    Type of Project >>>>

    Total Weights Total Score Total Weights Total Score

    Risk parameter

    I. Pre-Construction Risks 30 30

    1. Statutory Clearances 5 5

    2. Non-Statutory Approvals 2 2

    3. Finalization of Key Contracts 13 13

    4. Design Parameters 10 10

    II. Construction Risks 40 40

    III. Operations & Maintenance Risks 10 10

    1. Operational Risks 10 10

    2. Sales & Offtake Risk

    3. Political/Economy and Social Risks

    4. Force Majeure Events

    5. Techno Economic Parameters

    IV.Financials 20 20

    Total Score Obtained 100 100

    100

    Stage of the Proje

    COMPANY NAME :

    Project Name:

    Pre-Construction Construction

    Pre-Construction Construction

    COAL GAS

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    2/519

    Total Weights Total Score Stage of the Project>> Pre-Construction Construction

    Total Score 100

    Grade Assigned to Project PC1

    80 and above PP1 PC1

    Above 65 and below 80 PP2 PC2

    Above 50 and below 65 PP3 PC3

    Below 50 PP4 PC4

    Grading Matrix >>>

    t

    Operations & Maintenance Project Grading Matrix

    Operations & Maintainence

    HYDEL

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    3/519

    Ops.&Maint.

    PO1

    PO2

    PO3

    PO4

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    4/519

    No. Type of Risk Applicable Y/N Weightage Adjusted

    Wt.

    Marks

    Awarded

    Out Of 10

    Approvals/Permits/Clearan

    ces

    I.1 Statutory Clearances 10 10

    TEC Obtained

    Y 1 1 10 10

    Allocation Obtained

    Y 2 2 10 10

    State Government

    Acceptance Ontained

    Y 1 1 10 10

    SG's Consent Obtained

    Y 1 1 10 10

    EC Issued

    Y 2 2 10 10

    Approval from

    MoEF/SGMoEF

    Y 2 2 10 10

    Obtained Aviation

    Clearance

    Y 0.5 0.5 10 10

    Obtained

    Y 0.5 0.5 10 10

    I.2 Non-Statutory5 5

    Techno-economic clearance

    from CEAA

    Water AvailabilityB

    SPU/State Govt. clearanceC

    Pollution Clearance (water

    and air)D

    Environment Clearance (EC)E

    Other Statutory ClearancesH

    F Forest Land Clearance (FC)

    G

    Civil Aviation Clearance for

    chimney height

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    5/519

    Available as per

    Normative Total

    Requirement

    A Y 3 3 10 10

    Very Good

    Y 1 1 10 10

    Obtained

    Y 1 1 10 10

    1.3 Finalisation of Key

    Contracts 40 40

    Signed PPA for at least

    60% of Capacity

    Y 2 2 10 10

    Highly Favorable

    2 PPA-Tariff Y 2 2 10 10

    Very Good

    3 PPA- Term Y 1 1 10 10

    Very Good

    Y 8 8 10 10Fuel Required at

    Normative Availability

    (NA) for 12 Years is

    tied up

    Y 10 10 10 10

    2

    D A ) Project Implementation

    StructureEPC Contractor

    Finalized and EPC

    Awarded

    Y 8 0 10 10

    Experience of Power

    Sector

    Y 4 0 10 10

    Land/Site

    Others

    AccessB

    Fuel SupplyC

    C

    A PPA - Quantitative

    B PPA - Qualitative

    PPA - (% of capacity)1

    Status of EPC contract

    Contractor

    EPC NON-EPC

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    6/519

    Advantageous

    Y 3 0 10 10

    D B) Project Implementation

    Structure

    Supplier Finalized and

    Contract Awarded

    Y 7 7 10 10

    Supplier Finalized and

    Contract Awarded

    Y 3 3 10 10

    Very Good

    Y 5 5 10 10

    Contacts Awarded

    Y 1 1 10 10

    Contacts Awarded

    Y 1 1 10 10

    I.4 Design Parameters15 15

    Thermal

    Hydro

    Gas

    Thermal

    Hydro

    Gas

    Thermal

    Gas -Open Cycle

    Combined Cycle

    Thermal

    4 10Y 4

    3 103Y

    O & M Contracts

    Y 102 2

    Status of BTG Package

    Owner's, Owner Engineer's

    Experience/Track RecordE

    F

    Contractor's Relation with

    Owner's Group

    Status of BOP Package

    OthersG

    A Project Cost

    B Availability Factor

    C Heat Rate

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    7/519

    Gas

    Combined Cycle

    Thermal

    Very Reputed

    F DPR Consultants Y 2 2 10 10

    II. Construction Risk15 15

    Acquired at least 75%

    of Requirement

    Y 5 5 10 10

    Stage 2 Clearance

    Issued

    Y 2 2 10 10

    No History/Very Low

    Risk

    Y 2 2 10 10

    Very Good

    Y 4 4 10 10

    Stage 2 Clearance

    IssuedY 2 2 10 10

    IV. Project Financials15 15

    70:30

    Y 4 4 10 10

    > 1.5

    Y 4 4 10 10

    REC PLR +4%

    Y 3 3 10 10

    >18%

    Y 2 2 10 10

    60-70%

    Y 2 2 10 10

    2 10

    Y 2 102

    Y 2

    A Land/Site

    D Auxiliary Consumption

    Average DSCR

    IRR

    Return on Equity

    Break Even PLF (@ DSCR =1)

    D Evacuation Infrastructure

    EEvacuation Infrastructure -Forestry Clearance

    Debt-Equity

    B

    Plant Site - Forestry

    Clearance

    C Natural Disaster Risks

    E

    Secondary Fuel

    Consumption

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    8/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    9/519

    Total Scored

    10

    DPR Submitted Feasibility Study Done

    Pre-Feasibility

    (Survey of Site) Rejection

    8 4 2 0 1.0In-principle Approval

    from SG Obtained for

    Full requirement

    In-principle Approval

    from SG Obtained for

    partial requirement Source Identified Rejection

    8 6 2 0 2.0

    - - Applied For Rejection

    - - 2 0 1.0

    - -

    Applied For Consent

    of the SPCB Rejection

    8 6 2 0 1.0Public Hearing

    Completed

    Scoping (TOR

    Issued)

    Screening

    Completed Rejection

    8 4 2 0 2.0

    In-Principle Approval

    from MoEF

    SG Forestry

    Recommends

    Application for

    Diversion of Land Rejection

    8 6 2 0 2.0

    - - Applied For Rejection

    8 6 2 0 0.5

    Applied For Rejection

    8 6 2 0 0.5

    5

    Grading Guidelines

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    10/519

    About 80% or above

    of the Norms

    About 60% or above

    (50% of Fuel Required

    (@NA) for 12 Years is

    tied up

    >50% of Fuel

    Required (@NA) for

    5 Years is tied up No Action Yet

    8 6 4 0 10

    Bids Received and

    Contactor(s) being

    finalized

    Bidders shortlisted and

    RFP Floated RFQ for Bids Floated No Action Yet

    8 4 2 0 0

    Experience of Allied

    Power

    Good experience of

    other than Power

    Sector

    Very Less

    experience of other

    than Power Sector No experience

    8 6 2 0 0

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    11/519

    Low Risk Medium Risk High Risk Very High Risk

    8 6 4 0 0

    Bids Received and

    Contactor(s) being

    finalized

    Bidders shortlisted and

    RFP Floated RFQ for Bids Floated No Action Yet

    8 6 4 0 7Bids Received and

    Contactor(s) being

    finalized

    Bidders shortlisted and

    RFP Floated RFQ for Bids Floated No Action Yet

    8 6 4 0 3

    Above Average Average Below Average Poor

    8 6 2 0

    5Bids Received andContactor(s) being

    finalized

    Bidders shortlisted and

    RFP Floated RFQ for Bids Floated No Action Yet

    8 4 2 0 1Bids Received and

    Contactor(s) being

    finalized

    Bidders shortlisted and

    RFP Floated RFQ for Bids Floated No Action Yet

    8 4 2 0 1

    15

    4-5 Crores 5-6 Crores 6.0-6.5 Crores 6.5-7.0 Crores

    10 8 6 46-7 Crores 7-8 Crores 8-8.5 Crores > 8.5 Crores

    10 8 6 4

    4-4.5 Crores 4.5-5.0 Crores 5-5.50 Crores > 5.50 Crores

    10 8 6 4

    >85% 70-85% 60-70% 60% 50-60% 40-50% 85% 75-85% 65-75%

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    12/519

    10 8 6 4

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    13/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    14/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    15/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    16/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    17/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    18/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    19/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    20/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    21/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    22/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    23/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    24/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    25/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    26/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    27/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    28/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    29/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    30/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    31/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    32/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    33/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    34/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    35/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    36/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    37/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    38/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    39/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    40/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    41/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    42/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    43/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    44/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    45/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    46/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    47/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    48/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    49/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    50/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    51/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    52/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    53/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    54/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    55/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    56/519

    Y 1 1 10

    Y 0.5 0.5 10

    Y 0.5 0.5 10

    I.3 Key Contracts

    13 13

    A PPA-Quantitative

    Y 2 2 10

    PPA-Tariff Y 1 1 10

    PPA- Term Y 1 1 10

    Y 1 1 10

    Y 2 2 10

    2

    Y 2 0 10

    Status of EPC contract

    AccessB

    OthersC

    Land/SiteA

    PPA -% of Capacity1

    2

    3

    PPA - QualitativeB

    C Fuel Supply

    D A ) Project Implementation Structure

    EPC NON-EPC

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    57/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    58/519

    F DPR Consultants

    II. Construction Risk

    40 40

    Y 7 7 10

    Y 5 5 10

    Y 5 5 10

    Y 5 5 10

    Y 4 4 10

    Y 6 6 10

    Y 6 6 10

    Y

    Y 1 101

    11 10

    FProject Implementation - Plant &Machinery - Costs

    G

    Project Implementation - Plant &

    Machinery -Time Schedule

    Evacuation Infrastructure

    C Natural Disaster Risks

    D

    Evacuation Infrastructure - Forestry

    ClearanceE

    Plant Site - Forestry Clearance

    Auxilary ConsumptionD

    Y 1 1 10

    Secondary Fuel ConsumptionE

    A Land/Site

    B

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    59/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    60/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    61/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    62/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    63/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    64/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    65/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    66/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    67/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    68/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    69/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    70/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    71/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    72/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    73/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    74/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    75/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    76/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    77/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    78/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    79/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    80/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    81/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    82/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    83/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    84/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    85/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    86/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    87/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    88/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    89/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    90/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    91/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    92/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    93/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    94/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    95/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    96/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    97/519

    Total Scored

    5

    TEC Obtained DPR Submitted Feasibility Study Done

    Pre-Feasibility

    (Survey of Site) Rejection

    10 8 4 2 0 0.5

    Allocation Obtained

    from SG Obtained for

    Full requirement

    from SG Obtained for

    partial requirement Source Identified Rejection

    10 8 6 2 0 1

    State GovernmentAcceptance Obtained - - Applied For Rejection

    10 - - 2 0 0.5

    SPCB's Consent (NOC)

    Obtained - -

    Applied For Consent

    of the SPCB Rejection

    10 8 6 2 0 0.5

    EC Issued

    Public Hearing

    Completed

    Scoping (TOR

    Issued)

    Screening

    Completed Rejection

    10 8 4 2 0 0.5

    Approval from

    MoEF/SGMoEF

    In-Principle Approval

    from MoEF

    SG Forestry

    Recommends

    Application for

    Divesrion of Land Rejection

    10 8 6 2 0 1

    Obtained Aviation

    Clearance - - Applied For Rejection

    10 8 6 2 0 0.5

    Obtained Applied For Rejection

    10 8 6 2 0 0.5

    2

    Grading Guidelines

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    98/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    99/519

    10 8 6 2 0 0

    Advantageous Low Risk Medium Risk High Risk Very High Risk

    10 8 6 4 0 0

    Supplier Finalized and

    Contract Awarded

    Bids Reeceived and

    Contactor(s) being

    finalized

    Bidders shortlisted and

    RFP Floated RFQ for Bids Floated No Action Yet

    10 8 6 4 0 2.00

    Supplier Finalized and

    Contract Awarded

    Bids Reeceived and

    Contactor(s) being

    finalized

    Bidders shortlisted and

    RFP Floated RFQ for Bids Floated No Action Yet

    10 8 6 4 0 1

    Very Good Above Average Average Below Average Poor

    10 8 6 2 0 1.00

    Contacts Awarded

    Bids Reeceived andContactor(s) being

    finalized

    Bidders shortlisted and

    RFP Floated RFQ for Bids Floated No Action Yet

    10 8 4 2 0 1

    Contacts Awarded

    Bids Reeceived and

    Contactor(s) being

    finalized

    Bidders shortlisted and

    RFP Floated RFQ for Bids Floated No Action Yet

    10 8 4 2 0 1

    10

    Thermal 4-5 Crores 5-6 Crores 6.0-6.5 Crores 6.5-7.0 Crores

    10 8 6 4

    Hydro 6-7 Crores 7-8 Crores 8-8.5 Crores > 8.5 Crores

    10 8 6 4

    Gas 4-4.5 Crores 4.5-5.0 Crores 5-5.50 Crores > 5.50 Crores

    10 8 6 4

    Thermal >85% 70-85% 60-70% 60% 50-60% 40-50% 85% 75-85% 65-75%

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    100/519

    10 8 6 4

    Combined Cycle 2.0

    10 8 6 4

    Very Reputed Reputed Experienced Limited Exp. Unknown

    10 8 6 4 2

    40

    Acquired at least 75%

    of Requirement

    Acquired at least 50%

    of Requirement

    Acquired at least 33%

    of Requirement

    Land Identified and

    Acquisition in

    progress -Advances

    Paid/Notification

    Issued Not Yet Started

    10 8 6 2 0 7

    Stage 2 Clearance

    Issued

    Applied for Stage 2

    Clearance

    Stage 1 Clearance

    Issued

    Applied for Stage 1

    Clearance Not Yet Started

    10 8 6 2 0 5

    No Hostory/Very Low

    Risk Low Risk Medium Risk High Risk Very High Risk

    10 8 6 2 0 5

    Very Good Above Average Average Below Average Poor

    10 8 6 2 0 5

    Stage 2 Clearance

    Issued

    Applied for Stage 2

    Clearance

    Stage 1 Clearance

    Issued

    Applied for Stage 1

    Clearnce Not Yet Started

    10 8 6 2 0 4

    No Impact and Risk

    completely Addressed

    Low Impact and Risk

    Adequately

    Addressed Average Impact High Impact Very High Impact

    10 8 6 2 0 6

    No Impact and Risk

    completely Addressed

    (10)

    Low Impact and Risk

    Adequately

    Addressed (8) Average Impact (6) High Impact (4) Very High Impact (6)

    10 8 6 2 0 6

    No Impact and Risk

    completely Addressed

    Low Impact and Risk

    Adequately

    Addressed Average Impact High Impact Very High Impact

    1

    1

    1

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    101/519

    10 8 6 2 0 2

    10

    Available for

    Expansion

    More than Required

    for Capacity

    Adequate for Proposed

    Capacity

    Less than Normative

    Requirement Not Adequate

    10 8 6 2 0 5

    More than AdequateAdequate for Life of

    the PlantAdequate for Medium

    TermAdequate only for

    Short Term Not Adequate

    10 8 6 2 0 5

    20

    70:30 75:25 80:20 85:15 90:10

    10 8 6 2 0

    > 1.5 1.3 - 1.5 1.2 - 1.3 1.1 - 1.2 1.0 - 1.1

    10 8 6 4 2

    REC PLR +4% REC PLR +3% REC PLR +2% REC PLR +1% REC PLR +0.5%

    10 8 6 4 2

    >18% 15-18% 13-15% 10-13% 90%

    10 8 6 4 2 3

    5

    5

    4

    3

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    102/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    103/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    104/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    105/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    106/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    107/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    108/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    109/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    110/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    111/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    112/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    113/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    114/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    115/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    116/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    117/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    118/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    119/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    120/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    121/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    122/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    123/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    124/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    125/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    126/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    127/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    128/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    129/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    130/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    131/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    132/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    133/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    134/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    135/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    136/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    137/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    138/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    139/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    140/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    141/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    142/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    143/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    144/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    145/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    146/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    147/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    148/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    149/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    150/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    151/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    152/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    153/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    154/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    155/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    156/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    157/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    158/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    159/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    160/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    161/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    162/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    163/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    164/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    165/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    166/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    167/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    168/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    169/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    170/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    171/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    172/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    173/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    174/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    175/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    176/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    177/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    178/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    179/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    180/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    181/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    182/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    183/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    184/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    185/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    186/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    187/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    188/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    189/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    190/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    191/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    192/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    193/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    194/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    195/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    196/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    197/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    198/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    199/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    200/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    201/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    202/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    203/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    204/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    205/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    206/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    207/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    208/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    209/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    210/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    211/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    212/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    213/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    214/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    215/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    216/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    217/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    218/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    219/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    220/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    221/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    222/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    223/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    224/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    225/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    226/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    227/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    228/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    229/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    230/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    231/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    232/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    233/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    234/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    235/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    236/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    237/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    238/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    239/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    240/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    241/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    242/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    243/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    244/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    245/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    246/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    247/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    248/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    249/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    250/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    251/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    252/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    253/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    254/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    255/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    256/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    257/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    258/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    259/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    260/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    261/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    262/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    263/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    264/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    265/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    266/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    267/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    268/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    269/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    270/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    271/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    272/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    273/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    274/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    275/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    276/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    277/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    278/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    279/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    280/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    281/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    282/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    283/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    284/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    285/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    286/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    287/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    288/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    289/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    290/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    291/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    292/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    293/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    294/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    295/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    296/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    297/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    298/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    299/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    300/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    301/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    302/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    303/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    304/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    305/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    306/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    307/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    308/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    309/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    310/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    311/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    312/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    313/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    314/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    315/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    316/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    317/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    318/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    319/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    320/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    321/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    322/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    323/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    324/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    325/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    326/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    327/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    328/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    329/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    330/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    331/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    332/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    333/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    334/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    335/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    336/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    337/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    338/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    339/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    340/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    341/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    342/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    343/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    344/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    345/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    346/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    347/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    348/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    349/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    350/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    351/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    352/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    353/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    354/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    355/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    356/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    357/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    358/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    359/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    360/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    361/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    362/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    363/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    364/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    365/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    366/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    367/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    368/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    369/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    370/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    371/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    372/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    373/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    374/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    375/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    376/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    377/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    378/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    379/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    380/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    381/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    382/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    383/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    384/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    385/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    386/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    387/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    388/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    389/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    390/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    391/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    392/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    393/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    394/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    395/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    396/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    397/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    398/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    399/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    400/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    401/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    402/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    403/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    404/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    405/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    406/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    407/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    408/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    409/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    410/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    411/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    412/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    413/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    414/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    415/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    416/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    417/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    418/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    419/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    420/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    421/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    422/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    423/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    424/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    425/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    426/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    427/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    428/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    429/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    430/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    431/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    432/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    433/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    434/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    435/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    436/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    437/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    438/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    439/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    440/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    441/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    442/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    443/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    444/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    445/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    446/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    447/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    448/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    449/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    450/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    451/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    452/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    453/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    454/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    455/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    456/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    457/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    458/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    459/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    460/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    461/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    462/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    463/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    464/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    465/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    466/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    467/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    468/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    469/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    470/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    471/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    472/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    473/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    474/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    475/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    476/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    477/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    478/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    479/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    480/519

    No. Type of Risk Applicable

    Y/N

    Weightage Adjusted

    Wt.

    Marks

    Awarded

    Out Of 10

    I Statutory Clearances 5 5

    Obtained

    Y 5 5 10 10

    II. Construction Risk 15 15

    Acquired at least 75% of

    Requirement

    Y 2 2 10 10

    Stage 2 Clearance Issued

    Y 2 2 10 10

    No Hostory/Very Low Risk

    Y 2 2 10 10

    Very Good

    Y 2 2 10 10

    Stage 2 Clearance Issued

    Y 1 1 10 10

    No Impact and Risk completely

    Addressed

    Y 3 3 10 10

    No Impact and Risk completely

    Addressed

    Y 2 2 10 10

    No Impact and Risk completely

    Addressed

    Y 1 1 10 10

    III. Operations &

    Maintenance

    III.1 Operational Risks

    18 18

    Very Good

    Land/SiteA

    A Statutory Clearances

    B

    Plant Site - Forestry

    Clearance

    C Natural Disaster Risks

    D

    G

    Project Implementation -

    Plant & Machinery -Time

    Schedule

    H

    Accident/ Damage/

    Destruction

    Evacuation Infrastructure

    E

    Evacuation Infrastructure

    - Forestry Clearance

    F

    Project Implementation -

    Plant & Machinery -

    Costs

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    481/519

    Y 4 4 10 10

    Adequately Covered

    Y 2 2 10 10

    Available for ExpansionY 1 1 10 10

    Low

    Y 1 1 10 10

    Fuel Related Risks

    Very Strong

    Y 2 2 10 10

    Vey High

    Y 2 2 10 10

    More than Adequate

    Y 2 2 10 10

    Adequately Covered

    Y 1 1 10 10

    Adequately Covered

    Y 1 1 10 10

    Adequately Covered

    Y 1 1 10 10

    Adequately Covered

    Y 1 1 10 10

    III.2 Sales/ Offtake Risk 10 10

    Highly Favorable

    Y 1 1 10 10

    Signed PPAs for: >70% of

    Capacity

    Y 2 2 10 10

    Adequately Covered

    Y 1 1 10 10

    A Equipment Performance

    E Source

    F Supplier

    G Fuel - Quantity & Quality

    B

    Performance Guarantee

    & LDs

    CWater Availability &Adequacy

    Cooling TechnologyD

    L

    Environmental/ Pollution

    Risks

    A Demand Risk

    B

    Capacity Tied up through

    PPAs

    I Fuel Price risk

    J Fuel transportation Risk

    K O & M risks

    Evacuation RiskC

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    482/519

    Highly Favorable

    Y 2 2 10 10

    Very Good

    Y 2 2 10 10

    Very Good

    Y 1 1 10 10

    Very Good

    Y 1 1 10 10

    III.3 Political/Economic Risks

    5 5

    Low

    Y 2 2 10 10

    Low

    Y 1 1 10 10Low

    Y 2 2 10 10

    III.4 Force Majeure Risk2 2

    Adequately Covered

    Y 1 1 10 10

    Adequately Covered

    Y 1 1 10 10

    III.5 Techno Economic10 10

    Thermal

    Hydro

    Gas

    Thermal

    Hydro

    Gas

    Thermal

    Gas -Open Cycle

    Y 4 4 10

    Y 3 10B PLF/ Availability 3

    A

    Foreign Exchange -

    Project Cost

    B

    Foreign Exchange - On

    Cost of Generation

    C

    Change of Policies - Fuel

    Supply

    Tariff Risk

    Levelised Tariff

    Quality of Receivables

    Payment Security

    D

    E

    F

    G

    A

    Natural

    Calamity/Disaster

    BNon-Natural: DirectPolitical

    A Project Cost

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    483/519

    Combined Cycle

    Thermal

    Gas

    Combined Cycle

    Thermal

    IV. Financials

    35 35

    70:30

    Y 7 7 10 10

    > 1.5

    Y 8 8 10 10

    REC PLR +4%

    Y 8 8 10 10

    >18%

    Y 6 6 10 10

    60-70%

    Y 6 6 10 10

    Y 1 101

    D Auxilary Consumption 1

    1Y 1 10

    Y 1 10

    E

    Secondary Fuel

    Consumption

    Average DSCR

    IRR

    Return on Equity

    Break Even PLF (@ DSCR

    =1)

    Debt-Equity

    C Heat Rate

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    484/519

    Total Scored

    5

    5

    15

    Acquired at least 50%

    of Requirement

    Acquired at least 33%

    of Requirement

    Acquistion in progress

    -Advances

    Paid/Notification Not Yet Started

    8 6 2 0 2

    Applied for Stage 2

    Clearance

    Stage 1 Clearance

    Issued

    Applied for Stage 1

    Clearnce Not Yet Started

    8 6 2 0 2

    Low Risk Medium Risk High Risk Very High Risk

    8 6 2 0 2

    Above Average Average Below Average Poor

    8 6 2 0 2

    Applied for Stage 2

    Clearance

    Stage 1 Clearance

    Issued

    Applied for Stage 1

    Clearnce Not Yet Started

    8 6 2 0 1

    Low Impact and Risk

    Adequately

    Addressed Average Impact High Impact Very High Impact

    8 6 2 0 3

    Low Impact and Risk

    Adequately

    Addressed Average Impact High Impact Very High Impact

    8 6 2 0 2ow mpact an s

    Adequately

    Addressed Average Impact High Impact Very High Impact

    8 6 2 0 1

    18

    Above Average Average Below Average Poor

    Some Clearances are Still Pending

    0

    Grading

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    485/519

    8 6 2 0

    Reasonably Covered Medium Coverage Low Coverage Not Covered

    8 6 2 0

    More than Required

    for Capacity

    Adequate for

    Proposed Capacity

    Less than Normative

    Requirement Not Adequate8 6 2 0

    Medium Impact Average Impact High Impact Very High Impact

    8 6 2 0

    Strong Medium Strength Weak Very Weak

    8 6 2 0

    High Average Low Very Low

    8 6 2 0

    Adequate for Life of

    the Plant

    Adequate for Medium

    Term

    Adequate only for

    Short Term Not Adequate

    8 6 2 0

    Reasonably Covered Medium Coverage Low Coverage Not Covered

    8 6 2 0

    Reasonably Covered Medium Coverage Low Coverage Not Covered

    8 6 2 0

    Reasonably Covered Medium Coverage Low Coverage Not Covered

    8 6 2 0

    Reasonably Covered Medium Coverage Low Coverage Not Covered

    8 6 2 0

    10

    Favorable Somewhat Favorable Unfavorable Highly Unfavorable

    8 6 2 0

    Signed PPAs for: 60-

    70% of Capacity

    Signed PPAs for: 50-

    60% of Capacity

    Signed PPAs for: 40-

    50% of Capacity

    Signed PPAs for:

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    486/519

    Favorable Moderately Favorable Lowly Favorable Unfavorable

    8 6 2 0

    Good Average Below Average Poor

    8 6 4 2

    Good Average Below Average Poor

    8 6 4 2

    Above Average Average Below Average Poor

    8 6 2 0

    5

    Medium Impact Average Impact High Impact Very High Impact

    8 6 2 0

    Medium Impact Average Impact High Impact Very High Impact

    8 6 2 0

    Medium Impact Average Impact High Impact Very High Impact

    8 6 2 0

    2

    Reasonably Covered Medium Coverage Low Coverage Not Covered

    8 6 2 0

    Reasonably Covered Medium Coverage Low Coverage Not Covered

    8 6 2 0

    10

    4-5 Crores 5-6 Crores 6.0-6.5 Crores 6.5-7.0 Crores

    10 8 6 4

    6-7 Crores 7-8 Crores 8-8.5 Crores > 8.5 Crores

    10 8 6 4

    4-4.5 Crores 4.5-5.0 Crores 5-5.50 Crores > 5.50 Crores

    10 8 6 4

    >85% 70-85% 60-70% 60% 50-60% 40-50% 85% 75-85% 65-75%

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    487/519

    10 8 6 4

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    488/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    489/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    490/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    491/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    492/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    493/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    494/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    495/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    496/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    497/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    498/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    499/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    500/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    501/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    502/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    503/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    504/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    505/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    506/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    507/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    508/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    509/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    510/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    511/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    512/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    513/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    514/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    515/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    516/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    517/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    518/519

  • 7/31/2019 Appraisal Risk Matrix REC Crisil

    519/519