    AE1172-L-FIS-DWS-1086 comments (by OE)

    1 FCE Comment (09.02.2014): Illumination level values will be considered as average

    values for different areas, in accordance with proposed method statement. These values

    shall fulfill contractual requirements. However, for particular relevant cases (i.e.instrumentation, measuring or control equipment, panels, check-points, laboratory or

    office desks, etc. relevant values shall be recorded and shall fulfill contractual

    requirements at these locations, too.!lease confirm.

    (DWS Reply) The illumination level for main equipment (which must be checked every day) shouldbe maintained the level to identify at any time.

    2 FCE Comment (09.02.2014): !lease refer to the scanned schedule of lighting

    requirements, having marked comments as per contractual requirements. "ontractor is

    advised to clarify.

    (DWS Reply) Reflected. Refer to Table . Schedule of !i"htin" Requirements

    3 FCE Comment (09.02.2014): "ontractor shall consider that functional test of emergency

    lighting shall be included, especially # hour battery back-up and illumination level

    measuring, in accordance with requirements of $huweihat $% &!" "ontract, 'nne ',

    part ), $ection #*.+.+ - v.

    (DWS Reply) Reflected. Refer to #$% for &llumination Test'Rev.

    !age 1of 2

  • 8/12/2019 Attachment 2. Reply Sheets for AE1172 L FIS DWS 1086 & AE1172 L FIS DWS 1089

    2/2

    AE1172-L-FIS-DWS-1089 comments (by SAPCO O!)

    1 SAPCO Comment (12.02.2014): ocations listed in the attached file are not found in the

    procedure. "ontractor is advised to consider these locations in order to be included.

    (DWS Reply) Reflected. Refer to Table . Schedule of !i"htin" Requirements

    2 SAPCO Comment (12.02.2014): 'ccording to $huweihat $% &!" "ontract lighting

    intensity shall be measured at *.+m above floor level and not #.* m, as stated in the

    procedure. or walkways and corridors, measurement shall be done at ground level. Tet

    of the method statement shall be corrected accordingly.

    (DWS Reply) Reflected. Refer to Section .*.+

    3 SAPCO Comment (12.02.2014): The procedure shall be measurement of /lare Inde,which shall be checked with values accordingly with contractual requirements.

    (DWS Reply) Reflected. Refer to Table . Schedule of !i"htin" Requirements

    4 SAPCO Comment (12.02.2014): The uniformity of Illuminance, which is the ratio of the

    minimum to average value, shall be calculated. The 0niformity of the task Illuminance

    shall not be less than *.1, as specified in "I& !ublication 2o. )3, referred in the

    $huweihat $% &!" "ontract. !lease confirm. (2ote 4 this comment shall be corroborated

    with 5wner &ngineer comment no. # from the above mentioned correspondence.

    (DWS Reply)uildin" &nside and &ndoor Room , not less than -.+ (as specified in &/ %ublication 0o. 12)Road and Traffic Routes , not less than -.* (as specified in Road !i"htin" 3anual issued by 4buDhabi Department of Tranport. %lease refer to enclosed Road !i"htin" 3anual pa"e 56).

    5 SAPCO Comment (12.02.2014): 6eference to procedure Table # 7$chedule of ighting

    6equirements8, for some areas (listed below the required u level is not considered in

    accordance with $huweihat $% &!" "ontract requirements. "ontractor shall provide

    feedback as advised. (2ote 4 this comment shall be corroborated with 5wner &ngineer

    comment no. ) from the above mentioned correspondence.

    (DWS Reply) Reflected. Refer to Table . Schedule of !i"htin" Requirements