سازمان حفاظت محيط زيست
گزارش پيشرفت سالانه طرح در سال كارى 2011
2011
"Annual Progress Report 2011"
«طرح حفاظت از تالاب هاى ايران»
![Page 2: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/2.jpg)
Conservation of Iranian Wetlands
Annual Report 2011
Submitted on
4 March 2012
Prepared By: Endorsed By:
______________________________
____________________________
Dr Ali Nazaridoust Dr Asghar Mohammadi Fazel
National Project Manager National Project Director
Date: Date:
![Page 3: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/3.jpg)
Conservation of Iranian Wetlands Project Annual Report - 2011
Prepared by:
Conservation of Iranian Wetlands Project Office
Department of Environment
Islamic Republic of Iran
http://wetlandsproject.ir
Compiled by: Mohsen Soleymani Roozbahani Deputy National Project manager [email protected] Mehdi Safari Oskouei Financial Assistant [email protected]
Submitted to:
United Nations Development Programme – Iran
8 Shahrzad Boulevard, Darrous, Tehran, Iran
Phone: +98 21 22860691-4
www.undp.org.ir
![Page 4: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/4.jpg)
Contents
![Page 5: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/5.jpg)
![Page 6: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/6.jpg)
List of Acronyms and Abbreviations
bcm Billion Cubic Meters
mcm Million Cubic Meters
CBO Community Based Organisation
CPD Country Programme Document
CDR Combined Delivery Report
DCHT Department for Cultural Heritage and Tourism
DoE Department of Environment
GEF Global Environment Facility
IR Iran Islamic Republic of Iran
LP Lake Parishan
LU Lake Uromiyeh
LUB Lake Uromiyeh Basin
M&E Monitoring and Evaluation
MoJA Ministry of Jihad Agriculture
MFA Ministry of Foreign Affairs
MOE Ministry of Energy
MoI Ministry of Interior
MRT Ministry of Roads and Transport
MTE Mid-Term Evaluation
NPD National Project Director
NPM National Project Manager
NPT National Project Team
NRO Natural Resources Organisation
![Page 7: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/7.jpg)
SPAC Office of Strategic Planning Affairs and Control of the Government of the
Islamic Republic of Iran
SW Shadegan Wetland
TOR Terms of Reference
TPR Tripartite Review
UN United Nations
UNCTAD United Nations Conference on Trade and Development
UNDAF United Nations Development Assistance Framework
UNDP United Nations Development Program
WPA Wetland Protected Area
![Page 8: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/8.jpg)
Conservation of Iranian Annual Report 2011 Wetlands Project
Executive Summary
This is an annual report for the activities of the Conservation of Iranian Wetlands Project (the
Project) for 2011. Although the headings may differ, this Executive Summary provides a breakdown
of the key points from the body of this report.
Conservation of Iranian Wetlands Project in I. R. Iran
This is a project established through the cooperation of the Global Environment Facility (GEF),
United Nations Development Programme (UNDP) and the Iranian Department of Environment (DoE).
It was brought about because of the drastically worsening condition of Iranian wetlands and to
develop methods for Iran to comply with its international environmental commitments, notably the
1971 Ramsar Convention.
It aims to systematically remove, or substantially mitigate, threats to the biodiversity and
sustainability of Lake Uromiyeh (LU), Lake Parishan (LP) and Shadegan Wetland (SW). In doing this it
also aims to ensure that the lessons learned through this Project are absorbed with Iran’s Wetland
Protected Area (WPA) management systems. As many of Iran’s wetlands face similar threats,
particularly the tendency for key threats to originate within the wider watershed area outside of
WPA boundaries, a demonstration of the removal of these threats will be of broad relevance.
As a result, the project places substantial emphasis on demonstrating approaches to conservation,
sustainable use and threat removal/mitigation at WPAs within the Lake Uromiyeh Ecological Zone,
Lake Parishan and Shadegan Wetland. This ecological zone includes LU itself, a c. 5,000 km2
hypersaline lake and National Park in the highlands of northwestern Iran, together with various
ecologically connected and smaller satellite wetlands of international importance. Further support
also goes towards ensuring conservation and sustainable use of LP and SW, which are located in Fars
and Khuzestan Provinces respectively.
For the last ten years, Iran has also been experiencing a severe ongoing drought. As a result, the
UNDP and the DoE are working together to develop a Drought Risk Management System for
wetlands. This has also been added as an additional component of this Project and Lake Urmia
demonstration site.
Outlines of the key Project facts are noted in Tables 2 and 4.
Overall Progress and Achievements
The Project has now completed its 7th year of operation and has made substantial progress towards
its objectives. These objectives are noted in full in Tables 3 and 5. It is currently working to
complete the remaining objectives at the demonstration sites. For the next one year, its focus
extends to rolling out the wetland management framework to other Wetland Protected Areas
(WPAs) throughout Iran. As such, it will be working to ensure the sustainability of the Project’s
activities by working to establish the National Wetlands Strategy Committee and having the DoE act
as a secretariat for this committee. It will also look to build the capacities of national partners so
that they may assume responsibility for the wetlands. The advantage here is that they will have the
benefit of several years of established practice and experience to draw on.
![Page 9: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/9.jpg)
Major Results in 2011
Key results that have culminated in 2011 are as followed:
a. Implementation of Integrated Management Plans of Demonstration Sites
Implementation status of the management plans until the end of 2011 is as followed:
b. Demonstration sites management structures established and start functioning
The first meeting of LU regional council was held.
WA provincial management committee was established and had four meetings in 2011.
LP provincial and local management committee had two meetings. LP subcommittee had several meetings
LU technical working groups had two meetings each to discuss their role and new responsibilities
SW local management committee established in 2011 and had two meetings. Technical working groups had several meetings mainly focused on finalizing monitoring plans and protocols.
Capacity development program implemented for demonstration sites secretariats
The secretariats have also established their website for better information sharing among stakeholders.
c. Development of wise use strategies and action plans
“Action Plan on LP pollution management and control” was prepared and approved
Shadegan wetland zoning maps and codes of practice were finalized and developing SW
sustainable fishery strategy was started
LP ecotourism strategy and action plan was prepared
d. Lake Uromiyeh Water Right and Water Share
After water right approval in previous years, there has now been final agreement on the LU Water-share among three provinces around the lake and there has been lots of effort to implement the agreements.
e. LUB drought risk management plan
Considering the current ongoing drought crisis in Lake Urmia , CIWP started a sub-project since 2009 to develop a drought risk management plan for the lake. The plan is in final stages of preparation and will be a synthesis of drought characteristic (Spatial/Temporal behaviour), meteorological and
Assessment on LU MP Implementation Assessment on LP MP Implementation
![Page 10: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/10.jpg)
hydrological variables trend in LUB, drought management structure (organization), agriculture situation and monitoring system reports which were finalized in 2011.
f. LU satellite wetlands
Gorigol wetland management plan was finalized
Kanibarazan wetland designated as a Ramsar convention site and as Wild Life Refuge
g. Conservation and monitoring of LP biodiversity and endangered species
Three conservation ponds established and monitored to save LP endangered fish species.
Capacity development for conservation and monitoring of Otter
More than 100 students and teachers, Guards and local communities were trained and a local team was trained for further monitoring of Otter in cooperation with DoE guards.
LP land conflict resolution process
A map which indicates possible area of conflicts among different stakeholders was prepared and process of issuing title-deed for the wetland was started by judiciary office.
h. Community engagement and public awareness
SW and LP local community engagement in wetland management
8 representatives from different part of the SW are now members of working groups and provincial and local management committees.
Active participation in developing sustainable agriculture, Female Sustainable Agriculture Facilitators initiatives and participation in tour leader training course are good examples of their effective role.
TV and Radio Programs
Eight talk shows of a 26 episode series about LU problems and management were broadcasted from EA provincial TV. A Radio program about LU is broadcasting from WA Radio channel every week.
i. Developing sustainable agriculture around LP and LU
Dmonstration farms were established around LP
Organic farming introduced to gardens around Gorigol
j. National wetland strategy and action plan finalized
k. Securing National budget for wetland management system
The first budget was part of 5th development plan, in which the amount of 175 billion Toman was allocated to a 5-years project, another 90 billion Toman emergency budget for wetland management and restoration.
l. Capacity development and engagement of DoE habitat office for CIWP exit strategy
Preparation of wetland management toolkit based on CIWP experience
n. Iranian Wetland Database structure was finalized.
![Page 11: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/11.jpg)
o. Sharing CIWP experience with Key national stake holders
Meetings with Parliament members on wetland management
MoU with University of Environment
Close Cooperation with Ministry of Interior through consultative and training seminars for
managers and senior experts
Half day training seminars for DoE, MoJA an MoE mangers and experts
p. Sharing achievements and lessons learnt at international level
Participating in Ramsar convention Asia Regional Pre-COP11 meeting
Support 40th anniversary of Ramsar convention (global forum on wetlands for the future)
Publishing and sharing results of Regional Community of Practice for Wetland Conservation
Managers
q. CIWP exit strategy
There was an special focus on implementing this strategy within 2011 and it was also reflected on project activities during 2011 and planned ones for 2012. As a result, project concentrated more on finalizing activities in demonstration sites, securing national funds and budget for national wetland management system through developing national programs, close cooperation with related DoE offices to deliver responsibilities, develop and implement staff exit plan, reducing input and leadership for joint activities with stakeholders, concentrating more on documentation and production to roll out project achievements and approaches.
Indirect Results
a. Engagement of Civil Society
This Project has utilised the support and capacities of over 10 NGOs and approximately 12 CBOs1. In
doing this, it has provided opportunities for these organisations to grow and develop, while also
working towards the main project objectives. Through this, the capacity of civil society is developed
such that it may continue to support the project goals and the community after the closure of the
Project. An example of this is in the fact that the SW local and provincial Management Committees
have 4 seats dedicated to NGOs, CBOs village representatives. Where possible, the Project has also
worked to implement wetland protection initiatives proposed by local communities, both at LP and
SW.
b. South-South Cooperation
Study visit of Pakistan technical group from CIWP experiences in demonstration sites
In a new initiative and in line with South-South cooperation, CIWP in cooperation with Ramsar Regional Center for West and Central Asia, hosted A technical/managerial Pakistani group to visit CIWP demonstration sites.
The group included governmental managers and experts working closely with Pakistan National wetland project which was implemented by World Wide Fund for Nature (WWF-Pakistan). The team visited Lake Urmia and Lake Parishan and was acquainted with CIWP activities, achievements and lessons learnt mainly on local community engagement, wetland management structures, field
1
![Page 12: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/12.jpg)
activities by stakeholders and management plan development and implementation while sharing their comments and ideas with the project team.
Contribution towards attaining CPD and UNDAF Outcomes
a. Country Programme Document
The Country Programme Document (CPD) has among its aims the objective of improving Iran’s ability to meet the MDG targets. This Project’s focus is in line with MDG-7, environmental sustainability. Due to the high demand on water resources, the Project is engaged in finding ways in which sustainable water management systems can be promoted and adopted within the Government’s national strategies. Further, the levels of international cooperation this Project exhibits also contributes towards MDG8, the fostering of global partnerships.
The CPD also works to have environmental sustainability incorporated into national and local development strategies. This Project works to do just that and have WPA management systems incorporated at local, provincial and national levels through various committees, which are established and supported by the Project at various levels of Government. Further, these management plans have been tested and are currently being institutionalised.
b. United Nations Development Assistance Framework
This Project works directly towards the achievement of UNDAF Outcome 4.2 – “Global and national environmental concerns and environmentally sensitive development integrated into national development frameworks and implemented through community-based approaches to the sustainable use of natural resources, capacity-building, environmental assessment and the removal of financial, economic, legal, institutional and technological barriers.”
This Project works by a philosophy of participation and integration in which the capacity development of local communities and organisation are actively pursued. What is more, it has worked to incorporate this philosophy into the wetland management plans. These plans factor in the various development and environmental concerns of the areas in question and have now been incorporated into national development strategies.
Recommendations from Lessons Learned and Good Practices
Project exit strategy and safe ending
Developing an exit strategy for the final years of the project, provided a good basis for a gradual shift
of project technical responsibilities to related stakeholders and a plan for staff exit from the project.
Close cooperation with implementing agency offices and governmental stakeholders
It could be a risk for the project to focus on project activities without establishing useful and
effective links with the experts of the IA and other governmental organizations. Developing such
links and establishing inter-sectoral management mechanisms may prevent large changes within
project management body itself and established mechanisms due to political and managerial
changes in these organizations.
![Page 13: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/13.jpg)
Gradual change
Sometimes projects tends to start and insist on big changes within IA and partner organizations in
short period which may normally cause to resistant from those agencies and reducing effectiveness
and speed of activities. Changes in a longer period are more acceptable and sustainable.
As a recommendation, secured national budget as co-funding for international projects
One of the problems that international developing projects normally faced is secured national
budget in line with project activities. One recommendation for overcome this problem is developing
and approving a national program within governmental financial system which support the joint
project activities and provide financial resources in more secured mechanisms.
Risks and Challenges
The CIWP has recorded the risk of drought as serious and critical for the last several years, and
various mitigation activities are being undertaken. However, the drought conditions have continued
such that the risk has become reality. The Lake Parishan demonstration site has now been largely
dry since 2009, whilst at Lake Uromiyeh water levels have fallen throughout the project period and
salinity has become so high as to inhibit ecological functioning. Lake Uromiyeh’s satellite wetlands
have been less affected as a result of restoration measures. Biodiversity outcome targets are
therefore mainly “Red”.
For addressing the risk, CIWP has made a report to summarise the impacts of a persistent drought
on the expected outcomes of the IRI/UNDP/GEF Conservation of Iranian Wetlands Project, presents
the mitigatory and adaptive measures that have been taken, and makes a number of
recommendations.
Conclusion
Over the last seven years of implementation, the Project has come a long way towards achieving its
objective of establishing an effective management system that addresses the threats to the Project
Sites in cooperation with the main stakeholders at national and provincial levels. At the same time,
on a national level, the urgent need to address the threats to wetland ecosystems has been taken to
the highest levels of Government through developing national wetland strategy and action plan and
LU national management committee. Wetland data bank has been developed and is ready to be
used by DoE and a project toolkit is under construction for further application by stakeholders. On
the other hand national budget has been secured for five years for application and roll out of CIWP
experiences and new management system for important wetlands around the country.
What is more, it is working to ensure the lessons learned from this experience are absorbed within
WPA management systems throughout Iran.
![Page 14: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/14.jpg)
1.0 Introduction
Iran is a geographically diverse country. Its rich ecology and biodiversity can be found in its dry
desert landscapes, snowy mountain peaks and green pastures and forests. Given that much of the
country is characterised by dry, arid conditions, the many wetlands and watercourses across Iran
provide an important escape and oasis. It is also here that much of the country’s unique flora and
fauna can be found. However, over past decades, these wetlands have come under increasing
threat and as a result, have necessitated the implementation of active protection measures.
This is an annual report for the Conservation of Iranian Wetlands Project (the Project), which is being
implemented by Department of Environment (DoE) in the Islamic Republic of Iran (IR Iran). The
Project receives funding from the Government of IR Iran, but is also supported by the Global
Environment Facility (GEF) and the United Nations Development Programme (UNDP). It also has had
some assistance from an international donor, the Government of Netherlands. The Project works to
strengthen national wetland management capacities through applying ecosystem approach for
addressing key threats to the environmental stability at three pilot wetland sites: Lake Uromiyeh
(LU), Lake Parishan (LP) and Shadegan Wetland (SW).
This report provides an overview of the Project’s activities for 2011. It starts by providing a general
contextual background to the Project and a brief outline of the project history and key institutions
involved. It then moves to discuss the progress against the Project objectives to date. This is
followed by sections providing an overview of the Project finances, existing challenges and issues,
potential upcoming risks and some lessons learned from good practices. It finishes by providing
some recommendations for moving forward.
The objective of this document is to provide an outline to the contextual and operational
background to the Project activities, a review of each Project’s activities, and an outline of the
lessons learned and recommendations to date.
![Page 15: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/15.jpg)
2.0 Contextual Background
This chapter provides a basic description of the context in which the Project operates. This is done
by first providing a brief situation analysis of Iran and wetlands in general. Within the context of the
Ramsar Convention, a description of the status of wetlands in Iran is then provided.
2.1 Iran and Wetlands
Iran is a geographically expansive country at 1.648 million km2 in size. To its north lies the Caspian
Sea and at its southern border is the Persian Gulf. It also shares a border with Iraq to the west;
Turkey, Armenia and Turkmenistan to the north; and Afghanistan and Pakistan to the East. The
country boasts a varied terrain that ranges from coastal lagoons, dry desert plains, two expansive
mountain ranges and green northern forests.
Iran also contains over 1000 wetland sites, over 150 of which are of international significance.2
Wetlands are among the world’s most productive environments.3 They house vast amounts of
biological diversity and provide the water to countless species, including humans, need for survival.
They also support high concentrations of birds, mammals, reptiles, amphibians, fish and invertebrate
species.4 Iran’s wetlands provide not only scenic beauty, but are also a cradle for a wide range of
flora and fauna, many of which transit Iran in the form of migratory birds. These wetlands are also
essential for providing sustenance to the people who inhabit the areas surrounding these wetlands.
However, like many other countries, as Iran has developed, increasing pressure has been placed on
it’s environment and natural resources, among these were the precious wetlands. This pressure did
not go unnoticed by authorities and over the 1960’s increased international momentum was gained
for the establishment of some means of protecting these areas.
2.1.1 Ramsar Convention 1971
This international momentum culminated in the Convention on Wetlands of International
Importance, especially as Waterfowl Habitat (Ramsar Convention). The Ramsar Convention is an
intergovernmental treaty that provides a framework for national action and international
cooperation for the conservation and sustainable use of wetlands and wetland resources.5
The general text of the convention was prepared over a series of technical meetings. Initially, the
Convention aimed at protecting waterfowl, but as discussions progressed it developed into one
conserving wetland habitats as a whole. Eventually, the final text was agreed to at a conference
held in Ramsar, Iran in 1971. It entered into force in 1975 and has since then, worked to provide a
general framework for the conservation and sustainable management of wetlands.
2
3
4
5
![Page 16: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/16.jpg)
As States become members to the Ramsar Convention, they must designate at least one national
wetland site to be registered as an official Ramsar site. This is done in accordance with criteria set
out in the Convention. Needless to say, Iran too is a signatory to the Convention and has several
registered Ramsar sites. Table 1 below contains a breakdown of Iranian wetlands and their national
and international status.6
Breakdown of Iranian Wetland Sites Breakdown of the Number of Sites
Area (ha)
Wetland sites in Iran 1000+
Wetland sites in DoE database 84
Wetlands classified as Ramsar Sites 24 1,486,438
Wetland sites considered of international significance (WIS) 47
- WIS sites not Ramsar listed nor nationally protected 9
- Wetland protected areas (WPAs) Ramsar listed only 25
- WPAs with some national legal protection 61
- National Park 6 685,650
- Wildlife Refuge 14 639,277
- Protected Area 20 1,931,564
- No-hunting area 21 185,823
Table 1
2.2 Long Running Drought and Water Resource Management
Over the last decade, Iran as a whole has been suffering from a long running drought. This drought
is affecting water levels in lakes across the country, including the wetlands that are the subject of
this Project.
Since the year 2000, Lake Uromiyeh has had decreasing water levels and increased levels of salinity.
The surrounding wetlands are also under threat as a result of rapid unplanned urbanisation, the
construction of water resource development infrastructure and unsustainable water usage, the
unprecedented increase in land use for agriculture and pollution.7
Lake Uromiyeh is recharged through 17 tributary rivers, 39 flood-ways, and 14 seasonal rivers which
are mainly in the southern part of the basin. This inflow is estimated to be approximately 5300 mcm
6
7
![Page 17: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/17.jpg)
annually.8 It also receives direct rainfall and groundwater seepage, however this has been greatly
reduced in recent years due to agricultural groundwater extraction.
The Lake Uromiyeh Basin (LUB) has a population of over 5.9 million9 and there are now more than
36 cities and 3150 villages the area.10 To meet the increasing demand on water, the Government
has completed or planned several resource development projects. Reportedly, 231 water
development projects have been identified as feasible for the next 20 years. This includes 74
storage dams and 124 diversion weirs.11
As a result of its size, LU is a major factor in defining the microclimate of the region. This increased
environmental and social pressure on LU and the surrounding wetlands is potentially catastrophic
for the local environment and its inhabitants.
To address this, a supplementary project on drought risk management was created by the UNDP and
DoE. This project is discussed further in the next chapter of this report.
8
9
10
11
![Page 18: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/18.jpg)
Conservation of Iranian Annual Report 2011 Wetlands Project
3.0 Conservation of Iranian Wetlands Project in Iran
This chapter provides an outline of the Project itself as well as the key actors involved. For brevity,
Tables 2 and 4 below have been prepared to provide the key information relating to the Project.
3.1 Wetlands Project Outline
As noted above, Iran has been an active founding member of the Ramsar Convention. However,
actions previously taken in protecting wetland areas have not been effective in addressing the
threats to these ecosystems. Over recent decades, it was noted that more work was needed to
actively protect the country’s wetlands. Many were becoming seriously degraded, some to the
point where the biodiversity and human activities that were reliant on them were dying out.12 This
brought about the gradual development of the Conservation of Iranian Wetlands Project.
The Project plan was drawn up over six years from 1998 to 2004 by international consultants
working with the Government of Islamic Republic of Iran (IR Iran), the United Nations Development
Programme (UNDP) and Global Environment Facility (GEF).13
Once the Project plan was completed, the Iranian Department of Environment (DoE) was designated
as the Executing Agency14. The Ministry of Energy was also brought onboard to assist in
implementing the support provided by the Government of Netherlands and coordinating with the
GEF/Government components of the Project. Other participating national agencies were: Office of
Strategic Planning and Control of the Government of the IR Iran (SPAC)15, Ministry of Foreign Affairs
(MFA), Ministry of Jihad Agriculture (MoJA), the Ministry of Roads and Transportation (MRT),
Ministry of Interior (MoI) and Cultural Heritage Organization (CHTO) in later steps of project. The
involvement of these later organisations was largely in assisting in the coordination of the Project
through representatives in its steering committee. In accordance with GEF requirements, the UNDP
was designated as the implementing agency of the Project.
Originally the Project was planned to be completed by the end of 2011, however at the beginning of
implementation, there were several changes in key staff that resulted in delays. Also, the onset of a
continuing drought further hindered implementation. As a result, the project was extended for an
additional one year on a no-cost basis.16
The Project is now planned to take eight years and has been assigned a budget of
USD$12.905 million. This is comprised of funds from the Government of IR Iran (USD$9.190m) and
from GEF (USD$2.915m). An additional USD$0.6m was granted by the Government of Netherlands
for an existing project in a similar area, however this project was largely completed before the full
commencement of the Project at hand.
12
13
14
15
16
![Page 19: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/19.jpg)
Thus, an “at a glance” overview of the project is provided in Table 2 below.
Project Title Conservation of Iranian Wetlands
Project Duration 8 Years
Project Budget USD$12.905 million
Executing Entity Iranian Department of Environment (DoE)
Cooperating National Agencies
The Ministry of Energy
Office of Strategic Planning Affairs and Control of the Government of the IR Iran (SPAC)
Ministry of Foreign Affairs (MFA)
Ministry of Jihad Agriculture (MJA)
Ministry of Roads and Transportation (MRT)
Ministry of Interior (MoI)
Implementing Agency
United Nations Development Programme (UNDP)
Table 2
The underlying aim of the Project is to conduct a pilot and demonstration conservation operation,
which if proven successful, could be adopted by the Government and applied to the other national
wetlands. Two pilot sites were select for this: Lake Uromiyeh Basin (LUB) and Lake Parishan (LP).
The LUB, as part of a larger wetlands ecological zone, includes Lake Uromiyeh (LU), several satellite
wetlands that were of international importance and a national park. Lake Parishan is a fresh water
lake located in Arjan & Parishan Protected Area in Fars Province. In 2009, following a Mid-Term
Evaluation (MTE), it was also decided that Shadegan Wetland (SW), which had previously considered
a replication site for the Proect, be considered a pilot site on its own.
In light of previous experience, if it were to be successful, the Project had to address the main
threats to the pilot sites, namely:17
Changes to the water regime (dams, diversion, irrigation, wastage);
Aquatic and noise pollution (from agriculture, industry, domestic, boats and aircraft);
Unsustainable exploitation of wetland resources (over-fishing, over-grazing and over-
hunting);
17
![Page 20: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/20.jpg)
Conversion of wetland habitats (agriculture and urban development);
Land degradation in watersheds (deforestation, over-grazing, agriculture);
Transport infrastructure; and
Species introductions, particularly invasive species (accidental and deliberate).
Because previously the designation of Wetland Protected Areas (WPAs) by the DoE had not proven
effective, the designers of the Project wished to develop a plan that took a new approach in wetland
conservation in Iran. “Ecosystem Approach” as the new approach that was decided upon is
characterised by two key words:18
1. Participation – for relevant stakeholders to be appropriately and actively engaged in the
conservation effort; and
2. Integration – to ensure that decisions about land, water and biodiversity use, which affect
wetlands, take into account the diverse influences upon wetlands by all sectors of human
economic development and livelihood activities.
Thus the goal, objectives and intended outcomes of the Project were developed. They are
summarised in Table 3 below:19
Project Goal
To catalyse the sustainability of Iran’s system of wetland protected areas (WPAs), thereby enhancing its effectiveness as a tool for conserving globally significant biodiversity.
Project Objective
To establish an effective management system to systematically remove or substantially mitigate threats facing globally significant biodiversity and sustainability at two WPA demonstration sites, while ensuring that the lessons learned are absorbed within WPA management systems throughout Iran.
Outcome 1
Model wetland management system designed and being implemented by DoE and other local stakeholders at demonstration sites to effectively address the most significant ‘internally arising’ threats to globally significant biodiversity.
Outcome 2
Model intersectoral coordination demonstrated at provincial and basin level enhances the sustainability of the wetland conservation system by, inter alia helping to address threats arising at ecosystem level.
Outcome 3 National level wetland management and inter-sectoral
18
19
![Page 21: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/21.jpg)
coordination structures poses and utilize enhanced capacities, and the model system developed through Outcomes 1 and 2 above is applied to wetlands throughout Iran through strategies, replications, tools and exchange of knowledge and lessons learned.
Table 3
3.2 Drought Risk Management Project
As noted previously, the LUB is facing a critical threat in the form of a persistent drought and
increased demands on local water resources. If this were to continue, it would be disastrous to the
local microclimate and biodiversity. What is more, it puts to question the relevance and
effectiveness of the overall Project.
In light of this critical situation, joint UNDP and Project team visits were undertaken in early July
2008. Discussions were held with local stakeholders including local officials, NGOs and communities.
It was agreed to develop a drought risk management plan to be integrated into the Project.
As a result, the Lake Uromiyeh Drought Risk Management Project for Sustainable Livelihoods,
Biodiversity and Microclimate Management Project was created. The rational of the project is to
provide technical support that would “focus on building a critical technical knowledge base around
climate change and its impacts on microclimates, persistent droughts and biodiversity.”20
For brevity, Table 4 outlines the project key facts that differ from the overall Project, and Table 5
states the project goal and objective, it also contains the four outputs required of it.
Project Title
Lake Uromiyeh Drought Risk Management Project for Sustainable Livelihoods, Biodiversity and Microclimate Management Project
Project Duration 2 Years
Project Budget USD$200,000.00 (UNDP) TRAC Funding
Table 4
Project Goal
To establish an ecosystem based management for the lake and its satellite wetlands within the context of sustainable development with effective involvement of all stakeholders including local communities.
Project Objective Effective drought risk management for sustainable livelihoods and biodiversity in the environs of Lake Uromiyeh.
Output 1 [X] pubic officials, technical experts and NGO representatives benefited from national and international knowledge/experience exchange visits and other learning
20
![Page 22: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/22.jpg)
opportunities.
Output 2
International technical research and capacity building support provided to relevant public agencies for scientific research around causative links/scientific evidence for climate change, persistent drought and local development interventions and threats to Lake Uromiyeh, including identification of opportunities for sustainable resource use.
Output 3 [X] multistakeholder demonstrative projects developed and implemented for improved /diversified livelihoods and natural resource management.
Output 4 [X] knowledge management/reflection sessions/researches organised to produce lessons learned documents/reports and wide distribution for replication.
Table 5
3.3 Project Entities
There are several entities involved in the Project, three of which are noted below.
a. Global Environment Facility
The Global Environment Facility (GEF) was established in 1991 through the World Bank to assist
developing countries protect the global environment and to promote environmentally sustainable
development. The GEF works by providing grants, which when applied, should transform a national
project into one that benefits the global environment.21 Globally, GEF grants support projects
related to biodiversity, climate change, international waters, land degradation, the ozone layer, and
persistent organic pollutants.
In 1994, GEF was restructured so that it became a permanent and separate institution in its own
right. The UNDP, United Nations Environment Program and World Bank are the initial three
implementing partners of GEF, though the World Bank has also become a trustee of the GEF Trust
Fund. 22
Today, the GEF is the largest funder of projects to improve the global environment. It has allocated
USD$9.2 billion, supplemented by more than USD$40 billion in co-financing, for more than 2,700
projects in more than 165 developing countries and countries undergoing economic transition.
Through its Small Grants Programme, the GEF has also made more than 12,000 small grants directly
to nongovernmental and community organizations, totalling $495 million.23
21
22
23
![Page 23: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/23.jpg)
b. United Nations Development Programme
The UNDP is the UN’s development network. It works to advocate for change and connect countries
to knowledge, experience and resources. In doing this, it also assists countries attract and use aid
effectively.24 In this way, the UNDP is often, as in this case, an implementing partner and assists
national projects in receiving and administering funds.
c. Department of Environment
The DoE is headed by the First Vice President and tasked with the protection of Iran’s natural
environment. In order to achieve this, the DoE not only works to control the hunting of Iran’s
wildlife, but it also works in areas such as the preventing of the release of pollutants into waterways
and the atmosphere, the prevention of the over extraction of Iran’s natural resources and the
compliance with Iran’s international environmental commitments. In doing this, it also works with
other Government ministries to find a balance between often competing demands.
3.4 Monitoring and Evaluation Framework
A detailed Monitoring and Evaluation (M&E) Plan is included as Annex 1.2 of the Project Document.
A summary of this M&E Plan is as follows:
Type of Action Stakeholders Due by
Planning
1 Preparation and Submission of the Project Annual Planning & Reporting Package
Project Board & Project Team
By end of January 2011
2 Quarterly Work plans 2011 Project Team 15 January, April, July, October 2011
Reporting
3 Quarterly Progress Reports Executive Board, Implementing Partners as described in Project Document, Project Team, General Public (via Project website)
For comments: 1st Q report by 15 April 2011, 2nd Q report by 15 July 2011 & 3rd Q report by 15 Oct 2011
4 Workshops to be reported by assigned rapporteur
Project Management, M&E and Workshop Participants
Within 1 month of workshop
5 Bilingual Annual Report Project Board, Implementing Partners as described in Project Document, Project Team, General Public (via Project website)
11 Dec 2011 to be sent for review of Project Team 15 Dec 10 incorporate comments, 17 Dec 2011 send copy to Board
24
![Page 24: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/24.jpg)
members
Monitoring
6 Update Project Equipment Inventory List
Project Management & M&E Quarterly (last week of March, June, September and December 2011)
7 Site visits Project Management Two missions in each quarter. Reports are due within three days upon return from mission.
8 Mission Logs M&E Quarterly (last week of Mar, Jun, Sept and Dec 10)
9 Risks, Issue and Lessons Learnt Logs
M&E Quarterly (last week of Mar, Jun, Sept and Dec 10)
10 Project SC Meetings Project Board Members, M&E
July and Dec 10
11 Reviewing and applying management response for MTE
Project Board, Implementing Partners as described in Project Document, Project Team, General Public (via Project website)
Quarterly (last week of Mar, Jun, Sept and Dec 10)
Table 6
![Page 25: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/25.jpg)
4.0 Progress in attaining Project Outcomes
This section of the report discusses the overall progress towards achieving the Project outcomes.
Each section begins by stating the respective target outcome or objective and is followed by the key
results for that outcome that have culminated in 2011. This is followed by a general overview
regarding the Project’s progress towards the overall objective, with reference to Table 10 is included
in Annexure IV.
4.1 Local Model Wetland Management System
Outcome One: Model wetland management system designed and being implemented by
DoE and other local stakeholders at demonstration sites to effectively
address the most significant ‘internally arising’ threats to globally
significant biodiversity.
a. Implementation of Integrated Management Plans of Demonstration Sites
Along with the formation of managerial structures, implementation of management plans was also
in high priority in 2011. Implementation status of the management plans until the end of 2011 is as
followed:
Assessment on LU MP Implementation
Assessment on LP MP Implementation
![Page 26: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/26.jpg)
b. Development of wise use strategies and action plans
“Action Plan on LP pollution management and control” was prepared and approved
This action plan was prepared in a participatory process through a workshop to discuss and review
the stakeholders’ comments on the draft of the afore-mentioned plan by CIWP’s representatives
and the government stakeholders.
Modified and finalized draft of action plan was also discussed in the LP biodiversity and water sub-
committee to indicate monitoring and implementation mechanisms of this plan in line with their
internal commitments and report to LP management committee. This action plan was finally
approved in LP management committee.
Shadegan wetland zoning maps and codes of practice were finalized
Zoning maps and codes of practice are very important tools for further development around
wetlands and they are attached to integrated management plans for approval. SW zoning maps and
codes of practice were finalized by Khouzestan DoE and other provincial and local stakeholders and
shared with all related authorities for implementation and consideration in development projects.
LP ecotourism strategy and action plan was prepared
Several meetings were held by LP ecotourism subcommittee to prepare LP ecotourism strategy and
action plan in line with MP management plan and based on an agreed road map and required steps.
This strategy and action plan is now a basis for the subcommittee for developing new ecotourism
projects and reviewing submitted proposal.
Agreement and initial steps for developing SW sustainable fishery strategy
After preparing a road map, Khouzestan DOE is leading process of development of SW fishery
strategy in cooperation with related organizations and representatives of Local communities
including fisherman in wetland areas.
c. LU satellite wetlands
Final draft of Gorigol wetland and first draft of Gharegheshlagh wetland management plans
were prepared
LU satellite wetlands are playing a very important and supportive rule within LU ecosystem and LU
integrated management plan has a special emphasis on their management and conservation.
Gorigol wetland (near Tabriz) management planning process which was started around 2 years ago,
had its final participatory workshop for the last comments from stakeholders and final version is
ready for ratification at local and provincial level. In line with this steps Gorigol water canals were
also repaired and modified for a better water flow to the wetland.
Gharegheshlagh wetland (near Bonab) basic studies is almost finished and its management planning
process started through holding the first workshop and preparing the first draft.
Kanibarazan wetland designated as a Ramsar convention site and as Wild Life Refuge
After a one year follow up and cooperation among WA DoE, DoE habitat office and CIWP required
document for Kanibarazan wetland designation was prepared and submitted to the Ramsar
convention secretariat. Designation of Kanibarazan as a Ramsar site and Wild Life Refuge was
announced in 40th anniversary of the convention in Iran
![Page 27: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/27.jpg)
d. Conservation and monitoring of LP biodiversity and endangered species
Three conservation ponds established and monitored to save LP endangered fish species.
LP faced a severe drought in recent years and it caused a serious threat to biodiversity especially
endemic fishes of the wetland. As an urgent response to the current situation a 0.7 ha in-site pond
was established beside one of the wetland active springs with involvement of local community,
NGOs and local DoE. In two other parts of the nearby areas on in habitat and one artificial small
ponds were established in cooperation with local DoE and fishery organization to save and monitor
remaining endemic fishes of the wetland.
Installation boundary markers (buoys) for High Sensitivity zone of LP
The LP sensitivity zones were developed in a participatory way with representation from the main
stakeholder groups, particularly the fishermen. The High sensitivity zones will play an important role
both as refuges from human disturbance for wintering and breeding waterbirds (including globally
threatened species), as well as providing a no fishing zone, which has great potential to help improve
fish stocks. This identification of core zones is a crucial management and conservation tool.
Hence, according to CIWP workplan, a project for buoys installation around the high sensitivity zone
of Lake Parishan was carried out by Kazeroun DoE .
Capacity development for conservation and monitoring of Otter and Typha
Otter and Typha were distinguished as indicator species for LP wetland condition and monitoring of
these species was part of LP management plan priority actions. Several activities were accomplished
in cooperation with a national NGO (Plan for Land) for community empowerment on monitoring
Otter around the wetland. More than 100 students and teachers were trained, in this training
course, Guards and local communities and NGOs were trained about joint cooperation and methods
of identifying and detecting wildlife and Otter, which was highly welcomed by participants.
Two training booklets and one brochure were published and a local team received advanced and
field training for further monitoring of the Otter. Basic field study is finished and preparation of an
action plan for Otter conservation has been started.
An experimental exclosure has been established for Typha around LP and a local NGO monitor and
record the condition of the Typha within exclosure in comparison with the one out of it for further
analysis and actions.
LP land conflict resolution process
Land conflict around LP is a long history dispute between local community and local authorities
including Local DoE office. Resolution of this conflict was the first priority action within management
planning process from most of stakeholders view point.
Following CIWP’s efforts for resolution of land conflicts in LP during 2011, a road map and action
plan which show the approach and role of responsible authorities was prepared and approved. A
map which indicates possible area of conflicts among different stakeholders was prepared by natural
resources organization as a next important step. Judiciary office announced the boarders of the map
in the news paper as one of legal step to issue the wetland title-deed after resolving possible
conflicts. At the same time negotiation has been started with local community representatives to
discuss land conflicts and more than 4 km of borders was fixed and marked by Kazeroun DoE.
![Page 28: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/28.jpg)
e. LP Summary baseline report
This report compiles existing information on Lake Parishan to describe the Lake and its attributes,
including the, ecological and socio-economical characteristics of the lake and its surrounding
villages. The report provides a concise baseline of the status of the Lake at the time of the
UNDP/GEF/DOE Conservation of Iranian Wetlands Project.
f. Community engagement and public awareness
SW local community engagement in wetland management structures
Shadegan wetland has a unique structure in terms of large number of villages and local community
around the wetland and their direct impact of SW functions and values with their livelihood.
For an effective involvement of the local community within wetland management processes, several
meetings were held with different villagers to discuss SW management plan and several trainings
were held for more than 100 students and teachers in 8 schools around the wetland.
8 representatives from different part of the wetland are now members of working groups and
provincial and local management committees.
Community engagement for LP management plan implementation
LP Community had a strong role in the management plan development and this role continued in
the next phase which was implementation. Active participation in developing sustainable
agriculture around the lake, involvement in training for Otter conservation and formation of a local
monitoring team, Female Sustainable Agriculture Facilitators initiatives on establishing micro credits
and participation in tour leader training course as an alternative livelihood initiatives are some good
examples of such an effective role.
TV and Radio Programs
Eight talk shows of a 26 episode series about LU problems and management were broadcasted from
EA provincial TV with participation of responsible authorities and NGOs at national and provincial
level as public awareness initiative and basis for further discussion on the issues.
At the same time a Radio program about LU is being broadcasted from WA Radio channel every
week. Also project manager has participated in different TV/radio programs about issues of Iranian
Wetlands with particular focus on Lake Urumiyeh.
SW water and biodiversity monitoring protocols prepared
After preparation and approval of SW management plan its monitoring plan and protocols remained
to be discussed among stakeholders. Khouzestan water authority as head of WAWG led the
preparation of water monitoring protocols in cooperation with other members and Khouzestan DoE
did the same for biodiversity protocols. These protocols will be attached to the management plan in
publishing stage.
“Wetlands management for biodiversity” training courses
Three workshops on management and restoration of Parishan and Shadegan wetlands and Lake
Urmia for biodiversity conservation were held in June 2011 and more than 90 experts from different
related provincial authorities were trained.
![Page 29: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/29.jpg)
The main issues raised and presented in this workshop included wetlands biodiversity management,
management of wetland habitats, species management and restoration of biodiversity. In the last
session of this workshop, management achievements, the effects of exploitation of wetland
ecosystems products, the necessity of habitats restoration, enhancement of water resources and
improvement of fauna and flora were reviewed by CIWP’s international consultant.
4.2 Provincial Level Model Intersectoral Coordination
Outcome Two: Model intersectoral coordination demonstrated at provincial and basin
level enhances the sustainability of the wetland conservation system by,
inter alia, helping to address threats arising at ecosystem level.
a. The first meeting of LU regional council
The first meeting of LU regional council was held jointly with LU national management committee in
West Azerbaijan, chaired by WA governor, with participation head of DoE, LU National Committee
members (representatives of interior and agricultural ministries), East Azerbaijan and Kordestan
governors and head of all related provincial authorities from three provinces as the regional council
members.
In this meeting, the latest approvals of the National Committee, implementation guidelines for LU
water right and provincial water share, the 5-years priority projects and the financing issues,
implementation structure of LU regional and management council and also the problems of LU in
line with implementation of LU management plan were reviewed and discussed.
b. Lake Uromiyeh Water Right and Water Share
With Project’s support and following the approval of water right in last year, there has now been
final agreement on the LU Water-share among three provinces around the lake. This agreement
ensures that each province will allocate a specific amount of water as an environmental right for
preservation of the LUB environment. There has been much effort including prioritizing proposals
from implementing agencies and selecting 24 projects for urgent implementation through technical
and managerial meetings at national and provincial level among stakeholders. There have been good
achievements but still ways to go for full commitment and implementation of agreements.
c. Developing sustainable agriculture around LP and LU
Demonstration farms were established around LP
To develop sustainable agriculture around LP, one demonstration farm was established around LP
after initial coordination with local farmers and authorities. The established farm had different
experiments and introduced different techniques to manage water resources and chemical pesticide
and fertilizers. The farm provides technical support and trainings for 25 farms around it and they
weekly meetings were held in the main farm to review the result of each technique and possibility of
its implementation in their farms. 25 other farms applied at least 2 techniques in their farms. The
results are as follows:
Water Use Management
![Page 30: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/30.jpg)
Method: Participatory Technology Development (PTD),
Total pilot area: 29.5 ha (the main pilot farm is 1.8 ha),
The number of pilot farms: 25
Water consumption in normal situation (crop: tomato): 1080 (m3/ha),
Average of saving water (the main pilot farm): 6606 (m3/ ha) and totally 11890.8 (m3),
Average of saving water (total pilot area): 4119.9 (m3/ ha) and totally 121537 (m3),
Integrated Pest Management
No Traditional Techniques Consumption
(Traditional
situation)
Consumption
(main pilot farm)
1 Chemical fertilizer (Phosphate) 200 (Kg/ ha) 0
2 Chemical fertilizer (Nitrate) 300 (Kg/ ha) 70 (Kg/ ha)
3 Chemical fertilizer (Potash) 300 (Kg/ ha) 0
4 Chemical Poisons
(Fungicide, Herbicide, Insecticide)
5+ 1+ 4 1+ 1+ 0
Crop Yield:
Crop: Tomato Average of crop yield (the main farm): 97.37 (Ton/ ha), Increase crop yield in the main pilot farm in compare with traditional situation: 17.9 %
Organic farming introduced to gardens around Gorigol and Seyran Goli wetlands
An MoU among CIWP, provincial agriculture organizations and local cooperative on developing
sustainable agriculture were finalized and signed (Gorigol and Sirangoli). These initiatives will be also
supported by GEF/SGP Iran through proposals which will be submitted by local NGOs.
In villages around Gorigol, basic surveys were done for 120 gardens (1118 ha) and 64 gardens were
selected for detailed studies as demonstration farms. For issuing level of organic farming an
international company (BCS) had a three day monitoring visit from selected gardens.
In villages around Sirangoli wetland, a technical committee was established in WA and 25 farmers
and 4 products were selected for introducing sustainable agriculture to the region. As initial steps
basic surveys were done and water management plan was developed for demonstration farms.
d. Demonstration sites management committees and technical working groups
Establishing management committees and their technical working groups for three demonstration
sites are one of the major achievements of CIWP to introduce a new approach of management for
![Page 31: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/31.jpg)
wetland ecosystems and sustainability of these structures are one of the main project concerns for
2011 and 2012.
WA provincial management committee was established and had four meetings in 2011. This
committee is chaired by deputy governor and has a very strong role in coordination among
governmental authorities within the province
LP provincial and local management committee had two meetings to review and approve
proposals for management plan implementation and strategies and decision developed by
technical subcommittees. LP Water, Land conflict resolution, biodiversity and alternative
livelihoods technical subcommittees had several meetings to plan and monitor their related
priority actions in management plan and develop related strategies for further actions.
LU Water and Agriculture, Biodiversity and Public awareness and Participation working
groups had two meetings each to discuss their role and new responsibilities regarding the
first meeting of LU regional council and Plan for their related priority actions in management
plan.
SW local management committee established in 2011 and had two meetings to finalize the
committee membership and duties, review management plan priority actions and further
activities and responsibilities of stakeholders. Technical working groups had several
meetings mainly focused on finalizing monitoring plans and protocols and reviewing
proposals for MP priority actions.
e. Capacity development of demonstration sites secretariats
The secretariats play a very important role in efficient function and sustainability of multi-sectoral
management committees and technical working groups of demonstration wetlands. The secretariats
were established during previous years since management plans approval in each site which mainly
includes DoE staffs.
These secretariats should have enough capacity to play such a crucial role. For addressing this issue
as part of project exit strategy, CIWP developed draft of a capacity building program for the
secretariats. As an initial step, staffs of these secretariats that are mainly DoE staffs were
participating in a workshop to receive some training on required skills and share their experiences
and challenges with each other to be considered in the program.
The secretariats have also established their website for better information sharing among
stakeholders.
4.3 National Wetland Management and Coordination
Outcome Three: National level wetland management and intersectoral coordination
structures poses and utilize enhanced capacities, and the model system
developed through Outcomes 1 and 2 above is applied to wetlands
throughout Iran through strategies, replications, tools and exchange of
knowledge and lessons learned.
![Page 32: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/32.jpg)
a. National wetland strategy and action plan finalized
In order to create a national wetland management framework and assist in the coordination of the
various organisations and stakeholders, the Project has now finalised National Wetland
Conservation Strategy and Action Plan. This is a document that incorporates both a strategy and an
action plan and aims to set a clear process for conserving Iran’s wetlands.
This document has been finalized after including final comments and inputs from main stakeholders
(NGOs, MOJA, DOE related offices, Water Authority, NRO, DCHT) and ratification by DoE head and
deputies council. The enclosed legal document for approval in the cabinet which clarify and secure
institutional arrangements and funds for implementation has also been prepared in close
cooperation with DoE related offices.
b. Securing National budget for wetland management system
As a part of rolling out strategy, CIWP was involved in securing two important national budgets for
DoE. The first budget was from article 212 (32) of 5th development plan, in which the amount of 175
billion Toman was allocated to a 5-years project, namely, Ecosystem Management of Iranian
Wetlands Project.
The second fund was secured from the emergency budget plan, which is a fund allocated from
excess oil revenue of the country. The fund is specifically assigned for management of water
resources in adjacent to the country borders as well as inhibition of aerosols in the border provinces
and conservation of Iranian wetlands. CIWP was involved in securing the amount of 90 billion Toman
from the mentioned fund.
c. Capacity development and engagement of DoE habitat office for CIWP exit strategy
As a part of CIWP exit strategy, one of the main objectives of CIWP is sustainability of its activities
after the project’s termination. Since DoE habitat office has the key role in conservation of Iranian
wetlands, capacity building of the office staffs was essential in order to provide an appropriate
circumstances for the sake of transferring CIWP responsibilities to wetland section of the habitat
office.
Initially, after conducting several investigations a capacity assessment questionnaire were devised
for habitat office, which was filled and discussed by the staffs through several meetings. In addition,
for the sake of gradual transferring of CIWP responsibilities to habitat office a table of monitoring
joint activities was developed. Currently, DoE habitat office staffs are under tailored trainings
according to the training course package, which was developed based on the questionnaire’s
outcome.
d. Preparation of wetland management toolkit based on CIWP experience
Conservation of Iranian Wetlands Project, as an ecosystem based project, has gained many
experiences which can be documented to be used by others involved in wetlands management.
To classify the achievements and lessons learned of the project, it was decided to develop a user-
friendly toolkit for the use of all wetland stakeholders and other. The toolkit is comprised of 8 main
parts including: ecosystem approach, baseline studies, management planning, institutional
![Page 33: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/33.jpg)
arrangements and financing for wetland management, implementation of management plans, CEPA,
replication, institutionalization and roll-out and project management. This toolkit can provide an
online resource to support the establishment of ecosystem-based management plans for Iranian
Wetlands.
During 2011 the main framework and structure of the toolkit has been developed through several
meetings and correspondence of the project staff and consultants. The main categories have also
been divided into several subcategories.
e. Development of Iranian Wetland Database
The Wetland Database is a web-based system and It is based on the approach taken by the MEDWET
initiatives and will be a tool for the storing, monitoring and sharing of information on the status of
wetlands around the country. This is a tool that all provincial DoE in coordination with headquarter
related offices are able to update and track information on habitat details of their local wetlands.
Eventually these data will be made available to the public and could be used as a monitoring tool for
managers and experts.
The structure and software design of database has been finalized during 2011 after several testing,
modification and including feedbacks and comments from related DoE offices. Meetings and
workshops were held with DoE provincial and national experts to clarify data filling and approval
procedures and train experts as users of the data bank.
f. Sharing CIWP experience with Key national stake holders
Meetings with Parliament members on wetland management
Parliament members were one of project target groups to advocate the new system of wetland
management and having their support to develop legal infrastructures. CIWP participated in
parliament members’ technical working group meetings to support developing draft of a law for
implementing the new wetland management system in the country and for all important wetlands.
MoU with University of Environment
University of Environment is one of CIWP main counterpart to institutionalize and develop the
experience of ecosystem approach application for wetland management among university students,
professors and DoE experts.
Cooperation between CIWP and UOE was initiated in 2010 through joint training seminars for
university students and an MoU was signed between them in 2011 to enhance the cooperation in a
systematic context.
Following the signing of the MoU a meeting was held on 18th of Dec 2011, for exchanging and
sharing experience with university scientific board and professors and proposal was developed for
training of DoE staff and mangers on wetland management.
Close Cooperation with Ministry of Interior
Ministry of Interior along with provincial governor offices has a very important role in inter-sectoral
coordination among governmental authorities and CIWP supported improvement of this role in
close cooperation with related offices within the ministry.
![Page 34: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/34.jpg)
In line with above cooperation, a consultative meeting was held on the importance of conservation,
management and socio-economic functions of wetlands and reviewing the role Ministry of the
Interior (MOI) and the Governors in implementing the integrated management plans.
In the other hand, 32 rural development director generals from all provincial governor offices were
gathered for a training workshop in ministry of interior and in one section CIWP provided a training
course on environment and wetland management based on ecosystem approach.
In this course some issues about management of local organizations, rural development, Local
councils and structures, strengthening local organizations were reviewed and discussed.
Study visits of other national projects from CIWP demonstration sites
CIWP facilitated and welcomed request from other national related project to visit project activities
in demonstration sites.
A technical group of Alborz project mainly from agriculture ministry experts visited LP and
sustainable agriculture demonstration farms and planning was started for Anzali wetland Project
team in 2012.
Half day training seminars for DoE, MoJA an MoE mangers and experts
Considering the significant role of all national stakeholders in integrated steering of the wetlands’
management activities in the provinces, raising awareness of the main national entities regarding
their roles in wetland conservation is of great importance. Hence, CIWP held three half day seminars
for the most important national stakeholders, namely, DoE, MoJA and MoE.
The target groups of these half day seminars were key managers and experts, who are involved in
wetlands related activities decision makings. The seminars’ agenda was mainly revolving around
CIWP activities elaboration along with discussion regarding the current responsibilities and tasks of
the organizations, which are in alignment with wetlands integrated management and CIWP goals.
g. Sharing achievements and lessons learnt at international level
Ramsar convention Asia Regional Pre-COP 11 meeting
This meeting was held on 13-18 Nov 2011 in Indonesia, with presence of Ramsar convention
member countries, international NGOs and the regional centres of the convention as a preparation
for next COP.
In this meeting, along with active participation of CIWP representative in the event, the report of
Conservation of Iranian wetlands project and the organization actions for wetlands management
and specially Lake Urmia Basin were presented and discussed as one of the successful experiences in
the basin.
Study visit of Pakistan technical group from CIWP experiences in demonstration sites
In a new initiative and in line with South-South cooperation, CIWP in cooperation with Ramsar Regional Center for West and Central Asia, hosted A technical/managerial Pakistani group to visit CIWP demonstration sites.
The group included governmental managers and experts working closely with Pakistan National wetland project which was implemented by World Wide Fund for Nature (WWF-Pakistan). The team visited Lake Urmia and Lake Parishan and was acquainted with CIWP activities, achievements and lessons learnt mainly on local community engagement, wetland management structures, field
![Page 35: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/35.jpg)
activities by stakeholders and management plan development and implementation while sharing their comments and ideas with the project team.
40th anniversary of Ramsar convention (global forum on wetlands for the future)
The 40th anniversary of Ramsar convention was held on 5th of March 2011 in Tehran. The President of Islamic republic of Iran, The vice president, Head of Department of Environment and also 12 ministers of environment and representatives of 50-member countries attended at this ceremony.
CIWP provided technical support for the seminar and had a key lecture about the project activities and achievements while CIWP NPM was also selected as the national wetland champion.
Regional Community of Practice for Wetland Conservation Managers
After holding the first event of Regional Community of Practice for Wetland Conservation Managers in 2010 and gathering of wetland conservation managers from the region and sharing ideas, lessons learnt, good practice and experiences in wetland conservation a bilingual hand book was published and shared based on the workshop results and achievements with all the participants and related national and international organizations.
As the workshop proved very successful an initial planning was started to have the next workshop in Nepal.
h. CIWP exit strategy
In preparation for the final years of the project, CIWP team developed an exit strategy along with regular annual workplans for sustainability of the project achievements within national wetland management system and gradual delivery of project activities and responsibilities to related offices within DoE. There was a special focus on implementing this strategy within 2011 and it was also reflected on project activities during 2011 and planned ones for 2012.
As a result, the project concentrated more on finalizing activities in demonstration sites, securing national funds and budget for national wetland management system through developing national programs, close cooperation with related DoE offices to deliver responsibilities, develop and implement staff exit plan, reducing input and leadership for joint activities with stakeholders, concentrating more on documentation and production to roll out project achievements and approaches.
4.4 Drought Risk Management
Objective: Effective Drought Risk Management for Sustainable Livelihoods and
Biodiversity in the Environs of Lake Uromiyeh.
a. LUB drought risk management plan
Considering the current ongoing drought crisis in Lake Urmia , Conservation of Iranian Wetlands
Project started a project since 2009 to develop a drought risk management program for this
lake.The main objective of preparing LUB drought risk management plan is to identify LU water right
provision circumstances in drought situation. Since in recent years drought has affected LUB water
resources, there was a question that how LU water right should be provided in drought conditions
which in the water resources are reduced. This plan is in final stages of preparation and will be a
synthesis of the following reports and will be attached to LUB MP after being approved in LUB
national committee/regional council
![Page 36: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/36.jpg)
LUB drought risk management International workshop
Since drought risk management plan is designed to be developed with a participatory approach also
using international experiences, this workshop has been held as a first activities of preparing next
reports. In this 4 day workshop some experiences in coping with drought from mediteranean
countries and Australia which have some similarities with LUB conditins presented for participants
who were key stakeholders in developing droght. Also it was a good opportunity to have these
stakeholders comments on how LUB DRM plan should be developed. In every day of workshop,
participants fulfilled questionnaires which were prepared before based on that day topics and
results were used for developing drought management structure. Also a particular report was
prepared for the workshop.
Drought characteristic (Spatial/Temporal behaviour)
Prefinal draft of this report was prepared, which includes the following sections:
- Drought spatial and temporal analysis in the defined base period with required resolution
- A historical analysis of drought in the basin in provincial scope on the base of the proper indicators
- Analyses drought severity- duration- frequency for each province in the LUB
Meteorological and hydrological variables trend in LUB
This report studies meteorological and hydrological variables trend based on 35 stations in LUB since
40 last years.
Drought management structure (organization)
The first report of LUB drought management structure was developed after a broad review on
several experiences specially using stakeholders’ ideas that were raised by the international
workshop questionnaires.
After that, it was revised by CIWP comments and sent to provincial Water Authorities and Jihad
Agriculture Authorities also to be more practical by their comments. It was also discussed in separat
meetings with these 2 authorities and then again was revised after receiving these stakeholders’
opinions.
Agriculture report
A model and related software has been developed by the consultant that through agriculture data of
every sub-basin in LUB, calculates optimized water requirements and distribution in different
drought levels for different crops based on agriculture area and crop pattern(crop clustering,
agriculture calendar, plant grow period,..). Based on this model, drought is considered as 4 different
levels(low to high intensity) and in each level water right reduction percent of cultivations and
gardens is specified to meet LU water right in that sub-basin.
This report was prepared for Aji-chai sub-basin and after that in a special meeting with LUB
provincial JA As, the methodology and gathered data were presented and been discussed. After this
participatory meeting, this report was revised based on received written comments of these
authorities and now is being developed for all the sub-basins.
Monitoring system report:
Another new report on LUB DRM, is the Monitoring system/software. A monitoring system and also
software is developed for LUB, to monitor drought daily or in defined periods. UDMP (Urmia
Drought Monitoring Package) is an analytical software that can calculate
hydrological/meteorological drought indicators (SDI, DI, SPI, EDI) in the basin.
![Page 37: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/37.jpg)
Water allocation model report:
This report/model is the main report of DRM project. A pre-report for LUB water resources
allocation model was developed and after that in a same cycle like agriculture report, it was revised
by CIWP and then presented for LUB WAs in a meeting and again revised after receiving their
comments on it.
Now, this report is being developed for all the LUB sub-basins by the consultant, based on provincial
WAs Data about providing LU water right conditions and mainly on optimized water agriculture
results in the related sub-basins.
Along with developing LUB DRM plan, a synthesis report was prepared on LU and LP drought
situation, drought impacts on the wetland and possible solutions for the future for being submitted
to GEF as a description of demonstration wetlands.
4.5 Progress Towards the Overall Objective
Overall Objective: To establish an effective management system to systematically remove or
substantially mitigate threats facing globally significant biodiversity and
sustainability at two WPA demonstration sites, while ensuring that the
lessons learned are absorbed within WPA management systems
throughout Iran.
The Project has now completed its seventh year of operation and has made substantial progress
towards its objectives. It is currently working to complete the remaining objectives of Outcomes
One and Two. For the next one year, its focus will be on rolling out the wetland management
framework beyond the project sites and to all the other Wetland Protected Areas (WPAs). This is in
line with Output 3.2 of the Annual Work Plan and mobilising resources from national budgets. As
such, it will be working to ensure the sustainability of the Project’s activities by working to establish
the National Wetlands Strategy Committee and having the DoE act as a secretariat for this
committee. It will also look to build the capacities of partners so that they may assume
responsibility for the wetlands.
![Page 38: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/38.jpg)
5.0 Financial Overview
The information below is a break down of the Project finances to date. Please note that unless
stated otherwise, all figures are given in US Dollar denominations. 25
Table 7 below provides a breakdown of the various sources of funding for the Project. Only two
sources of funding are controlled by the UNDP, that from the TRAC and GEF budget lines. The rest is
provided in parallel from government partners.
Fund Allocation
TRAC 200,000.00
GEF 2,915,000.00
Government of Iran (In Parallel)
9,190,000.00
Government of Netherlands (In Parallel)
600,000.00
Total 12,905,000.00
Table 7
Table 8 below provides information on the total amount of TRAC and GEF funding budgeted and
utilised by the Project. An annual breakdown of the figures below is available in Annexure V as Table
11. However, for simplicity, Figures 1 and 2 on the following page present this information in
graphical form.
Fund Total Allocated TRAC and GEF
Funding
Funds Utilised
(2005-2011) Balance
TRAC 200,000.00 199,560.09 439.90
GEF 2,915,000.00 2,616,213.54 298,786.40
TOTAL 3,115,000.00 2,815,773.63 299,226.30
Table 8
25
![Page 39: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/39.jpg)
0.00
20,000.00
40,000.00
60,000.00
80,000.00
100,000.00
120,000.00
1 2 3
Am
on
t: $
Year: 2009-2011
TRAC
TRAC AWP
TRAC Delivery
0.00
100,000.00
200,000.00
300,000.00
400,000.00
500,000.00
600,000.00
700,000.00
800,000.00
900,000.00
2005 2006 2007 2008 2009 2010 2011
Am
ou
nt:
$
Year
GEF
GEF AWP
GEF Delivery
![Page 40: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/40.jpg)
The last table, Table 9, provides a breakdown of how the TRAC and GEF funding lines. Tables 11 and
12 in Annexure V provide an individualised breakdown for these budget lines.
Budget Categories TRAC and GEF
Funds Utilised in
2005-2011
Percentage of Total TRAC & GEF Utilised ($2.3mil)
Human Resources (including consultants)
1,725,077.54 61.26
Travel 335,620.11 11.92
Equipments 524,950.27 18.64
Others 231,760.12 8.23
Gain & Loss -930.58 -0.03
Total 2,815,773.54 100.00
Table 9
For 2012, the Project will move into the implementation of its exit strategy. As such it will focus its
activities and spending on the achievement of outcome three and the rolling-out of the Wetland
Management Systems to all the national wetland areas.
![Page 41: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/41.jpg)
6.0 Challenges and Issues
a. Institutionalisation of Budgets and Management Structures
Although the Project has not had any direct budget problems itself and funds allocated by some of
national and local stakeholders for MPs implementation, a challenge faced by the Project has been
in having the budget allocations for the LU, LP and SW Management Plans institutionalised within
national systems. As such, this has also meant that there is a challenge in ensuring these budget
allocations are sustained into the future.
Related to this is the challenge of ensuring management structures are sustainable. The Project has
been successful in having key management structures created for the sustainable management of
the Project Sites. However, it will be important to ensure that these entities are able to be
maintained by national partners into the future. The secretariats have very important role for
sustainability of these management structure, but still need capacity development for implementing
the role.
These will be issues that will need to be overcome if the successes achieved to date are to continue
after the Project has closed.
b. Transferring Responsibilities
Over the life of the Project, many new and innovative activities have been attempted and these
have, by and large, been successful. The Project is now moving into its final stage of ensuring the
work done can be adopted into the wetland management system. As such, a challenge faced by the
Project is having the newly created responsibilities transferred over to national partners and carrying
out the national roll-out strategy.
![Page 42: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/42.jpg)
7.0 Risk Management
Risk Suggested Solution
Wetlands may dry out as a result of
the severe drought.
The Drought Risk Management component has been added
to the Project through the assistance of the UNDP to address
this risk at LU. This could then become part of the Ecological
Management Plan.
At LP immediate action has been taken to help save
endangered species. This included the collection and
transfer of turtles to available water bodies with the local
community. A pond has also been created on the coastal
part of LP to create a temporary habitat for endangered
species.
To continue to mitigate this risk, it will be important to
ensure the Water-share Agreement is adhered to in the
future.
A shift in priorities such that
agreements made on wetlands are
not complied with; the water-share
for the LUB is an example.
In order to minimise this risk, the agreement reached by
technical working groups and being approved by
management committees. As an example, LU water
requirement has been approved by the LUB national
management committee and the regional council. But
implementations of all these decisions still need follow ups
and coordination with stakeholders.
Reduction of project team
incentives due to implementation of
staff exit plan in the final year
To address the risk, CIWP team developed a participatory
staff exit plan which tried to consider both project final year
limitations and staff individual concerns.
![Page 43: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/43.jpg)
8.0 Lessons Learned and Good Practices
a. Project exit strategy and safe ending
Developing an exit strategy for the final years of the project, provided a good basis for a gradual shift
of project technical responsibilities to related stakeholders and a plan for staff exit from the project.
b. Management plans and critical situation
Project followed up and facilitated process of developing management plans in a participatory
process and cooperation with local community, governmental and non-governmental organizations.
This process brought the sense of ownership that in urgent environmental situation for the
wetlands, this management plans provide a very good common basis for further actions and
decision.
c. Some win-win small projects could accelerate the process of management plan
implementations
Implementing some win-win small projects in demonstration site in an earlier stage of the project
could have a good effect on MPs implementation in later steps and even the sense of MP
effectiveness by local communities and local authorities.
d. Close cooperation with implementing agency offices and governmental
stakeholders
It could be a risk for the project to focus on project activities without establishing useful and
effective links with the experts of the IA and other governmental organizations. Developing such
links and establishing inter-sectoral management mechanisms may prevent large changes within
project management body itself and established mechanisms due to political and managerial
changes in these organizations.
e. Gradual change
Sometimes projects tends to start and insist on big changes within IA and partner organizations in
short period which may normally cause to resistance from those agencies and reducing effectiveness
and speed of activities. Changes in a longer period are more acceptable and sustainable.
f. Community Engagement
If projects are to be successfully implemented and the outcomes to be long lasting, it is critical that
local community leaders are assured of the motives of the project and agree with the proposed
activities. To achieve this, the support and networks of local NGOs can be obtained and utilised.
The Project’s experiences and commitment to implementing a plan that was based on participation
and integration, coupled with its successes to date, are an example of the benefits of community
engagement.
g. Dispute Resolution
A key challenge that the Project Team has learnt to overcome is how to manage disputes with locals
at project sites. These often occurred because there were disagreements about the boundary of the
![Page 44: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/44.jpg)
lakes and wetlands and the land should be used. To overcome this, the Project team establish a
structured dispute resolution mechanism at LP where grievances could be aired and addressed. This
was done with the cooperation of key partners, including the judiciary. This mechanism is still a
work in progress though it is assisting in the gradual resolution of disputes.
h. Establishing a Community of Practice
A good practice implemented by the Project was a site visit by an expert team from Pakistan. This
visit was an example of south-south cooperation and brought good amount of knowledge exchange
for the both sides due to common cultural and environmental basis of experiences.
![Page 45: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/45.jpg)
9.0 Recommendations
a. Secured national budget as co-funding for international projects
One of the problems that international development projects normally faced is to secure national
budget in line with project activities. One recommendation for overcome this problem is developing
and approving a national program within governmental financial system which support the joint
project activities and provide financial resources in more secured mechanisms.
b. Previous Recommendations
Following the Mid-Term Evaluation (MTE), ten recommendations were made. Of those
recommendations, seven have been fully implemented and three are being finalised as part of the
national roll-out strategy.
It was noted by the Project Team that if programmes are to be implemented that require local buy-
in, a useful method in achieving this is to hold a large ceremony at the start of implementation.
However, instead of having the Project Office organise the ceremony, give the responsibility of
organisation to the local community. In this way, they are more likely to take pride in the event
organised and that they have a stake in the success of the programme.
![Page 46: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/46.jpg)
10.0 Conclusion
Over the last seven years of implementation, the Project has come a long way towards achieving its
objective of establishing an effective management system that addresses the threats to the Project
Sites in cooperation with the main stakeholders at national and provincial leves. What is more, it is
working to ensure the lessons learned from this experience are absorbed within WPA management
systems throughout Iran.
On a national level, the urgent need to address the threats to wetland ecosystems has been taken to
the highest levels of Government through developing the national wetland strategy and action plan
and LU national management committee. Wetland data bank has been developed and is ready to be
used by DoE, and a project toolkit is under construction for further application by stakeholders. In
the other hand national budget has been secured for five years for application and roll out of CIWP
experiences and new management system for important wetlands around the country.
On a provincial and basin level, LU and LP integrated Management Plans implementation had a good
progress in the Project sites. Three demonstration sites Management committees and technical
working groups had several meetings and a reasonable function. Further, a water distribution
model has been developed for LU and approved by management committees. This should ensure
that the provinces surrounding LU release adequate water into LU to maintain its ecological
integrity. The Lake Uromiyeh Basin Regional council had one meeting. LU drought risk management
plan Prefinal draft has been prepared. Sustainable agriculture was introduced to LU and LP basin and
one demonstration farm established in LP.
At the local level, Shadegan wetland mapping, zoning and codes of practice have been developed
and finalized. The fact that this has been possible has been through the active engagement of the
local community and authorities. The efforts of the Project team have also helped to establish
mechanisms for the resolution of land use disputes between the DoE and locals. Gorigol wetland
management plan was finalized. In collaboration with NGOs and the UNDP, participatory approaches
to wetland rehabilitation and management have also been advocated to local communities.
In spite of these successes, the persistent drought continues to be a major threat to Iran’s wetlands,
particularly. Of particular concern is that they have resulted in the drastic diminishing of the water
levels of LU and LP and as a result both lakes are on the brink of desiccation. The Drought Risk
Management component of the Project is in final stage of approval and implementation which may
address this problem in next year.
![Page 47: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/47.jpg)
References
The documents reviewed in the preparation of this report were:
Conservation of Iranian Wetlands Project, Annual Progress Report (2007)
Conservation of Iranian Wetlands Project, Annual Progress Report (2008)
Conservation of Iranian Wetlands Project, Annual Progress Report (2009)
Conservation of Iranian Wetlands Project, Progress Implementation Report (2011).
Global Environment Facility Website, www.thegef.org.
Hunnam, Peter and Raya Benis, Conservation of Iranian Wetlands Project Mid-Term Evaluation,
Conservation of Iranian Wetlands Project, 2009.
Ramsar Website, www.ramsar.org.
United Nations Development Programme – Iran, Conservation of Iranian Wetlands Project
Document, (2004).
United Nations Development Programme – Iran, Lake Uromiyeh Drought Risk Management
Project for Sustainable Livelihoods, Biodiversity and Micro-climate Management (Supplementary
project to the ongoing UNDP/GEF Conservation of Iranian Wetlands Project).
United Nations Development Programme Website, www.undp.org.
![Page 48: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/48.jpg)
Annexure I– Progress towards Project Objective26
Objective: To establish an effective management system to systematically remove or substantially mitigate threats facing globally significant
biodiversity and sustainability at two WPA demonstration sites, while ensuring that the lessons learned are absorbed within WPA management
systems throughout Iran.
Indicator Project Target Level Baseline Status at 30 June 2011
Population of indicator bird
species in Lake Uromiyeh
and satellite wetlands.
Flamingos >2,500
breeding pairs annually
White Pelican, >200
breeding pairs annually
Four globally threatened
waterbirds, 20% increase
in counts
Flamingos ,209 pairs,
Average 2003-2006.
(Was15-25,000 pairs in
mid-1970s (Scott 1995))
White Pelicans, 110 Pairs,
Average 2003-2006. (Was
1000-1600 pairs in mid
1970s (Scott 1995))
Marmaronetta
Angustirostris: 9
Oxyura Leucocephala: 40
Aythya Nyroca: 27
Branta Ruficollis: 1
TOTAL: 77
Average 2003-2006 (all
satellite wetlands)
Flamingos: 2531
0 breeding pairs
white pelicans: 7
0 breeding pairs
Marmaronetta angustirostris : 86
Oxyura leucocephala: 78
Aythya nyroca: 5
Branta ruficollis: 0
TOTAL: 169
Lake Uromiyeh’s status and
salinity levels.
Safeguard as “a
magnificent example of a
natural, hypersaline lake
The current status of “a
magnificent example of a
natural, hypersaline lake
Drought crisis has further reduced water levels
and scenic beauty
26
![Page 49: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/49.jpg)
with great scenic
beauty.”
Salinity less than 240 g/L.
with great scenic beauty”
at risk due to increased
salinity levels and
decreased water levels.
Salinity 258.46 g/L
Salinity: 380 - 400 gr/lit Salinity: 370 g/L.
Area of protected satellite
wetlands around Lake
Uromiyeh.
1000 ha of satellite
wetlands gain increased
protection.
0 ha
Kanibarazan Satelite Wetland (927 ha) gained
increased protection and designated as non-
hounting area Kanibarazan was
designated as a Ramsar Site and gained its
designation in Feb 2011 as Iran 24th site
Breeding population of
globally threatened
Dalmatian Pelican at Lake
Parishan.
>200 pair annually.
There is no 2000-05 data
on breeding the
population. Scott (1995)
quotes 5-10 pairs for mid
1970s.
Wintering: 64 (2000-05
January average).
Wintering: 0 (Jan 2011) because of Severe drought
0 breeding pairs
Area of disputed
agricultural lands
encroached into Lake
Parishan.
Reduced by 50%. Ca. 800 ha (Still
under negotiation)
0% (The issue raised in local management
committee, mapping of the wetland and land conflict
area has been prepared and approved by main stake
holders which is a key toolkit for next step and
common area for further discussion , a special
committee formed for conflict resolution )
Ecosystem approach being
applied strategically to
WPAs at national level.
Ecosystem approach to
WPAs being promoted
through national
No strategy, 0
provinces.
Final version of National Wetland Conservation
Strategy and Action plan was prepared
5 provinces (W.Azerbayjan, E.Azerbayjan, Kurdistan,
![Page 50: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/50.jpg)
strategy by end 2011 and
being implemented in
minimum 5 provinces by
EoP.
Fars and Khouzestan) are now implementing the
approach through 3 signed management Plan (for LP,
LU and SW) mplementation in three demonstration
sites stakeholders workshop and hoped to be
approved in the near future.
Table 10
![Page 51: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/51.jpg)
Annexure II – Detailed Project Finances
The Table 11 below provides an annual breakdown of the total GEF and TRAC funding allocated to the Project and the total amount utilised.
Year GEF AWP GEF Delivery TRAC AWP TRAC Delivery Total CDR
2005 341,461.00 55,107.13 - - 55,107.13
2006 782,194.00 358,924.64 - - 358,924.64
2007 463,340.00 352,962.03 - - 352,962.03
2008 662,122.00 522,136.50 - - 522,136.50
2009 442,500.00 394,294.80 77,900.00 60,006.09 454,300.89
2010 501,500.00 481,991.27 100,000.00 59,691.90 541,683.17
2011 481,000.00 450,797.44 80,302.00 79,862.10 530,659.54
TOTAL 3,674,117.00 2,616,213.54 258,202 199,560.09 2,815,773.90
Table 11
Tables 12 and 13 on the subsequent pages provide a breakdown of how the respective TRAC and GEF budget lines were spent.
![Page 52: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/52.jpg)
Budget Categories
Total TRAC budget (2009-
2011)
Amount of TRAC Utilised 2005-
2011*
Percentage of Variation From
Total TRAC Budget ($200K)
Percentage from Total Funds
Utilsed ($120K) Remarks
Human Resources including Consultants
141,000.00 165,949.53 -17.69% 83.16%
Machinery and Equipment
23,500.00 6,719.89 71.40% 3.37%
Travel 33,000.00 25,169.05 23.73% 12.61%
Others 2,500.00 2,685.00 -7.40% 1.35%
Gain and loss 0.00 -259.55
-0.13%
TOTAL 200,000.00 199,560.00 0.22% 100.00%
Table 12
![Page 53: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/53.jpg)
Budget Categories
Total GEF Budget (2005-2012)
Amount of GEF Utilised 2005-
2011
Percentage of Variation from
Total GEF Budget ($2.915 mil)
Percentage from Total GEF Utilzed
($2.166mil) Remarks
Human Resources Including Consultants
1,258,600.00 1,559,128.01 -0.24 0.60
Travel 713,390.00 328,900.22 0.54 0.13
Office Machinery & Equipments
301,250.00 499,781.22 -0.66 0.19
Others 641,760.00 229,075.12 0.64 0.09
Gain & Loss 0.00 -671.03 0.00
TOTAL 2,915,000.00 2,616,213.54 0.10 1.00
Table 13
![Page 54: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/54.jpg)
National Co-Financing, GEF, TRAC budget`s Expenditure 2005-2011
Year 2005 2006 2007 2008 2009 2010 2011
GOV 39,302 131,100 393,820 569,200 889,000 959,400 17,188,900
GEF 55,107 358,924 352,962 522,136.5 394,294 481,991 428,300
UNDP 0 0 0 0 60,006 59,692 80,302
Total 96,414 492,030 748,789 1,093,344.5 1,343,300 1,501,083 17,697,502
![Page 55: ASYCUDA Islamic Republic of Iran · 2013. 2. 24. · mcm Million Cubic Meters ... CPD Country Programme Document CDR Combined Delivery Report DCHT Department for Cultural Heritage](https://reader035.fdocuments.us/reader035/viewer/2022071517/613b929af8f21c0c8269126a/html5/thumbnails/55.jpg)
National Budget Expenditure (Cash and In-Kind), 2005-2011
0
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
16,000,000
18,000,000
2005 2006 2007 2008 2009 2010 2011
16,486,200
In kind
In cash