APPENDIXINVOLVING THE USERS
APPENDIX 1 STAKEHOLDER ANALYSIS
2 TERMS OF REFERENCE FOR USER INVOLVE-MENT
3 AGENDA FOR A USER MEETING
4 DECISION PLAN
5 FORM FOR CHANGE MANAGEMENT
6 INITIAL WPA
ANNEX 1
STAKEHOLDER ANALYSIS
Example table of contents for a stakeholder analysis. Read more at www.i2p.dk
BASIC ASSUMPTIONS1 Background to the project
Why was the project started?
2 Goal of the project What does the client hope to achieve with the project?
3 Client and project organisation: How is the project and client organisation set up?
ANALYSIS, GOALS AND STRATEGY
4 Stakeholder identification and prominence Who are the stakeholders and how important are they?
5 Analysis of the stakeholders’ perception of the project and the client organisation What are the stakeholders’ views and expectations of the project and the client?
6 Analysis of the purpose of stakeholder management What behaviour do the project and client organisation expect of the stakeholders?
7 Strategy for stakeholder management What specific goals should stakeholder management meet for the project and client organisation?
IMPLEMENTATION OF STAKEHOLDER MANAGEMENT
8 Organisation and procedures Who should manage stakeholder analysis and management? Who should do what, and how should these things be done?
9 Schedule and activities When and how should the stakeholders be dealt with?
10 Budget What resources should be allocated to stakeholder analysis and management?
11 Evaluation and measurement Is the stakeholder management producing the expected results?
ANNEX 2
TERMS OF REFERENCE FOR USER INVOLVEMENT
Example table of contents for user terms of reference:
1 PURPOSE OF USER INVOLVEMENT
2 SUCCESS CRITERIA
3 ORGANISATIONOrganisation and decision plan for user involvement
4 ROLES AND RESPONSIBILITIESPolicy-makers
Administrators
External consultants
User groups
Authorities
5 DESCRIPTION OF GROUPS AND TASKSUser groups in general
Handling feedback
Total consultant
User steering group and consultative group
Departmental groups
Interdisciplinary subject-groups
Other stakeholders
6 THE PHASESStart of process
Design specification phase
Outline proposal
Preliminary design
Pre-project – regulatory project
Detailed design
Commissioning
7 PROCESS TO DATE
8 TIME SCHEDULE
9 DOCUMENT LIST AND LINKS
The Client GroupUBST, KU, LIFE
ANNEX 3
AGENDA FOR USER MEETINGCOPENHAGEN PLANT SCIENCE CENTRE PROGRAMME FOR KICK-OFF-WORKSHOP
8.30 Doors open Coffee and pastries
9.00 Off we go! Chair and facilitator: Tenna Tychsen, Promonitor Interaction Welcome and structure of the day, from Lone Zeeberg Nielsen, Campus Chef LIFE
Presentation session: Project management group/Client group, Steering group, Planning group, Con-sultants, Departments, Faculty service
9.30 Presentation of the project from Lundgaard og Tranberg, architects Approx. 10.00 – Questions on the project
10.30 Coffee break (and mobile check!)
10.45 Presentation of the departments • Department of Agriculture and Ecology – Svend Christensen • Department of Plant Biology – Svend Christensen • Department of Soil Science and Environment – Susanne Sørensen • Department of Food Science – Nanna Viereck
12.00 Lunch
12.45 Values – appearance and function of the building The client has described the values in the tender specifications. The consultants have incorporated
user requirements and values into the project. We all have our own ideas and expectations. Now we have a chance to bring these values into play and arrive at shared images and ideas of the values that we consider important, such as:
• What is a unique research and training environment? • What does it mean to say the building should support creativity? • What does a spirit of efficiency and technical innovation feel like? • How can we maintain clinical cleanliness together with transparency, shared functions and flow?
Group work and plenary discussion
14.30 Walkabout in groups (with a few questions to think about)
15.00 Time for coffee (and mobile check)
15.30 Presentation of organisation and process by Anette A. Persson, KU and Anja Gabelgård, LIFE Approx. 15.45 – Questions and comments
16.00 The good process Participants’ expectations of the process and collaboration.
Participants give their initial ideas of values and elements of a good process, to be developed in elaborating the design brief in the coming weeks.
Group work and plenary discussion Expectations of next steps
17.00 Wrap-up of the day by Lone Zeeberg Nielsen
17.15 Guided tour
18.00 Dinner
21.00 Thanks and good night
ANNEX 4
DECISION PLANKUA 2. BYGGEAFSNITPROCESPLAN DISPOSITIONSFORSLAG
DEN 23.09.2008
UGER 2008 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11
BYGHERRE
BRUGERE
RÅDGIVERE
f
DIALOG MED KUALEDELSE, KUA DRIFT OG KUTA
Dialogform: Fremdriftmøder hver anden uge
ANALYSEFASEIDE- OG HOVEDDISPONERING27 ARBEJDSDAGE
INDHOLD
HOVEDDISPONERING
PRINCIPPERRev. økonomi
PRÆSENTATIONGruppebasis:
ALLE
BYGHERREMØDE
19.08.08
GO
DK
EN
DE
LS
E -
DIS
PO
SIT
ION
SF
OR
SL
AG
D
EN
11.
03.0
9
DIALOG MED KUALEDELSE, KUA DRIFT OG KUTADIALOG MED BRUGERGRUPPER
Dialogform: Fremdriftmøder hver anden uge, incl. kontaktmøder med
brugergrupper
DIALOG MED KUALEDELSE, KUA DRIFT OG KUTA
DIALOG MED BRUGERGRUP.
Dialogform: Fremdriftmøde
INDARBEJDELSE AF BRUGERINPUT19 DAGE
DETAILDISPONERINGINDARBEJDELSE AF BRUGERINPUT34 (-5) DAGE
INDHOLD
DETAILDISPONERING
INDRETNING
Rev. økonomi
PRÆSENTATIONGruppebasis:
BRUGERGRUPPER
BY
GH
ER
RE
G
RA
NS
KN
ING
OG
G
OD
KE
ND
EL
SE
A
F
DIS
PO
SIT
ION
SF
O
RS
LA
G
BYGHERRE MØDE 30.09.08 BYGHERRE MØDE 18.11.08
INDHOLDFREMLÆGGELSE OG
PRINCIPGODKENDELSEAF
DISPOSITIONSFORSLAGØkonomikalkule
PRÆSENTATIONGruppebasis:
ALLE / BRUGERGRUPPER
FM 20.08.08 FM 03.09.08 FM 10.10.08 FM 22.10.08 FM 05.11.08 FM 26.11.08FM 17.09.08 FM 10.12.08
FÆRDIGGØRELSE AF DISP.FORSLAGGRANSKNING / KS
14 DAGE
FASESTART 15.08.08
FR
EM
LÆ
GG
EL
SE
1H
OV
ED
DIS
PO
SIT
ION
ER
+ Ø
KO
NO
MI
24.
09.0
8
BYGHERRE MØDE 06.01.09
BYGGEUDVALGS MØDE 20.01.09
FR
EM
LÆ
GG
EL
SE
2D
ET
AIL
DIS
PO
NE
RIN
G +
ØK
ON
OM
I(1
2-13
-14)
.11.
08
FR
EM
LÆ
GG
EL
SE
5P
RIN
CIP
GO
DK
EN
DE
LS
E
(04
-05)
.02.
09
FR
EM
LÆ
GG
EL
SE
3D
ET
AIL
DIS
PO
NE
RIN
G
(10-
11).
12.0
8
FR
EM
LÆ
GG
EL
SE
4D
ET
AIL
DIS
PO
NE
RIN
G +
ØK
ON
OM
I(1
4-15
).01
.200
9
AFLEVERINGDISP.FORSLAG
25.02.2009
INDARBEJDELSE AF BRUGERINPUT14 DAGE
INDARBEJD.BRUGERINPUT14 DAGE
INDHOLD
DETAILDISPONERING
INDRETNING
PRÆSENTATIONGruppebasis:
BRUGERGRUPPER
INDHOLD
DETAILDISPONERING
INDRETNING
PRÆSENTATIONGruppebasis:
BRUGERGRUPPER
DIALOG MED KUALEDELSE, KUA DRIFT OG KUTA
DIALOG MED BRUGERGRUP.
Dialogform: Fremdriftmøde
DIALOG MED KUALEDELSE, KUA DRIFT OG KUTADIALOG MED
BRUGERGRUP.
Dialogform:
FM 07.01.09 FM 28.01.09
BYGHERRE MØDE (ikke aftalt)
BYGGEUDVALGS MØDE (ikke aftalt)
STUDIETURDeltagere:
BygherregruppenBrugerledelse
DekanatRådgivere
KUA 2. BYGGEAFSNITPROCESPLAN DISPOSITIONSFORSLAG
DEN 23.09.2008
UGER 2008 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11
BYGHERRE
BRUGERE
RÅDGIVERE
f
DIALOG MED KUALEDELSE, KUA DRIFT OG KUTA
Dialogform: Fremdriftmøder hver anden uge
ANALYSEFASEIDE- OG HOVEDDISPONERING27 ARBEJDSDAGE
INDHOLD
HOVEDDISPONERING
PRINCIPPERRev. økonomi
PRÆSENTATIONGruppebasis:
ALLE
BYGHERREMØDE
19.08.08
GO
DK
EN
DE
LS
E -
DIS
PO
SIT
ION
SF
OR
SL
AG
D
EN
11.
03.0
9
DIALOG MED KUALEDELSE, KUA DRIFT OG KUTADIALOG MED BRUGERGRUPPER
Dialogform: Fremdriftmøder hver anden uge, incl. kontaktmøder med
brugergrupper
DIALOG MED KUALEDELSE, KUA DRIFT OG KUTA
DIALOG MED BRUGERGRUP.
Dialogform: Fremdriftmøde
INDARBEJDELSE AF BRUGERINPUT19 DAGE
DETAILDISPONERINGINDARBEJDELSE AF BRUGERINPUT34 (-5) DAGE
INDHOLD
DETAILDISPONERING
INDRETNING
Rev. økonomi
PRÆSENTATIONGruppebasis:
BRUGERGRUPPER
BY
GH
ER
RE
G
RA
NS
KN
ING
OG
G
OD
KE
ND
EL
SE
A
F
DIS
PO
SIT
ION
SF
O
RS
LA
G
BYGHERRE MØDE 30.09.08 BYGHERRE MØDE 18.11.08
INDHOLDFREMLÆGGELSE OG
PRINCIPGODKENDELSEAF
DISPOSITIONSFORSLAGØkonomikalkule
PRÆSENTATIONGruppebasis:
ALLE / BRUGERGRUPPER
FM 20.08.08 FM 03.09.08 FM 10.10.08 FM 22.10.08 FM 05.11.08 FM 26.11.08FM 17.09.08 FM 10.12.08
FÆRDIGGØRELSE AF DISP.FORSLAGGRANSKNING / KS
14 DAGE
FASESTART 15.08.08
FR
EM
LÆ
GG
EL
SE
1H
OV
ED
DIS
PO
SIT
ION
ER
+ Ø
KO
NO
MI
24.
09.0
8
BYGHERRE MØDE 06.01.09
BYGGEUDVALGS MØDE 20.01.09
FR
EM
LÆ
GG
EL
SE
2D
ET
AIL
DIS
PO
NE
RIN
G +
ØK
ON
OM
I(1
2-13
-14)
.11.
08
FR
EM
LÆ
GG
EL
SE
5P
RIN
CIP
GO
DK
EN
DE
LS
E
(04
-05)
.02.
09
FR
EM
LÆ
GG
EL
SE
3D
ET
AIL
DIS
PO
NE
RIN
G
(10-
11).
12.0
8
FR
EM
LÆ
GG
EL
SE
4D
ET
AIL
DIS
PO
NE
RIN
G +
ØK
ON
OM
I(1
4-15
).01
.200
9
AFLEVERINGDISP.FORSLAG
25.02.2009
INDARBEJDELSE AF BRUGERINPUT14 DAGE
INDARBEJD.BRUGERINPUT14 DAGE
INDHOLD
DETAILDISPONERING
INDRETNING
PRÆSENTATIONGruppebasis:
BRUGERGRUPPER
INDHOLD
DETAILDISPONERING
INDRETNING
PRÆSENTATIONGruppebasis:
BRUGERGRUPPER
DIALOG MED KUALEDELSE, KUA DRIFT OG KUTA
DIALOG MED BRUGERGRUP.
Dialogform: Fremdriftmøde
DIALOG MED KUALEDELSE, KUA DRIFT OG KUTADIALOG MED
BRUGERGRUP.
Dialogform:
FM 07.01.09 FM 28.01.09
BYGHERRE MØDE (ikke aftalt)
BYGGEUDVALGS MØDE (ikke aftalt)
STUDIETURDeltagere:
BygherregruppenBrugerledelse
DekanatRådgivere
KUA 2. BYGGEAFSNITPROCESPLAN DISPOSITIONSFORSLAG
DEN 23.09.2008
UGER 2008 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11
BYGHERRE
BRUGERE
RÅDGIVERE
f
DIALOG MED KUALEDELSE, KUA DRIFT OG KUTA
Dialogform: Fremdriftmøder hver anden uge
ANALYSEFASEIDE- OG HOVEDDISPONERING27 ARBEJDSDAGE
INDHOLD
HOVEDDISPONERING
PRINCIPPERRev. økonomi
PRÆSENTATIONGruppebasis:
ALLE
BYGHERREMØDE
19.08.08
GO
DK
EN
DE
LS
E -
DIS
PO
SIT
ION
SF
OR
SL
AG
D
EN
11.
03.0
9
DIALOG MED KUALEDELSE, KUA DRIFT OG KUTADIALOG MED BRUGERGRUPPER
Dialogform: Fremdriftmøder hver anden uge, incl. kontaktmøder med
brugergrupper
DIALOG MED KUALEDELSE, KUA DRIFT OG KUTA
DIALOG MED BRUGERGRUP.
Dialogform: Fremdriftmøde
INDARBEJDELSE AF BRUGERINPUT19 DAGE
DETAILDISPONERINGINDARBEJDELSE AF BRUGERINPUT34 (-5) DAGE
INDHOLD
DETAILDISPONERING
INDRETNING
Rev. økonomi
PRÆSENTATIONGruppebasis:
BRUGERGRUPPER
BY
GH
ER
RE
G
RA
NS
KN
ING
OG
G
OD
KE
ND
EL
SE
A
F
DIS
PO
SIT
ION
SF
O
RS
LA
G
BYGHERRE MØDE 30.09.08 BYGHERRE MØDE 18.11.08
INDHOLDFREMLÆGGELSE OG
PRINCIPGODKENDELSEAF
DISPOSITIONSFORSLAGØkonomikalkule
PRÆSENTATIONGruppebasis:
ALLE / BRUGERGRUPPER
FM 20.08.08 FM 03.09.08 FM 10.10.08 FM 22.10.08 FM 05.11.08 FM 26.11.08FM 17.09.08 FM 10.12.08
FÆRDIGGØRELSE AF DISP.FORSLAGGRANSKNING / KS
14 DAGE
FASESTART 15.08.08
FR
EM
LÆ
GG
EL
SE
1H
OV
ED
DIS
PO
SIT
ION
ER
+ Ø
KO
NO
MI
24.
09.0
8
BYGHERRE MØDE 06.01.09
BYGGEUDVALGS MØDE 20.01.09
FR
EM
LÆ
GG
EL
SE
2D
ET
AIL
DIS
PO
NE
RIN
G +
ØK
ON
OM
I(1
2-13
-14)
.11.
08
FR
EM
LÆ
GG
EL
SE
5P
RIN
CIP
GO
DK
EN
DE
LS
E
(04
-05)
.02.
09
FR
EM
LÆ
GG
EL
SE
3D
ET
AIL
DIS
PO
NE
RIN
G
(10-
11).
12.0
8
FR
EM
LÆ
GG
EL
SE
4D
ET
AIL
DIS
PO
NE
RIN
G +
ØK
ON
OM
I(1
4-15
).01
.200
9
AFLEVERINGDISP.FORSLAG
25.02.2009
INDARBEJDELSE AF BRUGERINPUT14 DAGE
INDARBEJD.BRUGERINPUT14 DAGE
INDHOLD
DETAILDISPONERING
INDRETNING
PRÆSENTATIONGruppebasis:
BRUGERGRUPPER
INDHOLD
DETAILDISPONERING
INDRETNING
PRÆSENTATIONGruppebasis:
BRUGERGRUPPER
DIALOG MED KUALEDELSE, KUA DRIFT OG KUTA
DIALOG MED BRUGERGRUP.
Dialogform: Fremdriftmøde
DIALOG MED KUALEDELSE, KUA DRIFT OG KUTADIALOG MED
BRUGERGRUP.
Dialogform:
FM 07.01.09 FM 28.01.09
BYGHERRE MØDE (ikke aftalt)
BYGGEUDVALGS MØDE (ikke aftalt)
STUDIETURDeltagere:
BygherregruppenBrugerledelse
DekanatRådgivere
Enlarged extract from an example decision plan:
ANNEX 5
CHANGE MANAGEMENT FORMExample of filled-in A3 form to document choice of solution:
Nyt
Nira
s D
omic
il Ve
ntila
tion
fra
labo
rato
rier
(stin
kska
be)
Dea
dlin
e fo
r af
klar
ing:
201
1-11
-21
Stat
us:
U
nder
uda
rbej
dels
e __
__
Til k
omm
ente
ring
_X__
_ G
odke
ndt
____
Afvi
st _
___
1. N
uvæ
rend
e si
tuat
ion
(res
um
é)
P
roje
kt f
or v
entil
atio
n til
/fra
labo
rato
riest
inks
kabe
for
elig
ger,
men
al
tern
ativ
er ø
nske
s be
lyst
af
hens
yn t
il øk
onom
i, æ
stet
ik o
g fu
nktio
nalit
et.
Res
umé
af a
naly
se f
orts
at
Skem
atis
k ev
alue
ring
af a
ltern
ativ
er (
eksk
lusi
v øk
onom
iske
bet
ragt
ning
er)
Ford
ele
mar
kers
med
grå
Fa
ktor
er
krit
erie
r A
lter
nati
v 1
: Ud
vend
ig k
anal
førin
g A
lter
nati
v 2
:
Kana
lførin
g vi
a ko
ntor
er
Alt
erna
tiv
3:
Kana
lførin
g vi
a re
ngør
ings
rum
Ko
nstr
uktiv
e in
dgre
b M
indr
e er
bed
re
Inge
n Ta
gmem
bran
gen
nem
bryd
es
Hul
ler
i dæ
k ka
n m
ax v
ære
ca.
30
0 m
m u
d fr
a væ
ggen
Ved
brug
af f
irkan
tede
kan
aler
ka
n hu
l-dæ
k ge
nneb
ryde
s ud
en
stør
re k
onst
rukt
ive
tilta
g.
Tagm
embr
an g
enne
mbr
ydes
. H
ulle
r i d
æk
kan
max
. væ
re c
a.
400
mm
ud
fra
vægg
en
Vent
ilatio
nsm
æss
ige
hens
yn
Rund
e ka
nale
r er
be
dre
end
firka
nted
e Ka
n ge
nnem
føre
s m
ed
rund
e ka
nale
r, s
om e
r bi
llige
re o
g be
dre.
Kan
kun
genn
emfø
res
med
re
ktan
gulæ
re k
anal
er
Kan
mul
igvi
s ge
nnem
føre
s m
ed
rund
e ka
nale
r so
m e
r bi
llige
re
og b
edre
Min
dre
varm
eiso
lerin
g er
bed
re
Varm
eiso
lerin
g af
såv
el
indb
læsn
ings
- so
m
udsu
gnin
gska
nal
Inge
n va
rmei
sole
ring
Inge
n va
rmei
sole
ring
Bran
dmæ
ssig
e he
nsyn
M
indr
e er
bed
re
Inge
n D
er s
kal b
ygge
s br
ands
ektio
nerin
gs-r
ørka
sse
på
1. s
al
Kana
l ska
l bra
nd is
oler
es e
ller
der
skal
mon
tere
s br
ands
pjæ
ld
i eta
gead
skill
else
Tø
mre
rarb
ejde
r M
indr
e er
bed
re
Inge
n In
dven
dig
rørk
asse
(se
ove
nfor
) N
edhæ
ngt l
oft o
g ni
che
v.
elev
ator
i st
ueet
age
Æst
etik
Sk
julte
inst
alla
tione
r er
bed
re
Er s
ynlig
t ud
efra
Er
kun
syn
ligt i
kon
tor
på 1
. sal
Ka
n sk
jule
s v.
opb
ygni
ng a
f ni
che
Funk
tiona
litet
Har
inge
n ko
nsek
vens
O
ptag
er p
lads
i ko
ntor
på
1. s
al
Mul
ig r
educ
erin
g af
nyt
tela
st,
som
i gi
vet
fald
ska
l god
kend
es
af u
dlej
er. R
educ
erin
g af
ny
ttel
ast e
r uh
ensi
gtsm
æss
igt i
fo
rhol
d til
pla
cerin
g af
tung
e re
oler
opa
d væ
g m
od e
leva
tor-
skak
t
Tage
r et
min
dre
områ
de a
f ga
ngar
eal/l
ofth
øjde
M
ulig
red
ucer
ing
af n
ytte
last
, so
m i
give
t fa
ld s
kal g
odke
ndes
af
udl
ejer
(m
en a
f min
dre
bety
dnin
g i s
amm
enlig
ning
med
al
tern
ativ
2, d
a næ
rvæ
rend
e dæ
kele
men
t ikk
e vi
l bliv
e be
-la
stet
af l
aste
n fr
a tu
nge
reol
er)
Bekv
emm
elig
hed
Nem
t at i
nsta
llere
og
serv
icer
e Ar
bejd
et k
an u
dfør
es
uafh
æng
igt a
f udl
ejer
s øv
rige
arbe
jder
, men
ka
nale
r er
uds
at fo
r ve
jrlig
Hvi
s ar
bejd
et ik
ke e
r af
slut
tet
inde
n 2.
janu
ar, v
il de
t ikk
e væ
re m
ulig
t at e
tabl
ere
sikk
erhe
dsko
ntor
et fr
a st
art
af.
Øko
nom
isk
anal
yse
Anlæ
gsom
kost
ning
er d
er e
r fo
rske
llige
for
førin
gsve
je (
inde
hold
er ik
ke k
omfo
rtve
ntila
tion
elle
r in
dkøb
og
mon
terin
g af
agg
rega
ter,
sty
ring
mv.
) Ty
pe o
mko
stni
ng
A
lter
nati
v 1
A
lter
nati
v 2
A
lter
nati
v 3
Ko
nstr
uktio
nsar
bejd
er
12.0
00 k
r.
30.0
00 k
r.
18.0
00 k
r.
Vent
ilatio
nsar
bejd
er
50.0
00 k
r.
25.5
00 k
r.
30.0
00 k
r.
Tøm
rera
rbej
der
12
.000
kr.
36
.000
kr.
Ta
garb
ejde
r
5.00
0 kr
. 5.
000
kr.
SUM
62
.000
kr.
72
.000
kr.
89
.000
kr.
2. S
tyri
ngsm
ål
Ø
kono
mi:
Høj
prio
ritet
(fo
r le
jer)
Æst
etik
: Sk
al k
unne
god
kend
es a
f ud
leje
r
Fun
ktio
nalit
et:
Skal
kun
ne f
unge
re d
riftm
æss
igt,
men
indr
etni
ng a
f ko
ntor
plad
ser
er f
leks
ibel
. 3.
For
slag
: Vi
fore
slår
at a
ltern
ativ
3 v
ælg
es, i
det d
et im
ødek
omm
er u
dlej
ers
ønsk
e om
sk
jult
kana
lførin
g (m
odsa
t alte
rnat
iv 1
) og
i sa
mm
enlig
ning
med
alte
rnat
iv 2
er
forb
unde
t med
fles
t for
dele
kon
stru
ktio
nsm
æss
igt,
funk
tions
mæ
ssig
t og
vent
ilatio
nsm
æss
igt (
jf. s
kem
a). F
orsk
el i
økon
omi i
forh
old
til a
ltern
ativ
2
vurd
eres
rel
ativ
t beg
ræns
et.
4. R
esum
é af
ana
lyse
: G
rund
lægg
ende
fac
ts:
R
unde
ven
tilat
ions
kana
ler
skal
væ
re Ø
400
+ e
vt. i
sole
ring
U
dven
digt
pla
cere
de k
anal
er –
båd
e in
dblæ
snin
g og
uds
ugni
ng –
ska
l is
oler
es m
od v
arm
etab
og
afsl
utte
s m
ed m
alet
pla
debe
klæ
dnin
g
Eta
gead
skill
else
er
opby
gget
af
hul-d
æk
V
ed g
enne
mbr
ydni
ng a
f br
ands
ektio
ner
(eta
gedæ
k) s
kal p
åreg
nes
ente
n br
andi
sole
ring
elle
r op
bygn
ing
af b
rand
sekt
ione
rings
vægg
e
Ved
kan
alfø
ring
genn
em r
engø
rings
rum
ska
l lof
tet
fora
n el
evat
oren
i st
ueet
agen
sæ
nkes
An
dre
forh
old,
ant
agel
ser
elle
r ub
eken
dte:
Myn
digh
edsg
odke
ndel
se
U
dlej
ers
even
tuel
le a
ccep
t af
udv
endi
ge/s
ynlig
e ka
nale
r Bi
ndin
ger
til a
ndre
løsn
inge
r/be
slut
ning
er/d
elpr
ojek
ter/
:
Stø
jend
e ar
bejd
er ø
nske
s ud
ført
inde
n ib
rugt
agni
ng d
. 2. j
anua
r
5. H
envi
snin
g ti
l an
dre
sags
doku
men
ter:
Ve
ntila
tions
proj
ekt
(ikke
uds
endt
), S
tyre
grup
pem
øder
efer
at n
r. 0
7
6. K
omm
enta
rer
i for
bind
else
med
rev
isio
n/go
dken
dels
e:
U
darb
ejde
t af
: M
ikae
l Hyg
um T
hyss
en
Dat
o: 1
5. n
ovem
ber
2011
G
odke
ndt
af:
D
ato
Ko
mm
ente
ret
af:
Søre
n Ly
kke
Jens
en (
SLJ)
, Lar
s Th
omse
n (L
AT),
Nik
olaj
Sno
g (N
SN)
God
kend
t af
: D
ato
Ford
elin
g: S
LJ, L
AT,
NSN
, CLP
ANNEX 6
INITIAL WPAExtract from an initial workplace assessment. Find out more at www.arbejdsmiljo.ku.dk
DEPARTMENT FOR SMALL ANIMAL DISEASES – COMMISSIONING WPA
...
INDOOR CLIMATE WHERE
It gets too warm/no air-con ICU/ISO and corridor 1-72 / Reception 1-81; 1-82;
Poor ventilation
All of 1-72 (Cardio); preparation area and cages 15 and 16 1-72
Rehab (smell of chlorine) 1-71
Ventilation at floor level in preparation area?
Too warm in the summer/too cold in the winter Reception 1-81; 1-82; Foyer; Rehab 1-71; 1-72
Curtains do not keep the light out / can’t unlock the awnings
Reception 1-81; 1-82;
Bright light all summer Reception 1-81; 1-82;
Lighting timer should be set so lights do not go out ICU
Bad smell from drains 1-81; 1-82; and 1-72
Consultation room too small The 2 small consultation rooms in 1-811
Lack of daylight Preparation area 1 -72
Lamps not correctly placed over tables Preparation area 1 -72
No windows in doors to individual consulting rooms Small consulting room in 1-81
High humidity and temperature when the door is closed
Neuroclinic
Lack of daylight (no windows) Hospital and Patient preparation 1-72
Sufficient lux?? Preparation/Surgery/ICU/HOSP 1-72
NOISE WHERE
Poor acoustics
Lunch room/Reception/Foyer 1-71 A; 1-72
Phone calls can be heard from a distance
Hard to hear phone calls
In Reception/noise from dogs/clients 1-81; 1-82;
Waiting room
Noise from cage rooms for specialist clinics Specialist clinics/Cardio/Rehab/Reception 1-71;1-81; 1-82;
Noise from many people Preparation 1-72
Noise from dogs coming round Orangery 1-72
COMMUNAL AREAS WHERE
Dogs urinating in heating gratings, stale smell Reception 1-81; 1-82;
Automatic doors allow loose dogs to run off Reception 1-81; 1-82; Foyer 1-71A
Doors not always locked/outsiders can get in Foyer/Outside doors
Light constantly going on and off Reception 1-71
Automatic door opener to be fine-tuned Foyer
Door sticks Closed consultation room ??
No sofa groups/noise damping Foyer
...