Assembly instructions Part 1 PPE & Tools
12
Assembly instructi ons Part 1 PPE & Tools 19 January 2014 Sunrider II
description
Sunrider II. Assembly instructions Part 1 PPE & Tools. 19 January 2014. Contents part 1 Section Subjest Slide part 1 – 1HSE 4 part 1 – 2Tools5. 1 . Persoonlijke beschermings-middelen (PBM). Use appropriate Personal Protective Equipment (PPE): Work gloves. Disposable gloves. - PowerPoint PPT Presentation
Transcript of Assembly instructions Part 1 PPE & Tools
Assembly instructionsPart 1PPE & Tools
19 January 2014
Sunrider II
Contents part 1Section Subjest Slidepart 1 – 1 HSE 4part 1 – 2 Tools 5
1.Persoonlijke beschermings-middelen (PBM)
Use appropriate Personal Protective Equipment (PPE):
• Work gloves.• Disposable gloves.• Hearing protection.• Dusk mask.• Safety goggles.
2.Tools.
Hole saw.
‘Cats-tail’ file.
Multi saw.
(battery) drill.
Power file.
Blind rivet pliers.
Locking pliers.
Rivet insert nut plier.
ScaleMixing cups, large, small.Stir wood.
Grain 150 sandpaper.Sanding block.
Vice.
Benzene.
Clamps, jaw length ~ 90 mm and 140 mm.
Sharp knife.
Mastic gun.
Ballast, minimum 25 kg (2x).