Una Società Finmeccanica
Ansaldo Nucleare &
i Laureati in Ingegneria Elettrica
Federico Fortunato Product Manager Electrical
and I&C Systems Genova, Sept. 13th, 2012
Una Società Finmeccanica
Main Italian Company in the nuclear sector
Sound presence in the new
international markets
50 years of nuclear know-how
Full-cycle responsibility for the nuclear
energy business
Una Società Finmeccanica
ANSALDO NUCLEARE HEADQUARTERS GENOVA
200 DIPENDENTI 135 DI QUESTI
IMPIEGATI NELLO SVILUPPO PROGETTI ED INGEGNERIA
Una Società Finmeccanica
Ansaldo Nucleare nel Mondo
Nuclear Power Plants
Waste Facilities and Nuclear Research Center
Una Società Finmeccanica
Ansaldo Nucleare in Italia
Nuclear Power Plants
Waste Facilities and Nuclear Research Center
EUREX Saluggia Caorso NPP
Brasimone
Trino NPP
Casaccia
CISAM
Latina NPP Garigliano NPP
Trisaia (Rotondella)
Una Società Finmeccanica
The most flexible among
global players
Customer-driven approach
Partnerships in nuclear plants adopting different technologies
An innovative and reliable
business partner
Design, production, service and de-commissioning capabilities
Development of fourth generation nuclear programs
High technology & human touch
Una Società Finmeccanica
Ansaldo Nucleare offer: product lines
NEW NUCLEAR POWER PLANTS
(NPPs)
DECOMMISSIONING & RADIOACTIVE WASTE
MANAGEMENT
SERVICES TO NUCLEAR PLANTS
MARKETING & SALES
PROJECT MANAGEMENT
DESIGN & ENGINEERING
PROCUREMENT & CONTRACTING
FABRICATION
SITE IMPLEMENTATION
COMMISSIONING
Una Società Finmeccanica
Carbon-free power generation
Research on new generation nuclear technologies
Commitment to improving fuel efficiency & minimizing radwaste
Development of new, accident-proof
technologies & solutions
Upgrading of existing plants
with enhanced safety features
Safety assessment of new & operating plants & facilities
Una Società Finmeccanica
is devoted to the nuclear technology and provides its total, absolute and
unwavering commitment to nuclear safety, public transparency and
professional integrity. 9
Relatore Note di presentazione Ansaldo Energia is a developer and manufacturer of power generation technologies. Energy has been our core business for more than 150 years, and has shaped our Company culture.
Una Società Finmeccanica
Flexible Connections The system allows extending the concept of “Plug and Socket” to the Electrical Distribution System, at different voltage level (medium up to 11 kV, low up to 400 V) and with a large scale of available power up to 10 MVA
10
EU STRESS TESTS & POST FUKUSHIMA MEASURES
Una Società Finmeccanica
Flexible Connections The system consists in the installation, on a remote position, identified as safe, of the connection point and of the panel that provides the interface between the plant electrical system and the external power source. This allows for a flexible management of external emergency power sources to cope with the post-accident required safety functions, by matching the limited power available with the most urgent needs in the optimal sequence.
11
EU STRESS TESTS & POST FUKUSHIMA MEASURES
Una Società Finmeccanica
Ansaldo Nucleare Propose New Stand-by Diesel Generator stations complete with: • Buildings with cranes and ventilation • Mechanical & electrical auxiliary equipment • Engineering activities and documents • Construction and commissioning • Quality assurance and surveillance
Main Services: • Electrical engineering (design of the DG set control and power systems load- flow study, selectivity study, transient study) • Civil engineering (design of the new Diesel buildings) • Mechanical engineering (design of the DG set fluid circuits, general arrangements)
12
EU STRESS TESTS & POST FUKUSHIMA MEASURES
Una Società Finmeccanica
Ansaldo Nucleare Propose New Stand-by Diesel Generator Design Concept: • Auxiliary Systems are designed, manufactured and qualified as single skid • Qualification process has been performed both by Analysys and by Test • Monitoring System with all the functional parameters of each Systems • Electrical Equipment with dedicated Oscilloperturbograph and Disturbance
Recording
Stand-by Diesel Generator Stations
13
EU STRESS TESTS & POST FUKUSHIMA MEASURES
Una Società Finmeccanica L’ingegnere Elettrco in
Ansaldo Nucleare Ogni Impianto Nucleare o di trattamento rifiuti è prima di tutto un Impianto che produce e utilizza Energia Elettrica. Quindi In ognuno dei nostri impianti sono NECESSARI:
Studi di Rete, Corto Circuito, Load Flow, Selettività
Voltage Levels
500. kV 132. kV 22. kV 6.6 kV 0.38 kV
PowerFactory 13.2.336
Project: Graphic: Grid Date: 18-Feb-2010 Annex:
Load Flow Balanced Nodes Line-Line Voltage, Magnitude [kV] Voltage, Magnitude [p.u.] Voltage, Angle [deg]
Branches Active Power [MW] Reactive Power [Mvar] Current, Magnitude [kA] Loading [%]
External Grid Active Power [MW] Reactive Power [Mvar] Power Factor [-]
G1
649.00 MW 402.21 Mvar
19.93 kA 100.00 %
G~
B D
-G 1
-648.98 MW -402.20 Mvar
19.93 kA 87.62 %
B D
-G 1
649.00 MW 402.21 Mvar
19.93 kA 87.62 %
TP
-646.77 MW -295.51 Mvar
0.82 kA 101.55 %
-1
TP
648.93 MW 401.97 Mvar
19.93 kA 101.55 %
-1
B D
2A -5
32 0
B D
2A -5
32 0
B D
1A -5
32 0
B D
1A -5
32 0
B D
2U -5
32 0
B D
2U -5
32 0
B D
1U -5
32 0
B D
1U -5
32 0
Ext Grid 132 kV
49.06 MW 31.28 Mvar
0.84 Ext Grid 500 kV
-646.77 MW -295.51 Mvar
-0.91
B D
4- 53
23
5. 47
M W
3. 26
M va
r 0.
56 k
A 5.
72 %
B D
4- 53
23
-5.47 MW -3.26 Mvar 0.56 kA 5.72 %
BD3-5323
2.58 MW 1.59 Mvar 0.26 kA 2.70 %
BD3-5323
-2.58 MW -1.59 Mvar
0.26 kA 2.70 %
BD3-5324
18 .9
3 M
W 10
.5 2
M va
r 1.
88 k
A 19
.2 8
%BD3-5324
-18.93 MW -10.52 Mvar
1.88 kA 19.28 %
BD2-5323
0.00 MW -0.00 Mvar 0.00 kA 0.00 %
BD2-5323
-0.00 MW 0.00 Mvar 0.00 kA 0.00 %
BD2-5324
0. 00
M W
-0 .0
0 M
va r
0. 00
k A
0. 00
% BD2-5324
-0.00 MW 0.00 Mvar 0.00 kA 0.00 %B
D 1-
53 23
0. 00
M W
-0 .0
0 M
va r
0. 00
k A
0. 00
%
B D
1- 53
23
-0.00 MW 0.00 Mvar 0.00 kA 0.00 %
Brk-MC-3-E
-2.35 MW -1.46 Mvar
0.24 kA 0.00 %
Brk-MC-3-EBrk-MC-3-O
0.00 MW 0.00 Mvar 0.00 kA 0.00 %
Brk-MC-3-O
TA 2
27.43 MW 17.53 Mvar
0.14 kA 94.35 %
1
TA 2
-27.27 MW -14.94 Mvar
2.72 kA 94.35 %
1
TA 1
21.62 MW 13.75 Mvar
0.11 kA 74.23 %
1
TA 1
-21.52 MW -12.12 Mvar
2.14 kA 74.23 %
1
TU 2
0.02 MW 0.11 Mvar 0.00 kA 0.31 %
-1
TU 2
-0.00 MW 0.00 Mvar 0.00 kA 0.31 %
-1
TU 1
0.02 MW 0.11 Mvar 0.00 kA 0.31 %
-1
TU 1
-0.00 MW 0.00 Mvar 0.00 kA 0.31 %
-1 B
D 4-
53 24
21.80 MW 11.69 Mvar
2.17 kA 22.22 %
B D
4- 53
24
-21.80 MW -11.69 Mvar
2.17 kA 22.22 %
B D
1- 53
24
0.00 MW -0.00 Mvar
0.00 kA 0.00 %
B D
1- 53
24
-0.00 MW 0.00 Mvar 0.00 kA 0.00 %
Bus G1 22.115 1.005
-22.946
Bus 22 kV 22.115 1.005
-22.947
Bus 500 kV 500.000 1.000 0.000
Bus 132 kV 132.000
1.000 0.000
MC-3-OE 6.592 0.999 -3.752
MC-3-E 6.592 0.999 -3.752
MC-3-O 6.652 1.008 -2.930
MC-4-E 6.592 0.999 -3.752
MC-4-O 6.652 1.008 -2.930
D Ig
SI LE
N T
Voltage Levels
500. kV 132. kV 22. kV 6.6 kV 0.38 kV
PowerFactory 13.2.336
Project: Graphic: MC-4 Date: 18-Feb-2010 Annex:
Max. 3-Phase Short-Circuit acc. to IEC Short Circuit Nodes Initial Short-Circuit Power [MVA] Initial Short-Circuit Current [kA] Peak Short-Circuit Current [kA] Short-Circuit B