24.0m
564.0m
Case of Sonohara dam
Water storage capacity
Winter season before the Olympic game
The Olympic year
THE METROPOLITAN WATER RESOURCES MANAGEMENT ACTION PLAN
FOR TOKYO 2020 OLYMPIC AND PARALYMPIC GAMES
REQUEST FOR UTILIZATION OF MUNICIPAL WATER FOR DEDICATED POWER GENERATION
CAPACITY OF DAM (YAGIZAWA DAM)
If there is a danger of severe damage caused by water shortage, TEPCO Holdings is requested to use the power generation capacity of the Yagisawa Dam for municipal water, and the water supply will be increased.
WATER RESOURCES SECURITY ACTION (7)
Yagisawa dam storage capacity allocation矢木沢ダム
出典︓水資源機構
12
Water use capacity
Sand storage capacity
Power generation capacity
Source: Japan Water Agency (JWA)
Photos of Yagisawa dam
Full water level
Crest
L.L.W.L.
L.L.W.L. for water use
Bedrock
Water intake
Hollow Jet Valve
Full water level in flooding
THE METROPOLITAN WATER RESOURCES MANAGEMENT ACTION PLAN
FOR TOKYO 2020 OLYMPIC AND PARALYMPIC GAMES
For River maintenance flow, Irrigation water, municipal water, power generation water
WATER SUPPLY FROM MULTIPLE RIVER BASINS (UTILIZATION OF RAW WATER TANSFER PIPES)
WATER RESOURCES SECURITY ACTION (8)
Raw water transfer pipes that can interchange the raw water of the Tone River/the Arakawa River /the TamaRiver will be utilized, and the raw water of the TamaRiver will be operated according to the water shortage situation.
Utilizing raw water conduits that can accommodate raw water from the Sagami River and the Sakawa River, a stable supply of water is ensured.
Utilization of raw water transfer pipe that can accommodate raw water from the Sagami River
and the Sakawa RiverUtilization of raw water transfer pipe due to water
shortage in the Tone River
利根川水系の対応
多摩川水系の対応 秋ヶ瀬取水堰
朝霞浄水場
東村山浄水場
村山貯水池(上下)
山口貯水池
小河内貯水池
(奥多摩湖)
利根大堰
武蔵水路
小作取水堰
羽村取水堰
原水連絡管
津久井導水路
道志導水路
原水導水管
原水導水管(至川崎市)
(酒匂川→相模川)
13
From Tone Riverto Tama River
Ogouchi Dam(Lake Okutama)
Hamuraintake weir
Ozakuintake weir
Yamaguchi reservoir
Murayamareservoirs
Higashi-Murayamawater purification plant
Asaka
water purificationplant
Water transfer pipe
Tone large weir
Source: Tokyo Metropolitan Waterworks Bureau
Musashi Water
Conveyance Channel
Sagami dam
Shiroyama damDoushi dam Lake Sagami
Lake TsukuiLake Oku-Sagami
Miyagase dam
Lake Miyagase
Doushiwater transfer pipe
Tsukuiwater transfer pipe
Water transfer pipe(from Sakawa River to Sagami River)
Lake Tanzawa
Miho Dam
Sagami large weir
Sagami bay
Samukawa intake weir
Iizumi intake weir
Sakawa River Basin
Sagami River Basin
武蔵水路
Akigaseintake weir
羽村取水堰
小作取水堰
小河内貯水地(奥多摩湖)
From Tama Riverto Tone River
利根川水系の対応
多摩川水系の対応
秋ヶ瀬取水堰
利根大堰
朝霞浄水場
村山浄水場
THE METROPOLITAN WATER RESOURCES MANAGEMENT ACTION PLAN
FOR TOKYO 2020 OLYMPIC AND PARALYMPIC GAMES
Source: Kanagawa Prefecture
• Consists of water utilities across the country
• ・ Regional Chapters, 46 Prefectural Chapters, 5 Hokkaido Regional Council
• Regional branch offices of MLIT, METI and MAFF
• Tokyo• Chiba• Saitama• Kanagawa• Ibaraki• Gunma• Tochigi• JWA
JWWA support for the Great East Japan Earthquake
Water supply support from water
utilities across the countryPublic relations about water saving
• Installation of water-saving banners at the government buildings• Awareness of water saving through digital signage• Awareness of water saving in advertising media (web, poster
postings, public relations magazines, radio, SNS, etc.)
• Share information with the Japan Water Works Association (JWWA) when there is a risk of severe water shortage.
• In case of water outage, water supply support will be provided based on the JWWA mutual support scheme.
写真3 2016(H28)年渇水でのSNSによる節水啓発
JWWAThe council members
Photo 1Emergency water supply at an evacuation center the Great East Japan Earthquake(Support by Tokyo Metropolitan Waterworks Bureau in
Sendai city)
Request for restriction or suspension
of fountains, etc.
Depending on the water shortage situation, restriction and suspension of water supply to the park fountains and other facilities using water are requested.
CONTINUOUS WATER SUPPLY SECURITY ACTIONS
Damage Support by JWWA
the Great East Japan EarthquakeMarch 11, 20111M9.0
1.Water outage2.57million houses(19 prefectures)2.Pipeline damage6,684 water transfer pipes6,957 water supply pipes
Emergency water supply / restoration: 562 entitiesTotal number of water trucks: about 13,800Total number of supporters: about 41,400Activity period: 152 days
14
Cooperation
Source: JWWA
Source: Tokyo Metropolitan Waterworks Bureau
Photo 4 The situation of the fountain suspension at
Hibiya Park during the 1994 water shortage
Source: Brochure of "1994 water shortage in Tokyo
metropolitan area"
Photo3 Awareness of water saving
through SNS (2016)
THE METROPOLITAN WATER RESOURCES MANAGEMENT ACTION PLAN