As on 31st March 2010 - BGR Energy Systems Limitedbgrcorp.com/_pdf.php?f=POWER...
Transcript of As on 31st March 2010 - BGR Energy Systems Limitedbgrcorp.com/_pdf.php?f=POWER...
2
BGR Energy – A Snapshot
Promoted by Mr. B.G. Raghupathy (BGR) as a joint venture with GEA Energietechnik GmbH, Germany in 1985
Business in two segments for Power, Oil & Gas sector
Turnkey project engineering and contracting; and
Supply of systems and equipment for Power, Oil & Gas industries
Accreditations
ISO:9001 Certification for three Manufacturing Units
ASME ‘U’ Stamp for two Manufacturing Units
ASME ‘S’ certification for one Manufacturing Unit
Approved by Indian Boiler Regulations (IBR)
Joint Venture and strategic alliances with multinational companies to cater to Power, Oil and Gas sectors
Recipient of 14 prestigious awards for export performance
Global operations – executed more than 150 contracts in 45 countries
Orders on hand – INR 102300 Million as on 31st March 2010
3
Proven track record in Design, Engineering and Turnkey Project Management capabilities across business divisions
Power Projects Division
Oil & Gas Equipment Division
Air Fin Cooler Division
Electrical Projects Division
Environmental Engineering Division
Captive Power Division
Group Companies
GEA BGR Energy System India Limited
Progen Systems & Technologies Limited
Joint Venture Company
GEA Cooling Tower Technologies (India) Pvt Ltd
Business Divisions
4
Revenue break up for
Year ended 31st March 2010Order backlog as of
31st March 2010
Total Revenue – INR 30693 Million
Total Order Backlog – INR 102300 Million
94%
2%2% 1%1%
Power Projects
Oil & Gas Equipment
Air Fin Cooler
Electrical Projects
Environmental Engineering
95948
45121840
In INR Million
Turnkey Engineering Project Contracting -Power
Turnkey Engineering Project Contracting -Oil & Gas
Supply of Systems and Equipments
Key Milestones
5
Incorporated as a JV with GEA Energietechnik GmbH, Germany
GEA Energietechnik divested its stake to promoters
Secured first EPC contract for 120 MW power plant in Tamil Nadu
Technical collaboration agreement with GEA Btt, France
Collaboration agreement with Crane Environment Inc, USA
1985
1993
1994
2001
2003
2006
1998
2000
First BOP order for a 95 MW CCPP
2007
Received power trading license
Received first 500 MW BOP contract from APGENCO for Vijayawada TPP
Won a contract for large gas processing complex from SCOP, Iraq
2008
Received 2x600 MW EPC contract from RRVUNL for Kalisindh TPP
Received 1x600 MW EPC contract from TNEB for Mettur TPP
Power Projects Division
established
Company Listed
2009Technical collaboration agreement with TME, Italy for CPP
Favorable Indian Industry Dynamics
(Billion Units)
Source: CEA & Min of Power
53%
10%
1%25%3
Coal Gas Oil Hydro Nuclear Renewable
Total – 159,398 MW
Total installed capacity – March 2010
6
53%
1%10%
23%
3%10%
548 579 624 666 689746
591 632691 739 774 830
7.3%
8.4%
9.6% 9.9%
11.0%10.1%
0.0%
2.0%
4.0%
6.0%
8.0%
10.0%
12.0%
0
250
500
750
1000
2004-05 2005-06 2006-07 2007-08 2008-09 2009-10
Power Supply Power Demand % Deficit
Source: CEA & Min of Power – Jan 2009
132329
78700
86500
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
Upto 10th Plan(past 50 Yrs actual)
11th & 12th Plan(future 10 Yrs plan)
In M
W
165200
12th Plan
11th Plan
Future 10 years planned capacity exceeds Past 50 years actual installed capacity
Potential in Indian Power Sector – Energizing India
PLAN Targets for Generation Capacity Addition
7
PLAN Targets for Generation Capacity Addition
Source: CEA & Min of Power – Jan 2009
34653
86014
39007760
45627
104193
15380
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
110000
120000
Hydro Thermal Nuclear R.E.S
Upto 10th Plan(past 50 Yrs actuals)
11th Plan(2007-12)
12th Plan(2012-17)
30000
44500
59693
In M
W
1562712000
8
Power Projects Division
9
Turnkey Engineering, Procurement & Construction (EPC) Contracting –3 x 600 MW
Balance of Plant (BOP) Contracting –7 x 500 MW
In-house design and engineering capabilities, gives edge in Cost , design and Project Schedule
40 – 50% of „Balance of Plant‟ systems manufactured in-house
Secured perhaps the India‟s largest ever EPC contract for 2 x 600 MW power Project
Early adopter of BOP concept in India
Income of Rs.28876 Million in FY 09-10
Order backlog of Rs.94672 Million as of 31st March 2010
Total Income from Power Projects Division
330 MW CCPP RRVUNL, Dholpur, Rajasthan
9251
16440
28876
FY 08 FY 09 FY 10
INR
Mil
lio
n
120 MW CCPP Aban Power, Karuppur, Tamil Nadu
95 MW CCPP Valuthur(Phase I), Tamil Nadu
10Vijayawada Thermal Power Station (Synchronized on 4th Apr „09)
POWER PROJECTS DIVISION - PROJECTS COMPLETED
PROJECT CAPACITY
(MW)FUEL
ORDER VALUE ( Rs. in Million)
SCOPE
Grasim Industries - CPP, Chittorgarh, Rajasthan 23 Coal 444
Turnkey Engineering, Procurement & Construction of Balance of Plant
including Civil Works
TNEB - CCPP, Valathur (Phase I), Tamil Nadu 95 Gas 594
RRVUNL - CCPP, Dholpur, Rajasthan 330 Gas 2095
APGENCO – Vijayawada TPS, Andhra Pradesh 500 Coal 5788
Aban Power - CCPP, Karuppur, Tamil Nadu 120 Gas 2697Engineering Procurement and
Construction
11
POWER PROJECTS DIVISION – EPC PROJECTS UNDER EXECUTION
PROJECT CAPACITY
(MW)FUEL
ORDER VALUE ( Rs. in Million)
Contractual Completion Schedule
RRVUNL - Kalisindh TPS, Rajasthan 2 x 600 Coal 49000 42 Months
TNEB - Mettur TPS, Tamil Nadu 1 x 600 Coal 31000 39 Months
Kalisindh Thermal Power StationBasic layout – Perspective view
Mettur Thermal Power Station Basic layout – Perspective view
12
POWER PROJECTS DIVISION – BoP PROJECTS UNDER EXECUTION
PROJECT CAPACITY
(MW)FUEL
ORDER VALUE ( Rs. in Million)
CSPGCL- Marwa TPS, Chhattisgarh 2 x 500 Coal 16330
MAHAGENCO - Chandrapur STPS, Maharashtra 2 x 500 Coal 16320
APGENCO - Kothagudem TPS, Andhra Pradesh 500 Coal 7930
MAHAGENCO - Khaperkheda TPS, Maharashtra 500 Coal 9980
APGENCO - Kakatiya TPS, Andhra Pradesh 500 Coal 6949
Khaperkheda Thermal Power Station (Under Construction)
Kothagudem Thermal Power Station (Under Construction)
Kakatiya Thermal Power Plant(Synchronized & Achieve Full Capacity)
Oil & Gas Equipment Division
13
Products and turnkey services for the Oil & Gas industry
Process Equipment Package and Systems
- 2/3 Phase Separator System / Skids
- Indirect Water Bath Heater
- Gas Conditioning, Regulating & Metering Systems
- Knockout Drums / Scrubbers
- Filter Separators / Dry Gas Filters
Pipeline Equipment - Pig Launchers/Receivers
Compressor Packaging
Storage Tanks
Income of Rs.583 Million in FY 09-10
Order backlog of Rs.4512 Million as on 31st March 2010
Indirect Water Bath Heaters
Compressor Packaging
Executing three export orders from the State Company for Oil Projects (SCOP) in Iraq for USD 97.82 Million
14
Oil & Gas Equipment Division
S/N Customer Scope Value
(USD in Million)
1Akas & Al-Mansuria Gas
Processing Projects, SCOP, Iraq Engineering, Procurement & Supply of Gas
Gathering Station 80.5
2 Karbala Oil Products Depot, SCOP, Iraq Engineering, Procurement & Supply of Oil
Storage Tanks 8.57
3 South Refineries Company (SRC), IraqEngineering, Procurement & Supply of
Double Deck Oil Storage Tanks 8.75
Assumption: 1 USD = 48 INR
Air Fin Cooler Division
15
Turnkey supply of Air Cooled Heat Exchangers for Oil & Gas processes and Power sector industries
Capable of producing all three variations of finned tubes – embedded, extruded and welded finned tubes
Certified by ASME with “U”, “U2” & “R” stamp
Key markets - India, Middle East, Southeast Asia and North Africa
List of clients include Larsen & Toubro Limited, Cameron Systems, Petrofac, Petrojet, Technip KT India Limited, KazStoryService Infrastructure India Pvt Ltd.
Income of Rs.810 Million in FY 09-10
Order backlog of Rs.1482 Million as on 31st March 2010
Air Cooled Heat Exchanger
Air Cooled Heat Exchanger, 120MW CPP Karuppur, Tamil Nadu
Electrical Projects Division
16
Undertakes Turnkey contracting for supply of Electrical Systems and Equipment for Power stations and process industries
Offering Turnkey solutions for:
EHV Substations
EHV Transmission Lines
Plant Electricals
Gas Insulated Switchgear Substations
Optical Fiber Communication Network
– OPGW, ADSS & OLTE
Rural Electrification
Electrical Balance of Plant for Thermal/ Hydro & Nuclear Power Projects
Power Trading – Category „F‟ Licensee
Exclusive partnership with JZT provides turnkey solutions for OPGW communication networks
Offers GIS Substations in association with leading manufacturers on case to case basis
Income of Rs.135 Million in FY 09-10
Order Backlog as on 31st March 2010 is Rs.1276 Million
17
66/11 KV KPTCL Substation, Ganji Kunte
Electrical Projects Division
230/11 KV Gas Insulated Substations,Hyundai, Chennai
Environmental Engineering Division
18
Product range includes:
Deaerators
Effluent Treatment & Recycling Plants leading to zero discharge
Water Treatment Plants (Pre-Treatment & DM Plant)
RO based Desalination Plants
CPP – Condensate Polishing Plants
Exclusive Technical Collaboration with TERMOMECCANICA, Italy for Condensate Polishing Plants
Supplied on turnkey basis the largest ever Deaerator in India for NPC (Tarapur) with capacity of 3,013 TPH
Commissioned- Deaerators for SIPAT Supercritical 3 x 660 MW Power Plant, NTPC
Under execution - Six large-size Deaerators for Marfiq in Saudi Arabia, Hyundai Heavy Industries, Korea
Income of Rs.290 Million in FY 09-10
Order backlog of Rs.358 Million as on 31st March 2010
CPP – Condensate Polishing Plant
Effluent Recycling Plant – Tiruppur
Environmental Engineering Division
19
Four large-size Membrane-based Effluent Recycling Plants at Tiruppur – largest in capacity in India for treating textile dye effluents
Sold over 100 Deaerators in India, Asia, Middle East and Africa, ranging in capacity from 10 TPH to 3,103 TPH
Deaerator – NPC, Tarapur
Captive Power Division
20
EPC Contracting for industrial captive power plants and public utility projects in India up to 150 MW
Captive Power Plants for industries like Steel, Cement, Textiles, Paper, Pharmacy, Refinery, Chemical, Petrochemical, Metallurgical etc
Coal Based Power Plants and Gas based Combined Cycle Power Plants
Commissioned 92.2 MW Valathur (Phase II) CCPP Engineering Procurement & Construction Contract for Tamil Nadu Electricity Board
Commissioned 25 MW TPP Engineering Procurement & Construction Contract in Mettur for Madras Aluminum Company Ltd.
92.2 MW Combined Cycle Power Plant Valathur, Tamil Nadu
Key Differentiators
Proven track record in equipment and Turnkey contracting
Dedicated to Power and Oil & Gas sector
Undertakes turnkey EPC projects for large Utility Power Plants upto 600 MW
Diverse Design & Engineering capabilities
Ability to Design & Manufacture customised products
In-house Design & Engineering gives control over costs, design, time and competitive edge
Diverse range of products and services
Significant synergies through complementary operations
Ability to service both large and small scale projects
Project management system and policy enable execution of large, multifaceted, complex projects
Manufacturing capability is an added advantage in EPC projects
Cost Competitiveness
Control costs by optimising product features and design
Global sourcing
Technology tie-ups
Successfully tied up with several international companies to obtain technology and know-how21
22
1. Design & Engineering of Civil, Electrical and Mechanical
Systems10. Effluent Treatment Plant
2. Civil Works including 11. Demineralization Plant
a. Chimney 12. Ash Handling System
b. Natural and Induced Draft Cooling Tower 13. Coal Handling System
3. Substation and Switchyard 14. Gas Conditioning & Metering Skid
4. Plant Piping System 15. Fabrication of Columns & Structures
5. Air Fin Cooler 16. Welded Finned Tubes
6. Air Cooled Condenser 17. Heat Recovery Steam Generator
7. Deaerator 18. On-line Condenser Tube Cleaning System
8. Desalination Plant including RO System 19. Debris Filter
9. Condensate Polishing Plant 20. Rubber Cleaning Balls for Condenser
BOP Package – In House Systems
Board of Directors
23
S/N Name & OccupationIndustry Experience
(Years)Designation
1Mr. B.G. RaghupathyIndustrialist
35 Chairman & Managing Director
2Mr. T. Sankaralingam Company Executive
34 Managing Director
2Mr. S. RathinamCompany Executive
30 Director (Finance)
3Mr. V.R. MahadevanCompany Executive
27Director (Technologies, HR & Infrastructure)
4Mr. A. SwaminathanCompany Executive
30Director (Sales & Marketing)
5Mr. Heinrich BöhmerBusiness
43 Independent Director
6Mr. M. Gopalakrishna, Retd. IASDirector-In-charge, Andhra Pradesh Gas Power Corporation Limited
48 Independent Director
7Mr. S.A. BohraEx. Sr. Exec. Director (Technical)Nuclear Power Corporation
44 Independent Director
8Mr. S.R. TagatChartered Accountant
28 Independent Director
9Mrs. Sasikala RaghupathyBusiness
24 Director
Leadership & Professional Management The company is managed by a highly motivated team of professionals
The Management of the company has rich and deep experience in the industry
– Average industry experience of the management is more than 25 years
24
Name PositionIndustry Experience
(Years)Experience with
BGR Energy
Mr. B.G. Raghupathy Chairman & Managing Director 36 25
Mr. T. Sankaralingam Managing Director 34 -
Mr. S. Rathinam Director (Finance) 30 17
Mr. V.R. Mahadevan Director (Technologies, HR & Infrastructure) 27 22
Mr. A. Swaminathan Director (Sales & Marketing) 30 12
Major H.L. Khajuria President & CEO, Environmental Engineering 39 12
Mr. R. Ramesh Kumar President, Corporate & Secretary 22 17
Mr. G. Suresh President & CEO, Captive Power 24 21
Mr. V. Balakrishnan President & CEO, Electrical Projects 27 6
Mr. S. Ilanchezhiyan President & CEO, Air Fin Cooler 24 3
Mr. N. Murali President & CEO, Oil & Gas Equipment 29 3
Mr. S. Venkataraman Head, Human Resource 35 -
Mr. P.R. Easwar Kumar Chief Financial Officer 16 15
Human Resources
25
Particulars No. of Employees
Total Employees 1752
Engineers 1468
Design & Engineering 497
Project Management & Quality Control 812
Planning, Procurement and Production 100
Marketing 59
Professional Staff 216
Finance and Accounts 102
Human resource, Legal, Secretarial and Systems 114
Others 68
As on 30th June ‟10
3 Years Financials – A Snapshot
26
INR Million
Audited Year ended 31.3.2008
(12 months)
%Audited
Year ended 31.3.2009
(12 months)
%Audited
Year ended 31.3.2010
(12 months)
%
TURNOVER 15048 100 19221 100 30692 100
EBIDTA 1510 10.03 2080 10.82 3481 11.34
PBT 1252 8.32 1747 9.09 3047 9.93
PAT 844 5.61 1150 5.98 2010 6.55
Robust Financials
27
Total Revenues EBITDA and EBITDA margin
PAT and PAT margin Earnings per share
Note: * FY07 is 18 months period ending March ’07;
7751
15048
19221
30692
FY 07* FY 08 FY 09 FY 10
INR
Mil
lio
n
8571510 2081
34
81
11.1%
10.0%
10.8%11.3%
FY 07* FY 08 FY 09 FY 10
INR
Mil
lio
n
EBITDA EBITDA Margin
392
844
1151
2010
5.1%5.6% 6.0% 6.5%
FY 07* FY 08 FY 09 FY 10
INR
Mil
lio
n
PAT PAT Margin
4.03
12.64
15.98
27
.92
FY 07* FY 08 FY 09 FY 10
INR
Mil
lio
n
28
Total Revenues
EBIDTA
Quarterly Financials
23
24
31
11
38
28 57
86
30
68
42
46
47
24 7
18
3
31
11
46
60 63
51
16
57
1
Q1 Q2 Q3 Q4
INR
Mil
lio
n
FY 07-08 FY 08-09 FY 09-10
26
3
33
0
39
5
53
0
31
2 43
8
53
6
83
6
42
2 57
4
71
4
17
52
Q1 Q2 Q3 Q4
INR
Mil
lio
n
FY 07-08 FY 08-09 FY 09-10