Annual Safeguard Monitoring Report
1st Annual Report March – December 2017 March 2018
UZB: Small Business Finance Project
Prepared by JSICB Ipak Yuli Bank, JSCB Hamkorbank, JSCB Davr Bank, and JSILC
Uzbekleasing International Company for Ministry of Finance, Republic of Uzbekistan and the
Asian Development Bank.
CURRENCY EQUIVALENTS (as of 31 December 2017)
Currency unit – Uzbekistan Sum (UZS)
UZS1.00 = $0.0001231516 $1.00 = UZS8,120.070000
ABBREVIATIONS
ADB - Asian Development Bank CBU - Central Bank of Uzbekistan DVB - Davr Bank Joint-Stock Commercial Bank ESMS - Environmental and Social Management System FIL - Financial Intermediary Loan GAP - Gender Action Plan HKB - Hamkorbank Joint-Stock Commercial Bank IYB - Joint Stock Innovation Commercial Bank “Ipak Yuli” MOF - Ministry of Finance PFI - Participating Financial Institution
PIAL - Prohibited Investment Activities List SPS - Safeguard Policy Statement
TA - Technical Assistance ALC - Joint Venture “UzbekLeasing International A.O.”, JSC
NOTE
In this report, "$" refers to US dollars, unless otherwise stated. This annual safeguards monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
______________________________________________________________________
1
Annual Safeguard Monitoring Report
Project Number: 42007-018
Reporting period: March - December 2017
Republic of Uzbekistan: Small Business Finance Project
(Financed by the ADB)
March 2018
Table of Contents
PART I - INTRODUCTION ................................................................................................................................. 2
1.1. SHORT DESCRIPTION OF THE PROGRAM ........................................................................................................... 2
1.2. SUMMARY OF ACTIVITIES AND PROJECT PROGRESS DURING THE PREVIOUS 10 MONTHS. .............................. 2
1.3 PROJECT ORGANIZATION AND ENVIRONMENTAL MANAGEMENT TEAM, INCLUDING ORGANIZATIONAL
RELATIONSHIPS WITH PFIS, SUB-BORROWERS ETC. ................................................................................................ 4
PART II – ENVIRONMENTAL ISSUES ............................................................................................................. 6
2.1. ENVIRONMENTAL ISSUES IN THE PREVIOUS 10 MONTHS .................................................................................. 6
2.2. EXPLANATIONS OF INSTANCES IN WHICH ENVIRONMENTAL STANDARDS OR GUIDELINES WERE EXCEEDED OR
ENVIRONMENTAL INCIDENTS HAPPENED ................................................................................................................... 7
2.3. REQUIRED RECOMMENDATIONS ........................................................................................................................ 7
PART III: COMPLIANCE WITH ADB’S SOCIAL PROTECTION REQUIREMENTS AND ADB’S PROHIBITED INVESTMENT ACTIVITIES LIST .............................................................................................. 8
3.1. PROVIDE AASSESSMENT ON THESE TWO SETS OF REQUIREMENTS ................................................................. 8
3.2. A BRIEF DESCRIPTION OF THE TAKEN MEASURES ............................................................................................. 8
3.3. PROVIDE SUMMARY OF ACTIONS TAKEN TO ENSURE COMPLIANCE OR CORRECTIVE ACTIONS TAKEN IN CASE
OF NON-COMPLIANCE ................................................................................................................................................ 8
PART IV: ESMS OPERATIONS (FOR PFIS WHICH ARE FINANCING B-CATEGORY SUB-PROJECTS) ......................................................................................................................................................... 9
4.1 SITE INSPECTIONS AND AUDITS – TO SUMMARIZE THE NUMBER AND TYPE OF SITE VISITS ............................. 10
4.2 NONCOMPLIANCE CASE – TO SUMMARIZE THE DETAILS, INCLUDING THE NUMBER OF NOTICES GIVEN OUT BY
THE PFIS OR BY THE LOCAL GOVERNMENT TO THE SUB-BORROWERS, HOW AND HOW MANY ISSUES COVERED. 10
4.3 CORRECTIVE ACTION PLANS – TO REPORT ON TIMELINESS OF PREPARATION AND COMPLETION .................. 10
4.4 CONSULTATION AND COMPLAINTS – TO REPORT ON ANY CONSULTATIONS UNDERTAKEN AND LIST ANY
COMPLAINTS RECEIVED AND HOW THEY WERE HANDLED OR RESOLVED. .............................................................. 11
PART V: CONCLUSION AND ACTION PLAN .............................................................................................. 12
5.1 CONCLUSIONS .................................................................................................................................................. 12
5.2 SUMMARY OF ACTIONS TAKEN DURING THE PREVIOUS REPORTING PERIOD ................................................... 12
5.3 ACTION PLAN FOR THE NEXT REPORTING PERIOD............................................................................................ 12
ANNEXES ............................................................................................................................................................ 2
ANNEX 1: CONSOLIDATED ANNUAL REPORTS BY PFIS ......................................................................... 2
ANNEX 2: PFI’S ANNUAL ENVIRONMENTAL AND SOCIAL PERFORMANCE REPORT FROM JSCB HAMKORBANK .................................................................................................................................................. 6
ANNEX 3: PFI’S ANNUAL ENVIRONMENTAL AND SOCIAL PERFORMANCE REPORT FROM JSC “UZBEK LEASING INTERNATIONAL A.O.” ................................................................................................... 2
ANNEX 4: PFI’S ANNUAL ENVIRONMENTAL AND SOCIAL PERFORMANCE REPORT FROM JSICB “IPAK YULI” ........................................................................................................................................................ 6
ANNEX 5: PFI’S ANNUAL ENVIRONMENTAL AND SOCIAL PERFORMANCE ANNUAL REPORT OF PJSCB “DAVR BANK” (AS OF MARCH 01, 2018) ..................................................................................... 41
PART I - INTRODUCTION
1.1. Short description of the program
1. The proposed financial intermediary loan (FIL) of $100 million provide US Dollar funding to
the participating financial institutions (PFIs) to finance investment and working capital loans to
small businesses. In addition, $0.5 million technical assistance (TA) support the selected PFIs
to improve their lending and outreach to small businesses, and enhance financial literacy of
small businesses. The impact will be improved contribution of small businesses to economic
growth and employment. The outcome will be increased sustainable provision of PFIs’ financing
to small businesses. The PFIs are expected to set examples for other financial institutions on
how to deepen their outreach, while retaining good asset quality and funding private enterprise
activities that generate jobs.
2. The output will be expanded capacity of the PFIs for financing to small businesses. At project
completion, at least 20% of the eligible sub-loans are expected to be made to women-owned
small businesses, and at least 60% of the eligible sub-loans are expected to be made to rural
small businesses outside the capital. The capacity development TA will complement this output
by focusing on measures for strengthening PFIs’ credit underwriting policies and procedures,
developing a credit scoring system as well as financial literacy training to small businesses. The
output will also include an established environmental and social management system (ESMS)
embedded in each PFI’s operations for adequate management of environmental and social
issues in compliance with the ADB’s Safeguard Policy Statement (2009) and national laws and
regulations.
1.2. Summary of activities and project progress during the previous 10 months.
3. In the course of project implementation, 42 subprojects were financed within 10 months. All
subprojects underwent preliminary environmental screening by the PFIs strictly following the
Environmental and Social Management System (ESMS) procedures of which all 42 projects are
classified as "B". Summary table of activities and project progress during the reporting period is
given in the Table 1.
4. For each sub-project, a State Environmental Expertise (SEE) was carried out on the basis of
a draft EIS (Environmental Impact Statement) and obtained approvals (Environmental
Conclusions) of the State Committee for Ecology and Environmental Protection. Control over
observance of the requirements of environmental legislation at the enterprises of each sub-
project is assigned to the regional department for ecology and environmental protection
(depending on which region and district the particular subproject belongs to).
3
5. Monitoring and reporting of the implementation of safeguards requirements and procedures within the established ESMS will be implemented and reports prepared by PFIs. The PFIs’ quarterly progress reports will include status of compliance with safeguards covenants. The PFIs will submit to MOF (the EA) annual ES performance reports (Attachment 11: Outline of an Environmental and Social Performance report) by the end of January every year. Based on the PFIs’ annual reports, TA Consultant - IESMS Environmental and Social Management System Specialist will submit to ADB Annual Safeguard Monitoring Report (Attachment 13: Annual Safeguard Monitoring Report) by mid-March of the following calendar year.
Table 1: Summary of activities and project progress during 10 months
PFIs ESMS approval
date
Number of sub-loans by environmental
categories
Sub-loan amount
(million USD $
B C Total 1 JSICB “Ipak Yuli” 24.05.2017
21 - 21 4.90
2 PJSCB “DAVR BANK” 15.05.2017
7 - 7 1,59
3 JSCB “Hamkorbank” 29.05.2017
14 - 14 3.01
4 JSC “Uzbek Leasing International A.O.”
12.05. 2017
- - - -
Total: 42 - 42 9.5
6. Most of the 42 subprojects financed within the Small Business Financed Project, including 18 subprojects (42%) belong to the textile production, which is one of the strategic directions of the economy of Uzbekistan. There is also a demand for financing of construction materials (14%) and food production (14%). Detailed information on the quantity of the total portfolio by sectors under Small Business Finance Project is given in table 2 below.
Table 2: Quantity of the total portfolio by sectors under Small Business Finance Project
# PFI Number of Subprojects Total
Text
ile
Pro
duct
ion
of
const
ruct
ion
mate
rials
Food
and
beve
rages
Road
Const
ruct
ion
Agricu
lture
Chem
ical
indust
ry
Printin
g
and
publis
hin
g
Whole
sale
tr
ade
tourism
Pharm
ace
utic
al i
ndust
ry
1 JSICB “Ipak Yuli”
5 3 4 - 3 1 2 2 - 1 21
2 PJSCB “DAVR BANK”
9 2 1 - - - - 1 1 - 14
3 JSCB “Hamkorbank”
4 1 1 1 - - - - - - 7
4 JSC “Uzbek Leasing International A.O.”
- - - - - - - - - - -
Summary 18 6 6 1 3 1 2 3 1 1 42 % 42 14 14 2.8 7.1 2.8 4.6 7.1 2.8 2.8 100
1.3 Project organization and environmental management team, including organizational relationships with PFIs, sub-borrowers etc.
7. The Ministry of Finance (MOF) is the executing agency. The MOF is responsible for: (i) Executing subsidiary loan agreements with the PFIs; (ii) Monitoring PFIs’ performance and compliance with project agreements against design and monitoring framework; (DMF) targets; (iii) Ensuring timely disbursement of ADB loan funds to PFIs; (iv) Submitting project completion report to ADB within 6 months from project closing date.
8. Participating financial institutions (PFIs) - Hamkorbank, Ipak Yuli Bank, Davr Bank, and Uzbek Leasing International A.O., acting as implementing agencies (IA) to carry out the project in accordance with the loan and project agreements of the government of Uzbekistan.
9. In each PFI established a project implementation unit (PIU) under its existing structure to oversee the implementation of the credit line activities at the respective PFI. The project organization chart is given in Figure 1.
5
Figure 1: Project Organization Chart
Note: ADB = Asian Development Bank; MOF = Ministry of Finance; PFI = participating financial institution;
PIU = project implementation unit
10. A PFI is responsible for: (i) Carry out credit origination and monitoring of eligible sub- borrowers in line with sound banking principles; (ii) Select subloans up to $300,000 in accordance with eligibility criteria set out in the project agreements; Monitor business outreach targets as agreed in the project agreements; (iii) Establish environmental and social management systems and ensure that subborrowers comply with ADB's Safeguard Policy Statement (SPS) and applicable environmental, health and safety and social laws and regulations of the Republic of Uzbekistan (iv) Manage financial reporting, accounting, and auditing of project-related activities; (v) Designate dedicated staff for project implementation unit; (vi)Implement Gender Action Plan (GAP); (vi) Submit to ADB annual audited financial statements that include an audit management letter and an audit opinion on the use of loan proceeds, and the statement of the imprest account; (vii) Submit to ADB quarterly progress reports using the format in Appendix 1 within 30 days from the end of each quarter, and respond to other information requests; (viii) Submit to ADB annual safeguards monitoring report in February each year.
PART II – ENVIRONMENTAL ISSUES
2.1. Environmental issues in the previous 10 months
11. During the project implementation period, within 10 months, PFIs did not face to significant
environmental problems for each sub-project.
12. On 6th November 2017, under the TA-9128 UZB: Strengthening Participating Financial Institutions an IESMS Environmental and Social Management System Specialist was hired under the project for 5 months, his responsibilities are the following: (i) assess PFIs' existing
environmental and social management system (ESMS) policies and how they are applied;(ii)
identify the gap between PFIs ESMS and ADB's SPS and Uzbek laws and regulations;(iii)
advise PFIs on the due diligence and mitigating measures required for sub-loans classified as category B for environment in line with the Safeguard Policy Statement and national regulations; (iv) review PFIs' annual environmental and social performance reports prior to submission to ADB, and consolidate PFIs' environmental and social performance reports into a safeguard
monitoring report for submission to ADB and the Ministry of Finance; and(v) regularly conduct
environmental audits for high-risk subprojects or any other subprojects, as needed; and (vi) conduct ESMS training for PFIs at least twice a year, and periodically report to, and address issues raised by, ADB. 13. On November the 23-24th of 2017, in Tashkent, under the financing of the Asian Development Bank, a 2-day-long training/workshop was held and was attended by all PFI representatives. The meeting considered all the issues regarding the screening and financing all sub-projects within the scope of the given project, as well as project implementation and monitoring issues.
14. With the project categorization aim, on November the 25-26th of 2017, TA Consultant -
IESMS Environmental and Social Management System Specialist hired within the scope of the
project by the ADB, together with the Environmental Specialists of Uzbek Leasing Bank, held
site visits for three sub-projects. During the visits, the Uzbek Leasing Bank representatives were
explained the main approaches to be used by them at the stage of screening and project
categorization.
15. During the site visits the following findings have been observed: quite often, the Safety Specialists of the PFIs assign the environmental categories without any analysis. These specialists mostly mechanically rely on the category assigned by „Uzbekgospriroda”. As a result of such an approach, quite often, the projects were given the categories higher than they really belonged to, in particular:
• JSICB “Ipak Yuli” simply assigned all sub-projects (21 sub-projects in total) category “B” in respect of resettlement despite the fact that no resettlement element was seen with any of the projects and all projects belonged to category “C” in respect of resettlement;
7
• In the field of environmental protection, most of the PFIs directly use the category assigned by Uzbekgospriroda to the sub-projects, what does not reflect the reality either, as with the funds required from ADB, a company usually plans to finance only one stage of the production process, while Uzbekgospriroda has assigned the environmental category to the whole production cycle of the company.
2.2. Explanations of instances in which environmental standards or guidelines were exceeded or environmental incidents happened
18. No similar cases were fixed within the scope of any project in 2017.
2.3. Required recommendations
19. Based on the examples described in the chapter 2.1, the PFI ESMS Managers and specialists should be provided with additional trainings, where the project environmental and social categorization requirements will be discussed along other issues related to the project. 20. As mentioned above, 42 subprojects have been already financed within the scope of the Project. None of the PFIs have been started the monitoring of sub-projects yet. It is recommended to undertake on-job trainings during the site visits for PFIs for better understanding environmental and social monitoring and inspection requirements of ADB.
PART III: COMPLIANCE WITH ADB’s SOCIAL PROTECTION REQUIREMENTS AND ADB’s PROHIBITED INVESTMENT ACTIVITIES LIST
3.1. Provide aassessment on these two sets of requirements 21. During of the project implementation, PFI specialists conducted a preliminary analysis (screening) of each sub-project with respect to social safeguard and environmental measures. Prior to approval, subprojects were screened according to the prepared questionnaires. 22. All sub-projects that are financed under the Small Business Finance Project after social screening are belong to "C" category sub-projects. Within the scope of all sub-projects, additional equipment will be purchased for expanding the existing business and installing on their own territory.
23. During the social screening carried out by the PJSCB “DAVR BANK” and JSCB “Hamkorbank” for all subprojects, ADB's social protection requirements were met. Both PFIs assigned all sub-projects category “C” during social screening. According to the list of prohibited types of investment activities, a preliminary screenings of environmental and social measures were carried out.
24. The exception is the screening procedure conducted by JSICB "Ipak Yuli" specialist during social screening.
25. As the PFI reports evidence, the JSICB “Ipak Yuli” specialists identify the categories of the project in an incorrect manner in respect of involuntary resettlement. All 21 sub-projects already financed by the ADB are assigned category “B” by the PFI specialists. At the same time, no “Resettlement Action Plan” required for category “B” was developed within the scope of any project. After considering several sub-projects, it became clear that in the view of involuntary resettlement, they belong to category „C“.
3.2. A brief description of the taken measures
26. All requirements are implemented based on the ESMS documents. Implementation of
corrective actions were not required during this reporting period.
3.3. Provide summary of actions taken to ensure compliance or corrective actions taken in case of non-compliance
27. There are no non-compliances fixed at this stage.
9
PART IV: ESMS OPERATIONS (for PFIs which are financing B-category sub-projects)
4.1. A brief description of the effectiveness of the ESMS within 10 months
28. According to paragraph B. “Disbursement” of Project Administration Manual (PAM) for Small Business Finance Project, dated June 2016, no withdrawal shall be made under the project for any PFI until such time as the PFI has: (a) established an ESMS in a manner satisfactory to ADB, which includes without limitation, (i) third party monitoring mechanism for sub-loans; (ii) guidelines for site visits of qualified subprojects; (iii) a tracking system of qualified subprojects; and (b) appointed designated staff who is capable and adequately trained in fully implementing the ESMS.
29. In this regard all PFIs have established ESMS (see table 1) and designated ESMS managers and coordinators. However, due to turnover of staff of PFIs, it is needed to conduct training for credit specialists of PFIs, who are reviewing ADB sub-loans. On 23-24rd November of 2017, within the scope of the project, in Tashkent, under the financing of the Asian Development Bank, a 2-day-long training/workshop was held and was attended by all PFI representatives. 30. According to paragraph C. “Monitoring and Reporting” of Project Administration Manual (PAM) for Small Business Finance Project, the PFIs are requested to submit to the ADB annual ES performance reports (Appendix 6 of ESMS linked document) by the end of March of every year. The submission dates of Annual ES Performance Reports for this reporting period of each PFI are given in the Table 3 below.
Table 3. Submission dates of Annual ESPRs
PFI Report Date of submission PJSCB “Davr Bank” Annual ES performance report 16.03.2018 JSC “Uzbek Leasing International A.O.”
Annual ES performance report 13.03.2018
JSICB “Ipak Yuli” Annual ES performance report 22.03.2018 JSCB “Hamkorbank” Annual ES performance report 28.03.2018
32. All sub-projects financed within the scope of the Small Business Finance Project underwent the following phases prior to financing:
• Screening, categorization, and review procedures: In 2017, total of 42 projects were approved within the scope of the project. The screenings are undertaken and relevant documents are prepared within the scope of all
projects. Submitted proposals have been screened against ADB’s “Prohibited Investment Activities List (PIAL)” and against Ineligible Loans as Regulated by the
Central Bank of Uzbekistan. PFI’s environmental and social managers completed the environmental and social screening checklists and identified the project category both, in social and environmental respects. In case the project was assigned environmental category “B”, environmental due diligence report was prepared by a credit officer based on the expert’s conclusion issued by Uzbekgospriroda. See Annex 1 for the detailed information about the project categorization.
• Monitoring and reporting systems:
In 2017, no environmental monitoring or inspection was held for any of the projects.
• Organizational structure and staffing including skills and competencies in environmental and social fields
The Ministry of Finance (MOF) is the executing agency. Participating financial institutions (PFIs) - Hamkorbank, Ipak Yuli Bank, Davr Bank, and Uzbek Leasing International A.O., acting as implementing agencies (IA) to carry out the project in accordance with the loan and project agreements of the government of Uzbekistan. In each PFI established a project implementation unit (PIU) under its existing structure to oversee the implementation of the credit line activities at the respective PFI.
• Capacity building and training plan Action plan for capacity building of PFIs in 2018 includes: (i) Improvement of the understanding of ADB environmental and social requirements; (ii) improvement of Environmental screening and categorization process; and (iii) Conducting environmental and social safeguards monitoring and inspection and preparing monitoring reports. As it was mentioned above, PFIs should start monitoring and inspections from 2018 and accordingly it is necessary to provide on-the-job trainings for PFI staff who are involved in this process.
The detailed schedule of trainings to be conducted in 2018 is presented in Table 4.
33. All 42 projects financed within the scope of the Project were subject to the above-listed stages.
4.2 Site inspections and audits – to summarize the number and type of site visits
34. No inspections or audits of any of the sites were held in 2017.
4.3 Noncompliance case – to summarize the details, including the number of notices given out by the PFIs or by the local government to the sub-borrowers, how and how many issues covered.
35. There were no non-compliances fixed in 2017.
4.4 Corrective action plans – to report on timeliness of preparation and completion
36. No corrective action plans were required.
11
4.5 Consultation and complaints – to report on any consultations undertaken and list any complaints received and how they were handled or resolved.
37. GRM system was established under each PFI. The PFI offices of all four banks and their regional branches designated the receivers of complaints from people affected by the project/sub-projects. Complaints received by the headquarters offices first refer back to the appropriate FI branch office. All complaints are addressed first by the FI branch office in coordination with local khokimiyat. 38 .The FI branch offices/regional offices also monitor whether any complaints or resolutions have been received by the local khokimiyat. The grievance is addressed in accordance with the merits of the case and relevant legislation. A response to any complaint or inquiry should be provided within 15 calendar days after receipt. 39. In case if the branch office is unable to resolve the complaint, the ESMS Coordinator, in coordination with regional khokimiyat, should be responsible to resolve the problem and to inform the EA/PMU of any unresolved problems.
40. The PFI’s ESMS coordinator is responsible for coordinating actions to resolve complaints and follow up on activities as part of resolving the complaints, for recording all complaints, for forwarding them to appropriate staff for resolution; the status of resolution of complaints received, and for preparing a summary of the complaints received to be included in PFI’s annual report.
41. During this reporting period no complaints were received.
PART V: CONCLUSION AND ACTION PLAN
5.1 Conclusions
42. Despite the fact that some sub-projects are financed, none of the PFIs have started the environmental monitoring or inspection. 43. The PFIs work with inaccuracy at the stage of the project categorization (See chapter 2.1);
44. The lack of qualified personnel is seen at large PFIs in the first instance.
5.2 Summary of actions taken during the previous reporting period
45. In 2017, the implementation of the sub-projects did not enter an active phase. 41 out of the 42 approved subprojects have been financed, and the finances for the last remained sub-project will be transferred in January of 2018. The total funds of all subprojects amounted to 10 million making 10% of the credit allocated within the scope of the project. 46. On 23-24rd November of 2017, within the scope of the project, in Tashkent, under the financing of the Asian Development Bank, a 2-day-long training/workshop was held and was attended by all PFI representatives. The meeting considered all the issues regarding the screening and financing all sub-projects within the scope of the given project, as well as project implementation and monitoring issues.
47. With the project categorization aim, on 25-26th November of 2017, the TA Consultant hired by ADB, together with the Environmental Specialists of Uzbek Leasing Bank, held site visits for three sub-projects. During the site visits, the PFI representatives were explained the main approaches to use by them at the stage of screening/identifying the project category.
5.3 Action plan for the next reporting period
48. In 2018, the PFIs will implement their activities in two main directions: (i) the process of screening of the subproject proposals will continue and (ii) the social and environmental monitoring and inspection of the financed subprojects will be done. 49. In order to implement abovementioned activities, each PFI must have the duly qualified staff. An environmental specialist hired by the PMO should help monitor PFIs’ training, also providing assistance to PFIs in the implementation of ESMS, including the preparation of Annual Environmental and Social (ES) performance reports of the PFIs and ensure on-time compilation of the annual report on ESMS. If necessary, provide assistance to PFIs and beneficiaries of environmental and social issues.
50. The table 4 below shows the action plans of the PFIs in 2018.
13
Table 4: Action plan for PFIs for the next reporting period
PFIs Issues Actions required Responsibility Time
JSICB «Ipak Yuli»
Improvement of the understanding of ADB environmental and social requirements
ESMS trainings
TA Consultant - IESMS Specialist/PFI safeguards manager
Q1, 2018
Environmental screening and categorization process
1. PIAL checklist; 2. Environmental screening checklist; 3. Social Safeguard Screening Checklist; 4. IEE report (follow Governments requirements); 5. Due diligence
PFI safeguards manager/sub-borrower
After receiving the new sub-project
Changes of responsible staff under PFI
ESMS trainings for new staff
PFI safeguards manager
Upon request
Monitoring and Inspection
Monitoring projects implementation and commissioning process
Sub-borrower/PFI
sub-borrower – permanently; PFI – Minimum once per 6 months.
Reporting 1. Project performance monitoring; 2. Preparation of Environmental and Social Safeguards Quarterly Reports; 3. Annual Environmental and Social Performance Reports of the PFIs
Sub-borrower/PFI
1. quarterly 2. quarterly 3. by the end of March of every year.
JSCB «Hamkorbank»
Improvement of the understanding of ADB environmental and social requirements
ESMS trainings
TA Consultant - IESMS Specialist/PFI safeguards manager
Q1, 2018
Environmental screening and categorization process
1. PIAL checklist; 2. Environmental screening checklist; 3. Social Safeguard Screening Checklist; 4. IEE report (follow Governments requirements); 5. Due diligence
PFI safeguards manager/sub-borrower
After receiving the new sub-project
Changes of responsible staff under PFI
ESMS trainings for new staff
PFI safeguards manager
Upon request
Monitoring and Inspection
Monitoring projects implementation and commissioning process
Sub-borrower/PFI
sub-borrower – permanently; PFI – Minimum once per 6 months.
Reporting 1. Project performance monitoring; 2. Preparation of Environmental and Social Safeguards Quarterly Reports; 3. Annual Environmental and Social Performance Reports of the PFIs
Sub-borrower/PFI
1. quarterly 2. quarterly 3. by the end of March of every year.
PJSCB “DAVR BANK
Improvement of the understanding of ADB environmental and social requirements
ESMS trainings
TA Consultant - IESMS Specialist/PFI safeguards manager
Q1, 2018
Environmental screening and categorization process
1. PIAL checklist; 2. Environmental screening checklist; 3. Social Safeguard Screening Checklist; 4. IEE report (follow Governments requirements); 5. Due diligence
PFI safeguards manager/sub-borrower
After receiving the new sub-project
Changes of responsible staff under PFI
ESMS trainings for new staff
PFI safeguards manager
Upon request
Monitoring and Inspection
Monitoring projects implementation and commissioning process
Sub-borrower/PFI
sub-borrower – permanently; PFI – Minimum once per 6 months.
Reporting 1. Project performance monitoring; 2. Preparation of Environmental and Social Safeguards Quarterly Reports; 3. Annual Environmental and Social Performance
Sub-borrower/PFI
1. quarterly 2. quarterly 3. by the end of March of every year.
15
Reports of the PFIs
“UzbekLeasing International A.O.”, JSC “
Improvement of the understanding of ADB environmental and social requirements
ESMS trainings
TA Consultant - IESMS Specialist/PFI safeguards manager
Q1, 2018
Environmental screening and categorization process
1. PIAL checklist; 2. Environmental screening checklist; 3. Social Safeguard Screening Checklist; 4. IEE report (follow Governments requirements); 5. Due diligence
PFI safeguards manager/sub-borrower
After receiving the new sub-project
Changes of responsible staff under PFI
ESMS trainings for new staff
PFI safeguards manager
Upon request
Monitoring and Inspection
Monitoring projects implementation and commissioning process
Sub-borrower/PFI
sub-borrower – permanently; PFI – Minimum once per 6 months.
Reporting 1. Project performance monitoring; 2. Preparation of Environmental and Social Safeguards Quarterly Reports; 3. Annual Environmental and Social Performance Reports of the PFIs
Sub-borrower/PFI
1. quarterly 2. quarterly 3. by the end of March of every year.
ANNEXES
Annex 1: Consolidated annual reports by PFIs
51. As it can be observed from the reports presented by the PFIs, the engagement of the small businesses in the project is quite significant. The project clearly promotes the development of traditional industrial branches in the country. Most of the presented project proposals are about the light industry.
52. It took too long PFIs to develop the reports, and we think it is the lack of their experience to blame. As already mentioned, the large banks/PFIs with their branches all over the country, clearly lack duly qualified personnel.
53. Thus, compliance with the policies and procedures of the ESMS will lead to long-term of economic and environmental sustainability and increased profitability for SME representatives.
Table 3: Information on all loans
Name of Sub-project
Type of
loan (large
corporate/
SME/trade
finance)
Tenor
of loan
(mont
hs)
Value
of
exposu
r e
(thousa
nd US$)
Industry
Sector
Safeguard
category
Any
outstan
ding
environ
mental
and IR
and IP
issues
during
reporting
period
and
actions
taken to
address
the
issues
Sub-
project
using ADB
funds
(yes/no)
ENV IR IP
JSCB «Hamkorbank»
LLC “Rolling Time” SME 70 Food and beverages
B C N/A No Yes
LLC “Luxury Furniture
Business”
SME 300 Textile B C N/A No Yes
3
LLC “Juita Gulshana Invest”
SME 300 Textile B C N/A No Yes
LLC “Azalea Garment” SME 154,39 Textile B C N/A No Yes
LLC “Sino Industrial Tashkent”
SME 300 Road Constructio
n
B C N/A No Yes
LLC “Macro Production” SME 300 Production of
construction materials
B C N/A No Yes
LLC “Bek Mega Textile” SME 170,5 Textile B C N/A No Yes
JSICB “Ipak Yuli”
МЧЖ"J-UNITED GROUP"
SME 23,13
300
Auxilary business activities service
B C n/a No Yes
ХУЖАОБОД FAYZ-M ХУСУСИЙ КОРХОНАСИ
SME 39,23 298,73 Textile B C n/a No Yes
ХУЖАОБОД FAYZ-M ХУСУСИЙ КОРХОНАСИ
SME 47,87 143 Textile B C n/a No Yes
АЛ-KHАКIM SME 40,63 299 Apparel B C n/a No Yes
OOO"GLOBAL STEEL" SME 30,37 300
Wholesale trade
B C n/a No Yes
ООО "GREEN TRADE EXPORT"
SME 27,70 220
Wholesale trade
B C n/a No Yes
MChJ "JURABEK LABORATORIES" QK
SME 32,53 150
Pharmaceutical
industry
B C n/a No Yes
OOO "SOFIYUN TORG" SME 60,47 150
Consumer goods
B C n/a No Yes
MChJ "SILVER VITA" SME 24,30 300
Food industry
B C n/a No Yes
"ARGUMENTI I FAKTI UZBEKISTAN" ООО
SME 24,30 300
Publishing company
B C n/a No Yes
OXALIK OLTIN BOGI MEVASI MCHJ
SME 81,70 295
Food industry
B C n/a No Yes
OOO "GLOBAL TRADE" SME 31,90 220
Non-metal mineral industry
B C n/a No Yes
POLIFLEKS MChJ SME 31,90 210
Printing and
publishing
B C n/a No Yes
ООО "O`ZJIHOZBUTLASH"
SME 31,90 132
Metal product
B C n/a No Yes
manufacturing
"ARK EKO TEKSTIL" МЧЖ ХК
SME 48,67 250 Textile B C n/a No Yes
ООО "TTMZ" SME 31,90 300 Textile B C n/a No Yes
MCHJ "ASIAN INTER IMPEX"
SME 31,90 300
Chemical industry
B C n/a No Yes
МЧЖ "INTER AGRO STAR"
SME 51,17 299,3 Agriculture B C n/a No Yes
"O'' ''ZBEKISTON" MCHJ SME 58,83 200 Agriculture B C n/a No Yes
MUSHTARI-OQDARYO MCHJ
SME 63,33 78 Agriculture B C n/a No Yes
MCHJ "TOXIR" SME 32,97 150
Food industry
B C n/a No Yes
“UzbekLeasing International A.O.”, JSC
None of the projects was financed by the said bank in 2017.
PJSCB «DAVR BANK»
"GLORY FOOD" LTD
SME
60
145.5
confectionery
B
C
no
Yes
"Xo'jaobod Fazo" LTD
SME
18
250
Knitting factory
B
C
no
Yes
"XAIT TEKS INVEST" LTD
SME
12
150
Cotton industry
B
C
no
Yes
AL'YORTEKS LTD
SME
48
300
Cotton industry
B
C
no
Yes
"COTTON GRAND TEXTILE" LTD
SME
18
295.37
Cotton industry
B
C
no
Yes
"BARAKA HAMKOR LUX " LTD
SME
18
100
Trade
B
C
no
Yes
"NEW LINE PRODUCTION SHO`RSUV" LTD
Construction industry
5
SME 60 246.5 B C no Yes
“NAMUNA” LTD
SME
36
137.36
Sewing factory
B
C
no
Yes
“Chin Ilhom”
PE
SME
60
263.5
Towels
production
B
C
no
Yes
"GREAT VOYAGE" LTD
SME
36
600
tourism
B
C
no
Yes
"APITEKS" LTD SME 18 210.4 Textile B C no Yes
"YUKSAK QURILISH SAVDO" " LTD
SME
48
300
Construction industry
B
C
no
Yes
"RUZMATJON OTA " LTD
SME
18
250
Textile
B
C
no
Yes
ADM TEKSTIL LTD
SME
24
300
Textile
B
C
no
Yes
Annex 2: PFI’s ANNUAL ENVIRONMENTAL AND SOCIAL PERFORMANCE REPORT from JSCB Hamkorbank
1. Please provide responses to the questions below. Please include additional sheets or
attachments as required to provide details on questions that have been answered Yes. The PFI is required to submit the annual performance report to RRA.
Name of the Financial
Institution
JSCB Hamkorbank
Completed by (name): Avazbek Fazliev
Position in
organization:
Head of sector for environmental assessment and monitoring
Date:01.01.2018
Portfolio Information
Report Covering Period:
From: To:
01.01.2017 01.01.2018
2. For the reporting period, please provide the following information about your portfolio where applicable:
A. Business Lines
Product
line
Description Total exposure
outstanding for
most recent
FY end
(US$)
Average loan
(or transaction)
size
(US$)
Microfinance Loans or other financial products for individuals
3 179 271,55
1725,99
Small Loans or other financial products 1 889 525,66 18 708,17
7
business for individuals
Long term: Transactions with tenor greater than 12 months
Microfinance Any lending, leasing or other financial assistance to any corporate or legal entity other than an individual, with individual transactions less than $50,000
140 282 834,35
5 557,73
Small business
Any lending, leasing or other financial assistance to any corporate or legal entity other than an individual, with individual transactions less than $300,000
46 212 351,96
115 632,61
Other
Other (if applicable)
Please describe
{Note: Please attach environmental and social audit or due diligence reports and environmental and social monitoring reports for each Project Company, if available}
B. If engaged in long-term in Business sector, please provide information on all loans with: (i) tenor longer than 12 months; and (ii) maximum $5000,000 loan size.
Name of
Subpro-ject
Type of loan
SME/trade
finance)
Tenor of loan
(months
)
Value of exposure
(US$)
Industry
Sector*
Safeguard category
Any outstanding environmental and IR
and IP issues during
reporting period and
actions taken to
address the issues
Subpro-ject using ADB funds
(yes/no)
Env IR IP
"GLORY FOOD" LTD
SME
60
145509,00
confectionery
B
C
no
Yes
"Xo'jaobod Fazo" LTD
SME
18
250000,00
Knitting factory
B
C
no
Yes
"XAIT TEKS INVEST" LTD
SME
12
150000,00
Cotton industry
B
C
no
Yes
AL'YORTEKS LTD
SME
48
300000,00
Cotton industry
B
C
no
Yes
"COTTON GRAND TEXTILE" LTD
SME
18
295370,00
Cotton industry
B
C
no
Yes
"BARAKA HAMKOR LUX " LTD
SME
18
100000,00
Trade
B
C
no
Yes
"NEW LINE PRODUCTION SHO`RSUV" LTD
SME
60
246500,00
Construction industry
B
C
no
Yes
9
“NAMUNA” LTD
SME
36
137360,00
Sewing factory
B
C
no
Yes
“Chin Ilhom”
PE
SME
60
263500,00
Towels production
B
C
no
Yes
"GREAT VOYAGE" LTD
SME
36
60000,00
tourism
B
C
no
Yes
"APITEKS" LTD
SME
18
210401,00
Textile
B
C
no
Yes
"YUKSAK QURILISH SAVDO" " LTD
SME
48
300000,00
Construction industry
B
C
no
Yes
"RUZMATJON OTA " LTD
SME
18
250000,00
Textile
B
C
no
Yes
ADM TEKSTIL LTD
SME
24
300000,00
Textile
B
C
no
Yes
*Please use the sectors listed in the earlier table or any standard classification. Note: Env = Environment, IR = Involuntary Resettlement, IP = Indigenous Peoples.
C. Environmental and Social Management System (ESMS) D. Requirement: (1) for existing subprojects: attachments of monitoring reports or
report on discharge permits; and
(2) FOR NEWLY APPROVED SUBPROJECTS: ATTACHMENTS OF ZVOS APPROVAL. Policies & Processes Yes/No
Has your organization developed and If yes, please attach a copy of the
implemented an ESMS? Yes ESMS to this report.
If there is an ESMS already in place, have there been any updates to the ESMS or policy and procedures adopted by your organization during the reporting period?
Yes
If yes, please provide a copy of the updates including dates and reasons for the same.
Has senior management signed off on the updated policy/procedure?
Yes
If yes, please provide the date and internal communication indicating the same.
Has your organization appointed staff tasked to implement the ESMS?
Yes
Coordinator for compliance with environmental regulations – A.Fazliev - Head of sector for environmental assessment and monitoring. He has 15 years experience in banking and MSME finance, bachelor’s degree.
Please give details of any transactions rejected due to environmental and/or social concerns.
No
Please state any difficulties and/or constraints related to the implementation of the ESMS.
Yes
Obtaining a statement of environmental impact on some projects for new customers. Sometimes, it is necessary to wait for up to 30 days to receive the statement of environmental impact
Please describe how you ensure that your subproject companies and their subprojects are operated in compliance with the national laws and regulations and applicable ADB’s requirements.
Yes
We request the conclusion of local environmental expertise. Conduct monitoring and in case violations are identified loan is suspended. Precautionary measures are undertaken, which are described in the contract.
Please give details of any material social and environmental issues associated with clients during the reporting period.
No
In case the existing ESMS is not fully functional, what is the action plan being
Please provide information or cite recommendations made by ADB’s review mission to improve the
11
implemented by your organization? - ESMS and its implementation. (We have fully functional ESMS)
Capacity Yes/No Please provide the name and contact information of the Environmental/Social Officer or Coordinator who has the overall responsibility for the implementation of the ESMS.
Yes
Coordinator for compliance with environmental regulations – A.Fazliev - Head of sector for environmental assessment and monitoring. Uzbekistan, 170119 Andijan, 85 Babur st. tel: +998 74 2980043 (1125) mob: +998 90 2530690 [email protected]
Training:
26-29/07/2017 Green climate found: training for ESMS;
22-28/08/2017 Green climate found: training for ESMS;
10-14/10/2017 Green climate found: training for ESMS;
23-24/11/2017 workshop for ESMS from Asian Development Bank.
Please provide current staffing of other core ESMS persons in the organization involved with ESMS implementation.
yes
All front and Back office staff was trained on-site in the branches to comply with environmental policies. Head of front office is the focal point for the environment compliance at branches
What was the budget allocated to the ESMS and its implementation during the year?
No
In our Bank the budget for the training not allocated. Trainings are organized as per reports and as per plan of study
Monitoring Yes/No Do you receive environmental and social monitoring reports from subproject companies that you finance?
No
If yes, please describe and provide supporting documents including any social and environmental considerations if applicable.
Do you check for ongoing compliance of your subproject companies with national regulation and any other requirements?
Yes
We check our clients in compliance with national regulation and chek their activity according to our ESMS
policy
Please describe how you monitor the subproject company and their subproject’s social and environmental performance.
Yes
After the loan’s disbursement we monitor the activities of clients once every 6 or 12 months according to our ESMS policy
Do you require the subproject owner to submit to you evidence of compliance with required environmental and social approvals and permits for the subprojects.
No
If yes, please describe how these are recorded as part subproject monitoring reports.
Please provide details of any accidents/ litigation/complaints/regulatory notices and fines:
- Any incidents of non-compliance with the applicable Environmental and Social Requirements
- Covenants/conditionalities imposed
by the Financial Institution to the subproject company as a result of any non-compliance
No
Reporting Yes/No Is there an internal process to report on social and environmental issues to senior management?
Yes
Report is provided monthly for mamagement:
1. The report of the monitoring in the branches
2. The report of the managar’s conclusions for financial projects
Do you prepare any social and environmental reports:
- For other multilateral agencies
- Other stakeholders
- E&S reporting in the Report
Sustainability reports
Yes
If yes, please provide copies of these reports.
Activities on ADB’s Prohibited Investment Activities List
13
If any, please indicate the dollar percentage of loans or investments out of your total outstanding exposure provided to clients who are substantially involved in ADB’s Prohibited Investment Activities List (Refer to page 122 of SPS).
0,54%
(production of or trade in alcoholic beverages)
If the percentage is not zero, please explain these exposures and any steps that have been taken to reduce such exposure.
We have an agreement with IFC to have up to 1% of the total credit portfolio for the production or trade in alcoholic beverages
exceeding
A. Category “B” Subprojects Using ADB Funds E. Please provide information about all new subprojects using ADB loan funding
approved during this reporting period.
Name of Subproject Company: "GLORY FOOD" LTD
Subproject location: Tashkent region, Uchtepa district, Farhod street 10
Industry sector: confectionery
Value of exposure (US$ ): 145509,00
Was any environmental and social due diligence undertaken by your organization?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy
Any environmental assessment report or audit reports reviewed by your organization?
Yes
What were the main environmental issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy (in ESMS policy in more detail described process analysis of clients)
Did you discuss with the subproject owner the applicable environmental and social safeguard requirements and their implementation?
Yes, we discuss with the owner all our check questions.
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
Yes
Have there been any recorded incidents of non-compliance or requests for corrective actions?
No
Have there been any grievances or complaints lodged on the subproject by any affected person or concerned stakeholder?
No
Name of Subproject Company: "Xo'jaobod Fazo" LTD
Subproject location: Andijan region, Hodjaabad district, Laylak street 3
Industry sector: Textile
Value of exposure (US$ ): 250000,00
Was any environmental and social due diligence undertaken by your organization?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy
Any environmental assessment report or audit reports reviewed by your organization?
Yes
What were the main environmental issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy (in ESMS policy in more detail described process analysis of clients)
Did you discuss with the subproject owner the applicable environmental and social safeguard requirements and their implementation?
Yes, we discuss with the owner all our check questions.
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
Yes
Have there been any recorded incidents of non-compliance or requests for corrective
No
15
actions?
Have there been any grievances or complaints lodged on the subproject by any affected person or concerned stakeholder?
No
Name of Subproject Company: "XAIT TEKS INVEST" LTD
Subproject location: Andijan region, Shakhrikhan district, Buvayda MFY
Industry sector: Cotton industry
Value of exposure (US$ ): 150 000,00
Was any environmental and social due diligence undertaken by your organization?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy
Any environmental assessment report or audit reports reviewed by your organization?
Yes
What were the main environmental issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy (in ESMS policy in more detail described process analysis of clients)
Did you discuss with the subproject owner the applicable environmental and social safeguard requirements and their implementation?
Yes, we discuss with the owner all our check questions.
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
Yes
Have there been any recorded incidents of non-compliance or requests for corrective actions?
No
Have there been any grievances or complaints lodged on the subproject by any affected
No
person or concerned stakeholder?
Name of Subproject Company: AL'YORTEKS LTD
Subproject location: Andijan region, Jalalkuduk district, Yorkishlok MFY
Industry sector: Cotton industry
Value of exposure (US$ ): 300 000,00
Was any environmental and social due diligence undertaken by your organization?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy
Any environmental assessment report or audit reports reviewed by your organization?
Yes
What were the main environmental issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy (in ESMS policy in more detail described process analysis of clients)
Did you discuss with the subproject owner the applicable environmental and social safeguard requirements and their implementation?
Yes, we discuss with the owner all our check questions.
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
Yes
Have there been any recorded incidents of non-compliance or requests for corrective actions?
No
Have there been any grievances or complaints lodged on the subproject by any affected person or concerned stakeholder?
No
Name of Subproject Company: "COTTON GRAND TEXTILE" LTD
17
Subproject location: Andijan region, Shakhrikhan district, Uzbekistan KFY
Industry sector: Cotton industry
Value of exposure (US$ ): 295 370,00
Was any environmental and social due diligence undertaken by your organization?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy
Any environmental assessment report or audit reports reviewed by your organization?
Yes
What were the main environmental issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy (in ESMS policy in more detail described process analysis of clients)
Did you discuss with the subproject owner the applicable environmental and social safeguard requirements and their implementation?
Yes, we discuss with the owner all our check questions.
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
Yes
Have there been any recorded incidents of non-compliance or requests for corrective actions?
No
Have there been any grievances or complaints lodged on the subproject by any affected person or concerned stakeholder?
No
Name of Subproject Company: "BARAKA HAMKOR LUX " LTD
Subproject location: Andijan region, Andijan city, Boburshokh street 21b
Industry sector: Trade
Value of exposure (US$ ): 100 000,00
Was any environmental and social due diligence undertaken by your organization?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy
Any environmental assessment report or audit reports reviewed by your organization?
Yes
What were the main environmental issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy (in ESMS policy in more detail described process analysis of clients)
Did you discuss with the subproject owner the applicable environmental and social safeguard requirements and their implementation?
Yes, we discuss with the owner all our check questions.
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
Yes
Have there been any recorded incidents of non-compliance or requests for corrective actions?
No
Have there been any grievances or complaints lodged on the subproject by any affected person or concerned stakeholder?
No
Name of Subproject Company: "NEW LINE PRODUCTION SHO`RSUV" LTD
Subproject location: Ferghana region, Uzbekistan district, Shursuv street 175
Industry sector: Construction industry
Value of exposure (US$ ): 246 500,00
Was any environmental and social due diligence undertaken by your organization?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy
19
Any environmental assessment report or audit reports reviewed by your organization?
Yes
What were the main environmental issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy (in ESMS policy in more detail described process analysis of clients)
Did you discuss with the subproject owner the applicable environmental and social safeguard requirements and their implementation?
Yes, we discuss with the owner all our check questions.
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
Yes
Have there been any recorded incidents of non-compliance or requests for corrective actions?
No
Have there been any grievances or complaints lodged on the subproject by any affected person or concerned stakeholder?
No
Name of Subproject Company: “NAMUNA” LTD
Subproject location: Andijan region, Andijan city, Sarkiy street 89
Industry sector: Sewing factory
Value of exposure (US$ ): 137 360,00
Was any environmental and social due diligence undertaken by your organization?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy
Any environmental assessment report or audit reports reviewed by your organization?
Yes
What were the main environmental issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy (in ESMS policy in more detail described process analysis of clients)
Did you discuss with the subproject owner the applicable environmental and social safeguard requirements and their implementation?
Yes, we discuss with the owner all our check questions.
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
Yes
Have there been any recorded incidents of non-compliance or requests for corrective actions?
No
Have there been any grievances or complaints lodged on the subproject by any affected person or concerned stakeholder?
No
Name of Subproject Company: “Chin Ilhom” PE
Subproject location: Andijan region, Balikchi district, Hujaobod city, Kahramon KFY 21
Industry sector: Towels production
Value of exposure (US$ ): 263 500,00
Was any environmental and social due diligence undertaken by your organization?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy
Any environmental assessment report or audit reports reviewed by your organization?
Yes
What were the main environmental issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy (in ESMS policy in more detail described process
21
dealt with (i.e., outcome of due diligence)? analysis of clients)
Did you discuss with the subproject owner the applicable environmental and social safeguard requirements and their implementation?
Yes, we discuss with the owner all our check questions.
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
Yes
Have there been any recorded incidents of non-compliance or requests for corrective actions?
No
Have there been any grievances or complaints lodged on the subproject by any affected person or concerned stakeholder?
No
Name of Subproject Company: "GREAT VOYAGE" LTD
Subproject location: Tashkent city, Yakkasaroy district, U.Nosir street 12
Industry sector: Tourism
Value of exposure (US$ ): 60 000,00
Was any environmental and social due diligence undertaken by your organization?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy
Any environmental assessment report or audit reports reviewed by your organization?
Yes
What were the main environmental issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy (in ESMS policy in more detail described process analysis of clients)
Did you discuss with the subproject owner the Yes, we discuss with the owner all our
applicable environmental and social safeguard requirements and their implementation?
check questions.
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
Yes
Have there been any recorded incidents of non-compliance or requests for corrective actions?
No
Have there been any grievances or complaints lodged on the subproject by any affected person or concerned stakeholder?
No
Name of Subproject Company: "APITEKS" LTD
Subproject location: Tashkent city, Yakkasaroy district, Beshchinor street 2
Industry sector: Textile
Value of exposure (US$ ): 210 401,00
Was any environmental and social due diligence undertaken by your organization?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy
Any environmental assessment report or audit reports reviewed by your organization?
Yes
What were the main environmental issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy (in ESMS policy in more detail described process analysis of clients)
Did you discuss with the subproject owner the applicable environmental and social safeguard requirements and their implementation?
Yes, we discuss with the owner all our check questions.
Does the subproject comply with applicable government requirements?
Yes
23
Does the subproject comply with applicable ADB safeguard requirements?
Yes
Have there been any recorded incidents of non-compliance or requests for corrective actions?
No
Have there been any grievances or complaints lodged on the subproject by any affected person or concerned stakeholder?
No
Name of Subproject Company: "YUKSAK QURILISH SAVDO" " LTD
Subproject location: Andijan region, Shakhrikhan district, Pakhtaobod KFY, Metar street 1
Industry sector: Construction
Value of exposure (US$ ): 300 000,00
Was any environmental and social due diligence undertaken by your organization?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy
Any environmental assessment report or audit reports reviewed by your organization?
Yes
What were the main environmental issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy (in ESMS policy in more detail described process analysis of clients)
Did you discuss with the subproject owner the applicable environmental and social safeguard requirements and their implementation?
Yes, we discuss with the owner all our check questions.
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
Yes
Have there been any recorded incidents of non-compliance or requests for corrective actions?
No
Have there been any grievances or complaints lodged on the subproject by any affected person or concerned stakeholder?
No
Name of Subproject Company: "RUZMATJON OTA " LTD
Subproject location: Ferghana region, Furqat district, Shoyimbek city
Industry sector: Textile
Value of exposure (US$ ): 250 000,00
Was any environmental and social due diligence undertaken by your organization?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy
Any environmental assessment report or audit reports reviewed by your organization?
Yes
What were the main environmental issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy (in ESMS policy in more detail described process analysis of clients)
Did you discuss with the subproject owner the applicable environmental and social safeguard requirements and their implementation?
Yes, we discuss with the owner all our check questions.
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
Yes
Have there been any recorded incidents of non-compliance or requests for corrective actions?
No
Have there been any grievances or complaints lodged on the subproject by any affected person or concerned stakeholder?
No
Name of Subproject Company: ADM TEKSTIL LTD
25
Subproject location: Tashkent city, Yashnaobod district, Jarqurgon street 39
Industry sector: Textile
Value of exposure (US$ ): 300 000,00
Was any environmental and social due diligence undertaken by your organization?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy
Any environmental assessment report or audit reports reviewed by your organization?
Yes
What were the main environmental issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
We check our clients in compliance with national regulation and chek their activity according to our ESMS policy (in ESMS policy in more detail described process analysis of clients)
Did you discuss with the subproject owner the applicable environmental and social safeguard requirements and their implementation?
Yes, we discuss with the owner all our check questions.
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
Yes
Have there been any recorded incidents of non-compliance or requests for corrective actions?
No
Have there been any grievances or complaints lodged on the subproject by any affected person or concerned stakeholder?
No
Annex 3: PFI’s ANNUAL ENVIRONMENTAL AND SOCIAL PERFORMANCE REPORT from JSC “Uzbek Leasing International A.O.”
Name of Organization JSC “Uzbek Leasing International A.O.” Completed by (name): Mukhrimov Davlat (ESMS manager) Position in organisation: Senior specialist of
Finance & Administration Department
Date: January 10, 2018
A. Portfolio Information Report covering period: From: January 2017 To: December 2017 Number of Leases approved during the period:
91
Amount US$ 18.49 mln B. For the reporting period, please provide the following information about your portfolio where applicable:
SECTORS:*
(Please complete) Number of leases for
the period Average lease
amount this period Percent of total lease amount for the period
Food Industry
Construction, construction materials
Chemical
Printing
Pulp and paper production
Transport
Mining
3
Trade
Poultry
Business and other services
Agriculture
Textile
TOTAL
* e.g.: automobiles, construction equipment, manufacturing equipment, etc. Please provide information on top 10 leases in your portfolio:
Company/ Project name
Type of lease Tenor of lease
(months)
Value of exposure (US$ mn)
Industry Sector1
Any environmental and social risks and measures taken to mitigate the risks*
*Please attach E&S due diligence reports with the E&S monitoring and ESAP
verification/updates, where available, for those leases. Please provide details on any leases in textile and agri-sectors currently in portfolio:
Client Description of main business/activity
Exposure, USD
Tenor of lease (date of signing – date of ending)
Share in total portfolio
Main E&S and labor impacts identified and mitigation measures proposed*
1 Please use any standard classification or the sectors listed in the earlier table
TOTAL * Please attached E&S due diligence reports for those clients performed according to Appendices 8 and 9 of your ESMS policy. C. Environmental & Social Management System (ESMS)
Processes Yes/No Details and comments Has your organization developed and implemented an ESMS?
Yes The Environmental and Social Management Policy of Uzbek Leasing International A.O. was approved by the Board of Directors and states that: The objectives of the environmental and social management system are: i) To avoid, and when avoidance is not possible, to minimize and mitigate or offset adverse impacts of subprojects on the environment and affected people; and ii) To maximize opportunities for environmental and social benefits.
Were any transactions rejected on account of the ULI’S Exclusion List?
No If yes, please provide details.
Were there any transactions categorized as cat A (category 1-2) reviewed with the application of IFC Performance Standards? If so, please separately provide examples of E&S due diligence reports for these projects.
No
Were any transactions rejected due to environmental and/or social concerns?
No If yes, please provide details.
Were there any difficulties and/or constraints related to the implementation of environmental procedures?
No If yes, please provide details.
Were there any material environmental and social issues associated with borrowers during the reporting period in particular?
No If yes, please provide details.
Please attach 3 copies of E&S due diligence reports for leases signed in the reporting period in various sectors
Please find attached files: 1. KOKAND PLUS MEDIKAL
SERVIS 2. DISCOVERY INVEST 3. Q
Capacity Yes/No Details and Comments
5
Please provide the name and contact information of the Environmental Officer or Coordinator who has the overall responsibility for the implementation of ESMS.
Yes Davlat Mukhrimov (ESMS manager) Mob.: +998909896633 e-mail: [email protected] Feruzbek Bannapov (ESMS coordinator) Mob.: +998909983377 e-mail: [email protected] ESMS manager and coordinator are attended training workshop on Promoting Adoption and Implementation of Environmental and Social Management System (ESMS) for Financial Intermediaries (FIs) which was held on 23-24th of November 2017 in Tashkent, Uzbekistan.
Please provide current staffing of other core ESMS persons in the organization involved with ESMS implementation.
Yes Mainly ESMS manager and ESMS cordinator. Regional representatives of ULC, Staff of Credit Department and Monitoring Department will assist ESMS manager and cordinator.
What was the budget allocated to the ESMS and its implementation during the year?
Yes Staff costs and training as well as any actual costs regarding to the ESMS and its implementation during the year was included to the Ordinary Core Business Expenses.
Supervision and monitoring Yes/No Details and comments
Do you supervise the performance of your projects?
Yes
Do you receive non-financial reporting from your clients. If so, please provide examples.
Yes
Do you conduct client site visits? Please attach examples of E&S monitoring reports (with E&S action plan implementation updates)
Yes
Describe how the borrower’s environmental and social performance is monitored (e.g. site visit by bank staff; inspection by environmental/health authorities; copies of updated or renewed permits, reports from the borrower; other (please specify).
Yes
Do borrowers receive visits by local environment and labour regulatory authorities to monitor their environmental and social performance?
Yes If so, please provide details
Reporting Yes/No Details and comments Is there an internal process to report on environmental and social issues to Senior management?
Yes If yes, please explain the process, reporting format and frequency and actions taken if any.
Do you prepare any environmental and social reports: - For other MLAs - Other stakeholders - S&E reporting in the Annual Report - Sustainability reports
Yes If yes, please provide copies of these reports.
Stakeholder engagement Yes/No How many complaints have you received during the reporting period through (1) external and (2) internal communication channels?
Please provide details of those, i.e. how those have been considered, what were the outcomes
Annex 4: PFI’s ANNUAL ENVIRONMENTAL AND SOCIAL PERFORMANCE REPORT from JSICB “Ipak Yuli”
Please provide responses to the questions below. Please include additional sheets or attachments as required to provide details on questions that have been answered Yes. The PFIs are required to submit the performance report to TA consultant.
Name of Organization JSICB “Ipak Yuli”
Completed by (name): T.Mahkamov, ESMS Manager; D.Nurmuhamedova, ESMS coordinator
Date: March 2018
Reporting period From: 01.01.2017 To:31.12.2017
Project No. Loan Number 3405-UZB, Small Business Finance Project
A. Portfolio Information
Report Covering Period: From:01.01.2017 To:31.12.2017
7
For the reporting period, please provide the following information about your portfolio where applicable:
Business Lines Product line Description Total exposure
outstanding for most recent FY year end (in US$)
Average loan or transaction size (in US$)
Retail banking/Consumer loans
Loans and other financial products for individuals (consumer, housing, vehicle loans)
13 032 109 2 923
Loans or other financial products for individuals (individual entrepreneurs)
23 812 248 7 204
Long term: Transactions with tenor greater than 12 months SME Any lending, leasing or other
financial assistance to any corporate or legal entity other than an individual, with individual transactions less than US$ 1 million
104 270 796 37 561
Subproject finance/Large Corporate finance
Any lending, leasing or other financial assistance to any corporate or legal entity other than an individual, with individual transactions larger than US$ 1 million
53 446 206 1 842 972
Trade finance Wholesale and retail trade loans 34 863 439 51 119 Short term (ST): Transaction with tenor less than 12 months
SME Transactions less than US$ 1 million
43 764 862 30 266
ST Corporate finance Transactions larger than US$ 1 million
4 864 849 1 621 616
ST Trade finance Wholesale and retail trade loans 9 405 254 17 384 Other Microfinance Other (if applicable) Please describe
Exposure by Industry Sectors If there is any exposure in the area of SME finance please provide an indicative % of portfolio that these sectors represent of the total SME portfolio.
Industrial Sector % of SME Portfolio
Apparel, fabric mills, integrated textile operation (spinning, weaving/knitting, but no garment ), spinning (yarn, including integrated with fiber poduction), textiles - others 14,0%
Chemicals 2,0%
Collective investment vehicles 0,0%
Construction 4,4%
Consumer goods 2,1%
Crop production 3,5%
Electrical equipment, appliances and components 0,2%
Fabricated metal product manufacturing 1,3%
Finance & insurance 0,7%
Finishing (dyeing, printing, finishing, etc.) 0,0%
Fishing 0,0%
Food & beverages 9,4%
Forestry 0,0%
Furniture and related products 2,1%
Internet subprojects 0,1%
Leather and allied products 0,1% Livestock 1,9%
Machinery and other Industrial 0,0%
Nonmetallic mineral product manufacturing 3,0%
Oil, gas and mining 0,0%
Plastics & rubber 4,4%
Primary metals 0,0%
Printing & publishing 1,5%
Paper 0,2%
9
Telecommunications 1,4%
Transport service, common carriers 2,9%
Transportation equipment 1,1%
Utilities 0,0%
Warehousing & storage 0,1% Wholesale and retail trade covering any of the following: gasoline stations, dry cleaners, printing, large auto and truck fleets, photographic film processing and any operations involving the use of any chemical of biological wastes or materials 2,8%
Wood products 0,2%
Real estate management 4,2% If engaged in long term project finance/corporate finance, please provide information as requested of all loan assets meeting the following conditions: • Longer than 12 months tenor • Larger than US$ 1 million outstanding exposure
Name of Subpro-ject
Type of loan
(large corporat
e/ SME/tra
de finance)
Tenor of
loan (mont
hs)
Value of
exposure
(US$ mn)
Industry Sector*
Safeguard category
Any outstanding environmental and IR and
IP issues during reporti
ng period
and action
s taken
to address the
issues
Subpro-ject using ADB
funds
(yes/no)
Env IR IP
МЧЖ"J-UNITED corporat Auxilary B C n/a No No
GROUP" e 23,13 1,50 business activities service
ХУЖАОБОД FAYZ-M ХУСУСИЙ КОРХОНАСИ
corporate
39,23
1,37
Textile B C n/a No No
ХУЖАОБОД FAYZ-M ХУСУСИЙ КОРХОНАСИ
corporate
47,87
1,05
Textile B C n/a No No
АЛ-ХАКИМ Хусусий корхонаси
corporate
40,63
1,62
Apparel B C n/a No No
OOO"GLOBAL STEEL"
corporate
30,37
1,16
Wholesale trade
B C n/a No No
ООО "GREEN TRADE EXPORT"
corporate
27,70
4,12
Wholesale trade
B C n/a No No
MChJ шаклидаги "JURABEK LABORATORIES" QK
corporate
32,53
1,67
Pharmaceutical industry
B C n/a No No
OOO "SOFIYUN TORG"
corporate
60,47
2,34
Consumer goods
B C n/a No No
MChJ "SILVER VITA"
corporate
24,30
1,40
Food industry
B C n/a No No
"ARGUMENTI I FAKTI UZBEKISTAN" Совместное предприятие в виде ООО
corporate
24,30
1,05
Publishing company
B C n/a No No
OXALIK OLTIN BOGI MEVASI MCHJ
corporate
81,70
1,00
Food industry
B C n/a No No
OOO "GLOBAL TRADE"
corporate
31,90
1,09
Non-metal mineral industry
B C n/a No No
POLIFLEKS MChJ corporate
31,90
2,72
Printing and publishing
B C n/a No No
ООО "O`ZJIHOZBUTLASH"
corporate
31,90
1,05
Metal product manufacturing
B C n/a No No
"ARK EKO TEKSTIL" МЧЖ ХК
corporate
48,67
1,75
Textile B C n/a No No
ООО "TTMZ" corporate
31,90
1,18
Textile B C n/a No No
MCHJ "ASIAN INTER IMPEX"
corporate
31,90
1,29
Chemical industry
B C n/a No No
МЧЖ шаклидаги "INTER AGRO
corporate
51,17
1,90
Agriculture B C n/a No No
11
STAR" чорвачилик-наслчилик хужалиги "O''''ZBEKISTON" MCHJ
corporate
58,83
1,62
Agriculture B C n/a No No
MUSHTARI-OQDARYO MCHJ
corporate
63,33
1,00
Agriculture B C n/a No No
MCHJ "TOXIR" corporate
32,97
1,40
Food industry
B C n/a No No
*Please use the sectors listed in the earlier table or any standard classification or Note: Env=Environment, IR=Involuntary Resettlement, IP=Indigenous Peoples
B. Environmental and Social Management System (ESMS) Policies & Processes Yes/No
Has your organization developed and implemented an ESMS?
Yes On April 15th, 2013, the Bank's Supervisory Council approved the Regulation “On the environmental and social risk management system” of the JSICB "Ipak Yuli". On September 13th, 2016, the Supervisory Council of the Bank approved the Policy “On the environmental and social risks management of JSICB "Ipak Yuli".
According to the above-mentioned documents, all projects considered by the bank for financing must comply with the requirements of ESMS.
If there is an ESMS already in place, have there been any updates to the ESMS or policy and procedures adopted by your organization during the reporting period?
Yes If yes, please provide a copy of the updates including dates and reasons for the same.
In addition to the mentioned in the above paragraph in connection with implementation of the ADB project 3471-UZB: Horticulture Value Chain Development, the Management Board of JSICB "Ipak Yuli" approved the ESMS Procedures for implementation of the said Project on May 24, 2017.
Has senior management signed off on the updated policy/procedure?
Yes If yes, please provide the date and internal communication indicating the same
As indicated in the paragraphs above, the internal documents of the bank on ESMS were approved by the Supervisory Board and the Management Board of the Bank.
Has your organization appointed staff tasked to implement the ESMS?
Yes IF yes, please provide information on number of staff and qualification (experience and education backgroud) to implment the ESMS.
In order to implement the ESMS, the ESMS Manager
and the ESMS Coordinator were appointed in the Bank's head office. In the branch offices, the heads of lending departments are appointed as regional ESMS managers (15 regional ESMS managers). Also all employees of the Bank's lending divisons are involved in the implementation of ESMS. Loan officers apply procedures for managing environmental and social risks when considering every project financed by the Bank. They ensure compliance with protective measures for environmental and social issues, and if required, ensure the availability of environmental documents for each decision on granting a loan. Moreover, the staff of the Loan Portfolio Monitoring department carry out monitoring on the fulfillment of the ESMS obligations by the borrower after granting loan. All the above-mentioned staff are trained and have knowledge about ESMS procedures of the Bank.
The head of the Risk-Management Department Tursun Makhkamov is the ESMS Manager of the JSICB "Ipak Yuli". T. Makhkamov received Master’s degree in International Economic Relations from the University of World Economy and Diplomacy. He has been working in the banking sector since 2000 and has experience of working in loan division of the Bank, and as head of the branch office of the Bank. At present he is the head of the Risk Management Department of the Bank.
Dinara Nurmukhamedova is ESMS coordinatorof the Bank. D.Nurmuhamedova graduated from the International Law Faculty of the University of World Economy and Diplomacy (Bachelor). She received LLM degree from Kyushu University (Japan). She also graduated from the Tashkent Finance Institute (bachelor degree in accounting and audit). She has been working in the banking sector since 2004 and has experience of working in the legal department, loan department and risk management department of the bank.
Project Implementation Unit
13
In accordance with the Order of the Chairman of the Bank Project Implementation Unit was established in order to implement ESMS for Small Business Finance Project. It consists of: Tursun Mahkamov, ESMS manager; Dinara Nurmukhamedova, ESMS coordinator; Muzaffar Safarov – Head of Project finance department; Shuhrat Mamatov – Head of Division in the Project Finance Department; Ulugbek Tavakallov – Head of Credit Portfolio Monitoring Department; Anvar Samandarov – credit risk leading specialist.
Please give details of any transactions rejected due to environmetnal and/or social concerns.
Yes Some examples from the Bank’s practice when the Bank rejected transactions due to environmental and / or social concerns:
- The client brought a contract for the purchase of slate, but could not provide information about percent of asbestos contained in the slate;
- B category was assigned to the project, however the client did not bring the required documents (state expertise conclusion, etc.);
- the client applied for funding the project of a poultry farm with more than 40 thousand hens.
Please state any difficulties and/or constraints related to the implementation of the ESMS.
Yes Sometimes there are difficulties in determining which category of environmental risk the project belongs to.
Please describe how you ensure that your subproject companies and their subprojects are operated in compliance with the national laws and regulations and applicable ADB’s requirements.
Yes Financing of projects by the bank (project evaluation, categorization, financing and monitoring) is carried out in accordance with Regulation “On the environmental and social risk management” and Policy “On the environmental and social risks management of JSICB "Ipak Yuli".
According to Order of Chairman the loan officers of the Bank must ensure fulfillment of ESMS requirements set in the Project Agreement (Small business finance) and enternal bank documents.
In particular, the loan officers have been familiarized with ESMS requirements, including ADB’s list of prohibited investments activities, Environmental exclusion Checklist.
Necessary templates for evaluation of environmental and social impact were provided to loan and monitoring specialists.
Environmenal screening checklist filled by a loan officer is checked and affirmed by ESMS mananger (coordinator).
After financing of the project, monitoring specialists conduct monitoring and check weather Environmental management plan is implemented by client.
In order to coordinate and monitor implementation of ESMS requirements, a Project Implementation Unit for Small Business Finance Project was organized in accordance with the Order of the Chairman of the Bank.
In addition, according to the local legislation the divisions of the Committee on Ecology and Environmental Protection monitor compliance with the requirements stated in the State Expert Examination Conclusion by enterprises.
Please give details of any material social and environmental issues associated with clients during the reporting period in particular.
No n/a
In case the existing ESMS is not fully funcional, what are the action plan beining implemented by your organization?
No The existing ESMS is fully functional.
Capacity Yes/No
Please provide the name and contact information of the Environmental and Social Officer or Coordinator who has the overall responsibility for the implementation of ESMS.
Yes Please describe the training or learning activities the Environmental/Social Officer or Coordinator attended during the year.
ESMS training
ESMS Manager – TursunMakhkamov
Tel. No. +998 (71) 140-78-04
Email: [email protected]
ESMS Coordinator – Dinara Nurmukhamedova
15
Tel. No. +998 (71) 140-69-43
Email: [email protected]
She participated and received Certificate at the ADB’ seminar for the implementation of the environmental and social management system for financial intermediaries in Uzbekistan, held on November 23-24, 2017.
She also participated in the following training courses and seminars:
-Training Center of State Committee for Ecology and Environmental protection - 72 hours course on environmental management (Certificate dated 16 February 2018);
- Seminar by ADB consultant Irakli Kavidadze (17 February 2018);
- Seminar of the Agency for Restructuring Rural enterprises on environmental management for commercial banks (Certificate, February 26, 2018)
Please provide current staffing of other core ESMS persons in the organization involved with ESMS implementation.
Yes Please describe the training provided to the ESMS persons and other team members during the year.
Project Implementation Unit
In accordance with the Order of the Chairman of the Bank, Project Implementation Unit was established in order to implement ESMS for Small Business Finance Project. It consists of: Tursun Mahkamov, ESMS Manager; Dinara Nurmukhamedova, ESMS Coordinator; Muzaffar Safarov – Head of Project Finance Department; Shuhrat Mamatov – Head of Division in the Project Finance Department; Ulugbek Tavakallov – Head of Credit Portfolio Monitoring Department; Anvar Samandarov – Credit Risk Leading Specialist.
In order to educate loan and monitoring specialists of the bank, including ESMS officer, in the field of environmental management, the Bank organized
training for 20 specialists of the bank from all branch offices and loan departments of the Head office together with Training Center of the State Committee for Ecology and Environmental Protection during the period of February 12-16, 2018 year. All specialists received certificates confirming upgrade of qualification in environmental management.
Also training was conducted in the Bank for 60 loan and monitoring specialists from all branches of the bank and the Head office on the topic: “Assistance in implementation of ESMS system for financial intermediaries in Uzbekistan, Small Business Finance Project” by ADB Consultant Mr.Irakli Kavidaze on February 17, 2018 in Tashkent.
Besides that, 18 loan and monitoring specialists of the Bank participated in a day-long training conducted by the Agency For Restructuring Rural Enterprises on the topic “Upgrading knowledge and qualification of loan officers working in the commercial banks which implement projects financed by International Finance Organizations” which was conducted during the period from 26 February to 13 March 2018 year.
What was the budget allocated to the ESMS and its implementation during the year?
Yes Please provide budget details including staff costs and training as well as any actual costs.
Salaries of employees involved in the implementation of ESMS. Other costs are payable as required.
Monitoring Yes/No
Do you receive environmental and social monitoring reports from subproject companies that you finance?
Yes After financing of the project, environmental and social issues are monitored according to the provided list of questions (template) which is provided to all monitoring divisions of the Bank. Also, the Bank's monitoring officer checks the implementation of the Environmental Management Plan of the project.
Do you check for ongoing compliance of your subproject companies with national regulation and any other requirements?
Yes If yes, please describe the process including any
social and environmental considerations if
applicable.
When completing Analysis of the environmental impact of the project and the preparation of the Environmental Management Plan, the requirements for mitigation measures prescribed in the Conclusion of the State Committee on Ecological and
17
Environmental Protection are considered. When monitoring is carried out, implementation of the activities envisaged in the environmental management plan is verified, thus implementation of the national rules and ADB’s standards is checked.
Also, according to the local legislation, the divisions of the Committee on Ecology and Environmental Protection carriy out monitoring on implementation of the requirements, envisioned in the Conclusion of the State Committee on Ecology and Environmental Protection by enterprese.
Please describe how you monitor the subproject company and their subproject’s social and environmental performance.
Yes Please describe and provide supporting documents such as environmental and social monitoring reports and please provide information on the number of subprojects where a field visit was conducted by staff to review aspects including social and environmental issues. Under the ADB loan 3405-UZB: Small business finance project as of 31 December 2017 the Bank provided finance to 20 projects for the total amount of 4.746.071 USD. For some of the sub-projects equipment or raw materials have been already delivered and put into operation.
Accordingly, at present, the bank conducted monitoring on environmental and social impacts for sub-projects where eqipment (raw materials) have been delivered.
After financing was made for the sub-projects, the loan files were transferred from the Investment Project Financing Department (loan department of brach office) to the Loan Monitoring Department (loan monitoring division of the branch). After familiarization with environmental and social protection documents the monitoring specialist during sight visit signed Act of Monitoring of environmental and social impact of the subproject. The monitoring specialist also checked implementation of environmental management plan.
Monitoring of environmental/social issues for the above mentioned sub-projects was conducted after equipment is put into operation or raw materials
delivered.
The frequency of monitoring is not less than once every 6 months.
Please provide details of any accidents/ litigation/complaints/regulatory notices and fines: - Any incidents of non-compliance
with the applicable Environmental and Social Requirements
- Covenants/conditionalities imposed by the Fund Manager to the subproject company as a result of any non-compliance
No n/a
Reporting Yes/No
Is there an internal process to report on social and environmental issues to Senior management?
Yes If yes, please explain the process, reporting format and frequency and actions taken if any. According to the adopted procedure, based on the results of the monitoring, if the borrower fails to meet the requirements for compliance with environmental protection measures, the monitoring specialist must notify the ESMS Manager for taking appropriate measures.
The ESMS Manager should provide timely reports on the implementation of ESMS policies and procedures to the Management Board and interested parties of the Bank.
Do you prepare any social and environmental reports: - For other multilateral agencies - Other stakeholders - E&S reporting in the Report - Sustainability reports
Yes If yes, please provide copies of these reports. Yes, prepared for Netherlands Development Finance Company (FMO)
Activities on ADB’s Prohibited Investment Activities List If any, please indicate the dollar percentage of loans or investments out of your total outstanding exposure provided to clients who are substantially involved in ADB’s Prohibited Investment Activities List (Refer to Attachment 1).
0%
If the percentage is not zero, please explain these exposures and any steps having been taken to reduce such exposure.
n/a
19
C. Subprojects Using ADB Funds
Please provide information about all new subprojects using ADB funds approved during this reporting period.
Name of Subproject Company:
LLC Favourite Textile Group
Subproject location:
Keles Town, Zangiota region, Korasaroymahallya, A.Karimov street
Industry sector:
Textile
Purpose of loan Purchase of raw materials Value of exposure (US$):
300 000
Safeguard category:
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your organization?
The following environmental due diligence was undertaken by the bank:
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening; 3) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Draft of ZVOS (statement of environmental impact) and positive Conclusion of State ecological expertise (05/2-1219 19.08.2015) were inspected by the loan specialist and ESMS coordinator. According to the mentioned Conclusion, the project is given 3rd category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
The area of the site: The site area is 1241,08m2, including three-storied building of 658m2. The production premises are already in place. Planned production capacity: annually 150 ton of fabric and 240 thous. sets of knitted goods. Total amount of workers: 50 people. Impact on atmosphere air: emission of cotton dust, heating boiler and kitchen stove – maximum ground level concentration is within established quotes. Impact on water: Utility fluids will be passed to water proofed concrete cesspit with timely disinfection and removal to the places indicated by the sanitary and epidemiological inspection body. There will be no impact on surface water, ground and soil, provided the above mentioned environmental protection measures are fulfilled.
Waste. There will be 8 types of waste. All wastes are low hazard wastes (4 class), food waste (5 class), except of fluorescent lamps (1 class high hazard). Temporary storage place for each type of waste and its further movement is determined. Cotton fiber waste and rugs will be recycled, waste fluorescent lamps will be passed for demercuration, utility waste – to landfill site.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
Name of Subproject Company:
JV LLC Ishonch-gilam
Subproject location:
Navoi city, Sputnik 3
Industry sector:
Manufacture (weaving carpet)
Purpose of loan Purchase of equipment for carpet production Value of exposure (US$):
78 000
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your organization?
The following environmental due diligence was undertaken by the bank:
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening; 3) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
21
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Statement of maximum permissible emission and positive Conclusion of State ecological expertise dated 20.07.2016 No.682/16. According to the mentioned Conclusion the project is given 3rd category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
The area of the site: The site area is 1,1183 hectar. The production premises are already in place. Carpet weaving equipment is used. Planned production capacity: annually 6000m2 of carpet. Impact on atmosphere air: carpet production area and heating boiler are sources of emission. The dust from these sources is captured 99,8% by dust camera. Ground level concentration of all ingredients does not exceed established quotes.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category for environmental impact according to ADB classification.
Name of Subproject Company:
Big Bag Production Ltd
Subproject location:
Tashkent city, Sergeli district
Industry sector:
Manufacturing
Purpose of loan Purchase of equipment for polypropylene bags production Value of exposure (US$):
300 000
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your
The following environmental due diligence was undertaken by the bank:
organization?
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening; 3) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Draft of ZVOS (statement of environmental impact) and positive Conclusion of State ecological expertise dated 29.03.2015 No.04-321 were inspected by the loan specialist and ESMS coordinator. According to the mentioned Conclusion, the project is given 3rd category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
The company will manufacture polypropylene bags from ready-made fiber. Polypropylene fiber will be purchased. Impact on atmosphere air: source of emission: the machine for cutting polypropylene fiber – maximum ground level concentration is within established quotes. Impact on water: Water will be used for domestic needs from municipal water system and waste water will be passed to municipal sewerage. Waste. There will be 3 types of waste. Scissoring of polypropylene fiber (low hazard waste 4 class), mercury lamps (1 class) will be passed to specialized company for demercuraton, domestic solid waste generated by livelihood of workers (5 class) will be taken to waste landfill. Noise – noise generated by equipment will be within permissible sanitary standards.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertize.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
23
Name of Subproject Company:
LLC Fuber Side Plast
Subproject location:
Tashkent city, Chilanzar district, Chorbog street, South Western Industrial zone
Industry sector:
Manufacturing
Purpose of loan Equipment for production of dry construction mixes Value of exposure (US$):
300 000
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your organization?
The following environmental due diligence was undertaken by the bank:
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening; 3) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Draft of Maximum Permissible Release of Wastes and positive Conclusion of State ecological expertise dated 10.04.2017 No.04-2613 were inspected by the loan specialist and ESMS coordinator. According to the mentioned Conclusion, the project is given 3rd category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
The company will manufacture plastering and coating gypsum. The raw gypsum will be purchased from third company. The technological process is as follows: raw materials will be mixed in a mixing equipment to homogeneous mass. Then, this homogeneous mass will be packed to three layer paper bags. The following waste will be generated: Waste mercury lamps (1 hazardous class) - will be passed to ASP Selta company for demercuration. Mineral flunk-outs (4 class) – will be sold to third company. Polypropelen bags – is returnable packaging. Paper bags will be passed to third company for utilization. Waste sponge cloth and waste work garmet will be passed to third company for recycling. Domestic solid waste generated by livelihood of workers (5 class) will be taken to waste landfill. It is necessary to control safe storage of waste on the territory of the company and not to allow keeping waste beyond prescribed amounts.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertize.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
Name of Subproject Company:
Archie Asia Trade
Subproject location:
Tashkent region, Zagiata region, Turkiston village, Balikchi street
Industry sector:
Food industry
Purpose of loan Equipment for can production Value of exposure (US$):
210 000
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your organization?
The following environmental due diligence was undertaken by the bank:
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening; 3) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Draft of ZVOS (statement of environmental impact) and positive Conclusion of State ecological expertise dated 24.06.2016 No.05/2-973 were inspected by the loan specialist and ESMS coordinator. According to the mentioned Conclusion, the project is given 3rd category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
The company will manufacture metal can by cutting metal sheets, rolling, welding, and pressing. The raw materials will be purchased from third company. Impact on atmosphere air: maximum ground level concentration is within established quotes. Impact on water: In the manufacturing process water will not be used. Waste. Paper waste in the amount of 0,25 tons per year (4 class) which will be passed to Uzbum company for utilization.
25
Metal waste will be passed to Tashkentvtorchermet company for recycling. Other wastes (rafts) will be passed to Utilsiryo company for recycling. Mercury lamps (19 lamps per year) will be passed to specialized company for demercuration.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
Name of Subproject Company:
Visage Electronic LLC
Subproject location:
Tashkent region, Zagiota region, Keles
Industry sector:
Food industry
Purpose of loan Equipment for production of items from polypropylene Value of exposure (US$):
300 000
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your organization?
The following environmental due diligence was undertaken by the bank:
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening; 3) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Draft of ZVOS (statement of environmental impact) were inspected by the loan specialist and ESMS coordinator. Positive Conclusion of State ecological expertise dated 24.06.2016 No.04-572 was issued.
What were the main The company will manufacture goods from polyethylene, the raw
environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
materials will be purchased from Shurtangaz company. Impact on atmosphere air: maximum ground level concentration is within established quotes. Impact on water: Water will be used from town water supply system. Utility fluids will be passed to cesspool and then taken to nearest water cleaning site. Waste. Plastic waste will be recycled by enterprise itself. Waste oil will be passed to specialized company for utilization. Metal waste will be passed to Uzikkilamchikormetal company for utilization. Solid utility waste will be taken to utility waste landfill. Mercury lamps will be submitted for demercuration to specialized company.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
Name of Subproject Company:
Nilufar LLC
Subproject location:
Honobod town
Industry sector:
Textile
Purpose of loan Equipment for textile production Value of exposure (US$):
220 000
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your organization?
The following environmental due diligence was undertaken by the bank:
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening; 3) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and
27
reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Draft of ZVOS (statement of environmental impact) and positive Conclusion of State ecological expertise dated 22.05.2017 No.11/940 were inspected by the loan specialist and ESMS coordinator. According to the mentioned Conclusion, the project is given 4 category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
The company will sew apparel (T-shirts, underwear) from ready knitted fabric. Impact on water: Water will be used from town water supply system. Utility fluids will be passed to sewage network. Waste. Utility waste will be taken to town landfill. Fabric rags will be recycled.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
Name of Subproject Company:
BAR-SUM-TEKS
Subproject location:
Tashkent city, Mirzoulugbek region, Altin Tepa street, 47
Industry sector:
Textile
Purpose of loan Equipment for textile production Value of exposure (US$):
299 300
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your
The following environmental due diligence was undertaken by the bank:
organization?
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening; 3) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Draft of ZVOS (statement of environmental impact) and positive Conclusion No.04-239 dated 18.03.2016 of State ecological expertise were inspected by the loan specialist and ESMS coordinator. According to the mentioned Conclusion, the project is given 4 category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
The company will manufacture stockings and socks. The technological process consists of knitting and sewing. Impact on water: Water will be used from town water supply system. Utility fluids will be passed to sewage network. Waste. Utility waste will be taken to waste landfill. Fabric rags will be recycled. Noise. Equipment for knitting is main source of noise. In order to decrease harmful influence of noise the premises must be sound and vibration proof.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
Name of Subproject Company:
Keng Makon
Subproject location:
Tashkent region, Zangiota, Chigatoy Oktepa
Industry sector:
Manufacturing
Purpose of loan Equipment for furniture production
29
Value of exposure (US$):
298 736
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your organization?
The following environmental due diligence was undertaken by the bank:
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening; 3) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Draft of ZVOS (statement of environmental impact) and positive Conclusion of State ecological expertise 23.12.2014 No. 05/3-2330 were inspected by the loan specialist and ESMS coordinator. According to the mentioned Conclusion, the project is given 3 category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
The company manufacture furniture. Sources of emission to the atmosphere are sites of semi finished products, MDF, particle boards treatment, mechanical assembly of semi finished items, wood evaporation as well kitchen. According to the draft of maximum permissible emission and calculation of emission amount, maximum over ground concentration of pollutants will not exceed established quotes. At two sites of the sources of pollutant emission dust cleaning devices are installed with cleaning capacity of 99%.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
Name of Subproject Company:
“Namangan yog’och mahsulotlari ishlab chiqarish” LLC
Subproject location: Namangan tumani, Irvadon KFI, Orta Rovuston MFI
Industry sector:
Textile
Purpose of loan Equipment for textile production Value of exposure (US$):
300 000
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your organization?
The following environmental due diligence was undertaken by the bank:
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening; 3) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Draft of ZVOS (statement of environmental impact) and positive Conclusion from 06.06.2014 No. 07-09/103 of State ecological expertise were inspected by the loan specialist and ESMS coordinator. According to the mentioned Conclusion, the project is given 3 category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
The company will manufacture textile products. Impact on water: Water will be used from water supply system. Utility fluids will be passed to sewage network. Waste. Utility waste will be taken to town landfill. Fabric rags will be recycled.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
31
Name of Subproject Company:
PE “Natural fruit juice”
Subproject location:
Namangan district, Mirishkor KFI, 1-Mirishkor MFI
Industry sector:
Juice production
Purpose of loan Raw materials Value of exposure (US$):
150 000 + 150 000 (total 300 000)
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your organization?
The following environmental due diligence was undertaken by the bank:
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening; 3) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Draft of ZVOS (statement of environmental impact) and positive Conclusion from 06.06.2017 No. 07-09/13 of State ecological expertise were inspected by the loan specialist and ESMS coordinator. According to the mentioned Conclusion, the project is given 4 category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
The company will manufacture fruit juices. The technological process for juice making consist of the following steps: washing, pealing, cutting, making juice, filtering juice, pasteurizing and packing. Fruit manufacturing site is considered to be source of waste. The generated fruit waste is low hazard (5 class). It is planned to discharge waste to waste landfill site.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
Name of Subproject Company:
Vizir Collektion LLC
Subproject location:
Tashkent city, Uchtepa, Zakariya Roziy street, 1-proezd, 24
Industry sector:
Textile
Purpose of loan Purchase of textile equipment Value of exposure (US$):
299 300
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your organization?
The following environmental due diligence was undertaken by the bank:
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening; 3) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Draft of ZVOS (statement of environmental impact) and positive Conclusion from 29.05.2015 No.17 of State ecological expertise were inspected by the loan specialist and ESMS coordinator. According to the mentioned Conclusion, the project is given 4 category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
The company will sew apparel. The textile fabric will be bought from third party. Emission to atmosphere: no emission of pollutants to atmosphere. Water: will not be polluted in technological process. Waste: - off-cuts of fabrics – will be passed to third company for
utilization; - mercury lamps – will be passed to specialized company for
demercuration; - utility waste- will be taken to landfill site.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
33
implementation? Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
Name of Subproject Company:
Agro city LLC
Subproject location:
Tashkent city, Sergeli region, Sogdiana street, 4A
Industry sector:
Agriculture
Purpose of loan Packing equipment for beans Value of exposure (US$):
132 000
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your organization?
The following environmental due diligence was undertaken by the bank:
4) Environmental impact analysis (ecological screening); 5) Social safeguards screening; 6) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Draft of ZVOS (statement of environmental impact) and positive Conclusion from 19.09.2016 No.59 of State ecological expertise were inspected by the loan specialist and ESMS coordinator. According to the mentioned Conclusion, the project is given 4 category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of
The company will process, clear and pack beans. The technological process include the following: cleaning, calibration, sorting out bad quality beans, photo sorting, sorting out broken beans, packing, marking. Water. Water will be used for utility needs and will be discharged to canalization network. Bean waste will be generated.
due diligence)? Bean dust will be emitted- there is aspiration system “Cyclon 150) which will capture the dust, and actually there will not be pollution of atmosphere. Solid utility waste will be taken to waste landfill site. Waste mercury lamps will be passed to specialized company for demercuration.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
Name of Subproject Company:
Ozod-K LLC
Subproject location:
Andijan town, Nayman street
Industry sector:
Cotton industry
Purpose of loan Equipment for textile production Value of exposure (US$):
250 000
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your organization?
The following environmental due diligence was undertaken by the bank:
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening; 3) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed
Yes. Draft of ZVOS (statement of environmental impact) and positive Conclusion from 06.06.2015 No.11/1281 of State
35
by your organization?
ecological expertise were inspected by the loan specialist and ESMS coordinator. According to the mentioned Conclusion, the project is given 3 category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
The company will produce fabric from thread. The thread will be treated with starch water. During manufacturing process cotton dust will be emitted. The manufacturing premises will be equipped with aspiration system and centralized dust cleaning system. The ground level concentration of emission is within established quotes. Utility water will be discharged to centralized canalization system. Solid utility waste will be taken to waste landfill site.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
Name of Subproject Company:
Mega Mebiko (LLC)
Subproject location:
Sergeli district, Tashkent city
Industry sector:
Chemical industry
Purpose of loan Equipment for pipe production Value of exposure (US$):
220 000
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your organization?
The following environmental due diligence was undertaken by the bank:
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening;
3) Safeguard due diligence briefing note; The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Draft of ZVOS (statement of environmental impact) and positive Conclusion from 18.04.2014 No.18/385 of State ecological expertise were inspected by the loan specialist and ESMS coordinator. According to the mentioned Conclusion, the project is given 3 category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
The company will produce pipes from polyethylene. The raw materials will be purchased from third company. The technological process consist of the following stages: polyethylene granules will go though control to be cleaned from alien particles. Then, granules will be placed to and melted in extruder. After, filtration and formation of pipes will take place. Water will be used in cooling system. Atmosphere. Calculation of maximum concentration of pollutants emitted to air shows that over ground concentration for each ingredient will be within established quotes. Water for utility needs will be taken from centralized network. Utility water will be discharged to hydro isolated concrete cesspool. Water for manufacturing needs will be from underground source, consumption of this water is unreturnable. Waste: -Mercury lamp waste (20 lamps/year) – will be passed to ASP Selta company for demercuration; - Polyethylene waste will be recycled by company itself. - Polypropylene bags will be returned to suppler of raw materials. - Waste cloth will be passed to “Vtorsiryo” company for utilization. - Utility waste will be discharged to landfill site.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertise.
37
requirements? Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
Name of Subproject Company:
Garant Mebel LLC
Subproject location:
Sergeli district, Massive Yuldosh, C2
Industry sector:
Manufacturing of pop (a carbonated, flavored, and sweetened soft drink) and cool tea
Purpose of loan Raw materials Value of exposure (US$):
300 000
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your organization?
The following environmental due diligence was undertaken by the bank:
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening; 3) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Draft of ZVOS (statement of environmental impact) and positive Conclusion from 11.03.2016 No.18 of State ecological expertise were inspected by the loan specialist and ESMS coordinator. According to the mentioned Conclusion, the project is given 3 category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
The company will produce soft drinks. The technological process include treatment of water which will be obtained from wellhole. The water will be cleaned through three filters. Then, water will be passed to tanks. Syrup will be prepared in steel mixer. The soft drink will be filled to PET bottles. Atmosphere. Calculation of maximum concentration of emission shows that over ground concentration for each ingredient will be within established quotes. Waste: Mercury lamps (1 class of hazard) will be passed to specialized company for demercuration. PET bottle waste, utility waste (4 class of hazard). Limits for storing at the company and places for discharge were designated.
Did you discuss with the Yes. Bank specialists discussed, explained to the subproject
subproject the applicable environmental and social safeguard requirements and their implementation?
owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
Name of Subproject Company:
SE Golden Silk
Subproject location:
Namangan region, Mullakuding
Industry sector:
Textile
Purpose of loan Equipment for textile production Value of exposure (US$):
295 000
Safeguard category: (see Annex of Attachment 11)
Environmental category B, Social category B
Were any environmental due diligence undertaken and by your organization?
The following environmental due diligence was undertaken by the bank:
1) Environmental impact analysis (ecological screening); 2) Social safeguards screening; 3) Safeguard due diligence briefing note;
The above documents were filled by loan specialist and reviewed by ESMS coordinator. The loan specialist also conducted field visit to learn situation on site.
Any environmental assessment report or audit reports reviewed by your organization?
Yes. Draft of ZVOS (statement of environmental impact) and positive Conclusion from 18.03.2011 No.18/229 of State ecological expertise were inspected by the loan specialist and ESMS coordinator. According to the mentioned Conclusion, the project is given 3 category of environmental impact.
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your
The company will produce textile items (cotton fabric). Atmosphere: Calculation of maximum concentration of emission shows that over ground concentration for each ingredient will be within established quotes. Water will be discharged to canalization network.
39
organization, and how were the issues dealt with (i.e., outcome of due diligence)?
Waste: Mercury lamps (40 per year) will be passed to specialized company for demercuration. Solid utility waste will be discharged to waste landfill.
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes. Bank specialists discussed, explained to the subproject owner all the requirements regarding the environmental and social safeguard that he/she should comply with during the implementation of project.
Were any conditions or covenants related to environmental and social issues made along with the investment?
The owner of the subproject should fulfill the requirement stated in the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable government requirements?
Yes, implementation of the project was permitted in accordance with the Conclusion of State Ecological Expertise.
Does the subproject comply with applicable ADB safeguard requirements?
Yes. The project is assigned B category according to ADB classification.
D. Sustainable Finance (subprojects with environmental and social benefits)
Sustainable finance Have you made any investments in subprojects that have social and environmental benefits such as investing in management systems, energy efficiency, renewable energy, cleaner production, carbon finance, pollution abatement and control, sustainable supply chain, corporate social responsibility, community development, etc.? Please list these in the format provided below: Subproject
Name Value financed by the Financial Institution
Type of social and
environmental benefit «QORA BAYIR SAVDO» ХК
60 492 (financed by the banks’ own funds jointly with Global Ecological Fund (GEF) in
proporation 60%/40%)
Installation of 130 кВт sun energy photo electric system
"Kesh Negtar" ҚК МЧЖ
64 113 financed by the banks’ own funds jointly with GEF in proporation 60%/40%)
Installation of pump which uses sun energy
"Frozen Products" МЧЖ
149 800 (financed by the banks’ own funds jointly with GEF in proporation 70%/30%)
150 кВт sun energy photo electric system
"Veterinar Shams Sharif" МЧЖ
479 050 (financed by the banks’ own funds jointly with GEF in proporation 70%/30%)
Installation of pump which uses sun energy
"O'ZBEKISTON" МЧЖ
215 845 ((financed by the banks’ own funds jointly with GEF in proporation 70%/30%)
200 кВт sun energy photo electric system
"TANO" ФХ 499 700 (financed by the banks’ own funds Biogas equipment installation
jointly with GEF in proporation 70%/30%) (1000 м3) "INTER GOLD FRUIT" МЧЖ
31 000 (financed by the banks’ own funds jointly with GEF in proporation 70%/30%)
Installation of pump which uses sun energy
Social benefit of the above sub-projects is to mitigate consequences of climate change. The bank also financed some projects to establish system of drip irrigation, which is aimed at saving water and prevention of climate change.
41
ANNEX 5: PFI’s ANNUAL ENVIRONMENTAL AND SOCIAL PERFORMANCE Annual report of PJSCB “DAVR BANK” (as of March 01, 2018)
Please provide responses to the questions below. Please include additional sheets or attachments as required to provide details on questions that have been answered Yes. The PFIs are required to submit the performance report to TA consultant.
Name of Organization PJSCB “DAVR BANK”
Completed by (name): Abubakirov Nuritdin Saydiganiyevich
Position in organization: Head of risk management division
Date: March 01, 2018
Reporting period From: To:
A. Portfolio Information
Report Covering Period: From: To: 01.01.2017 01.03.2018
For the reporting period, please provide the following information about your portfolio where applicable:
Business Lines
Product line Description Total exposure outstanding for most recent FY year end (in US$)
Average loan or transaction size (in US$)
Retail banking/Consumer loans
Loans or other financial products for individuals (includes retail housing finance and vehicle leasing)
8 012 696,15 743,98
Long term: Transactions with tenor greater than 12 months SME Any lending, leasing or other
financial assistance to any corporate or legal entity other than an individual, with individual transactions less than US$ 1 million
30 868 930,54 14 855,12
Subproject finance/Large Corporate finance
Any lending, leasing or other financial assistance to any corporate or legal entity other than an individual, with individual transactions larger than US$ 1
1 383 000 1 383 000
million Trade finance 0 0 Short term (ST): Transaction with tenor less than 12 months ST Corporate finance 866 510,17 72 209,18 ST Trade finance 0 0 Other Microfinance 455 183,31 2 310,58 Other (if applicable) Please describe 0 0
Exposure by Industry Sectors
If there is any exposure in the area of SME finance please provide an indicative % of portfolio that these sectors represent of the total SME portfolio.
Industrial Sector % of Corporate Portfolio
Apparel Chemicals Collective Investment Vehicles Common Carriers Construction and Real Estate 38 Consumer Goods Crop Production Electrical Equipment, Appliances and Components Fabric Mills Fabricated Metal Product Manufacturing Finance & Insurance Finishing (Dyeing, Printing, Finishing, etc.) Fishing Food & Beverages 4 Forestry Furniture and Related Products Integrated Textile Operation (Spinning, Weaving/Knitting, but no Garment ) Internet Subprojects Leather and Allied Products Livestock Machinery and Other Industrial Nonmetallic Mineral Product Manufacturing Oil, Gas and Mining Plastics & Rubber Primary Metals Printing & Publishing Pulp & Paper Spinning (Yarn, Including Integrated with Fiber Production) Telecommunications Textiles - Others 58 Transport Service
43
Transportation Equipment Utilities Warehousing & Storage Wholesale and Retail Trade covering any of the following. Gasoline stations, dry cleaners, printing, large auto and truck fleets, photographic film processing and any operations involving the use of any chemical of biological wastes or materials
Wood Products If engaged in long term project finance/corporate finance, please provide information as requested of all loan assets meeting the following conditions: • Longer than 12 months tenor • Larger than US$ 1 million outstanding exposure Name of Subpro-
ject
Type of loan
(large corporate
/ SME/trade finance)
Tenor of loan (month
s)
Value of exposure (US$ mn)
Industry
Sector*
Safeguard category
Any outstanding environmental and IR and
IP issues during
reporting period and
actions taken to
address the issues
Subpro-ject
using ADB
funds
(yes/no)
Env IR IP
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - *Please use the sectors listed in the earlier table or any standard classification or Note: Env=Environment, IR=Involuntary Resettlement, IP=Indigenous Peoples
B. Environmental and Social Management System (ESMS) Policies & Processes Yes/No
Has your organization developed and implemented an ESMS?
Yes Submitted
If there is an ESMS already in place, have there been any updates to the ESMS or policy and procedures adopted by your organization during the
No New procedure was approved on 15.05.2017 for ESMS, a copy was submitted.
reporting period? Has senior management signed off on the updated policy/procedure?
No Management has not signed an updated policy
Has your organization appointed staff tasked to implement the ESMS?
Yes AbubakirovNuriddin Head of Risk management division Gofurov Doniyor Deputy Head of the Credit division - Head of the Project implementation unit.
Please give details of any transactions rejected due to environmetnal and/or social concerns.
Yes Several subprojects were rejected according to ZVOS category and equipment's Country of origin
Please state any difficulties and/or constraints related to the implementation of the ESMS.
No There was not any difficulty regarding to implementation of ESMS.
Please describe how you ensure that your subproject companies and their subprojects are operated in compliance with the national laws and regulations and applicable ADB’s requirements.
Yes All subprojects which refinanced by ADB were screened by following steps: • in accordance with the list of prohibited investment activities; • according to the list of control questions for environmental screening; • According to the screening list for compliance with ADB's social risk measures
Please give details of any material social and environmental issues associated with clients during the reporting period in particular.
Yes
During refinancing subprojects, ESMS managers faced with many issues. For instance, organization located near to schools, kindergartens, near to population living places but there was not found any seriously risks which can influence to environment and social )
In case the existing ESMS is not fully funcional, what are the action plan beining implemented by your organization?
No Existing ESMS approved fully functional
Capacity Yes/No
Please provide the name and contact information of the Environmental and Social Officer or Coordinator who has the overall responsibility for the implementation of ESMS.
Yes Abubakirov Nuriddin Head of Risk management division Tel num: +998712070909 (internal numb 120) Gofurov Doniyor Deputy Head of the Credit division - Head of the Project implementation unit. Participated trainings:
1) Promoting adaptation and implementation of environmental and social management system for financial intermediaries which held on November 23-24, 2017
2) Promoting the approval and implementation of the environmental and social management
45
system (ESMS / ESMS) for financial intermediaries (FI) in Uzbekistan which held on February and seminar’s guest was Irakli Kaviladze (International Consultant of ADB)
Please provide current staffing of other core ESMS persons in the organization involved with ESMS implementation.
Yes Every month PJSCB “DAVR BANK” ESMS managers organizes seminars for credit officers in order to give correct perception to initiators of subprojects and implement monitoring while refinancing projects
What was the budget allocated to the ESMS and its implementation during the year?
No Budget is not allocated
Monitoring Yes/No
Do you receive environmental and social monitoring reports from subproject companies that you finance?
Yes Monitoring manager of the bank fills the act- “Typical area monitoring form” during refinancing for subprojects of ADB.
Do you check for ongoing compliance of your subproject companies with national regulation and any other requirements?
Yes Every six months, the project is monitored by monitoring officer.
Please describe how you monitor the subproject company and their subproject’s social and environmental performance.
Yes With access to the site, monitoring manager fills the act-“typical area monitoring form” after refinanced subproject.
Please provide details of any accidents/ litigation/complaints/regulatory notices and fines: - Any incidents of non-compliance
with the applicable Environmental and Social Requirements
- Covenants/conditionalities imposed by the Fund Manager to the subproject company as a result of any non-compliance
No During researching environmental and social risks of subprojects there was not any incident, ligation and complaints.
Reporting Yes/No
Is there an internal process to report on social and environmental issues to Senior management?
Yes During the processing of documents, specialist of the credit department gives a conclusion on approval of the project for refinancing, as well as on environmental and social checklist screening. After financing, every six months with the access to the site, the project will be monitored and environmental and social checklist will be completed by the monitoring department manager and the Bank's management will be informed about monitoring results.
Do you prepare any social and environmental reports: - For other multilateral agencies
No PJSCB “DAVR BANK” does not prepare any reports on social and environmental protection to other agencies.
- Other stakeholders - E&S reporting in the Report - Sustainability reports
Activities on ADB’s Prohibited Investment Activities List If any, please indicate the dollar percentage of loans or investments out of your total outstanding exposure provided to clients who are substantially involved in ADB’s Prohibited Investment Activities List (Refer to Attachment 1).
0%
If the percentage is not zero, please explain these exposures and any steps having been taken to reduce such exposure.
0%
C. Subprojects Using ADB Funds
Please provide information about all new subprojects using ADB funds approved during this reporting period. Name of Subproject Company:
LLC “Rolling Time”
Subproject location:
Tashkent region, Zangiota district, Nazarbek
Industry sector:
Food and beverages
Value of exposure (US$ mn):
70 000
Safeguard category: (see Annex of Attachment 11)
Environment: B Involuntary Resettlement: C Indigenous Peoples: N/A
Were any environmental due diligence undertaken and by your organization?
Yes Environmental Screening Checklist and Social Safeguards Screening
Checklists were attached
Any environmental assessment report or audit reports reviewed by your organization?
Yes Conclusion of State committee for Nature protection (ZVOS)
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
No
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes
47
Were any conditions or covenants related to environmental and social issues made along with the investment?
Yes
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
No
No
Name of Subproject Company:
LLC “Luxury Furniture Business”
Subproject location:
Djizzax region, Djizzax city, Industrial Zone A
Industry sector:
Textile
Value of exposure (US$ mn):
300 000
Safeguard category: (see Annex of Attachment 11)
Environment: B Involuntary Resettlement: C Indigenous Peoples: N/A
Were any environmental due diligence undertaken and by your organization?
Yes Environmental Screening Checklist and Social Safeguards Screening
Checklists were attached
Any environmental assessment report or audit reports reviewed by your organization?
Yes Conclusion of State committee for Nature protection (ZVOS)
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
No
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes
Were any conditions or covenants related to environmental and social issues made along with the investment?
Yes
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
No
No
Name of Subproject Company:
LLC “Juita Gulshana Invest”
Subproject location:
Djizzax region, Djizzax city, Industrial Zone A
Industry sector:
Textile
Value of exposure (US$ mn):
300 000
Safeguard category: (see Annex of Attachment 11)
Environment: B Involuntary Resettlement: C Indigenous Peoples: N/A
Were any environmental due diligence undertaken and by your organization?
Yes Environmental Screening Checklist and Social Safeguards Screening
Checklists were attached
Any environmental assessment report or audit reports reviewed by your organization?
Yes Conclusion of State committee for Nature protection (ZVOS)
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
No
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes
Were any conditions or covenants related to environmental and social issues made along with the investment?
Yes
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
No
No
Name of Subproject Company:
LLC “Azalea Garment”
Subproject location: Tashkent region, Piskent district,
49
Gulshan street Industry sector:
Textile
Value of exposure (US$ mn):
154 390
Safeguard category: (see Annex of Attachment 11)
Environment: B Involuntary Resettlement: C Indigenous Peoples: N/A
Were any environmental due diligence undertaken and by your organization?
Yes Environmental Screening Checklist and Social Safeguards Screening
Checklists were attached
Any environmental assessment report or audit reports reviewed by your organization?
Yes Conclusion of State committee for Nature protection (ZVOS)
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
No
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes
Were any conditions or covenants related to environmental and social issues made along with the investment?
Yes
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
No
No
Name of Subproject Company:
LLC “Sino Industrial Tashkent”
Subproject location:
Tashkent city, Mustaqillik street, 68 flat, 634 apartment
Industry sector:
Road Construction
Value of exposure (US$ mn):
300 000
Safeguard category: (see Annex of Attachment 11)
Environment: B Involuntary Resettlement: C Indigenous Peoples: N/A
Were any environmental due diligence undertaken Yes
and by your organization?
Environmental Screening Checklist and Social Safeguards Screening
Checklists were attached
Any environmental assessment report or audit reports reviewed by your organization?
Yes Conclusion of State committee for Nature protection (ZVOS)
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
No
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes
Were any conditions or covenants related to environmental and social issues made along with the investment?
Yes
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
No
No
Name of Subproject Company:
LLC “Macro Production”
Subproject location:
Tashkent region, Ohangaron city, industrial zone
Industry sector:
Production of construction materials
Value of exposure (US$ mn):
300 000
Safeguard category: (see Annex of Attachment 11)
Environment: B Involuntary Resettlement: C Indigenous Peoples: N/A
Were any environmental due diligence undertaken and by your organization?
Yes Environmental Screening Checklist and Social Safeguards Screening
Checklists were attached
Any environmental assessment report or audit reports reviewed by your organization?
Yes Conclusion of State committee for Nature protection (ZVOS)
What were the main environmental and social issues associated with this subproject that were identified
No
51
through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)? Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes
Were any conditions or covenants related to environmental and social issues made along with the investment?
Yes
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
No
No
Name of Subproject Company:
LLC “Bek Mega Textile”
Subproject location:
Tashkent city, Chorbog 2 street, flat 8
Industry sector:
Textile
Value of exposure (US$ mn):
170 500
Safeguard category: (see Annex of Attachment 11)
Environment: B Involuntary Resettlement: C Indigenous Peoples: N/A
Were any environmental due diligence undertaken and by your organization?
Yes Environmental Screening Checklist and Social Safeguards Screening
Checklists were attached
Any environmental assessment report or audit reports reviewed by your organization?
Yes Conclusion of State committee for Nature protection (ZVOS)
What were the main environmental and social issues associated with this subproject that were identified through due diligence conducted by your organization, and how were the issues dealt with (i.e., outcome of due diligence)?
No
Did you discuss with the subproject the applicable environmental and social safeguard requirements and their implementation?
Yes
Were any conditions or covenants related to environmental and social issues made along with the investment?
Yes
Does the subproject comply with applicable government requirements?
Yes
Does the subproject comply with applicable ADB safeguard requirements?
No
No
D. Sustainable Finance (subprojects with environmental and social benefits)
Sustainable finance Have you made any investments in subprojects that have social and environmental benefits such as investing in management systems, energy efficiency, renewable energy, cleaner production, carbon finance, pollution abatement and control, sustainable supply chain, corporate social responsibility, community development, etc.? Please list these in the format provided below: Subproject
Name Value financed by the Financial Institution
(US$ million) Type of social and
environmental benefit
REPORT from PJSCB “DAVR BANK”