Chapter19 - Comprehensive Audit of Balance Sheet and Income Statement Accounts
Audit Sheet 1s
-
Upload
suman94103 -
Category
Documents
-
view
214 -
download
0
Transcript of Audit Sheet 1s
-
7/27/2019 Audit Sheet 1s
1/6
TOP MA
0.2 0.4 0.6 0.8 1
10
FULLMARKS
10
DEPARTMENT HEAD
85
b)
I) No unnecessary things kept/
thrown/ left on the machines
(Dust, used wheels etc.)
II) No obsolete & dirty papers on
Display Boards
c)
5
5
3
Sorting/ Segregation of material is
done and only necessary materials
are kept there (i.e. Good, Rework
& Scrap materials are keptseparately, No chance of mixup,
Only one/ running symbol material
is kept there).
Sorting/
Segregation
and removal of
unnecessarythings
10
10
a) 10
No 'unneccessary' things (means
not required or required at very
less frequency*in that area) are
kept/ thrown in that area (i.e.
everything is sorted out on need
base and then kept there on the
stand)
Walking &working area
segregation10
1
No materials (Good, Rework &
Scrap), accessories, spares, tools
& fixtures, trays, prong standsare
kept/ thrown directly on floor.
b)
Nothing on
floor2
b)
a)
No oil, coolant, chips, cotton
waste, tag, components, wheels,
trash, muck are kept/ thrown/
leakage directly on floor.
TPM Circle's working and
walking areas are clearly defined.No overlapping is there.
a)
PASS (YES/ NO)AUDITOR'S NAME &
SIGNATURE
FAIR GOOD
Nothing is kept/ thrown in walking
area
ITEM DESCRIPTION
AUDIT BY:
QUALIFYING SCORE
SELF AUDIT [LEADER/OFFICER]
90
AUDIT DATE:
MARKS SCORED
JISHU HOZEN AUDIT SHEET'1 S' SEIRI: SORTING / SEGREGATION & REMOVAL
DEPARTMENT: AREA: CIRCLE NAME: CIRCLE LEA
SCOREEXCELL
ENTBAD POOR
-
7/27/2019 Audit Sheet 1s
2/6
0.2 0.4 0.6 0.8 1
ITEM
NO2 3
FULL
MARKS20 30
HOW TO EVALUATEBAD
0.2
Shopfloor
Hardly
anything
done
Circle
All members
are not
showing
interest
ADDITIONAL COMMENTS / SUGGESTIONS:
10
10
10
4
The concept of 2S is understood &
action Plan for Fixed location, one
touch pickup & mistake proofing
and demarcation of different areas,
is made.
10
5
4
Is the concept of 1S well
understood by the members and
responsibility defined
a)
a)
Concept &
Action Plan
for 1S
ITEM DESCRIPTION BAD POOR FAIR GOODEXCELL
ENT
FULLMARKS SCORE
Circle
members
involvement
5
SCORE
SHEET
1
20
EVALUATION
LEVEL
b) Are all the circle members
involved and participating in the
activity in their area.
20
CIRCLE
SCORE
POOR
0.4
0.6
Areas
Maintained
well
Most of the
points are
maintainedwell
FAIR GOODMARKS =>
ITEM 1
TO 4
ITEM
5
0.8
Members
are doing
the easiest
portions
only
Most of the
jobs are
performed by
members
Visible/
Major
points only
Only
Leader is
doing
-
7/27/2019 Audit Sheet 1s
3/6
NAGEMENT
DER:
80
REMARKS
-
7/27/2019 Audit Sheet 1s
4/6
TOTAL
100
EXCELLENT
1
Satisfactory
progress and
countermeasure taken
All members
responsibilit
y is clearly
defined &
strictly
followed
REMARKS
-
7/27/2019 Audit Sheet 1s
5/6
Step 5 Diagnosis Sheet 7 2 9 - 12
Subsection Section TPM Autonomous Maintenance Step 5 Diagnosis date: __/__/
Department Autonomous Inspection Diagnosis Sheet Diagnosed by __/10
Target equipment:
Diagnosis points Evaluation points
(c)Are proper accuracy checks
of equipment and tools forchecking processes being
carried out?
4
Well defined
3
Defined
2
Passably
1
Not defined
(Comments) /12
Diagnosis points Evaluation pointsAre inspections being carried out
in accordance with inspection
standards, and are records being
kept?
4
Thorough inspection
and record keeping
3
Inspections and record
keeping are being
performed for the most
part
2
Could do better
1
No record
keeping
Implementation
status of
inspections
Are improvements being made
for problem points identified as a
result of inspections?
4
Thoroughlyimproved
3
Improved for the
most part
2
Could do better
1
No im-provement
-
7/27/2019 Audit Sheet 1s
6/6
Are areas of deterioration being
reliably identified and handled as
a result of inspection cleaning?
4
Reliably
identified
3Identified for the
most part
2
Could do better
1
Not yet started
(Comments) /12
Diagnosis points Evaluation points
Skill of
inspection
To devise means for raising the
level of inspection skills,(a)Are the weak points of
inspection skills understood?
4
Well understood
3
Understood for
the most part
2
Understood
vaguely
1
Not understood
(b)Are there plans for that
training and education?
4
Plans are clear
3
Drafting of plans
in progress
2
Drafting of plans
scheduled
1
Not yet started
(Comments) /8Diagnosis points Evaluation points
Are the number of meetings, time and level
of participation in TPM group activities
satisfactory?
4
Satisfactory
3
Normal