Page 1 of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’ Electrical Installations In The New Electricity Market October 2002 Forms & presentation material will be published in the EMA website www.ema.gov.sg

Transcript of Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING...

Page 1: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’

Page 1 of 13LEW BRIEFING

Electricity Supply Application

Application ProceduresFor Electricity Connection To

Consumers’ Electrical InstallationsIn The New Electricity Market

October 2002

Forms & presentation material will be published in the EMA website www.ema.gov.sg

updated 26/12/02
Page 2: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’

Page 2 of 13LEW BRIEFING

Electricity Supply Application

SCOPE OF PRESENTATION

1. Submission of Consultation Form2. Submission of Application

a. For Direct Connection Load ≤ 45 kVAb. For Indirect Connection Load ≤ 45 kVAc. For Direct Connection Load > 45 kVAd. For Indirect Connection Load > 45 kVA

Page 3: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’

Page 3 of 13LEW BRIEFING

Electricity Supply Application

SUBMISSION OF CONSULTATION FORM

Procedure for New Electricity Market

1. Connection Applicant may seek consultation on the supply scheme & technical requirements at the conceptual level by submitting Consultation Form through the LEW to PowerGrid.

2. PowerGrid needs info such as site plan, gross floor area, usage of premises, supply requirement & expected date of completion.

Page 4: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’

Page 4 of 13LEW BRIEFING

Electricity Supply Application

SUBMISSION OF APPLICATIONFOR DIRECT CONNECTION LOAD ≤≤ 45 45 kVAkVA

1. The LEW shall submit an Application Form with 2 copies of site plan, on behalf of the customer, when applying for a new or modified connection to the Transmission System.

2. PSL shall endeavour to send the quotation for electricity supply connection to the customer within 10 business days.

3. Customer pays Service Connection Charge within the validity period of the quotation.

Page 5: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’

Page 5 of 13LEW BRIEFING

Electricity Supply Application

SUBMISSION OF APPLICATIONFOR DIRECT CONNECTION LOAD ≤≤ 45 45 kVAkVA

4. Upon receipt of payment, PowerGrid will commence work and inform the customer and LEW on completion

5. Customer has to open an account and pay deposit to PSL if he has not already done so. The LEW shall submit a copy of Certificate of Compliance(COC) and Application for Inspection of Electrical Installation Form (CS/5) on behalf of the customer. (Please note: First-time inspection is free-of-charge, however re-inspection will be charged accordingly.)

Page 6: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’

Page 6 of 13LEW BRIEFING

Electricity Supply Application

SUBMISSION OF APPLICATIONFOR INDIRECT CONNECTION LOAD ≤≤ 45 45 kVAkVA

1. Customer to open an account and pay deposit to PSL if he has notalready done so.

2. The LEW shall submit a copy of Certificate of Compliance(COC) and Application for Inspection of Electrical Installation Form (CS/5) on behalf of the customer together with the landlord’s consent on Form CS/3 or CS/3H and book an appointment for inspection and turn-on. (Please note: First-time inspection is free-of-charge, however re-inspection will be charged accordingly.)

Page 7: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’

Page 7 of 13LEW BRIEFING

Electricity Supply Application

SUBMISSION OF APPLICATIONFOR DIRECT CONNECTION LOAD > 45 > 45 kVAkVA

1. The LEW shall submit an Application Form with 2 copies of site plan, on behalf of the customer.

2. PSL shall advise the LEW & customer on the approval of the application & technical requirements within 10 business days for connections up to 22kV, within 60 business days for 66kV connectionsand within 100 business days for 230kV connections.

For Non-Contestable Customer

3. For Service without sub-station, the procedure is the same as for Direct Connection Load ≤ 45 kVA.

4. For Service with sub-station, LEW shall proceed to submit sub-station plan & metering requirements to PowerGrid for clearance.

Page 8: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’

Page 8 of 13LEW BRIEFING

Electricity Supply Application

SUBMISSION OF APPLICATIONFOR DIRECT CONNECTION LOAD > 45 > 45 kVAkVA

For Non-Contestable Customer

5. PSL shall send the Quotation, Supply Agreement & Deposit amount required for Opening of A/C to customer.

6. On receipt of payment of service connection charge & signed supply agreement, PowerGrid will commence work & inform LEW & customer on completion.

7. Customer shall proceed to open an account with PSL and apply to EMA for LEI.

8. LEW submits a copy of Certificate of Compliance (COC) and books an appointment for energisation of service connection at PSL Installation Section, St James’ Office.

Page 9: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’

Page 9 of 13LEW BRIEFING

Electricity Supply Application

SUBMISSION OF APPLICATIONFOR DIRECT CONNECTION LOAD > 45 > 45 kVAkVA

For Contestable Customer

3. All customers must make an application to PSL for classification as Contestable Customer.

4. Upon classification as a Contestable Consumer, PSL shall send the Quotation, Consumer Connection Agreement (CCA), Opening of A/C Form, GIRO Form, & Request For Installation of Meter Form (CS/6) to customer.

5. On receipt of payment of service connection charge & signed Consumer Connection Agreement, PowerGrid will commence work & inform LEW & customer on completion.

6. The customer shall subscribe and install one dedicated telephone line per metering point to be used for the purpose of remote meter reading.

Page 10: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’

Page 10 of 13LEW BRIEFING

Electricity Supply Application

SUBMISSION OF APPLICATIONFOR DIRECT CONNECTION LOAD > 45 > 45 kVAkVA

For Contestable Customer

7. Customer submits the application form to open an a/c together with a security deposit (if applicable) to PSL. LEW is also required to submit copy of the duly completed Form CS/6 to PSL. LEW shall liaise directly with PowerGrid to install meter.

8. PSL notifies LEW to apply to EMA for LEI.

9. LEW books an appointment for energisation of service connection at PSL Installation Section, St James’ Office.

Page 11: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’

Page 11 of 13LEW BRIEFING

Electricity Supply Application

SUBMISSION OF APPLICATIONFOR INDIRECT CONNECTION LOAD > 45 > 45 kVAkVA

1. When the premises is ready for installation of meters, the LEW/Customer has to open an account and pay deposit to PSL if he has not already done so and submit Form CS/7 for Request for Installation of Meter.

2. The LEW shall proceed to liaise with the Meter Section of PowerGrid to have the meters installed.

3. PSL shall then advise LEW to proceed to apply to EMA for LEI before the supply is turned on.

4. After the meters are installed, the LEW shall submit a copy of Certificate of Compliance and confirm the account activation date(which is the proposed turn-on date), with PSL.

Page 12: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’

Page 12 of 13LEW BRIEFING

Electricity Supply Application

SUBMISSION OF APPLICATIONFOR INDIRECT CONNECTION LOAD > 45 > 45 kVAkVA

5. The LEW shall be responsible for arranging the energisation of the service connection with the relevant party where the connection is taken via landlord’s switchboard such as HDB, JTC or private multi-metered buildings.

6. Landlord’s LEW will issue “Statement of Turn-on of Electricity” upon successful turn-on.

Impt: For Contestable Customer, the customer shall subscribe and install a dedicated telephone line per metering point to be used for the purpose of remote metering.

Page 13: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’

Page 13 of 13LEW BRIEFING

Electricity Supply Application

THE ENDThese procedures and forms can be obtained from the Handbook. For more information on Supply Application & Contract, you can refer to the Handbook “ How to apply for Electricity Connection” or contact PSL at 68238284/68238340. (PowerGrid is finalising on the Handbook and will soon make it available.)

Page 14: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’
Page 15: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’
Page 16: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’
Page 17: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’

CERTIFICATE OF COMPLIANCE

[Regulation 5(2) of the Electricity (Electrical Installations) Regulations 2002]

Particulars of Electrical Installation Name of Consumer : _______________________________________________ Address of Installation : _______________________________________________ _______________________________________________ Electrical Installation Licence No. ___________ MSS Account No. _____________ Approved load & Supply Voltage: _______________ kW ____________ Volts Generator(s) Installed: Operated in parallel with PowerGrid’s supply. No. of generator: ________ Rating: _________ kVA Standby generator. No. of generator: ________ Rating: _________ kVA Not applicable Certification by Licensed Electrical Worker I certify that the above-mentioned Electrical Installation complies with the requirements of the Electricity (Electrical Installations) Regulations 2003 and the Singapore Standards CP 5. I further certify that the technical requirements as stipulated by the person responsible for turning on the switchgear which controls the supply of electricity to the said electrical installation have been complied with.

I hereby request for the energisation of the supply line to the said Electrical Installation

on _________________ (date).

__________ _________ Name & Signature of LEW Licence No. Date Copy to: Market Support Services Licensee

REF: E(EW)REG R5(2)

Page 18: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’
Page 19: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’
Page 20: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’
Page 21: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’
Page 22: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’
Page 23: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’
Page 24: Application Procedures For Electricity Connection To ... · PDF filePage 1of 13 LEW BRIEFING Electricity Supply Application Application Procedures For Electricity Connection To Consumers’

STATEMENT OF TURN-ON OF ELECTRICITY [Regulation 5(4) of the Electricity (Electrical

Installations) Regulations 2002] ELECTRICITY SUPPLY TO ___________________________________________ (Name of Applicant) AT___________________________________________________________________ (Address of Installation)

______________________________________________________________________ ELECTRICAL INSTALLATION LICENCE NO* : __________________________ I agree that the above-mentioned electrical installation is suitable for connection to

the electrical system. I certify that the supply line to the

installation has been energised on __________________ at ___________________. (date) (time)

______________________________________________ ________________ ____________ Name & Signature of person responsible for Licence No. Date energisation of supply line I acknowledge that the supply line has been energised on the date and time indicated above. _______________________________________ ________________ ____________ Name & Signature of LEW requesting for Licence No. Date energisation of supply line I acknowledge that the supply line has been energised on the date and time indicated above and confirm that I will be responsible for the operation of this electrical installation hereafter. _______________________________________ _____________ ____________ Name & Signature of LEW responsible for the Licence No. Date operation of the electrical installation* I acknowledge that the supply line has been energised on the date and time indicated above. ________________________________ _____________ _________ Name & Signature of Applicant NRIC / Passport No. Date * This form is applicable to an electrical installation exceeding 45 kVA or a licensed electrical

installation.

REF: E(EI)REG R5(3)