ARS Coaches PD - August 2010
-
Upload
akron-ready-steps -
Category
Education
-
view
372 -
download
1
Transcript of ARS Coaches PD - August 2010
![Page 1: ARS Coaches PD - August 2010](https://reader035.fdocuments.us/reader035/viewer/2022081821/559621921a28ab79708b45bc/html5/thumbnails/1.jpg)
Getting Started
Coach PDAugust 25, 2010
![Page 2: ARS Coaches PD - August 2010](https://reader035.fdocuments.us/reader035/viewer/2022081821/559621921a28ab79708b45bc/html5/thumbnails/2.jpg)
Where We Were
June 1 notes…• Noted progress made on DEW ratings; focus on
room design• Revised shared book; read aloud protocols to
include ratings (0-3)• Revised approach to Topic Studies• Discussed coursework for Fall• Discussed PreK-K Council; Collaboratory
![Page 3: ARS Coaches PD - August 2010](https://reader035.fdocuments.us/reader035/viewer/2022081821/559621921a28ab79708b45bc/html5/thumbnails/3.jpg)
Where We Are
• Summary of Assessment Results• Protocol Revisions• Sept8-Oct4 Settings; ELLCO; CLASS training
• Curriculum: Topic Studies Format; Schedule • R&D in 2010-11
– eBook– Tier 2 Intervention Say-Tell-Do-Play
• Play Planning October Training
![Page 4: ARS Coaches PD - August 2010](https://reader035.fdocuments.us/reader035/viewer/2022081821/559621921a28ab79708b45bc/html5/thumbnails/4.jpg)
Summary of Assessment Results*outperformed control on all tasks
• PPVT: ≈ 93 benchmark: 85• GRR: ≈ 12 benchmark: 14• ALL-BC ≈ 6 benchmark: 15• ALL-BH ≈ 3 benchmark: 3• ALL-ALK ≈ 7 benchmark: 15• ALL-RN ≈ 90 benchmark: <105• GGG-R ≈ 10 benchmark: 7• GGG-A ≈ 7 benchmark: 5
![Page 5: ARS Coaches PD - August 2010](https://reader035.fdocuments.us/reader035/viewer/2022081821/559621921a28ab79708b45bc/html5/thumbnails/5.jpg)
Protocol Revisions
• Shared Book (21 items)• Read Aloud (15 items)
http://akronreadysteps.ning.com
![Page 6: ARS Coaches PD - August 2010](https://reader035.fdocuments.us/reader035/viewer/2022081821/559621921a28ab79708b45bc/html5/thumbnails/6.jpg)
Sept8-Oct4 Activities
• Room arrangement• ELLCO baseline• CLASS training Sept 15-17• Tutorial schedule• Curriculum prep
– Water Pipes– Play centers
![Page 7: ARS Coaches PD - August 2010](https://reader035.fdocuments.us/reader035/viewer/2022081821/559621921a28ab79708b45bc/html5/thumbnails/7.jpg)
Topic Studies
• Oct4-Nov24: Water Pipes• Nov29-Jan28: Buildings• Jan31-Mar25: Wheels• Mar28-May19: Flowers
![Page 8: ARS Coaches PD - August 2010](https://reader035.fdocuments.us/reader035/viewer/2022081821/559621921a28ab79708b45bc/html5/thumbnails/8.jpg)
Water Pipes Topic Study Walk-Through
![Page 9: ARS Coaches PD - August 2010](https://reader035.fdocuments.us/reader035/viewer/2022081821/559621921a28ab79708b45bc/html5/thumbnails/9.jpg)
R & D
e-Book• 4 classrooms• 4 phases; 6 weeks @
– e-book quality– Physical Place– Engagement– Instruction
• 4 teachers; small groups of children
• Training: TBD[ms submitted for review]
Tier 2 Interventionsay-tell-do-play• All classrooms• <85 ss on PPVT• Specified Read Alouds +
voc + play activities• Coaches > Teachers >
Teacher Assistants• 4 weeks@• Training: Sept 2; Sept 17
![Page 10: ARS Coaches PD - August 2010](https://reader035.fdocuments.us/reader035/viewer/2022081821/559621921a28ab79708b45bc/html5/thumbnails/10.jpg)
Play Planning