Audit Sheet Step1

download Audit Sheet Step1

of 2

Transcript of Audit Sheet Step1

  • 7/27/2019 Audit Sheet Step1

    1/2

    TOP MANAGEMEN

    0.2 0.4 0.6 0.8 1a)

    5

    b)

    5

    a)

    10

    b)

    10

    a)

    5

    b)

    5

    1

    CLEANING OF

    EQUIPMENT

    MAIN BODY

    Segregation and Placing of

    Input & Good/Scrap/RW

    materials on fixed locations,

    Passage around the m/c,

    Demarkation of Walking &

    3

    DESCRIPTION

    FULLMARKS

    SCORE

    REMARKBAD POOR FAIR GOODEXCELL

    ENT

    AUDIT DATE:

    QUALIFYING SCORE 90 85

    AUDIT BY: SELF AUDIT [LEADER/OFFICER] DEPARTMENT HEAD

    MARKS SCORED

    ITEM

    PASS (YES/ NO)

    JISHU HOZEN AUDIT SHEETSTEP 1: INITIAL CLEANING

    DEPARTMENT: AREA:

    2

    CIRCLE NAME: CIRCLE LEADER:

    80

    There should not be Dust, Oil,

    Coolant, Debris & Mist on non

    operating zone, M/c Guards,

    Piping & Cabling including the

    Hidden areas

    All Abnormalities (Leaks,Splashing, Loose, Damage, Broken,

    Missing, Vibration, Over heated etc.)

    must be identified and Taged(White/ Red)

    S SCORE

    CLEANING OF

    EQUIPMENT

    SUB-ASSEMBLY

    (Pneumatic,

    Hydraulic,

    Electrical &

    Lubrication

    Areas)

    There should not be Dust, Oil,

    Coolant, Debris & Mist on Sub -

    Assemblies (Proximities, Motors,Spindles, Wires,Valves, Gauges,

    Pipes, Hoses, Panel Box, Stirrer etc)

    All Abnormalities (Leaks,Splashing, Loose, Damage, Broken,

    Missing, Vibration, Over heated etc.)

    in each parts must be identified

    and Taged (White/ Red)

    CLEANING OF

    ACCESSORIES

    & AROUND

    THE

    EQUIPMENT

    There should not be Dust, Oil,

    Coolant, Debris & Mist on

    Accessories (Inspection Table, Hand

    tools, Measuring Instruments &Gauges, Boards, Conveyors, Crane

    etc) and around the m/c and no

    unwanted materials to be kept

  • 7/27/2019 Audit Sheet Step1

    2/2

    0.2 0.4 0.6 0.8 1a)

    4

    b)3

    c) 2

    d) 2

    e) 4

    f)3

    g) 2

    a) 10

    b) 10

    b) 20

    ITEM NO 2 TOTAL

    FULL

    MARKS20 100

    SCORE

    BAD EXCELLEN

    0.2 1

    Shopfloor

    Hardly

    anything

    done

    Satisfactory

    progress and

    countermeas

    taken

    Personnel

    All members

    are not

    showinginterest

    All members

    responsibilit

    clearly defin& strictly

    followed

    ADDITIONAL COMMENTS / SUGGESTIONS:

    Action Plan to remove the Tags

    Cleaning Schedule

    Action Plan for deficult for Easy

    to CLRI

    DISPLAY OF

    INFORMATION,

    ANALYSIS AND

    ACTION PLANS

    4

    Abnormality List with Location,

    7 Types, 5 Humen error &

    Relation to the Cause & Effect

    5

    40

    Do all of them Know how to do

    the activity?

    Before Photographs

    Location wise Tag Matrix

    Relation between Types of

    Abnormality with Humen error

    Do all of them understand the

    motive of the Jishu Hozen?

    5

    AWARENESS

    AND

    INVOLVEMENT

    OF

    OPERATORS/TPM CIRCLE

    MEMBERS IN

    THE ACTIVITY

    & KNOWLEDGE

    OF THE

    MOTIVE &

    THEIRROLE

    Are all of them participating in

    the activity?

    4

    10 10 20

    POOR FAIR GOOD

    EVALUATION

    LEVEL

    MARKS =>

    ITEM

    1 to 4

    5

    Only Leader is

    doing

    Members are

    doing the

    easiest portionsonly

    0.4

    Most of the jobs

    are performed

    by members

    SCORE

    SHEET

    0.6 0.8

    Visible/ Major

    points only

    Areas

    Maintained well

    Most of the

    points are

    maintained well

    1 3

    HOW TO EVALUATE

    ITEM DESCRIPTION

    FULLMAR

    REMARKBAD POOR FAIR GOODEXCELL

    ENT