API Preparatory Program 2014

9
1 API Preparatory Courses API 510 > API 570 > API 653 Contact: 0091 8089000250

Transcript of API Preparatory Program 2014

Page 1: API Preparatory Program 2014

1  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

API Preparatory Courses 

API 510 > API 570 > API 653 

Contact:  0091‐8089000250  

Page 2: API Preparatory Program 2014

2  

About us:

Decibel Nde Training Institute is an educational institution providing world class Training & Certification in the field of Non Destructive Testing Technology, Quality Management Engineering, Industrial Engineering Solutions & other Technology Disciplines.  

Decibel has always been a forward‐thinking, modern and student orientated Institution with a thriving and vibrant student community from across the globe. We have a firm commitment to confronting inequality and celebrating diversity. 

Our mission of 'Making Education Work’ mean our students' future is our top priority. With our excellent facilities and staff, you can be sure that Decibel is a first‐class choice for your chosen area of study. 

We have always been pioneering in our course provision, being the first Indian Institution to offer courses in advanced NDE Techniques like Time of Flight Diffraction & Phased Array and first Asian Institution to have an Organized Training program for Mechanical/General Quality Controller. 

We are also looking to the future ‐ a future that will continue to build on our foundations of academic excellence and 'Making Education Work’, inspiring students, scholars, teachers, and recruiters alike to come to the Decibel Nde. 

We are constantly investing in institution and facilities to ensure all students have a world‐class teaching and learning environment, state‐of‐the‐art facilities and enhancing the vibrancy of the institution experience to make your time in Decibel truly one to cherish. 

Whether you choose to come to Decibel to study or work, or simply as a visitor, we look forward to welcoming you to our institution and hope that you enjoy your time here. 

 

 

 

 

 

 

Page 3: API Preparatory Program 2014

 

 

PREP

Pressure V

Petrochem

corrosive o

may cause

The corros

vessels or

consequen

shutdowns

and evalua

More spec

and what to

cover meth

Course O

The API Co

equipments

measure d

If the asses

safe remai

If the decis

of the dam

equipment

conditions.

PARATO

Vessels, Piping

mical Plants, Oil

or toxic in natur

e corrosion and

sion may cause

piping at the co

nces to the plan

s, the degradati

ated so as to ar

ifically, these c

o accept so as

hods of repair,

Objectives

ourses provide

s. It also provid

e-gradation an

ssment indicate

ning life and th

sion is that the

aged part witho

by evaluating

ORY PRO

Systems and

l Terminals and

re. The equipm

d other damage

e thinning, pittin

orroded locatio

nt, personnel a

ion and damag

rrive at the 3R

courses describ

to evaluate the

alteration, re-ra

e the participan

des techniques

nd damages ca

es that the equ

he methods to e

equipment nee

out causing da

the mechanica

OGRAM

Storage Tanks

d other process

ments are also s

es to the vital e

ng or cracking o

ons, releasing t

nd the people

ges inflicted to t

decisions. i.e.

be the essentia

e safety and m

ating and repla

ts the guideline

s for the assess

used to the pro

uipment is safe

extend the use

eds repair, the

amage to the w

al integrity if it is

M FOR A

s are the major

s plants. They

subjected to hig

quipments.

of vessel walls

the explosive o

at large. It is th

the Plant Equip

Run-Repair-Re

als of what to in

mechanical integ

acements of aff

es and method

sment of the we

ocess equipme

to run, the par

ful life of the eq

course teaches

whole equipmen

s not possible t

API CER

r installations in

handle variety

gh pressures a

. The internal p

or toxic content

herefore essen

pment, Piping a

eplace decision

nspect, where t

grity of in-servi

fected equipme

dology of carryi

ear and tear of

ents due to the

rticipants are fu

quipments.

s the participan

nt. It also cover

to restore the e

TIFICAT

n Petroleum Re

of fluids, which

and temperatur

pressure will te

s resulting in s

tial that during

and Tanks sho

ns.

to inspect, how

ce equipments

ents.

ng out inspecti

f the equipmen

process condit

urther taught ho

nts, how to car

rs the methods

equipment to it

TION

efineries,

h may be explo

res. All these fa

end to burst the

erious

the planned

uld be monitor

w much to inspe

s. The courses

ion of in-service

nts as well as to

tions.

ow to estimate

ry out such rep

of re-rating the

s original desig

osive,

actors

e

red

ect

also

e

o

the

pairs

e

gn

Page 4: API Preparatory Program 2014

4  

Benefits of API Courses

Upon completion of this course, attendees will be able to:

1. Apply the requirements of the relevant industry standards and practices to the maintenance of pressure vessels, heat exchangers, piping systems, and storage tanks.

2. Develop and execute inspection and maintenance programs of process plant equipment and piping systems using several NDT methods and analytical procedures.

3. Carry out appropriate repairs and alterations to process plant equipment and piping systems so as to ensure for safe and reliable operation.

API 510 Pressure Vessel Inspector Course for In-Service Equipments

This course explains the step-by-step method for carrying out inspection and repairs of Pressure Vessels, Heat exchanges, Columns, etc during the shut-down period of Refineries, Fertilizer Plants, Oil and Gas plants Petrochemical plants. The participant will know how to inspect and analyze the damages like corrosion, erosion, pitting, and cracking, and how to decide whether the equipment is safe for operation or needs repairs. If needs repairs how to perform repairs (or re-rating) of the equipment so that it can be safely used again. The course is ideally suited for all Inspectors and QA/QC Professionals in Oil & Gas plants, Chemical Plants, Refineries, etc. It is also useful for the engineers and supervisors in operation, maintenance and engineering departments. The course contents are as follows

• Common Construction Codes for Pressure Vessels and Heat Exchanges. • Review of ASME Sec. VIII Div 1 Code. • Design of shells and dished heads. • Effects of Corrosions on the Pressure Vessels. • Effects of high and low temperatures. • De-gradation and damages during the operations. • How and when to take the plants shut-down?. • Inspections of equipments during the shut-down. • Inspections methods: External, Internal and On-stream. • How to judge the equipment is safe for future operation?. • Estimation of safe "Remaining life" of the equipments. • Repairs, Alternation and Re-rating of equipments. • Methods of repairs: temporary and permanent repairs. • Life-extension methods of the equipments. • Review of major NDT methods (ASME Sec. V). • Review of welding qualifications (ASME Sec. IX). • Effects on Refinery equipments due to the Sour Crude, Hydrogen embitterment, stress-corrosion cracking

etc.. • Review of RISK-BASED-INSPECTION methodology. • Hydrostatic and pneumatic testing of the equipments. • Inspection records and documentation. • Review Quiz and Feedback. • During the course several examples, illustrations and case studies will be discussed and participants will be

given additional reading materials and practice questions for their study purpose.

Page 5: API Preparatory Program 2014

 

API 570

This course

shut-down

The partici

decide whe

of the pipin

Profession

in operatio

Constructio

• R• D• Ef• Te• Ef• In• In• Es• R• R• C• Li• H• R• R• R• In• R

Dgi

Piping Insp

e explains the

period of Refin

pant will know

ether the piping

ng so that it can

als in Oil & Ga

n, maintenance

on codes for th

Review of ASMEesign of pipingffects of corrosemperature effffects of Creep

nspection methnspection of bustimation of sa

Repair, alternatiRepairs by weld

alculation of reife extension mydrostatic and

Review of NDT Review of weldinRISK - BASED -nspection recor

Review Quiz and

uring the coursiven additional

pectors Cou

step-by-step m

neries, Oil and

how to find out

g is safe for op

n be safely use

as Plants, Chem

e and engineer

e plant piping.

E B 31.3 code. g for internal presion on the pipifects on piping.p, Fatigue, Streods: External, ried piping.

afe remaining lifon and re-ratining, Non-weldi

etirement thicknmethods for pipi

Pneumatic tesmethods (ASMng qualification- INSPECTIONrd and documed Feedback.

se several examreading mater

urse for In-S

method for carry

Gas Plants, Fe

t and inspect th

eration or need

ed again. The c

mical Plants an

ring departmen

essure. ng. . ss, Corrosion, Thickness and

fe. ng of piping. ng repairs.

ness and renewing systems. sting.

ME Sec. V). ns (ASME Sec N (RBI) method

ntation.

mples, illustratiials and practic

Service Pipi

ying out inspec

ertilizer Plants

he damages lik

ds repairs. If ne

course is ideally

d Refineries. It

nts. The course

Cracking, and d Auxiliary.

wal of old pipin

IX). ology.

ions and case ce questions fo

ing:

ction and repair

and Petrochem

ke corrosion, er

eeds repairs ho

y suited for all

t is also useful

e contents are a

Pitting.

g.

studies will be or their study pu

rs of process p

mical plants.

rosion, pitting,

ow to perform r

Inspectors and

for the enginee

as follows:

discussed andurpose.

piping during th

cracking and h

repairs (or re-ra

d QA/QC

ers and superv

d participants w

e

how to

ating)

visors

will be

Page 6: API Preparatory Program 2014

 

API 653

This course

down perio

The partici

damage to

The course

Refineries.

departmen

Constructio

• B

• R

• Ef

• C

• In

• In

• R

• Ev

• M

• R

• C

• Ta

• R

• R

• In

• R

During the additional r

 

Tanks Insp

e explains the

ods of Refinerie

pant will know

the tank shell,

e is ideally suite

It is also usefu

nts. The course

on codes for th

rief review of A

Review of desig

ffects of corros

orrosion of tan

nspection meth

nternal and exte

Repairs and alte

valuation of Se

Methods for hot-

Re-constructed

athodic protect

ank lining: Thin

Review of NDT

Review of weldin

nspection Reco

Review Quiz and

course, severareading materia

pectors Cou

step-by-step m

es, Oil and Gas

how to conduc

, roof, bottom a

ed for all Inspe

ul for the engin

e contents are a

e storage tank

API 650 code.

n and construc

sion on tank sh

k bottom due t

ods for shell, ro

ernal inspection

eration of tanks

ettlement of tan

-tapping.

tanks.

tion of tanks.

n film and Thick

methods (ASM

ng qualification

ords and docum

d Feedback.

al examples, illals and practic

urse for In S

method for carry

s Terminals, an

ct the external a

and how to repa

ectors and QA/Q

neers and supe

as follows:

ks.

ction of storage

ell, bottom and

to soil-corrosion

oof and bottom

n.

s.

nk bottom.

k film lining.

ME Sec. V).

ns.

mentations (AS

ustrations and e questions for

Service Stor

ying out inspec

nd other Hydroc

and internal ins

air the damage

QC Profession

ervisors in oper

e tanks: Cone r

d roof.

n.

m. while the tan

ME Sec. IX).

case studies wr their study pu

rage Tanks

ction and repair

carbon Proces

spection of tan

e, so that the ta

als in Oil & Ga

ration, maintena

roof, Dome roo

k is in service.

will be discusseurpose.

rs of storage ta

sing Plants.

ks, how to che

ank can be safe

s plants, Chem

ance and engin

f and Floating

ed and particip

anks during the

ck and evaluat

ety used again

mical Plants and

neering

roof tanks.

ants will be giv

e shut-

te the

.

d

ven

Page 7: API Preparatory Program 2014

Mon

Marc

May

June

July

Septe

Octo

Nove

 

 

The Upco

 

Examinat

Preparato

Preparato

 

 

th

ch

e

ember

ober

ember

ming Program

tion Fee: USD

ory Course Fe

ory Course Fe

API 510

17-22

5-10

2-7

7-12

8-13

6-10

3-7

m Schedule is

D 900/‐  

ee: API 570 &

ee: API 510 – 

API 570

3-8

19-23

9-14

14-19

15-20

13-18

10-14

s as Follows, 

& 653 – INR: 2

INR: 25000/‐

API 653

10-15

26-30

16-21

21-26

22-27

20-25

17-21

22000/‐ + Serv

‐ + Service Ta

Ma

M

J

Ju

Septe

A

Nov

vice Tax 

ax 

Examinatio

API 653arch 21 – 31,

API 510May 16 – 25, 2

API 570June 20‐30, 2

API 653uly 18 – 28, 2

API 510ember 19 – 2

API 570August 8, 20

API 653vember 14‐24

on

2014

2014

014

2014

29, 2014

014

4, 2014

Last Appl

Januar

March

April

May

July 1

October 1

Septemb

Date of lication

ry 10, 2014

h 7, 2014

11, 2014

9, 2014

11, 2014

17 – 27, 2014

ber 5, 2014

4

Page 8: API Preparatory Program 2014

 

 

 

IMPORTA

As per APis mandathe Exam  The API aSupply Bu  Exam pac Trainees r Participancan be mawill be acc

Hard cop

BSB. Softaccess to

Bank Det

Bank Nam

G-3/4, Su

Branch Co

Beneficiar

Account N

Account T

ANT INFORMA

I directives, Eatory for attenpack / code b

uthorized puureau (BSB – I

cks can be pu

registered wit

nts will have toade by wire trcepted.

py exam pack

t copies (If op their site from

tails for paym

me & Address

rya Kiran Bui

ode: 0003

ry: Book Supp

No: 00032320

Type: Current

ATION ABOU

Exam Packagending all partbooks from a

blication and India). The Ex

rchased in ha

th IET for the

o make the pransfer / by D

s will be cour

pted for) can bm where soft

ment of Book S

s: HDFC Bank

lding, 19, K. G

ply Bureau

0003705

t

T USE OF CO

e or code booicipants appen API authori

exam packs dxam Pack can 

ard copy or ca

e training cour

ayment direcDD – Payable

riered to the p

be downloadecopy of the e

Supply Burea

k Limited

G. Marg, New

DE BOOKS

oks used for tearing for the ized distribut

distributors abe obtained 

an be downlo

rse are entitle

ctly to Book Suat New Delhi

participants pr

ed from anywexam pack ca

u is given bel

w Delhi – 1100

he ICP ExamsICP exams toor. 

are IHS (USA),directly from

oaded as soft 

ed for a disco

upply Bureaui, India. Strictl

referred addre

here. BSB / Tn be downloa

low for Wire T

001

s should be ino purchase a l

, Techstreet (m them. 

copy (PDF). 

ount of 20% o

u, New Delhi, ly no cash or

ess (Within In

Techstreet / IHaded.

Transfer of Pa

n original. Henlicensed copy

USA) and Boo

on code books

India. Paymecheque paym

ndia) directly f

HS will provid

ayment:

nce it y of 

ok 

s. 

ent ments

from

de

Page 9: API Preparatory Program 2014

 

Bank MIC

RTGS/NE

 

CR Code: 110

EFT IFSC: HD

0240001

DFC0000003 

W

Dec

E

Ph

WWW.D

cibel Nde I1st Floor PlainPattambi, P

Email: info.ker@en

one: 0091‐ 93

DECIBEL

nspectionfield Businessalakkad [email protected]@de387674153, 8

LNDE.CO

s & TraininEnclave, Nearct, Kerala, Indiacom [email protected],

OM 

ng InstitutCivil Court,  a 679303 ibelnde.com 

9349122467 

te