Biggest Anti Termite Treatment
Mistakes You Can Easily Avoid!
By ITEM (Integrated Termite Elimination Method)
Hi, this topic is about Anti - termite treatment and its methods. How the detection of
phase takes place as well as how pest control treatment takes place. ITEM
(Integrated Termite Elimination Method) is an ultra modern technology adapted
from Israel Technology.
TIME OF APPLICATION: Soil treatment shall start when the foundation trenches and pits are ready
to receive mass concrete in foundations. Lying of mass concrete shall start
when the chemical emulsion has been absorbed by the soil and the surface
is quite dry. Treatment shall not be carried out when it is raining or soil is
wet with rain or sub-soil water. The foregoing earth surface within the
plinth before laying the sub-grade for the floor.
Types of Termite Control Procedure:
Anti Termite Treatment – Method Statement:
Anti termite treatment is carried out in four stages described below.
FIRST PHASE:
This treatment is applied on the set, compacted hardcore, i.e on the
underside of the floor slab with concentration of spray on both
sides/edges of the ground beams. This constitutes the first stage of the
treatment.
SECOND PHASE:
1. The treatment is applied on the prepared, compacted hardcore, i.e.
on the underside of the floor slab with concentration of spray on both
sides/ edges of the ground beams. This constitutes the first stage of the
treatment.
2. During the second stage, anti- termite solution is applied on the
prepared hardcore at the apron area, porch, patio, lanai and other
covered areas.
THIRD PHASE:
1. Anti treatment is applied on the foundation and ground beams with
concentration on both sides/edges of the ground beams.
2. Anti termite treatment is applied on the prepared, compacted
hardcore
3. Anti termite treatment is carried out on the prepared hardcore at the
apron area.
FOURTH PHASE (FINAL):
1. When piling is completed, we carry out the anti termite treatment into
the soil at the foundations.
2. After the pile caps are erected, the anti termite treatment is carried
out at the ground beams.
3. The anti termite treatment is applied on the prepared compacted
hardcore floor slab.
4. Anti termite treatment is carried out on the prepared hardcore at the
apron area.