Ateneo Gawad Kalinga Overview and School Feeding Project

30
AFTER A YEAR: Tacloban and Leyte as of October 2014 A. LEYTE: Tacloban and nearby towns 1) School Feeding Program 2) Construction of Classrooms 3) Construction of Housing B. GK (Gawad Kalinga) Sites in other Provinces 1) GK in other Post-Haiyan sites 2) GK Cox, Lupang Pangako, Payatas 3) GK St. Joseph, Cabiao, Nueva Ecija 4) GK Lanit, Iloilo

Transcript of Ateneo Gawad Kalinga Overview and School Feeding Project

AFTER A YEAR: Tacloban and Leyteas of October 2014

A. LEYTE: Tacloban and nearby towns1) School Feeding Program2) Construction of Classrooms3) Construction of Housing

B. GK (Gawad Kalinga) Sites in other Provinces 1) GK in other Post-Haiyan sites 2) GK Cox, Lupang Pangako, Payatas 3) GK St. Joseph, Cabiao, Nueva Ecija 4) GK Lanit, Iloilo

Alang-Alang ES:HOW WERE YOU DURING YOLANDA?

HOW ARE YOU TODAY?

HOW WERE YOUR HOMES?WHO REPAIRED THEM? DID YOU GET ANY

HELP?

CONTRAST WITH DECEMBER AND MARCHTHIS WAS A DESOLATION

BACK TO “OLD NORMAL”.

f

TACLOBAN PIER BACK TO “OLD NORMAL”. CITY TRAFFIC HEAVY AGAIN. MARKET BUSY. PUBLIC BUILDINGS REPAIRED

GK KUSINA NG KALINGASCHOOL FEEDING PROGRAMFOR 3,800-5,000 CHILDREN

Alang-Alang, LEYTE

Parent-Volunteers Packing LunchesFor the Feeding Program

CHOPPING CARROTS

CORN

COOKING

JHOEL WITH CONTAINERS FOR FOOD PACKS TO BE DELIVERED TO THE SCHOOLS AND CLASSROOMS

Preparing the Food Containers(color-coded: orange, blue, etc.)

Putting in the Rice

Putting in the Viand and Packing for Delivery

PRAYER BEFORE MEALS

With children and teachers

List of Ingredients & Schedule of Purchasing

Menu consists of Nutritious Meals