ACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE LICENCE (BACKGROUND) Mayo County Council, Aras an Chontae, Castlebar, Co. Mayo is making an application to the Environmental Protection Agency (E.P.A.) for a waste water discharge license for the Achill Waste Water Treatment Plant at Purteen and Agglomeration in compliance with the Waste Water Discharge (Authorisation) Regulations 2007 (S.I. No. 684 of 2007) Under Schedule 2 of the above regulations, the prescribed date for submissions of Waste Water Discharge License Applications for agglomerations (with discharges with a population equivalent of 2,001 PE to 10,000 PE) is 22 nd September, 2008. The waste water works at Purteen, Achill Island falls under this category, presently having an agglomeration with a population equivalent of approximately 2,500 PE. The original scheme was built in 1991. 2. DESCRIPTION OF PURTEEN, ACHILL ISLAND WASTE WATER WORKS. The Purteen Waste Water Treatment Plant with a capacity of 4,000 PE is currently being operated by Mayo County Council. Treated effluent from the Plant is discharged to the Atlantic Ocean (Primary Discharge Point.) The waste water works in Purteen, Achill Island consists of a Wastewater Treatment Plant with a collection network of Foul Sewers and 4 No. Pumping Stations. The municipal treatment works is based on the extended aeration process and is designed to treat sewage from a population equivalent of 4000 PE. The Municipal Treatment Process consists of the following: Inlet works with 12mm automatic screen, standby manual screen, screenings flushed to macerator, compaction and grit removal. 2 No. Aeration Tanks 2 No. Secondary Settling Tanks Final Effluent Sampling Point Sludge Pumping Sludge Thickening Sludge Dewatering Supernatent return to inlet works. Of the 4 No. Pumping Stations, 2 pump directly to the Treatment works, with the remaining 2 located as topography dictates around the catchments. 3. SOURCES OF EMISSIONS: Emissions from the Treatment works are discharged to the Atlantic Ocean (through an outfall labelled SW1). This is the primary discharge point.

Transcript of Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS ›...

Page 1: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

ACHILL WASTE WATER TREATMENT SCHEME

Non Technical Summary.

1. WASTE WATER DISCHARGE LICENCE (BACKGROUND) Mayo County Council, Aras an Chontae, Castlebar, Co. Mayo is making an application to the Environmental Protection Agency (E.P.A.) for a waste water discharge license for the Achill Waste Water Treatment Plant at Purteen and Agglomeration in compliance with the Waste Water Discharge (Authorisation) Regulations 2007 (S.I. No. 684 of 2007) Under Schedule 2 of the above regulations, the prescribed date for submissions of Waste Water Discharge License Applications for agglomerations (with discharges with a population equivalent of 2,001 PE to 10,000 PE) is 22nd September, 2008. The waste water works at Purteen, Achill Island falls under this category, presently having an agglomeration with a population equivalent of approximately 2,500 PE. The original scheme was built in 1991.

2. DESCRIPTION OF PURTEEN, ACHILL ISLAND WASTE WATER WORKS. The Purteen Waste Water Treatment Plant with a capacity of 4,000 PE is currently being operated by Mayo County Council. Treated effluent from the Plant is discharged to the Atlantic Ocean (Primary Discharge Point.) The waste water works in Purteen, Achill Island consists of a Wastewater Treatment Plant with a collection network of Foul Sewers and 4 No. Pumping Stations. The municipal treatment works is based on the extended aeration process and is designed to treat sewage from a population equivalent of 4000 PE. The Municipal Treatment Process consists of the following:

Inlet works with 12mm automatic screen, standby manual screen, screenings flushed to macerator, compaction and grit removal.

2 No. Aeration Tanks 2 No. Secondary Settling Tanks Final Effluent Sampling Point Sludge Pumping Sludge Thickening Sludge Dewatering Supernatent return to inlet works.

Of the 4 No. Pumping Stations, 2 pump directly to the Treatment works, with the remaining 2 located as topography dictates around the catchments.

3. SOURCES OF EMISSIONS: Emissions from the Treatment works are discharged to the Atlantic Ocean (through an outfall labelled SW1). This is the primary discharge point.

Page 2: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

There are 3 No. secondary discharge points (labelled SW2, SW3 and SW4). These are emergency overflows at the Pump Houses located at PS4, PS2 and PS3 respectively. These emergency overflows are provided in case of difficulties, such as power cuts at the pumping plant and excessive rainfall. To protect Keel Strand there is no storm-water overflow at the Keel Pumping Station. There is, however, a Balancing Tank and a standby Generator. To protect Dooagh Strand the total pumping capacity at the main Dooagh Pumping Station is 12 times D.W.F.

4. NATURE AND QUANTITY OF FORESEEABLE EMISSIONS: The Wastewater Treatment Works is designed to produce a final effluent that is at least to ‘Royal Commission’ standards. That is a maximum BoD of 20mg/l and maximum suspended solids of 30mg/l. The average volume currently discharged from the municipal effluent stream of the Treatment Plant is 562.5 cu.m/day (2,500 PE @ 225l/per PE day). This is equivalent to an average daily discharge of 162 kg BoD. It is not anticipated that the municipal effluent will increase appreciably in the meantime.

5. TECHNOLOGY FOR PREVENTION OR REDUCTION OF EMISSIONS: Emissions from the Wastewater Treatment Plant are monitored and the treatment process is constantly adjusted to maximise the efficiency of the plant in removing pollutants.

6. SUPERVISION OF WORKS: The wastewater treatment works is staff by a plant manager and an assistant. The Plant Manager’s hours are 39 hours for a 7 day week plus any necessary overtime and call outs. Cover for the Plant Manager is provided every 4th weekend and holidays.

Page 3: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

Tobercolman

Rises

Slievemore

Rises

Rises

Ooghnadirka

Rises

Ooghnagertleen

Ooghnabo

(Disused)

Quarry

Uggoole

Gubnahooeycam

Ooghduff

(in Ruins)

Signal Tower

Uggoolegarve

Feagher Point

Cornaclea Point

Rises

Lough Nakeeroge

SandShingle

DOOGORT WEST

Lough Aigher

Slivevemore

(Calvy)

BAL OF DOOKINELLY

Slievemore Caher

Giant's Grabe

Cromlerh

Danish Ditch

Cromuch Cumulus

Grave Yard

Ground

Cross(Site of)

Burial

Gubroe

School

Crumpaun

SLIEVEMORE

Tenr

egee

Rive

r

Portnalvinga

Gubalennaun beg

QuayPier

Reservoir

ShingleSand

Pollagh

Church

(Site of)Cemetrey

BELLANASALLY

Ballaknock

School

River

Sruhillbeg Lough

Sand Hills

Pagan

Cabin

Trawmore

Sand &Shingle

Sand Hills

Sand Hills

Sand Hills

Midens

Sand

(Site of)

Sand Hills

Keel Lough

KEEL EAST

DOOKINELLY

(Thulis)

Dookinelly

Sand

ShingleSand &

Gallaghers River

Sand &Shingle

SLIEVEMORE

ATLANTIC OCEAN

Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192

Mayo County Council G.I.S. Section

Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2008/10 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2008.

LEGEND

Agglomeration Boundary

Achill WastewaterTreatment Plant Boundary

Drg. Title:

Achill Wastewater Treatment PlantAgglomeration Served by the Wastewater Treatment Works

Project:

Waste Water Discharge Licence Application

Scale: Date:

Drg. Nr: Rev:

Drawn By: Checked By: Approved By:

1: 22,000 (Inset 1: 50,000) 29.08.08

Map B.1. A

L. Collier S. Verity T. Reidy

Achill WastewaterAchill WastewaterAchill WastewaterAchill WastewaterAchill WastewaterAchill WastewaterAchill WastewaterAchill WastewaterAchill WastewaterTreatment PlantTreatment PlantTreatment PlantTreatment PlantTreatment PlantTreatment PlantTreatment PlantTreatment PlantTreatment Plant

Page 4: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

Reservoir

HWM

HWM

CF

UN

D

!!

Sludge Drying BedsSludge Drying BedsSludge Drying BedsSludge Drying BedsSludge Drying BedsSludge Drying BedsSludge Drying BedsSludge Drying BedsSludge Drying Beds

Sludge Dewatering BuildingSludge Dewatering BuildingSludge Dewatering BuildingSludge Dewatering BuildingSludge Dewatering BuildingSludge Dewatering BuildingSludge Dewatering BuildingSludge Dewatering BuildingSludge Dewatering Building

Sludge Holding TankSludge Holding TankSludge Holding TankSludge Holding TankSludge Holding TankSludge Holding TankSludge Holding TankSludge Holding TankSludge Holding Tank

Control BuildingControl BuildingControl BuildingControl BuildingControl BuildingControl BuildingControl BuildingControl BuildingControl Building

Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2

Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1

Sludge PumpSludge PumpSludge PumpSludge PumpSludge PumpSludge PumpSludge PumpSludge PumpSludge Pump

Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1

Inlet WorksInlet WorksInlet WorksInlet WorksInlet WorksInlet WorksInlet WorksInlet WorksInlet Works

Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2

SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW5SW5SW5SW5SW5SW5SW5SW5SW5

SP1SP1SP1SP1SP1SP1SP1SP1SP1

SP2SP2SP2SP2SP2SP2SP2SP2SP2

Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192

Mayo County Council G.I.S. Section

Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2008/10 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2008.

!!!

LEGEND

Inlet Sampling PointOutlet Sampling Point

Primary Discharge PointSecondary Discharge PointStormwater Discharge Point

Pumping Station

Achill WastewaterTreatment Plant Boundary

Drg. Title:

Achill Wastewater Treatment PlantLayout Plan

Project:

Waste Water Discharge Licence Application

Scale: Date:

Drg. Nr: Rev:

Drawn By: Checked By: Approved By:

1: 1,000 (Inset 1: 50,000) 01/09/08

Map B.2. A

L. Collier S. Verity T. Reidy

!

!!

!

!

PS4PS4PS4PS4PS4PS4PS4PS4PS4

PS3PS3PS3PS3PS3PS3PS3PS3PS3 PS2PS2PS2PS2PS2PS2PS2PS2PS2PS1PS1PS1PS1PS1PS1PS1PS1PS1

SP2SP2SP2SP2SP2SP2SP2SP2SP2 SP1SP1SP1SP1SP1SP1SP1SP1SP1

SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW5SW5SW5SW5SW5SW5SW5SW5SW5

SW2SW2SW2SW2SW2SW2SW2SW2SW2SW4SW4SW4SW4SW4SW4SW4SW4SW4 SW3SW3SW3SW3SW3SW3SW3SW3SW3

(3Nr)(1Nr)

(1Nr)(1Nr)

(4Nr)

(1Nr)

ATLANTIC OCEANATLANTIC OCEANATLANTIC OCEANATLANTIC OCEANATLANTIC OCEANATLANTIC OCEANATLANTIC OCEANATLANTIC OCEANATLANTIC OCEAN

Note: There are no upstreamor downstream monitoring points at Achill WWTP.

Page 5: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

BELLANASALLY

KEEL EAST

SLIEVEMORE

ATLANTIC OCEAN

!

!!

!

!

PS4PS4PS4PS4PS4PS4PS4PS4PS4

PS3PS3PS3PS3PS3PS3PS3PS3PS3PS1PS1PS1PS1PS1PS1PS1PS1PS1 PS2PS2PS2PS2PS2PS2PS2PS2PS2

SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW5SW5SW5SW5SW5SW5SW5SW5SW5

SW3SW3SW3SW3SW3SW3SW3SW3SW3SW4SW4SW4SW4SW4SW4SW4SW4SW4

SW2SW2SW2SW2SW2SW2SW2SW2SW2

SP2SP2SP2SP2SP2SP2SP2SP2SP2 SP1SP1SP1SP1SP1SP1SP1SP1SP1

Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192

Mayo County Council G.I.S. Section

Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2008/10 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2008.

!!!

LEGEND

Inlet Sampling Point (1Nr)Outlet Sampling Point (1Nr)

Primary Discharge Point (1Nr)Secondary Discharge Point (3Nr)Stormwater Discharge Point (1Nr)

Agglomeration Boundary

Achill WastewaterTreatment Plant Boundary

Pumping Station (4Nr)

Drg. Title:

Achill Wastewater Treatment PlantLocation of Primary Discharge Point (SW1)

Project:

Waste Water Discharge Licence Application

Scale: Date:

Drg. Nr: Rev:

Drawn By: Checked By: Approved By:

Overview 1:22,000Zoom-in 1:1,000 01/09/08

Map B.3. A

L. Collier S. Verity T. Reidy

Reservoir

HWM

HWM

UN

D

!!

Inlet WorksInlet WorksInlet WorksInlet WorksInlet WorksInlet WorksInlet WorksInlet WorksInlet WorksFinal Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1

Sludge PumpSludge PumpSludge PumpSludge PumpSludge PumpSludge PumpSludge PumpSludge PumpSludge Pump

Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2

Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2

Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1

SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)

SP2SP2SP2SP2SP2SP2SP2SP2SP2

SP1SP1SP1SP1SP1SP1SP1SP1SP1

Note: There are no upstream or downstreammonitoring points at Achill WWTP.

ATLANTIC OCEANATLANTIC OCEANATLANTIC OCEANATLANTIC OCEANATLANTIC OCEANATLANTIC OCEANATLANTIC OCEANATLANTIC OCEANATLANTIC OCEAN

Page 6: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

Gubroe

Mill Stream

School

Crumpaun

SLIEVEMORE

Tenr

egee

Rive

r

Church

(Site of)Cemetrey

BELLANASALLY

Ballaknock

School

River

Sruhillbeg Lough

Sand Hills

Pagan

Cabin

Trawmore

Sand &Shingle

Sand Hills

Sand Hills

Sand Hills

Midens

Sand

(Site of)

Sand Hills

Keel Lough

KEEL EAST

Waterfall

Holy Well

DOOKINELLY

(Thulis)

(Site of)

Cathedral Rocks

Sand &

Carrickwilliam

Shingle

Dookinelly

Sand

ShingleSand &

Gallaghers River

Sand &Shingle

SLIEVEMORE

ATLANTIC OCEAN

Portnalvinga

Gubalennaun beg

Inishgallon

QuayPier

Reservoir

ShingleSand

Pollagh

Gubalennaun More

!

!!

!

!

PS2PS2PS2PS2PS2PS2PS2PS2PS2PS3PS3PS3PS3PS3PS3PS3PS3PS3

PS4PS4PS4PS4PS4PS4PS4PS4PS4

PS1PS1PS1PS1PS1PS1PS1PS1PS1

SW3SW3SW3SW3SW3SW3SW3SW3SW3

SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW5SW5SW5SW5SW5SW5SW5SW5SW5

SW4SW4SW4SW4SW4SW4SW4SW4SW4

SW2SW2SW2SW2SW2SW2SW2SW2SW2

Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192

Mayo County Council G.I.S. Section

Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2008/10 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2008.

!!!

LEGEND

Inlet Sampling PointOutlet Sampling Point

Primary Discharge PointSecondary Discharge PointStormwater Discharge Point

Agglomeration Boundary

Pumping Station

Achill WastewaterTreatment Plant

Drg. Title:

Achill Wastewater Treatment PlantLocation of Secondary Discharge PointsKEY PLAN

Project:

Waste Water Discharge Licence Application

Scale: Date:

Drg. Nr: Rev:

Drawn By: Checked By: Approved By:

1:22,000 01/09/08

Map B.4.1 A

L. Collier S. Verity T. Reidy

(1Nr)

(4Nr)

(1Nr)(3Nr)

(1Nr)(1Nr)

Map B4.3Map B4.3Map B4.3Map B4.3Map B4.3Map B4.3Map B4.3Map B4.3Map B4.3

Map B4.4Map B4.4Map B4.4Map B4.4Map B4.4Map B4.4Map B4.4Map B4.4Map B4.4

Map B4.2Map B4.2Map B4.2Map B4.2Map B4.2Map B4.2Map B4.2Map B4.2Map B4.2

Note: There are no upstream or downstreammonitoring points at Achill WWTP

Page 7: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

HWM

5.9

6.7

!

PS4PS4PS4PS4PS4PS4PS4PS4PS4

SW2SW2SW2SW2SW2SW2SW2SW2SW2

Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192

Mayo County Council G.I.S. Section

Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2008/10 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2008.

Drg. Title:

Achill Wastewater Treatment PlantLocation of Secondary Discharge Point SW2(Dooagh No.2 Pump Station)

Project:

Waste Water Discharge Licence Application

Scale: Date:

Drg. Nr: Rev:

Drawn By: Checked By: Approved By:

1: 1,000 19/08/08

Map B4.2 A

L. Collier S. Verity T. Reidy

!!!

LEGEND

Inlet Sampling PointOutlet Sampling Point

Primary Discharge PointSecondary Discharge PointStormwater Discharge Point

Agglomeration Boundary

Pumping Station

Achill WastewaterTreatment Plant

(1Nr)

(4Nr)

(1Nr)(3Nr)

(1Nr)(1Nr)

Note: There are no upstream or downstreammonitoring points at Achill WWTP

Atlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic Ocean

Mill StreamMill StreamMill StreamMill StreamMill StreamMill StreamMill StreamMill StreamMill Stream

Page 8: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

School

FF

UND

!

PS2PS2PS2PS2PS2PS2PS2PS2PS2

SW3SW3SW3SW3SW3SW3SW3SW3SW3

Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192

Mayo County Council G.I.S. Section

Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2008/10 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2008.

Drg. Title:

Achill Wastewater Treatment PlantLocation of Secondary Discharge Point SW3(Dookinelly Pump Station)

Project:

Waste Water Discharge Licence Application

Scale: Date:

Drg. Nr: Rev:

Drawn By: Checked By: Approved By:

1: 1,000 01/09/08

Map B4.3 A

L. Collier S. Verity T. Reidy

!!!

LEGEND

Inlet Sampling PointOutlet Sampling Point

Primary Discharge PointSecondary Discharge PointStormwater Discharge Point

Agglomeration Boundary

Pumping Station

Achill WastewaterTreatment Plant

(1Nr)

(4Nr)

(1Nr)(3Nr)

(1Nr)(1Nr)

Note: There are no upstream or downstreammonitoring points at Achill WWTP

Gallaghers River

Gallaghers River

Gallaghers River

Gallaghers River

Gallaghers River

Gallaghers River

Gallaghers River

Gallaghers River

Gallaghers River

Page 9: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

9.4

10.8

11.69.2

PO

8.7

6.9

S a n d

8.1

11.8

7.3

8.7

Dooagh

11.8

10.4

10.1

!

PS3PS3PS3PS3PS3PS3PS3PS3PS3

SW4SW4SW4SW4SW4SW4SW4SW4SW4

Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192

Mayo County Council G.I.S. Section

Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2008/10 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2008.

Drg. Title:

Achill Wastewater Treatment PlantLocation of Secondary Discharge Point SW4(Dooagh No.1 Pump Station)

Project:

Waste Water Discharge Licence Application

Scale: Date:

Drg. Nr: Rev:

Drawn By: Checked By: Approved By:

1: 1,000 01/09/08

Map B4.4 A

L. Collier S. Verity T. Reidy

!!!

LEGEND

Inlet Sampling PointOutlet Sampling Point

Primary Discharge PointSecondary Discharge PointStormwater Discharge Point

Agglomeration Boundary

Pumping Station

Achill WastewaterTreatment Plant

(1Nr)

(4Nr)

(1Nr)(3Nr)

(1Nr)(1Nr)

Note: There are no upstream or downstreammonitoring points at Achill WWTP

Tenregee River

Tenregee River

Tenregee River

Tenregee River

Tenregee River

Tenregee River

Tenregee River

Tenregee River

Tenregee River

Atlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic Ocean

Page 10: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

(Calvy)

DOOKINELLY

BELLANASALLYKEEL EAST

SLIEVEMORE

ATLANTIC OCEAN

!

!!

!

!

PS2PS2PS2PS2PS2PS2PS2PS2PS2PS3PS3PS3PS3PS3PS3PS3PS3PS3

PS4PS4PS4PS4PS4PS4PS4PS4PS4

PS1PS1PS1PS1PS1PS1PS1PS1PS1

SP2SP2SP2SP2SP2SP2SP2SP2SP2 SP1SP1SP1SP1SP1SP1SP1SP1SP1

SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW5SW5SW5SW5SW5SW5SW5SW5SW5

SW3SW3SW3SW3SW3SW3SW3SW3SW3SW4SW4SW4SW4SW4SW4SW4SW4SW4

SW2SW2SW2SW2SW2SW2SW2SW2SW2

Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192

Mayo County Council G.I.S. Section

Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2008/10 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2008.

!!!

LEGEND

Inlet Sampling PointOutlet Sampling Point

Primary Discharge PointSecondary Discharge PointStormwater Discharge Point

Agglomeration Boundary

Pumping Station

Achill WastewaterTreatment Plant

Drg. Title:

Achill Wastewater Treatment PlantLocation of Stormwater Discharge Points (SW5)

Project:

Waste Water Discharge Licence Application

Scale: Date:

Drg. Nr: Rev:

Drawn By: Checked By: Approved By:

Top Panel: 1/ 25,000Bottom Panel: 1: 2,500 01/09/08

Map B.5 A

L. Collier S. Verity T. Reidy

(1Nr)

(4Nr)

(1Nr)(3Nr)

(1Nr)(1Nr)

Note: There are no upstream or downstreammonitoring points at Achill WWTP

Gubalennaun beg

LWM

LWM

QuayPier

UNDHWM

UND

LWM

Reservoir

HWM

HWM

CF

UN

D

!!

SP2SP2SP2SP2SP2SP2SP2SP2SP2

SP1SP1SP1SP1SP1SP1SP1SP1SP1

SW5SW5SW5SW5SW5SW5SW5SW5SW5

Atlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic Ocean

Page 11: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

SITE NOTICE

APPLICATION TO THE ENVIRONMENTAL PROTECTION AGENCY FOR A WASTE WATER DISCHARGE LICENCE

Applicant: Mayo County Council, Áras an Chontae, The Mall, Castlebar, County Mayo.

Mayo County Council intends to apply to the Environmental Protection Agency for a Waste Water Discharge Licence, in accordance with the Waste Water Discharge (Authorisation) Regulations 2007 for the discharge from the Achill Waste Water Treatment Plant and Agglomeration. The Achill Waste Water Treatment Plant, located at Purteen, Achill Island, County Mayo (62,053E, 303,854N) comprises of the existing municipal treatment plant and the associated collection network. This application relates to the following existing discharges; Primary Outfall SW1 (P) & Stormwater Overflow SW5 (61,942E, 303,731N) and Secondary SW2 (59,984E, 304,590N), Secondary SW3 (65,717E, 304,829N) and Secondary SW4 (60,459E, 304,855N). The Waste Water Treatment Plant uses biological processes in conjunction with physical settling and chemical dosing to remove the pollutants from the influent and treat it to the standard set out in Urban Wastewater Treatment Regulations 2001. Effluent is to be discharged into the Atlantic Ocean. A copy of the application and information related to the application will be available for inspection or purchase at the headquarters of the Agency and at the offices of Mayo County Council, Áras an Chontae, The Mall, Castlebar, County Mayo as soon as is practicable after receipt. Submissions in relation to the application may be made to the Agency at its headquarters:

Environmental Protection Agency, Johnstown Castle Estate,

Co. Wexford.

Page 12: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE
Page 13: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

Gubalennaun beg

LWM

LWM

QuayPier

UNDHWM

UND

LWM

Reservoir

HWM

HWM

CF

UN

D

Shingle

Pollagh

CF

19.2

Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192

Mayo County Council G.I.S. Section

Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2008/10 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2008.

LEGEND

Location of Site Notice

Agglomeration Boundary

Achill WastewaterTreatment PlantBoundary

Drg. Title:

Achill Wastewater Treatment PlantLocation of Site Notice

Project:

Waste Water Discharge Licence Application

Scale: Date:

Drg. Nr: Rev:

Drawn By: Checked By: Approved By:

1: 2,500 (Inset 1: 50,000) 01/09/08

Map B.8. A

L. Collier S. Verity T. Reidy

Achill WastewaterAchill WastewaterAchill WastewaterAchill WastewaterAchill WastewaterAchill WastewaterAchill WastewaterAchill WastewaterAchill WastewaterTreatment PlantTreatment PlantTreatment PlantTreatment PlantTreatment PlantTreatment PlantTreatment PlantTreatment PlantTreatment Plant

Atlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic Ocean

Page 14: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

Achill Wastewater Treatment Scheme

C1 Operational Information Requirements: The Achill Wastewater Treatment Scheme consists of a Wastewater Treatment Plant at Purteen with a collection network of foul sewers and 4 no. pumping stations. Achill Island Wastewater Treatment Plant was built in 1991 and consists of inlet works with screening, disintegration and grit removal. The Treatment Process consists of two aeration tanks followed by two final settlement tanks. Sludge is stored in a sludge holding tank prior to dewatering by a belt press. Plant has storage for 26 cu. m. At present sludge is dewatered at the Achill WWTP to a cake with a dry solids concentration of between 15 and 18 %. Final disposal is currently being conducted by Ormonde Waste, Recycling and Organics, Ballinalacken, Attanagh. The Purteen Wastewater Treatment Plant has a capacity of 4000 PE and is currently operated by Mayo County Council. The average volume currently discharged from the municipal effluent stream is 562.5 cu. m/day (2500 PE @ 225L/PE Day). This is equivalent to an average daily discharge of 162 Kg B.D. It is not anticipated that the municipal effluent will increase appreciably in the near future. The Wastewater Treatment Plant has adequate capacity to handle the effluent from the current population. The effluent quality complies with the discharge standards. Emissions from the Treatment Works are discharged to the Atlantic Ocean (through an outfall labelled SW1). This is the primary discharge point. A storm overflow discharges all flows in excess of 3 DWF to the sea. This is labelled SWS and is emitted through the same pipe as the primary discharge.

PS1 Keel Pumping Station: (63,776E, 304,779N) To protect Keel Strand there is no storm water overflow at the Keel Pumping Station. There is however a large Balancing Tank with a capacity of 320 cu. m and a standby generator. There are 3 no. submersible pumps, i.e. 1 no. Duty and 2 no. Standby.

Page 15: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

PS2 Dookinelly Pumping Station (65,711 E, 304, 846 N) There are 2 no. submersible pumps i.e. 1 no. Duty and 1 no. Standby. There is a storage capacity of 6 cu. m. There is a 300 mm diameter emergency overflow SW3.

PS3 Dooagh No 1 Pumping Station (60,349 E, 304,924 N) To protect Dooagh Strand there is a total pumping capacity at this Pumping Station for 12 times D.W.F. There is an emergency overflow SW4 which comprises a 450 mm diameter pipe with a non return valve to a percolator at the shore. There are 2 no. foul pumps i.e. 1 no. Duty and 1 no. Standby. There is a storage capacity of 75 cu. m.

PS4 Dooagh No 2 Pumping Station (60,020N, 304,633E) There are 2 no. submersible pumps i.e. 1 no. Duty and 1 no. Standby. There is a storage capacity of 10 cu. m. There is a 300 mm diameter emergency overflow with a non return valve SW2.

Page 16: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

Raw Waste Water

Treated Effluent

Inlet

to Atlantic Ocean

MechanicalScreen

ScreeningTreatment

Off-siteDisposal

Sludge Disposalto Land

(1094m )2 No.

3

GritTrap

AerationTanks

SludgeDewatering

TankHoldingSludge

PumpSludge

ValveDistribution

(10m dia)

FinalSettlement

Tanks2 No.

DryingSludge

Beds

Sludge Disposalto Land

Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192

Mayo County Council G.I.S. Section

Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2008/10 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2008.

Drg. Title:

Achill Wastewater Treatment PlantProcess Flow Diagram for Current Operation

Project:

Waste Water Discharge Licence Application

Scale: Date:

Drg. Nr: Rev:

Drawn By: Checked By: Approved By:

NTS 01/09/08

Map C.1.1. A

L. Collier S. Verity T. Reidy

LEGENDReturn LiquorsRaw WastewaterScreenings / GritStormwaterSludgeFinal EffluentFlow to Secondary TanksDewatered Sludge

Page 17: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

Reservoir

HWM

HWM

CF

UN

D

!!

Sludge Drying BedsSludge Drying BedsSludge Drying BedsSludge Drying BedsSludge Drying BedsSludge Drying BedsSludge Drying BedsSludge Drying BedsSludge Drying Beds

Sludge Dewatering BuildingSludge Dewatering BuildingSludge Dewatering BuildingSludge Dewatering BuildingSludge Dewatering BuildingSludge Dewatering BuildingSludge Dewatering BuildingSludge Dewatering BuildingSludge Dewatering Building

Sludge Holding TankSludge Holding TankSludge Holding TankSludge Holding TankSludge Holding TankSludge Holding TankSludge Holding TankSludge Holding TankSludge Holding Tank

Control BuildingControl BuildingControl BuildingControl BuildingControl BuildingControl BuildingControl BuildingControl BuildingControl Building

Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2Aeration Tank No.2

Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1Aeration Tank No.1

Sludge PumpSludge PumpSludge PumpSludge PumpSludge PumpSludge PumpSludge PumpSludge PumpSludge Pump

Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1Final Settlement Tank No.1

Inlet WorksInlet WorksInlet WorksInlet WorksInlet WorksInlet WorksInlet WorksInlet WorksInlet Works

Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2Final Settlement Tank No.2

SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW5SW5SW5SW5SW5SW5SW5SW5SW5

SP1SP1SP1SP1SP1SP1SP1SP1SP1

SP2SP2SP2SP2SP2SP2SP2SP2SP2

Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192

Mayo County Council G.I.S. Section

Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2008/10 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2008.

!!!

LEGEND

Inlet Sampling PointOutlet Sampling Point

Primary Discharge PointSecondary Discharge PointStormwater Discharge Point

Pumping Station

Achill WastewaterTreatment Plant Boundary

Drg. Title:

Achill Wastewater Treatment PlantLayout Plan

Project:

Waste Water Discharge Licence Application

Scale: Date:

Drg. Nr: Rev:

Drawn By: Checked By: Approved By:

1: 750 01/09/08

Map C1.2 A

L. Collier S. Verity T. Reidy

(3Nr)(1Nr)

(1Nr)(1Nr)

(4Nr)

(1Nr)

Page 18: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

Achill Waste Water Discharge Application Attachment C.2

C.2/1

C.2 Outline Description of Outfall Design and Construction 1.0 Primary Discharge Point (P) 1.1 SW1 Location: Purteen, Achill Island, Co. Mayo 61,942E – 303,731N Receiving Water: Atlantic Ocean Originates: Final treated effluent from Achill wastewater treatment plant Invert Level: 0.0m Pipe Size: 500mm diameter Design Criteria: Open discharge to sea Construction Detail: Open discharge to sea 2.0 Secondary Discharge Points 2.1 SW2 Location: Emergency overflow from Dooagh No.2 Pumping Station 59,984E – 304,590N Receiving Water: Atlantic Ocean Originates: Emergency overflow from pumping station. Only anticipated if

there is a power cut, the pumping equipment breaks down or if maintenance work needs to carried out

Pipe Size: 300mm diameter with non return valve Design Criteria: Emergency/safety overflow – only to operate in case of pump

failure Construction Detail: 300mm diameter with non return valve 2.2 SW3 Location: Emergency overflow from Dookinelly Pumping Station 65,717E – 304,829N Receiving Water: Atlantic Ocean via Gallaghers River Originates: Emergency overflow from pumping station. Only anticipated if

there is a power cut, the pumping equipment breaks down or if maintenance work needs to be carried out

Pipe Size: 300mm diameter with non return valve Design Criteria: Emergency/safety overflow – only to operate in case of pump

failure Construction Detail: 300mm diameter with non return valve

Page 19: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

Achill Waste Water Discharge Application Attachment C.2

C.2/2

2.3 SW4 Location: Emergency overflow from Dooagh No.1 Pumping Station 60,459E – 304,855N Receiving Water: Atlantic Ocean Originates: Emergency overflow from pumping station. Only anticipated if

there is a power cut, the pumping station equipment breaks down or if maintenance work needs to be carried out

Pipe Size: 450mm diameter Design Criteria: Emergency/safety overflow – only to operate in case of pump

failure Construction Detail: 450mm diameter to percolator manhole 3.0 Storm Water Overflow Discharge Point 3.1 SW5 Location: Purteen, Achill Island Co. Mayo 61,942E – 303,731N Receiving Water: Atlantic Ocean Originates: Storm water overflow from Achill wastewater treatment plant Pipe Size: 500mm diameter Design Criteria: Flows in excess of three times the dry weather flow are diverted to

a storm water overflow pipe which connects into the primary discharge pipe.

Construction Detail: Shares the same outfall as the primary discharge point (SW1)

Page 20: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 1

WWD Licence Application

Agglomeration details

Contact details

Leading Local Authority Mayo County CouncilCo-ApplicantsAgglomeration Achill Waste Water Treatment PlantPopulation Equivalent 4000Level of Treatment SecondaryTreatment plant address Achill Waste Water Treatment Plant

PurteenAchill IslandCounty Mayo

Grid Ref (12 digits, 6E, 6N) 062035 / 303731 (Verifed using GPS)EPA Reference No:

Contact Name: Paddy MahonContact Address: Director of Services

Ballina Town CouncilCivic OfficesArran PlaceCo. Mayo

Contact Number: 096 76100Contact Fax: 096 76199Contact Email: [email protected]

Page 21: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 2

WWD Licence Application Annex I

Table D.1(i)(a): EMISSIONS TO SURFACE/GROUND WATERS (Primary Discharge Point)

Discharge Point Code: SW-1

Emission Details:

Local Authority Ref No: SW1 (P) - Sampled at SP2Source of Emission: Achill Wastewater Treatment PlantLocation: Purteen, Achill IslandGrid Ref (12 digits, 6E, 6N) 061942 / 303731 (Verifed using GPS)Name of Receiving waters: Atlanic OceanRiver Basin District Western RBDDesignation of Receiving Waters: Achill Head S.A.C. & close to Inishgallon N.H.A.Flow Rate in Receiving Waters: 0 m3.sec-1 Dry Weather Flow

0 m3.sec-1 95% Weather Flow

(i)Volume emittedNormal/day 562.5 m3 Maximum/day 1687.5 m3

Maximumrate/hour

70.3125 m3 Period of emission(avg)

60 min/hr 24 hr/day 365 day/yr

Dry Weather Flow 0.0065104167m3/sec

Page 22: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 3

WWD Licence Application Annex I

Table D.1(i)(b): EMISSIONS TO SURFACE/GROUND WATERS - Characteristics of The Emission

(Primary Discharge Point)

Discharge Point Code: SW-1

For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45m filter paper

For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.

Substance As discharged

Unit ofMeasurement

Sampling Method Max Daily Avg. kg/day

pH pH Grab =7.3

Temperature °C Grab =16.6

Electrical Conductivity (@ 25°C) µS/cm Grab =725

Suspended Solids mg/l Grab =3 1.6875

Ammonia (as N) mg/l Grab =0.022 0.012375

Biochemical Oxygen Demand mg/l Grab =5 2.8125

Chemical Oxygen Demand mg/l Grab =35 19.6875

Total Nitrogen (as N) mg/l Grab =0.044 0.02475

Nitrite (as N) mg/l Grab =0.097 0.0545625

Nitrate (as N) mg/l Grab =28.023 15.7629375

Total Phosphorous (as P) mg/l Grab =0.11 0.061875

OrthoPhosphate (as P) mg/l Grab =0.047 0.0264375

Sulphate (SO4) mg/l Grab =71.59 40.269375

Phenols (Sum) µg/l Grab <0.027 0.000015187

Page 23: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 4

WWD Licence Application Annex I

Table D.1(i)(c): DANGEROUS SUBSTANCE EMISSIONS TO SURFACE/GROUND WATERS -

Characteristics of The Emission (Primary Discharge Point)

Discharge Point Code: SW-1

For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45m filter paper

For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.

Substance As discharged

Unit ofMeasurement

Sampling Method Max Daily Avg. kg/day

Atrazine µg/l Grab <0.003 0.000001687

Dichloromethane µg/l Grab <1 0.0005625

Simazine µg/l Grab =0.013 0.000007312

Toluene µg/l Grab <1 0.0005625

Tributyltin µg/l Grab <0.02 0.00001125

Xylenes µg/l Grab <1 0.0005625

Arsenic µg/l Grab <0.5 0.00028125

Chromium µg/l Grab <0.5 0.00028125

Copper µg/l Grab =1 0.0005625

Cyanide µg/l Grab =2.3 0.00129375

Flouride µg/l Grab =450 0.253125

Lead µg/l Grab <0.5 0.00028125

Nickel µg/l Grab =2 0.001125

Zinc µg/l Grab <5 0.0028125

Boron µg/l Grab =14 0.007875

Cadmium µg/l Grab <0.5 0.00028125

Mercury µg/l Grab <0.05 0.000028125

Selenium µg/l Grab <0.5 0.00028125

Barium µg/l Grab =37 0.0208125

Page 24: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 5

WWD Licence Application Annex I

Table D.1(ii)(a): EMISSIONS TO SURFACE/GROUND WATERS (Secondary Discharge Point)

Discharge Point Code: SW-2

Emission Details:

Local Authority Ref No: Dooagh No.2(PS 4),Source of Emission: Achill Wastewater Treatment PlantLocation: DooaghGrid Ref (12 digits, 6E, 6N) 059984 / 304590 (Verifed using GPS)Name of Receiving waters: Atlantic OceanRiver Basin District Western RBDDesignation of Receiving Waters: Achill Head S.A.C. & close to Inishgallon N.H.A.Flow Rate in Receiving Waters: 0 m3.sec-1 Dry Weather Flow

0 m3.sec-1 95% Weather Flow

(i)Volume emittedNormal/day 0 m3 Maximum/day 0 m3

Maximumrate/hour

0 m3 Period of emission(avg)

0 min/hr 0 hr/day 0 day/yr

Dry Weather Flow 0 m3/sec

Page 25: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 6

WWD Licence Application Annex I

Table D.1(ii)(b): EMISSIONS TO SURFACE/GROUND WATERS - Characteristics of The

Emission (Secondary Discharge Point)

Discharge Point Code: SW-2

For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45m filter paper

For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.

Substance As discharged

Unit ofMeasurement

Sampling Method Max Daily Avg. kg/day

pH pH Grab =0

Temperature °C Grab =0

Electrical Conductivity (@ 25°C) µS/cm Grab =0

Suspended Solids mg/l Grab =0 0

Ammonia (as N) mg/l Grab =0 0

Biochemical Oxygen Demand mg/l Grab =0 0

Chemical Oxygen Demand mg/l Grab =0 0

Total Nitrogen (as N) mg/l Grab =0 0

Nitrite (as N) mg/l Grab =0 0

Nitrate (as N) mg/l Grab =0 0

Total Phosphorous (as P) mg/l Grab =0 0

OrthoPhosphate (as P) mg/l Grab =0 0

Sulphate (SO4) mg/l Grab =0 0

Phenols (Sum) µg/l Grab =0 0

Page 26: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 7

WWD Licence Application Annex I

Table D.1(ii)(c): DANGEROUS SUBSTANCE EMISSIONS TO SURFACE/GROUND WATERS -

Characteristics of The Emission (Secondary Discharge Point)

Discharge Point Code: SW-2

For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45m filter paper

For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.

Substance As discharged

Unit ofMeasurement

Sampling Method Max Daily Avg. kg/day

Atrazine µg/l Grab =0 0

Dichloromethane µg/l Grab =0 0

Simazine µg/l Grab =0 0

Toluene µg/l Grab =0 0

Tributyltin µg/l Grab =0 0

Xylenes µg/l Grab =0 0

Arsenic µg/l Grab =0 0

Chromium µg/l Grab =0 0

Copper µg/l Grab =0 0

Cyanide µg/l Grab =0 0

Flouride µg/l Grab =0 0

Lead µg/l Grab =0 0

Nickel µg/l Grab =0 0

Zinc µg/l Grab =0 0

Boron µg/l Grab =0 0

Cadmium µg/l Grab =0 0

Mercury µg/l Grab =0 0

Selenium µg/l Grab =0 0

Barium µg/l Grab =0 0

Page 27: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 8

WWD Licence Application Annex I

Table D.1(ii)(a): EMISSIONS TO SURFACE/GROUND WATERS (Secondary Discharge Point)

Discharge Point Code: SW-3

Emission Details:

Local Authority Ref No: Dookinelly(PS 2)Source of Emission: Achill Wastewater Treatment PlantLocation: DookinellyGrid Ref (12 digits, 6E, 6N) 065717 / 304829 (Verifed using GPS)Name of Receiving waters: Atlantic OceanRiver Basin District Western RBDDesignation of Receiving Waters: Achill Head S.A.C. & close to Inishgallon N.H.A.Flow Rate in Receiving Waters: 0 m3.sec-1 Dry Weather Flow

0 m3.sec-1 95% Weather Flow

(i)Volume emittedNormal/day 0 m3 Maximum/day 0 m3

Maximumrate/hour

0 m3 Period of emission(avg)

0 min/hr 0 hr/day 0 day/yr

Dry Weather Flow 0 m3/sec

Page 28: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 9

WWD Licence Application Annex I

Table D.1(ii)(b): EMISSIONS TO SURFACE/GROUND WATERS - Characteristics of The

Emission (Secondary Discharge Point)

Discharge Point Code: SW-3

For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45m filter paper

For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.

Substance As discharged

Unit ofMeasurement

Sampling Method Max Daily Avg. kg/day

pH pH Grab =0

Temperature °C Grab =0

Electrical Conductivity (@ 25°C) µS/cm Grab =0

Suspended Solids mg/l Grab =0 0

Ammonia (as N) mg/l Grab =0 0

Biochemical Oxygen Demand mg/l Grab =0 0

Chemical Oxygen Demand mg/l Grab =0 0

Total Nitrogen (as N) mg/l Grab =0 0

Nitrite (as N) mg/l Grab =0 0

Nitrate (as N) mg/l Grab =0 0

Total Phosphorous (as P) mg/l Grab =0 0

OrthoPhosphate (as P) mg/l Grab =0 0

Sulphate (SO4) mg/l Grab =0 0

Phenols (Sum) µg/l Grab =0 0

Page 29: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 10

WWD Licence Application Annex I

Table D.1(ii)(c): DANGEROUS SUBSTANCE EMISSIONS TO SURFACE/GROUND WATERS -

Characteristics of The Emission (Secondary Discharge Point)

Discharge Point Code: SW-3

For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45m filter paper

For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.

Substance As discharged

Unit ofMeasurement

Sampling Method Max Daily Avg. kg/day

Atrazine µg/l Grab =0 0

Dichloromethane µg/l Grab =0 0

Simazine µg/l Grab =0 0

Toluene µg/l Grab =0 0

Tributyltin µg/l Grab =0 0

Xylenes µg/l Grab =0 0

Arsenic µg/l Grab =0 0

Chromium µg/l Grab =0 0

Copper µg/l Grab =0 0

Cyanide µg/l Grab =0 0

Flouride µg/l Grab =0 0

Lead µg/l Grab =0 0

Nickel µg/l Grab =0 0

Zinc µg/l Grab =0 0

Boron µg/l Grab =0 0

Cadmium µg/l Grab =0 0

Mercury µg/l Grab =0 0

Selenium µg/l Grab =0 0

Barium µg/l Grab =0 0

Page 30: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 11

WWD Licence Application Annex I

Table D.1(ii)(a): EMISSIONS TO SURFACE/GROUND WATERS (Secondary Discharge Point)

Discharge Point Code: SW-4

Emission Details:

Local Authority Ref No: Dooagh No.1(PS 3)Source of Emission: Achill Wastewater Treatment PlantLocation: DooaghGrid Ref (12 digits, 6E, 6N) 060459 / 304855 (Verifed using GPS)Name of Receiving waters: Atlantic OceanRiver Basin District Western RBDDesignation of Receiving Waters: Achill Head S.A.C. & close to Inishgallon N.H.A.Flow Rate in Receiving Waters: 0 m3.sec-1 Dry Weather Flow

0 m3.sec-1 95% Weather Flow

(i)Volume emittedNormal/day 0 m3 Maximum/day 0 m3

Maximumrate/hour

0 m3 Period of emission(avg)

0 min/hr 0 hr/day 0 day/yr

Dry Weather Flow 0 m3/sec

Page 31: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 12

WWD Licence Application Annex I

Table D.1(ii)(b): EMISSIONS TO SURFACE/GROUND WATERS - Characteristics of The

Emission (Secondary Discharge Point)

Discharge Point Code: SW-4

For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45m filter paper

For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.

Substance As discharged

Unit ofMeasurement

Sampling Method Max Daily Avg. kg/day

pH pH Grab =0

Temperature °C Grab =0

Electrical Conductivity (@ 25°C) µS/cm Grab =0

Suspended Solids mg/l Grab =0 0

Ammonia (as N) mg/l Grab =0 0

Biochemical Oxygen Demand mg/l Grab =0 0

Chemical Oxygen Demand mg/l Grab =0 0

Total Nitrogen (as N) mg/l Grab =0 0

Nitrite (as N) mg/l Grab =0 0

Nitrate (as N) mg/l Grab =0 0

Total Phosphorous (as P) mg/l Grab =0 0

OrthoPhosphate (as P) mg/l Grab =0 0

Sulphate (SO4) mg/l Grab =0 0

Phenols (Sum) µg/l Grab =0 0

Page 32: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 13

WWD Licence Application Annex I

Table D.1(ii)(c): DANGEROUS SUBSTANCE EMISSIONS TO SURFACE/GROUND WATERS -

Characteristics of The Emission (Secondary Discharge Point)

Discharge Point Code: SW-4

For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45m filter paper

For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.

Substance As discharged

Unit ofMeasurement

Sampling Method Max Daily Avg. kg/day

Atrazine µg/l Grab =0 0

Dichloromethane µg/l Grab =0 0

Simazine µg/l Grab =0 0

Toluene µg/l Grab =0 0

Tributyltin µg/l Grab =0 0

Xylenes µg/l Grab =0 0

Arsenic µg/l Grab =0 0

Chromium µg/l Grab =0 0

Copper µg/l Grab =0 0

Cyanide µg/l Grab =0 0

Flouride µg/l Grab =0 0

Lead µg/l Grab =0 0

Nickel µg/l Grab =0 0

Zinc µg/l Grab =0 0

Boron µg/l Grab =0 0

Cadmium µg/l Grab =0 0

Mercury µg/l Grab =0 0

Selenium µg/l Grab =0 0

Barium µg/l Grab =0 0

Page 33: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 14

WWD Licence Application Annex I

Table D.1(iii)(a): EMISSIONS TO SURFACE/GROUND WATERS (Storm Overflow)

Discharge Point Code: SW-5

Emission Details:

Local Authority Ref No:Source of Emission: Achill Wastewater Treatment PlantLocation: Purteen, Achill IslandGrid Ref (12 digits, 6E, 6N) 061942 / 303731 (Verifed using GPS)Name of Receiving waters: Atlantic OceanRiver Basin District Western RBDDesignation of Receiving Waters: Achill Head S.A.C. & close to Inishgallon N.H.A.Flow Rate in Receiving Waters: 0 m3.sec-1 Dry Weather Flow

0 m3.sec-1 95% Weather Flow

(i)Volume emittedNormal/day 0 m3 Maximum/day 0 m3

Maximumrate/hour

0 m3 Period of emission(avg)

0 min/hr 0 hr/day 0 day/yr

Dry Weather Flow 0 m3/sec

Page 34: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

D.2 Tabular Data on Discharge Points

Point Code Point Type Local Authority Receiving Water Body Type Receiving Water Body Name Protected Area Type Easting Northing

SW1(P) Primary Mayo Co.Co. Coastal Atlantic Ocean SeeD(i)(a) 61,942 303,731

SW2 Secondary Mayo Co.Co. Coastal Atlantic Ocean SeeD(ii)(a) 59,984 304,590

SW3 Secondary Mayo Co.Co. Coastal Atlantic Ocean SeeD(ii)(a) 65,717 304,829

SW4 Secondary Mayo Co.Co. Coastal Atlantic Ocean SeeD(ii)(a) 60,459 304,855

SW5 Stormwater Mayo Co.Co. Coastal Atlantic Ocean SeeD(iii)(a) 61,942 303,731

Page 35: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 15

WWD Licence Application Annex I

TABLE E.1(i): WASTE WATER FREQUENCY AND QUANTITY OF DISCHARGE – Primary and

Secondary Discharge Points

Identification Code for Discharge point Frequency of discharge (days/annum) Quantity of Waste Water Discharged

(m3/annum)

SW-1 365 205312.5

SW-2 0 0

SW-3 0 0

SW-4 0 0

Page 36: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 16

WWD Licence Application Annex I

TABLE E.1(ii): WASTE WATER FREQUENCY AND QUANTITY OF DISCHARGE – Storm Water

Overflows

Identification Code for Dischargepoint

Frequency of discharge(days/annum)

Quantity of Waste WaterDischarged (m3/annum)

Complies with Definition of StormWater Overflow

SW-5 0 0 Yes

Page 37: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

Attachment E.2

Mayo County Council carries out sampling at Achill Island Waste Water Treatment Plant on a

monthly basis. This sampling is carried out on behalf of Mayo County Council by Complete

Laboratory Solutions (CLS) Ros Muc, Co. Galway. The following parameters are sampled at

both the inflow and outflow:

Total Phosphorus as P (sw)

Total Phosphorus as P (d)

Total Nitrogen as N (sw)

Total Nitrogen as N (d)

TON as N (sw)

TON as N (d)

Temperature

Suspended Solids (d)

Suspended Solids

pH

Orthophosphate as P

Dissolved Oxygen (%)

COD

BOD (with Nitrification inhibition)

BOD (sw)

Ammonium as NH4 (sw)

Ammonium as NH4 (d)

The external laboratory has INAB ISO 17025 accreditation for the following parameters:

pH

Chemical Oxygen Demand

Biochemical Oxygen Demand

Suspended Solids

TON as N

Orthophosphate as P

Ammonium as NH4

Page 38: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

CF

19.2

Gubalennaun beg

LWM

LWM

QuayPier

UNDHWM

UND

LWM

Reservoir

HWM

HWM

CF

UN

D

!!SW5SW5SW5SW5SW5SW5SW5SW5SW5SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)SW1(P)

SP2SP2SP2SP2SP2SP2SP2SP2SP2

SP1SP1SP1SP1SP1SP1SP1SP1SP1

Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192

Mayo County Council G.I.S. Section

Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2008/10 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2008.

!!!

LEGEND

Inlet Sampling PointOutlet Sampling Point

Primary Discharge PointSecondary Discharge PointStormwater Discharge Point

Achill WastewaterTreatment Plant Boundary

Pumping Station

Drg. Title:

Achill Wastewater Treatment PlantOverview of Sampling and Monitoring Points

Project:

Waste Water Discharge Licence Application

Scale: Date:

Drg. Nr: Rev:

Drawn By: Checked By: Approved By:

1: 2,500 28/08/08

Map E.2. A

L. Collier S. Verity T. Reidy

(4Nr)

(1Nr)

(1Nr)

(1Nr)(3Nr)

(1Nr)

Note: There are no upstream or downstreammonitoring points at Achill WWTP.

Atlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic OceanAtlantic Ocean

Page 39: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

PT_CD PT_TYPE MON_TYPE EASTING NORTHING VERIFIEDSP1 Inlet Sampling Point Sampling 62089E 303837N GPS EnvSP2 Outlet Sampling Point Sampling 62026E 303808N GPS

Page 40: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

Achill Waste Water Discharge Application Attachment E.4

E.4/1

E.4 Sampling Data Achill wastewater treatment plant discharges final effluent to comply with the Urban Waste Water Treatment Directive 91/271/EEC, which sets standards for final effluent being discharged to the receiving waters as follows: Biochemical Oxygen Demand 25mg/l O2 Chemical Oxygen Demand 125mg/l O2 Total Suspended Solids 35mg/l Under the Urban Waste Water Treatment Regulations, 2001 the minimum number of samples required for a plant this size is 12 samples during the first year; four samples in subsequent years, if it is shown that the water during the first year complies with the provisions of these Regulations; if one sample of the four fails, 12 samples must be taken in the year that follows.

Achill WWTP Average Ammonium(NH4) 7.3122 mg/l BOD 8.2444 mg/l Chemical Oxygen Demand 30.5556 mg/l Dissolved Oxygen % Saturation 67.6875 % Saturation Ortho-phosphate 0.7022 mg/l pH 7.3111 pH units Suspended Solids 5.5556 mg/l Temperature 12.8 °C Total Nitrogen 13.3189 mg/l Total Oxidised Nitrogen 3.4733 mg/l Total Phosphorus 0.7913 mg/l

Page 41: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

Attachment F.1

Mayo County Council will carry out an “appropriate assessment” as part of the

Waste Water Licensing Discharge process for Achill Island.

The extent of the assessment however will be scoped with the National Parks &

Wildlife Service.

Page 42: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 17

WWD Licence Application Annex I

TABLE F.1(i)(a): SURFACE/GROUND WATER MONITORING

Primary Discharge Point

For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45m filter paper

For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.

Discharge Point Code: SW-1MONITORING POINT CODE: aSW-1aGrid Ref (12 digits, 6E, 6N) 000000 / 000000

Parameter Results (mg/l) Samplingmethod

Limit ofQuantitation

Analysismethod /technique

01/01/50

pH = 0 Grab 0

Temperature = 0 Grab 0

Electrical Conductivity (@25°C)

= 0 Grab 0

Suspended Solids = 0 Grab 0

Ammonia (as N) = 0 Grab 0

Biochemical Oxygen Demand = 0 Grab 0

Chemical Oxygen Demand = 0 Grab 0

Dissolved Oxygen = 0 Grab 0

Hardness (as CaCO3) = 0 Grab 0

Total Nitrogen (as N) = 0 Grab 0

Nitrite (as N) = 0 Grab 0

Nitrate (as N) = 0 Grab 0

Total Phosphorous (as P) = 0 Grab 0

OrthoPhosphate (as P) = 0 Grab 0

Sulphate (SO4) = 0 Grab 0

Phenols (Sum) = 0 Grab 0

Page 43: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 18

WWD Licence Application Annex I

TABLE F.1(i)(b): SURFACE/GROUND WATER MONITORING (Dangerous Substances)

Primary Discharge Point

Discharge Point Code: SW-1MONITORING POINT CODE: aSW-1aGrid Ref (12 digits, 6E, 6N) 000000 / 000000

Parameter Results (µg/l) Samplingmethod

Limit ofQuantitation

Analysismethod /technique

01/01/50

Atrazine = 0 Grab 0

Dichloromethane = 0 Grab 0

Simazine = 0 Grab 0

Toluene = 0 Grab 0

Tributyltin = 0 Grab 0

Xylenes = 0 Grab 0

Arsenic = 0 Grab 0

Chromium = 0 Grab 0

Copper = 0 Grab 0

Cyanide = 0 Grab 0

Flouride = 0 Grab 0

Lead = 0 Grab 0

Nickel = 0 Grab 0

Zinc = 0 Grab 0

Boron = 0 Grab 0

Cadmium = 0 Grab 0

Mercury = 0 Grab 0

Selenium = 0 Grab 0

Barium = 0 Grab 0

Page 44: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 19

WWD Licence Application Annex I

TABLE F.1(ii)(a): SURFACE/GROUND WATER MONITORING

Secondary Discharge Point

For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45m filter paper

For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.

Discharge Point Code: SW-4MONITORING POINT CODE: aSW-4aGrid Ref (12 digits, 6E, 6N) 000000 / 000000

Parameter Results (mg/l) Samplingmethod

Limit ofQuantitation

Analysismethod /technique

01/01/50

pH = 0 Grab 0

Temperature = 0 Grab 0

Electrical Conductivity (@25°C)

= 0 Grab 0

Suspended Solids = 0 Grab 0

Ammonia (as N) = 0 Grab 0

Biochemical Oxygen Demand = 0 Grab 0

Chemical Oxygen Demand = 0 Grab 0

Dissolved Oxygen = 0 Grab 0

Hardness (as CaCO3) = 0 Grab 0

Total Nitrogen (as N) = 0 Grab 0

Nitrite (as N) = 0 Grab 0

Nitrate (as N) = 0 Grab 0

Total Phosphorous (as P) = 0 Grab 0

OrthoPhosphate (as P) = 0 Grab 0

Sulphate (SO4) = 0 Grab 0

Phenols (Sum) = 0 Grab 0

Page 45: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 20

WWD Licence Application Annex I

TABLE F.1(ii)(b): SURFACE/GROUND WATER MONITORING (Dangerous Substances)

Secondary Discharge Point

Discharge Point Code: SW-4MONITORING POINT CODE: aSW-4aGrid Ref (12 digits, 6E, 6N) 000000 / 000000

Parameter Results (µg/l) Samplingmethod

Limit ofQuantitation

Analysismethod /technique

01/01/50

Atrazine = 0 Grab 0

Dichloromethane = 0 Grab 0

Simazine = 0 Grab 0

Toluene = 0 Grab 0

Tributyltin = 0 Grab 0

Xylenes = 0 Grab 0

Arsenic = 0 Grab 0

Chromium = 0 Grab 0

Copper = 0 Grab 0

Cyanide = 0 Grab 0

Flouride = 0 Grab 0

Lead = 0 Grab 0

Nickel = 0 Grab 0

Zinc = 0 Grab 0

Boron = 0 Grab 0

Cadmium = 0 Grab 0

Mercury = 0 Grab 0

Selenium = 0 Grab 0

Barium = 0 Grab 0

Page 46: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 21

WWD Licence Application Annex I

TABLE F.1(ii)(a): SURFACE/GROUND WATER MONITORING

Secondary Discharge Point

For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45m filter paper

For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.

Discharge Point Code: SW-2MONITORING POINT CODE: aSW-2aGrid Ref (12 digits, 6E, 6N) 000000 / 000000

Parameter Results (mg/l) Samplingmethod

Limit ofQuantitation

Analysismethod /technique

01/01/50

pH = 0 Grab 0

Temperature = 0 Grab 0

Electrical Conductivity (@25°C)

= 0 Grab 0

Suspended Solids = 0 Grab 0

Ammonia (as N) = 0 Grab 0

Biochemical Oxygen Demand = 0 Grab 0

Chemical Oxygen Demand = 0 Grab 0

Dissolved Oxygen = 0 Grab 0

Hardness (as CaCO3) = 0 Grab 0

Total Nitrogen (as N) = 0 Grab 0

Nitrite (as N) = 0 Grab 0

Nitrate (as N) = 0 Grab 0

Total Phosphorous (as P) = 0 Grab 0

OrthoPhosphate (as P) = 0 Grab 0

Sulphate (SO4) = 0 Grab 0

Phenols (Sum) = 0 Grab 0

Page 47: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 22

WWD Licence Application Annex I

TABLE F.1(ii)(b): SURFACE/GROUND WATER MONITORING (Dangerous Substances)

Secondary Discharge Point

Discharge Point Code: SW-2MONITORING POINT CODE: aSW-2aGrid Ref (12 digits, 6E, 6N) 000000 / 000000

Parameter Results (µg/l) Samplingmethod

Limit ofQuantitation

Analysismethod /technique

01/01/50

Atrazine = 0 Grab 0

Dichloromethane = 0 Grab 0

Simazine = 0 Grab 0

Toluene = 0 Grab 0

Tributyltin = 0 Grab 0

Xylenes = 0 Grab 0

Arsenic = 0 Grab 0

Chromium = 0 Grab 0

Copper = 0 Grab 0

Cyanide = 0 Grab 0

Flouride = 0 Grab 0

Lead = 0 Grab 0

Nickel = 0 Grab 0

Zinc = 0 Grab 0

Boron = 0 Grab 0

Cadmium = 0 Grab 0

Mercury = 0 Grab 0

Selenium = 0 Grab 0

Barium = 0 Grab 0

Page 48: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 23

WWD Licence Application Annex I

TABLE F.1(ii)(a): SURFACE/GROUND WATER MONITORING

Secondary Discharge Point

For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45m filter paper

For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.

Discharge Point Code: SW-3MONITORING POINT CODE: aSW-3aGrid Ref (12 digits, 6E, 6N) 000000 / 000000

Parameter Results (mg/l) Samplingmethod

Limit ofQuantitation

Analysismethod /technique

01/01/50

pH = 0 Grab 0

Temperature = 0 Grab 0

Electrical Conductivity (@25°C)

= 0 Grab 0

Suspended Solids = 0 Grab 0

Ammonia (as N) = 0 Grab 0

Biochemical Oxygen Demand = 0 Grab 0

Chemical Oxygen Demand = 0 Grab 0

Dissolved Oxygen = 0 Grab 0

Hardness (as CaCO3) = 0 Grab 0

Total Nitrogen (as N) = 0 Grab 0

Nitrite (as N) = 0 Grab 0

Nitrate (as N) = 0 Grab 0

Total Phosphorous (as P) = 0 Grab 0

OrthoPhosphate (as P) = 0 Grab 0

Sulphate (SO4) = 0 Grab 0

Phenols (Sum) = 0 Grab 0

Page 49: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

WWD Licence Application - Achill Waste Water Treatment Plant - Page: 24

WWD Licence Application Annex I

TABLE F.1(ii)(b): SURFACE/GROUND WATER MONITORING (Dangerous Substances)

Secondary Discharge Point

Discharge Point Code: SW-3MONITORING POINT CODE: aSW-3aGrid Ref (12 digits, 6E, 6N) 000000 / 000000

Parameter Results (µg/l) Samplingmethod

Limit ofQuantitation

Analysismethod /technique

01/01/50

Atrazine = 0 Grab 0

Dichloromethane = 0 Grab 0

Simazine = 0 Grab 0

Toluene = 0 Grab 0

Tributyltin = 0 Grab 0

Xylenes = 0 Grab 0

Arsenic = 0 Grab 0

Chromium = 0 Grab 0

Copper = 0 Grab 0

Cyanide = 0 Grab 0

Flouride = 0 Grab 0

Lead = 0 Grab 0

Nickel = 0 Grab 0

Zinc = 0 Grab 0

Boron = 0 Grab 0

Cadmium = 0 Grab 0

Mercury = 0 Grab 0

Selenium = 0 Grab 0

Barium = 0 Grab 0

Page 50: Attachment A1 Achill Waste Water Treatment … › licences › lic_eDMS › 090151b28024c4dc.pdfACHILL WASTE WATER TREATMENT SCHEME Non Technical Summary. 1. WASTE WATER DISCHARGE

Achill Waste Water Discharge Application Attachment G.1

G.1/1

G.1 Compliance with Council Directives Achill wastewater treatment plant and agglomeration were planned and designed in such a way that the emissions from the agglomeration would comply with /not result in the contravention of all relevant Council Directives. All upgrades, expansions and improvements to Achill wastewater treatment plant and agglomerations in the future will ensure that the emissions from the agglomeration would comply with/not result in the contravention of the;

• Dangerous Substance Directive 2006/11/EC • Water Framework Directive 2000/60/EC • Birds Directive 79/409/EEC • Groundwater Directive 80/68/EEC & 2006/118/EC • Drinking Water Directive 80/778/EEC • Urban Waste Water Treatment Directive 91/271/EEC • Habitats Directive 92/43/EEC • Environmental Liabilities Directive 2004/35/EC • Bathing Water Directive 76/160/EEC • Shellfish Directive 79/923/EEC