How to Tame the Markets to Achieve Your Life's Goals — Ashvin Chhabra
ASHVIN MODI ARCHITECT ‘SMIT’ 02642 245992ashvinmodiarchitects.com/Ashvin_Modi_Architect.pdf ·...
-
Upload
truonglien -
Category
Documents
-
view
214 -
download
1
Transcript of ASHVIN MODI ARCHITECT ‘SMIT’ 02642 245992ashvinmodiarchitects.com/Ashvin_Modi_Architect.pdf ·...
ORGANIZATION HISTORY
Name of the firm : Ashvin Modi
Architect
Year of establishmen : 1984
Mailing Address : ‘Smit – 84’ Pritam Soc. 1,
BHARUCH - 392 002.
Gujarat – India.
Pin Code : 392 002.
Contact nos. : 02642 245992, 9824135877.
Email id : [email protected]
Website : ashvinmodiarchitects.com
Status : Individual Prop. Firm.
Name of the Bankers : State Bank of India,
Kasak, Bharuch - 392 002.
Licence No. : Council of Architecture,
Government of India,
New Delhi. CA / 84/8365
Language : English, Gujarati & Hindi
Architecture
Planning
Interior Designing
Landscaping
Structural Designing
Electrical Designing
Plumbing & Sanitation
HVAC Designing
Valuation
Data Designing
Water Harvesting & Recharging
Green Building designing
SERVICES rendered
Yognipun Associates, Baroda - Structural Consultants
Anil Mistry, SVN Consulants,Baroda - Structural Consultants
Shishir Raval - Landscaping Consultant
Vraj Sanitation, Baroda - Plumbing Consultants
L.I. Chauhan, Baroda - Plumbing Consultants
MSP Consultants, Baroda - Electrical Consultants
Jhaveri Associates, Ahmedabad - Electrical Consultants
Fairair Engineers, Baroda - HVAC Consultants
Air Devices, Baroda - HVAC Consultants
Shri Anil Navangule, Baroda - Acoustic Consultants
Shri C B Shah, Ahmedabad - Acoustic Consultants
Dr. A S. Patel - Water harvesting Consultant
Eco solutions, Pune - Green building Consultants.
ASSOCIATES for related services
1. Council of Architecture, Govt of India, New Delhi with
Regd.No.:CA-84/8365.
2. Indian Institute of Architects (I I A), Surat Chapter.
3. Indian Institute of Architects (I I A), Bombay Chapter.
4. Institute of Indian Interior Designers
5. Visiting Faculty, Dept. of Architecture, APIED, Vidyanagar.
6. Visiting Faculty, Dept.of Architecture, M.S.Uniiv. – Baroda.
Memberships of Professional Institutions.
Infrastructure
1. 2000 sq. ft. of office premises in prime area of
Bharuch.
2. Fully computerised & networked workstations :
10 Desktops and 6 laptops, A3 & A4 size
printers, scanner, Ammonia Printing machine
etc.
3. Licensed designing soft wares
Revit 2009 – 3 copies
Autocad 2009 – 3 copies
in addition to Operating systems, basic
computing soft wares.
4. Professionally trained & experienced technical
staff of 15 people.
OFFICE SET-UP
The firm is headed by Architect, Ashvin Modi.
He is a graduate from School of Architecture, CEPT, Ahmedabad. He
undertook his initial student training in Architecture with Architects P.S.
Rajan – Panna Rajan, Baroda.
He embarked on his private practice in 1983 and established his firm –
Ashvin Modi Architects at Bharuch.
The firm has always attempted a contextual, dynamic & innovative approach
for all of their projects and has a wide array of interesting projects to its
credit ranging from institutional centers, commercial complexes, sports
complexes, schools, hospitals, corporate sector offices as well as private
residences.
ORGANOGRAM
Employee Designation Qualification Areas of Work Experience
Tejal Rajput Associate Architect
Interior designer
Bachelor of Architecture. MSU
Baroda
* Architecture & Interior
designing
14 Yrs.
Nupur Patel Asst.Interior designer B.I.D., APIED, Vallabh Vidyanagar * Interior designing 3 Yrs
Chetsi Shah Asst. Inteior designer B.I.D., APIED, Vallabh Vidyanagar * Interior designing 3 Yrs
Vijay Prajapati Chief Draughtsman Civil Draughtsmanship I.T.I., -Ankl. * Autocad operator 22 Yrs.
Balwant Patel Chief Civil Engineer Dip.- Civil Engg. K.J. Polytechnic,
Bharuch
* Estimation & Valuation,
* Tendering, site supervisn
18 Yrs.
Manisha
Mistry
Senior Asst. Architect Dip - architectural asstantship.,
Govt. Girls Polytechic, Surat
* Architectural designing 10 Yrs
Ishank Patel Asst. Architect B – Arch, APIED, Vallabh Vidyanagar. * Architectural designing 1 Yrs
Varsha
Bhagat
Senior Civil Engineer Diploma in Civil Engg. K.J.
Polytechnic, Bharuch
* Estimation & Valuation,
* Tendering, Site supervisn
8 Yrs
Divya Gandhi Asst. Architect Dip - architectural assistantship.,
Govt. Girls Polytechic, Surat
* Architectural designing 2 Yrs.
Nayan Mahida Asst. Draughtman Civil Draughtsmanship I.T.I., -Ankl. * Autocad operator 1 yr.
Siddhi Jadav Asst. Civil Engineer Diploma in Civil Engg. K.J.
Polytechnic, Bharuch
* Architectural designing 5 Yrs
Dhruti Parekh Asst. Civil Engineer BE Civil from DDIT, Vidyanagar * Estimation and Tendering 1 Yr.
Ruchi Shah Asst. Civil Engineer BE Civil from GEC, Dahod. * Estimation and Tendering 1 Yr.
ORGANOGRAM
United Phosphorous Limited
Remi Metals Gujarat Limited.
Anglo French Drugs ( eastern) Co. Ltd.
Bharuch Textile Mills Ltd.
GNFC Ltd.
Phillips Carbon Black Limited.
China Light and Power.
Jaiprakash Industries Ltd.
Indian Oil Corporation, Ltd.
Ion exchange Ltd..
ONGC Ltd.
ABG Shipyards Ltd.
Coromandal Fertilizers Ltd.
Jilla Panchayat, Bharuch.
Aventis Pharmaceuticals.
Birla Cellulosic – Kharach, Bharuch.
Notified Area Office, Bharuch
Ankleshwar Industrial Association.
Notified Area Authority, Ankleshwar.
Rotary Club Of Bharuch.
Rotary Club Of Ankleshwar.
Narmada Education & Scientific Research Society
Ankleshwar Industrial Development Society.
Miranda Amsaw Ltd.
Lyka Labs Ltd.
Atul Organics Ltd.
Rajashree Polyfils Ltd.
Gujarat Agriculture University
Kalrav Charitable trust
Bharuch Enviro Infrastructure Ltd.
GIDC, Bharuch.
SEZ - Dahej
ABG Cement Ltd .
Grasim Industries Ltd – Villayat.
VALUED CLIENTS – CORPORATE & NGO’S
Sr.
No.
Name of Project Year Cost in
Lacs
Phase of Work.
1 School at Jhagadia For Rajashree Polyfil Ltd. 2008 100 I stage constructed.
2 Shabri Vidyalaya at Bharuch 2008 50 Completed.
3 Shishu gruh at Bharuch for Govt. of Gujarat 2008 50 In Progress.
4 Hospital at Rajpipla for Dr. Nikhil Mehta 2008 50 Completed.
5 Hospital for Dr. Ali at Bharuch 2007 50 Completed
6 Narmada college campus upgradation 2007 500 Completed
7 Office building for Jilla Panchayat, Bharuch. 2009 120 Conceptual stage
8 UPL Rotary institute of Chemical technology at Valia, Ankleshwar. 2006 5000 In Progress.
9 KALARAV - A School for mentally disabled children at Bharuch. 2003 50 Completed
10 Hospital at Surat for Dr. Deeptiben Patel. 1997 60 Completed
11 Dinbandhu Charitable Hospital At Kholwad, Surat. 1984 75 Completed
12 Project Shantivan – A crematorium For Rotary Club of Bharuch 1993 50 Completed
13 Open air theatre at GIDC, Ankleshwar - Ankleshwar Industries Assoc. 1994 50 Completed
14 Administrative Bldg. at Jhagadia for Remi Metals. 1995 50 Completed
15 Crematorium at Ankleshwar for Rotary Club of Ankleshwar. 1996 70 Completed
16 Community Centre at Ankleshwar for Ankleshwar Industries Assoc. 1998 70 Completed
17 Disaster Prevention & Management Centre At GIDC, Ankleshwar. 1998 140 Completed
PROJECTS
Category A :- Institutional / Public
Category B :- Recreational / Hospitality
Sr.
No.
Name of Project Year Cost
in Lacs
Phase of Work.
1.
2.
Proposed Club-house for Aventis Ltd. at GIDC, Ankleshwar
GIDC water reservoir front development, Ankleshwar
2009
2008
50
200
Conceptual stage
Conceptual stage
3. Swagat Farmhouses 2005 500 In progress
4. Vasudhara (Ank1) Monumental Development Project for ONGC, Ankleshwar. 2003 30 Conceptual stage
5. Extension of M.I. Patel Rotary youth Centre, Bharuch. 2003 50 Completed
6. Renovation of Rotary Hall At Ankleshwar. 2001 10 Completed
7. Expansion of Sports Gymkhana At Gadkhol, Ankleshwar. 1999 25 Conceptual stage
8. Sports Complex At GIDC, Ankleshwar. 1999 400 In progress.
9. Garden at GIDC, Ankleshwar. 1998 50 Completed
10. Sports Complex at Rajashree Polyfil Ltd. At Jhagadia. 1998 75 Conceptual stage
11. Badminton Hall at Rajashree Polyfil Ltd. At Jhagadia. 1998 25 Completed
12. Expansion of Shalimar Hotel at Ankleshwar. For Gujarat Shalimar Hotels Ltd. 1990 35 Completed
13. Swagat Hotel and Nursery at Kamrej, Surat. 1989-90 25 Completed
14. Sports Gymkhana at Bharuch for Rotary Welfare Trust at Bharuch. 1986 50 Completed
PROJECTS
Category C :- Commercial
Sr.
No.
Name of Project Year Cost in
Lacs
Phase of Work.
1
2
Swagat Amboli Shopping Complex
Showroom for Suzuki Motorcyles, Bharuch
2008
2006
500
100
Work to begin
Completed
3 Office building – Jaiprakash Associates 2005 50 Completed
4 Swagat Petrol pump at Kamrej, Surat. 2003 50 Completed
5 Modi Towers – Commercial cum Residential Centre at Bharuch. 2000 30 Completed
6 Filling Station for KU & Co. Vadadla. Dist Bharuch. 1990 25 Completed
7 Chandralok – A Commercial cum Residential Centre at Baroda. 2002 50 Completed
8 Shopping Centre for Shri Jayaben Modi Hospital at Ankleshwar. 1997 25 Completed
9 Shopping Centre at Ankleshwar for Shri Jayaben Modi Hospital. 1997 25 Completed
10 A Commercial Complex at Ankleshwar for Shri Dharmendrasinh Mahida. 1997 75 Completed
11 Municipal Shopping Centre and Office att Ankleshwar. 1990 50 Completed
12 Ashirwad Shopping Centre, Station Road, Bharuch. 1989 25 Completed
PROJECTS
Category D :- Industrial
Sr.
No.
Name of Project Year Cost in
Lacs
Phase of Work.
1 Non plant Buildings – Grasim Industries Ltd, Villayat 2012 4000 In progress
2 Fire Station for SEZ, Dahej 2012 100 In progress
3 R & D Center for Coromandal Fertilizers Ltd. at Ankleshwar 2008 200 In Progress
4 Food processing unit for Emperor Foods limited at Olpad, Surat 2008 200 In Progress
5 R & D Center for BEIL at Ankleshwar 2007 80 Yet to start
6 Plant for Minol Acids at Ankleshwar 2007 50 Completed
7 Pharmaceutical unit for Surya Life sciences at Ankleshwar 2006 200 In Progress
8 Admn. Building for GPEC at Paguthan, Bharuch. 2006 250 Completed
9 Rachna Dye-chem at Panoli 2004 50 Completed
10 Ion Exchange (India) Ltd At Ankleshwar. 2003 25 Completed
11 Natraj Food Products At Kamrej. 2003 150 Completed
12 Phillips Carbon Black Ltd. At Palej. 2003 80 Completed
13 Industrial Unit for Antico, Ankleshwar 1996 20 Completed
14 ETP plant, Drain / Road etc for Lyka Labs at GIDC, Ankl. 1996 25 Completed
15 ADM Building for Remi Metal Gujarat Ltd. At Jhagadia. 1995 50 Completed
16 Expansion of Factory for Gujarat Reclaim Rubber Industries, Ankleshwar. 1995 50 Completed
17 Administrative Bldg. at Jhagadia for Remi Metals. 1995 50 Completed
PROJECTS
Category E :- Residential – Mass housing
Sr.
No.
Name of Project Year Cost in
Lacs
Phase of Work.
1 Staff Qurarters and Guest house for Vardhman Acrylics 2012 225 Construction to start.
2. Township at Jhajjar, Haryana for China Light & Power 2008 5000 In progress
3. ABG Shipyard Colony with multistoried buildings at Bharuch 2008 4000 In progress
4. Multistoried residential expansion at GPEC Colony, Paguthan for CLP 2010 550 In progress
5. ‘A’ & ‘B’ Type Quarters at Jhagadia. Rajashree Polyfil Ltd. 2007 200 Completed
6. Guest House For Miranda Amsaw Ltd. At Ankleshwar. 2006 70 Completed
7. Navrachana – Multistoried Residential scheme at Ankleshwar. 2005 75 Completed
8. ‘E’ & ‘F’ Type Quarters at Jhagadia. Rajashree Polyfil Ltd. 2004 200 Completed
9. Doctors Quarters at Ankleshwar for Jayaben Modi Hospital. 1996 30 Completed
10. Housing Colony at Jhagadia. for Remi Metals Gujarat Ltd. 1995 250 Conceptual stage
11. Rohininagar Housing Complex at Bharuch. 1988 100 Completed
12. Marutinagar Housing Complex at Bharuch. 1988 152 Completed
13. Kausar Park – Residential Scheme at Bharuch. 1990 250 Completed
14. Low – Cost Housing Colony At Ankleshwar for Gujarat Reclaim Rubber Ltd. 1992 25 Completed
15. Housing Colony at Ankleshwar for Polymers & Transmission Products Ltd. 1992 50 Completed
16. Housing Colony at Ankleshwar for United Phosphorus Limited. 1994 225 Completed
17. Housing Colony at Bharuch. for Remi Metals Gujarat Ltd. 1994 200 Completed
PROJECTS
Category C :- Residential – Private
Sr.
No.
Name of Project Year Cost in
Lacs
Phase of Work.
1.
2.
House for Shri Suketu Majethia, Ankleshwar
House for Shri Bhavin Modi, Bharuch.
2008
2008
50
50
Construction started
Construction started
3. House for Shri Chetan Patel, Bharuch. 2008 40 Construction started
4. House for Shri Atul Patel, Bharuch. 2008 40 Construction started
5. House for Shri R D Mehta, Ankleshwar 2007 40 Construction started
6. House for Shri Manoj Anandpura, Ankleshwar. 2007 40 Construction started
7. House for Shri Chirag Tambedia, Bharuch. 2006 60 Completed
8. House for Vice President at Godrej colony, Ankleshwar 2004 20 Completed
9. House for Shri Khumansingh Vansia, Bharuch. 2003 30 Completed
10. House for Shri Jagdish Goswami, Ankleshwar 2004 25 Completed
11. House for Shri R D Dudhat, Baroda. 2002 50 Completed
12. House for Shri Bhadresh Shah, Baroda. 2002 30 Completed
13. House for Shri Nitin Shah, Baroda 2003 15 Completed
14. House for Dr. Nitin Shah, Surat . 2001 20 Completed
15. House for Dr. Deepti Patel, Surat 2001 25 Completed
16. House for Dr. Bhupendra Modi, Surat. 1994 20 Completed
17. House for Dr. Navin Modi, Bharuch. 1993 25 Completed
PROJECTS
Category C :- Interiors – Corporate / Public/ Commercial
Sr.
No.
Name of Project Year Cost in
Lacs
Phase of Work.
1.
2.
Infrastructure for Narmada college campus- Auditorium,
Canteen, Computer labs, conference room, Staff rooms,
Director and admn. Office at Bharuch.
Admn. Office interior for GPEC, Bharuch.
2008
2005
50
120
Completed
Completed
3. Admn. Office Interior for Minol Acids Ltd., Ankleshwar 2007 25 Completed
4. Hospital Interiors for Dr. Ali, Bharuch 2007 30 Completed
5. Admn. Office interior for Genesis, Baroda 2005 25 Completed
6. Office Interior for Bharuch Eco Infrastructure Ltd., Ankleshwar 2000 12 Completed
7. Office Interior for Ankleshwar Industries Assocn., Ankleshwar 1999 20 Completed
8. Office Interior for Notified Area Authority, GIDC, Ankleshwar 1999 10 Completed
9. Admn. Office Interior for IOCL, Dahej 1999 50 Completed
10.Interior for Multipurpose hall & Physiotherapy centre, Rotary
hall, Ankleshwar. 1995 15 Completed
11. Interior of Multipurpose Hall at Rotary Club, Bharuch. 1995 20 Completed
12. Interiors of Officers’ Colony for Remi Metals at Bharuch. 1994 50 Completed
13. Interiors of A & B type staff colony for UPL at Ankleshwar 1994 60 Completed
14. Hotel Interiors for Gujarat Shalimar Hotels Pvt. Ltd.at Ankleshwar 1990 20 Completed
15. Hotel Interiors for Hotel Swagat at Kamrej, Surat 1989 20 Completed
PROJECTS
Category C :- Interiors – Residential- selective works
Sr.
No.
Name of Project Year Cost in
Lacs
Phase of Work.
1.
2.
Interiors for Shri S. Majethia,s House, Ankleshwar.
Interiors for Shri B. Modi’s House, Bharuch.
2008
2008
30
25
Conceptual stage
Conceptual stage
3. Interiors for Kabrawala’s House, Bharuch 2008 30 Conceptual stage
4. Interiors for Mr. J. Kutty’s Penthouse, Bharuch 2008 20 Under execution
5. Interiors for Mr. P C Khatri’s Penthouse, Bharuch 2008 20 Under execution
6. Interiors for Shri C. Tambedia’s House, Bharuch 2006 30 Completed
7. Interiors for Shri J. Goswami’s House, Ankleshwar. 2005 25 Completed
8. Interiors for Shri B. Shah’s House, Baroda. 2004 15 Completed
9. Interiors for Shri R. Dudhat’s House, Baroda. 2003 25 Completed
10. Interiors for Mrs. T Patel’s House, Ankleshwar 2001 15 Completed
11. Interiors for Dr.N. Shah’s house, Surat. 2000 20 Completed
12. Interiors for Dr. B. Modi’s house, Surat. 1996 10 Completed
13. Interiors for Dr. N.C. Modi’s house, Bharuch 1994 12 Completed
14. Interiors for A. Modi’s house, Bharuch 1994 10 Completed
PROJECTS