Application of Value Engineering –The Crosstown Project
Presented To: CSVA Conference, Toronto
Presented by: Rick Thompson, Chief Project Manager – SRT/Yards
November 15, 2011
![Page 2: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/2.jpg)
1. Eglinton Scarborough Crosstown Overview
2. Value Engineering for the Crosstown Project
3. Examples of VE Workshops
(i) SRT Conversion(ii) Station Box Length(iii) Tunnel Design
4. Questions
11/18/2011Application of VE - The Crosstown Project
Agenda2
Agenda
![Page 3: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/3.jpg)
1. Eglinton Scarborough Crosstown Overview
11/18/2011 3
Agenda
Application of VE - The Crosstown ProjectAgenda
![Page 4: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/4.jpg)
4
Eglinton-Scarborough Crosstown
Application of Value Engineering 1 - The Crosstown Project
11/15/2011
![Page 5: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/5.jpg)
5
Eglinton Corridor
11/15/2011Application of Value Engineering
1 - The Crosstown Project
![Page 6: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/6.jpg)
6
SRT
11/15/2011Application of Value Engineering
1 - The Crosstown Project
![Page 7: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/7.jpg)
7
Maintenance and Storage Facilities (MSFs)
11/15/2011Application of Value Engineering
1 - The Crosstown Project
![Page 8: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/8.jpg)
8
Eglinton-Scarborough Crosstown
• Funded by the Province through Metrolinx - $8.4 Billion
• TTC responsible for delivery of the project, on behalf of Metrolinx
• Support future growth across the City
• Provide connections to the TTC subway and GO Transit
• Implement PRESTO transit fare card
11/15/2011Application of Value Engineering
1 - The Crosstown Project
![Page 9: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/9.jpg)
Eglinton-Scarborough Crosstown
9
Key facts:
• 25 km east-west corridor between Scarborough Centre and Jane Street / Black Creek
• 19 km underground tunnel (Jane/Black Creek to Kennedy)
• 6km through-running service along upgraded SRT to Scarborough Centre
• Up to 26 stations
• 3 interchanges with subway
• Two Maintenance and Storage Facilities (MSF)
11/15/2011Application of Value Engineering
1 - The Crosstown Project
![Page 10: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/10.jpg)
Light Rail Vehicles
1011/15/2011Application of Value Engineering
1 - The Crosstown Project
![Page 11: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/11.jpg)
Light Rail Vehicles
Bombardier Awarded Contract in June 2010
New LRV features:
• Low floor and accessible
• Audio and visual passenger information
• Enhanced noise and vibration mitigation• 31m long• Will operate in 3 car consist
1111/15/2011Application of Value Engineering
1 - The Crosstown Project
![Page 12: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/12.jpg)
Potential Interior Layout
1211/15/2011Application of Value Engineering
1 - The Crosstown Project
![Page 13: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/13.jpg)
13
• Deliver quality product
• Deliver accessible product
• Minimize property and construction impacts
• Minimize disruption to extensive utilities around stations
• Accommodate local traffic during construction
Goals
11/15/2011 Application of Value Engineering 1 - The Crosstown Project
![Page 14: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/14.jpg)
14
• SRT – Kennedy to McCowan – 2019
• Eglinton – Keele to Kennedy – target 2020
Project Implementation
11/15/2011 Application of Value Engineering 1 - The Crosstown Project
![Page 15: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/15.jpg)
15
– Nov. 2011 – Tunnels – Keele to Laird – 90% – Dec. 2011 – SRT Conversion – 30% – Dec. 2011 – SRT Kennedy Station – 10% – Early 2012 – Stations – Keele to Chaplin – 10%
Project Status - Design
11/15/2011 Application of Value Engineering 1 - The Crosstown Project
![Page 16: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/16.jpg)
16
• Jul. 2011 – West Launch Shaft @ Black Creek
• Summer 2012 – Tunnelling starts (west to east)
• 2014 – Eglinton Stations Start
• 2013/2014 – Advanced SRT construction
• Sep. 2015 – SRT shut down
• Sep. 2015 - – McCowan Maintenance & Storage Facility.
Project Status - Construction
11/15/2011 Application of Value Engineering 1 - The Crosstown Project
![Page 17: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/17.jpg)
11/18/2011Application of VE - The Crosstown Project
Agenda17
Agenda
1. Eglinton Scarborough Crosstown Overview
2. Value Engineering for the Crosstown Project
![Page 18: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/18.jpg)
18
Best value at lowest cost.
VE Objective
Application of VE2-Value Engineering for the Crosstown Project
11/15/2011
![Page 19: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/19.jpg)
19
In achieving best value at lowest cost, must:• Provide safe operation
• Adhere to design requirements
• Provide low life-cycle cost
• Provide high performance- reliability- availability- maintainability
• Be functional and aesthetically pleasing for customers.
VE Objective
11/15/2011 Application of VE2-Value Engineering for the Crosstown Project
![Page 20: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/20.jpg)
20
Value Engineering
– Traditionally perceived as a means to reduce costs. – Can also be applied to improve performance.– Measures to determine performance are specific to
each VE
What is Value?
11/15/2011 Application of VE2-Value Engineering for the Crosstown Project
![Page 21: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/21.jpg)
21
Creative
How Achieve Objectives?
11/15/2011 Application of VE2-Value Engineering for the Crosstown Project
The Box☺
![Page 22: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/22.jpg)
22
Pre-Judge
Defensive
Creative
“No” “No”
How Achieve Objectives?
11/15/2011 Application of VE2-Value Engineering for the Crosstown Project
☺ ☺
![Page 23: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/23.jpg)
23
How Achieve Objectives?
• Instil VE as a culture
• Promote creativity and an open-minded approach
• Optimize designs to deliver maximum value at the lowest achievable life-cycle cost
• Perform VE early to achieve greatest benefit
11/15/2011 Application of VE2-Value Engineering for the Crosstown Project
![Page 24: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/24.jpg)
24
VE Benefits
• Encourages design creativity
• Builds confidence within project teams
• Provides a mechanism to deliver optimum value and quality service
• Provides confidence to funding partners.
11/15/2011 Application of VE2-Value Engineering for the Crosstown Project
![Page 25: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/25.jpg)
25
3 Types of VE
• Mainstream
• Formal
• Construction
11/15/2011 Application of VE2-Value Engineering for the Crosstown Project
![Page 26: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/26.jpg)
26
3 Types of VE - Continued
Mainstream VE:
• Every day decisions throughout the design process
• Good engineering practice
• Request design variances
• Innovative design
11/15/2011 Application of VE2-Value Engineering for the Crosstown Project
![Page 27: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/27.jpg)
27
3 Types of VE - ContinuedFormal VE:• 3 VE Consultants retained
• VE Consultant retains appropriate specialists
• Perform at or before 30% design• 10% - evaluate options• 30% - evaluate selected options
• Constructibility
• To be used for:• Stations• Tunnels• Maintenance Facilities
11/15/2011 Application of VE2-Value Engineering for the Crosstown Project
![Page 28: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/28.jpg)
28
Formal VE Process – 5 Day Workshop
• Day 1 - Presentation by project team and site visit
• Days 2-4 - VE Consultant reviews project documentation and generates analysis of options. VE Consultant may contact project team for additional information.
• Day 5 - VE Consultant delivers presentation of VE recommendations.
11/15/2011 Application of VE2-Value Engineering for the Crosstown Project
![Page 29: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/29.jpg)
29
Formal VE Process Initial Evaluation
• VE Consultant provides draft report
• Project team reviews.
11/15/2011 Application of VE2-Value Engineering for the Crosstown Project
![Page 30: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/30.jpg)
30
Formal VE ProcessFinal Evaluation
• Project team develops position on each recommendation
• Project team modifies designs accordingly
• VE Register is updated with selected options.
11/15/2011 Application of VE2-Value Engineering for the Crosstown Project
![Page 31: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/31.jpg)
31
VE Register
• Active list of selected VE recommendations
• Important tool to convey message to other teams
• VE updates issued regularly
11/15/2011 Application of VE2-Value Engineering for the Crosstown Project
![Page 32: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/32.jpg)
32
3 Types of VE - Continued
Construction VE:
• Contracts encourage contractors to submit alternatives
• Internal evaluation
• Cost benefits shared with contractor
11/15/2011 Application of VE2-Value Engineering for the Crosstown Project
![Page 33: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/33.jpg)
11/15/11 Application of VE - The Crosstown Project3(i)– SRT Conversion
33
Agenda
1. Eglinton Scarborough Crosstown Overview
2. Value Engineering for the Crosstown Project
3. Examples of VE Workshops
(i) SRT Conversion
![Page 34: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/34.jpg)
34
SRT Conversion
11/15/11 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 35: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/35.jpg)
35
Elevated Section• Midland Station• Scarborough CC Stn• McCowan Station
Tunnel Section
At-Grade Section• Lawrence Station• Ellesmere Station
Kennedy Station
SRT Conversion
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 36: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/36.jpg)
3611/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 37: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/37.jpg)
37
SRT Conversion- New LRT Vehicle
11/15/2011
Mark 1 Flexity
• Heavier (Axle load 12 vs 6 tonnes)• Low floor• Catenary traction power• Longer consist (93m vs 51m)
Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 38: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/38.jpg)
38
SRT Conversion - Scope
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 39: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/39.jpg)
39
• Design was at approximately 10% • Improve design by focusing on high cost items
and improving project performance
• Assist in selection of design options
VE Workshop – SRT Conversion
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 40: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/40.jpg)
40
Establish Performance Attributes:
Transit OperationsUser AccessibilityMaintainability Construction ImpactsEnvironmental ImpactsProject ScheduleRisk
VE Workshop – SRT Conversion
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 41: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/41.jpg)
41
VE Workshop – SRT Conversion Performance Attribute Weighting
PERFORMANCE ATTRIBUTE MATRIXWhich attribute is more important to the project? TOTAL %
Transit Operations A A/B A A A A/F A 6.0 21.4%
User Accessibility B B B B B/F B 6.0 21.4%
Maintainability C C C C/F C 4.5 16.1%
Construction Impacts D E F D 2.0 7.1%
Environmental Impacts E F E 3.0 10.7%
Project Schedule F F 5.5 19.6%
Risks G 1.0 3.6%
28.0 100%
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 42: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/42.jpg)
Modify Roof Over Track
Proposed At-GradeStation Modification
11/15/2011 42
N
Extend Platform
Lower Platform
Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 43: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/43.jpg)
43
Validation - The Base Case design has the highest Value
OVERALL PERFORMANCE Performance (P)
% ChangePerformance
Cost (C) % Savings Value Index
(P/C)% Value
Improvement
Baseline 500 $237.7 2.10
A-8 Replace framing with thinner, shop fabricated beams 454 -9% $228.4 4% 1.99 -6%
A-4a Platform canopies only, no roof over tracks, raise track 369 -26% $223.3 6% 1.65 -21%
A-4b At extensions, no roof, only platform canopies 435 -13% $227.5 4% 1.91 -9%
VE Evaluation of At-Grade Stations
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 44: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/44.jpg)
SProposed Elevated Station ModificationRaise Roof over Track
Strengthen Track DeckAnd Raise Track
Strengthen Joints
11/15/2011 44
N
Extend Platform
VE Supported Base Case
Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 45: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/45.jpg)
45
SRT Conversion - Tunnel
Scope
Modify Tunnel to accommodate larger vehicle
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 46: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/46.jpg)
Tunnel ‐ Roof ModificationProposed Tunnel Modification
11/15/2011 46
Remove existing tunnel roof
Raise support columns & walls and add roof
Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 47: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/47.jpg)
47
Tunnel Modification - Sequencing
1. Construct detour and remove mainline
2. Remove tunnel roof, raise support columns and walls
3. Cast new tunnel roof
4. Re-install GO Transit mainline
5. Remove detour
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 48: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/48.jpg)
48
Tunnel Modification - Sequencing
6. VE: Use existing spur as detour (not acceptable to GO)
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 49: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/49.jpg)
Elevated Guideway Existing Structure
SRT ConversionElevated Structure with New Vehicle
49
Overstressed due to 100% additional load
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 50: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/50.jpg)
50
• Option 1 –Fibre Reinforced Polymer (FRP)
• Option 2 - Conventional Reinforcing
• Option 3 - New Superstructure
• Option 4 - New Guideway
• VE did not identify any new options
Elevated Structure Modification Options Identified by Project Team
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 51: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/51.jpg)
51
• Quality Control is a challenge
• Weather dependant
• Relatively new and on-going research
• VE did not recommend
VE EvaluationOption 1 - FRP Reinforcing
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 52: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/52.jpg)
Add Concrete Slab With 20 Dowels Per Metre
External Stirrups For Girder
Exterior Post-tensioning
Option 2. Conventional Reinforcing
5211/15/2011
Exterior Post-tensioning
Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 53: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/53.jpg)
53
VE Evaluation Option 2 - Conventional Reinforcing Evaluation
• Requires 40,000 dowels• Existing structure participates in live load
– Cracking Potential is High• Corrosion
• Only expect 25 year life• VE did not recommend
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 54: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/54.jpg)
Elevated Guideway Option 2 New Superstructure
EXISTING PIERPier Modification
Option 3. New Superstructure
11/15/2011 54
Proposed Superstructure
Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 55: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/55.jpg)
55
• Higher capital cost• 75 year life• Recommended by VE
VE Evaluation Option 3 - New Superstructure on Existing Piers/Foundations
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 56: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/56.jpg)
11/15/2011 56
• Highest capital cost• VE did not recommend
Option 4. New Guideway-Superstructure and Piers
Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 57: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/57.jpg)
57
• Life Cycle Cost Analysis conducted by TTC• Results support VE recommendation
Elevated Structure - VE Follow-Up
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 58: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/58.jpg)
58
• Did not result in capital cost savings• Did result in improved performance• Assisted in selection of options• Supported base case designs
VE Workshop – SRT Conversion Summary
11/15/2011 Application of VE - The Crosstown Project3(i)– SRT Conversion
![Page 59: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/59.jpg)
11/15/11 Application of VE - The Crosstown Project3 (ii) Station Box Length
59
Agenda
1. Eglinton Scarborough Crosstown Overview
2. Value Engineering for the Crosstown Project
3. Examples of VE Workshops
(i) SRT Conversion(ii) Station Box Length
![Page 60: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/60.jpg)
Station Design
6011/15/2011Application of VE - The Crosstown Project
3 (ii) Station Box Length
![Page 61: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/61.jpg)
61
Station Location
11/15/2011
• Minimize property and construction impacts
• Minimize disruption to extensive utilities around stations
• Accommodate local traffic during construction
Application of VE - The Crosstown Project3 (ii) Station Box Length
![Page 62: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/62.jpg)
6211/15/2011
Station Construction
• Smaller station– Less impact– Less cost– Shorter schedule
• VE performed on Station Box Length
Application of VE - The Crosstown Project3 (ii) Station Box Length
![Page 63: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/63.jpg)
63
Station Box Length
11/15/2011 Application of VE - The Crosstown Project3 (ii) Station Box Length
![Page 64: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/64.jpg)
64
Station Box Length
11/15/2011 Application of VE - The Crosstown Project3 (ii) Station Box Length
![Page 65: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/65.jpg)
65
Station Box Length
11/15/2011 Application of VE - The Crosstown Project3 (ii) Station Box Length
![Page 66: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/66.jpg)
66
Station Box Length
11/15/2011 Application of VE - The Crosstown Project3 (ii) Station Box Length
![Page 67: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/67.jpg)
6711/15/2011
Relocate Vent Fans
Application of VE - The Crosstown Project3 (ii) Station Box Length
![Page 68: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/68.jpg)
68
Station Box Length
11/15/2011
95 m
Application of VE - The Crosstown Project3 (ii) Station Box Length
![Page 69: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/69.jpg)
Station Box Length
6911/15/2011
VE Alternative Box Length Reduction
Cost Saving per Station
Vent fans outside station box at entrance buildings 22m $ 3.3 M
Delete fire fighter access shafts (in‐line stations) 3m $ 1.0 M
Platform length reduced from 97 to 95m 2m $ 0.6 M
POTENTIAL COST SAVING PER IN‐LINE STATION (Location Specific)
27m $ 4.9 M
TOTAL POTENTIAL COST SAVING $ 100 M
Application of VE - The Crosstown Project3 (ii) Station Box Length
![Page 70: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/70.jpg)
11/15/11 70
Agenda
1. Eglinton Scarborough Crosstown Overview
2. Value Engineering for the Crosstown Project
3. Examples of VE Workshops
(i) SRT Conversion(ii) Station Box Length(iii) Tunnel Design
Application of VE- The Crosstown Project3 (iii) – Tunnel Design
![Page 71: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/71.jpg)
71
Eglinton Tunnels
Scope
• 19 km tunnel from Kennedy to West Launch Shaft (Black Creek Drive)
11/15/2011 Application of VE- The Crosstown Project3 (iii) – Tunnel Design
![Page 72: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/72.jpg)
72
Eglinton Tunnels
Mainstream VE:
Tunnelling vs cut and cover
• Tunnelling more cost effective for long distances• Less impact to community
Tunnel Diameter
11/15/2011 Application of VE- The Crosstown Project3 (iii) – Tunnel Design
• Minimize to reduce costs
![Page 73: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/73.jpg)
Eglinton Tunnel Boring
7311/15/2011
• 4 TBMs have been purchased
Application of VE- The Crosstown Project3 (iii) – Tunnel Design
![Page 74: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/74.jpg)
74
Constructing New Stations & Tunnels
11/15/2011 Application of VE- The Crosstown Project3 (iii) – Tunnel Design
![Page 75: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/75.jpg)
75
Formal VE – Tunnel Design
Scope
• VE performed on 60% tunnel design.
• VE report under review
11/15/2011 Application of VE- The Crosstown Project3 (iii) – Tunnel Design
![Page 76: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/76.jpg)
Eglinton Tunnel Design
7611/15/2011
VE Alternative Cost Saving (Preliminary)
Excavate station boxes from Dufferin east to Yonge prior to tunnelling
$ 59 M
Utilize secant walls as part of the permanent station structure $ 44 M
Use Eglinton West Station box to extract and launch TBMs $ 30 M
Utilize longer TBM tunnel drives $ 26 M
POTENTIAL COST SAVINGS (TOP 4 BIG WINS) $ 159 M
Application of VE- The Crosstown Project3 (iii) – Tunnel Design
![Page 77: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/77.jpg)
7711/15/2011
Tunnel Construction
Application of VE- The Crosstown Project3 (iii) – Tunnel Design
![Page 78: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/78.jpg)
11/15/11 Application of VE - The Crosstown Project4 – Questions
78
Agenda
1. Eglinton Scarborough Crosstown Overview
2. Value Engineering for the Crosstown Project
3. Examples of VE Workshops
(i) SRT Conversion(ii) Station Box Length(iii) Tunnel Design
4. Questions
![Page 79: Application of Value Engineering – The Crosstown Project · Application of Value Engineering – The Crosstown Project Presented To: CSVA Conference, Toronto Presented by: Rick](https://reader033.fdocuments.us/reader033/viewer/2022051801/5ad9f9e17f8b9a86378cbb5a/html5/thumbnails/79.jpg)
11/15/11 Application of VE - The Crosstown Project4 – Questions
79
Questions
Contact: Rick ThompsonChief Project Manager – SRT/YardsToronto Transit CommissionTransit Expansion DepartmentTel: 416-397-4870e-mail: [email protected]