ANNUAL PERFORMANCE REPORT - 2014-15 The present day Northeast Frontier Railway was carved out of the...

75
1 ANNUAL PERFORMANCE REPORT - 2014-15 BRIEF HISTORY OF N.F. RAILWAY The tea, oil and coal industries were set up in Upper Assam area around the 1860s and 70s. Transportation of the produce was by river routes down the Brahmaputra. A need was felt for construction of a Railway from the tea and oil producing centres in the hinterland to the river port at Dibrugarh. The Assam Railways and Trading Company Limited which was incorporated in July 1881, took up the task of construction of the first railway line - and the first Metre Gauge train in the Northeast region chugged from the river ghat in Dibrugarh to Jeypore road on 1 st May 1882. By February, 1884 the railway line had reached the coalfields of Margherita and by May, 1884 another line from Makum to Doomdooma was constructed. This network formed what was known as the Dibru Sadiya Railway (DSR). About this time, an overseas market had been created for tea and jute, the principal products of Assam and Eastern Bengal. The Assam Bengal Railway (ABR) was formed in 1892 to connect the port of Chittagong by rail to upper Assam and provide an outlet for these products for the overseas markets. The railway also expected to pick up some of the already existing road traffic between Dhaka and Chittagong leading to the steady economic development of the area. The railway line from the port of Chittagong to Tinsukia (Makum) was constructed in three phases – from Chittagong to Badarpur with branch lines to Silchar and Laksham, from Badarpur to Lumding through the North Cachar Hills and in the third phase from Lumding further North to connect the DSR at Makum. The line from Lumding to Guwahati was constructed as a branch line to this alignment from Makum to Chittagong. The Chittagong-Badarpur section opened for traffic up to Badarpur on December 4, 1896 and was extended up to Silchar on November 8, 1898. It was for the first time that a part of the Northeast was rail-linked to the rest of India (with a river crossing between Chandpur and Goalundo).

Transcript of ANNUAL PERFORMANCE REPORT - 2014-15 The present day Northeast Frontier Railway was carved out of the...

  • 1

    ANNUAL PERFORMANCE REPORT - 2014-15

    BRIEF HISTORY OF N.F. RAILWAY

    The tea, oil and coal industries were set up in Upper Assam areaaround the 1860s and 70s. Transportation of the produce was by riverroutes down the Brahmaputra. A need was felt for construction of aRailway from the tea and oil producing centres in the hinterland to theriver port at Dibrugarh. The Assam Railways and Trading CompanyLimited which was incorporated in July 1881, took up the task ofconstruction of the first railway line - and the first Metre Gauge train inthe Northeast region chugged from the river ghat in Dibrugarh to Jeyporeroad on 1st May 1882.

    By February, 1884 the railway line had reached the coalfields ofMargherita and by May, 1884 another line from Makum to Doomdoomawas constructed. This network formed what was known as the DibruSadiya Railway (DSR).

    About this time, an overseas market had been created for tea andjute, the principal products of Assam and Eastern Bengal. The AssamBengal Railway (ABR) was formed in 1892 to connect the port ofChittagong by rail to upper Assam and provide an outlet for theseproducts for the overseas markets. The railway also expected to pickup some of the already existing road traffic between Dhaka andChittagong leading to the steady economic development of the area.The railway line from the port of Chittagong to Tinsukia (Makum) wasconstructed in three phases – from Chittagong to Badarpur with branchlines to Silchar and Laksham, from Badarpur to Lumding through theNorth Cachar Hills and in the third phase from Lumding further Northto connect the DSR at Makum. The line from Lumding to Guwahatiwas constructed as a branch line to this alignment from Makum toChittagong. The Chittagong-Badarpur section opened for traffic up toBadarpur on December 4, 1896 and was extended up to Silchar onNovember 8, 1898. It was for the first time that a part of the Northeastwas rail-linked to the rest of India (with a river crossing betweenChandpur and Goalundo).

  • 2

    NORTHEAST FRONTIER RAILWAY

    Besides the Dibru-Sadiya Railway (DSR) and Assam Bengal Railway(ABR), the Eastern Bengal Railway (EBR) was the third importantconstituent of the present N. F. Railway. These three Railways weremerged during World War-II and came to be known as the BengalAssam (BA) Railway. Thereafter, some of the company-owned railwaysviz, Bengal Dooars Railway, Jorhat Provincial Railway, ChaparmukhSilghat Railway, Katakhal Lalabazar Railway etc. were also mergedwith the Bengal Assam Railway system.

    With the partition of India in August 1947, the Bengal Assam Railwaywas bifurcated according to the political boundaries leading to theformation of the Assam Railway with its headquarters at Pandu. In1948, the Darjeeling Himalayan Railway (DHR) was taken over by theGovernment of India and merged with the Assam Railway.

    The partition of India severed the links of the Assam Railway withthe rest of the country, connected as the two were, till then, through therailway network in East Pakistan. For restoration of the link to the AssamRailway, the Assam Rail Link Project was taken up on top priority toprovide the connection through the “chicken neck” corridor of NorthBengal. This link was completed in January 1950.

    The re-organization of the railway zones in 1951 led to the mergerof the Assam Railway and Avadh Tirhut Railway and these two formedpart of the North Eastern Railway with headquarters at Gorakhpur. Thethen North Eastern Railway thus extended right across northern Indiacovering UP, Bihar, Bengal and Assam, from Bareilly to Tinsukia andBadarpur / Silchar.

    The present day Northeast Frontier Railway was carved out of theNorth Eastern Railway and set up with its headquarters at Maligaon on15th of January, 1958.

  • 3

    ANNUAL PERFORMANCE REPORT - 2014-15

    AN OVERVIEWSTATUS AS ON 01.04.2015

    BG MG NG TotalRoute Length (Km)

    3299.21 601.32 87.48 3988.01Track K.M. 5038.95 866.25 96.98 6002.51

    No. of Stations 436* 48 10 494* including BG/MG - 2, BG/NG - 2 & BG/MG/NG - 1

    State-wise route length (Km) :Assam - 2463.55 Arunachal - 11.67Bihar - 327.42 Meghalaya - 8.76Tripura - 151 Manipur - 1.35West Bengal - 1009.51 Mizoram - 1.50Nagaland - 12.85Total - 3988.01 KM

    Coach Holding : 2673 (BG-2428, DEMU - 88, MG-93& NG - 64)

    Mail & Exp. Services : BG -98.57 trains/day, MG-Nil

    Passenger Services : BG - 101.71 trains/dayMG - NilDEMU - 14.71 trains/dayNG - 16 trains/day

    Freight Daily Interchange (in Trains) :

    Taken Over Made Over

    (FY 2013-14) ER 15.4 16.3

    ECR 11.6 10.5

    Passengers carried : 90.84 million (2.49 lakhs/day)(FY 2014--15)

    Wagon Holding(FY 2014-15) : BG = 5491

  • 4

    NORTHEAST FRONTIER RAILWAY Loco Holding : Diesel (378 BG + 26 MG + 4 NG) +

    Steam (13 NG)

    Diesel Sheds at : Malda, Siliguri, New Guwahati,Lumding

    Workshop outturn : (In vehicle units of POH)

    Workshop Coaches/month Wagons/monthNew Bongaigaon 53.33 104.3

    Dibrugarh 57 —

    Originating LoadingFY 2012-13 : 10.54 MTFY 2013-14 : 12.15 MTFY 2014-15 (Target) : 12.50 MTFY 2014-15 (Actual) : 11.53 MT

    Commodities(Inward/Outward) : Coal, Dolomite, Cement,

    Food- grain, POL,Mize,Fertilizer, Bamboo, Paper.

    Level crossing gates : Manned - 1155 (BG+MG): Unmanned - 669

    (BG+MG+NG)

    PRS Centers : 132 Nos. UTS Location : 365 Nos. UTS cum PRS : 96 Nos. Total Originating Earnings

    FY 2012-13 : ` 3108.91 Cr.FY 2013-14 : ` 3425.41 Cr.FY 2014-15 (Target) : ` 4240.82 Cr.FY 2014-15 (Actual) : ` 3679.83 Cr.

    FreightFY 2012-13 : ` 1314.11 Cr.FY 2013-14 : ` 1459.41 Cr.FY 2014-15 (Target) : ` 1985.59 Cr.FY 2014-15 (Actual) : ` 1449.52 Cr.

  • 5

    ANNUAL PERFORMANCE REPORT - 2014-15Passenger

    FY 2012-13 : ` 1052.76 Cr.FY 2013-14 : ` 1222.13 Cr.FY 2014-15 (Target) : ` 1473.07 Cr.FY 2014-15 (Actual) : ` 1400.88 Cr.

    Sundry

    FY 2012-13 : ` 614.78 Cr.FY 2013-14 : ` 606.13 Cr.FY 2014-15 (Target) : ` 630.00 Cr.FY 2014-15 (Actual) : ` 673.89 Cr.

    Other Coaching

    FY 2012-13 : ` 127.26 Cr.FY 2013-14 : ` 137.74 CrFY 2014-15 (Target) : ` 152.16 Cr.FY 2014-15 (Actual) : ` 155.54 Cr.

    Working Expenses

    FY 2012-13 : ` 3853.85 Cr.FY 2013-14 : ` 4473.08 Cr.FY 2014-15 (Final Grant) : ` 4953.23 Cr.FY 2014-15 (Actual) : ` 4751.85 Cr.

    Employees On Roll : 64729 (Gazetted - 988): (Non-Gazetted - 63741)

  • 6

    NORTHEAST FRONTIER RAILWAY

    DIVISIONSKATIHAR –DIVISION

    A. InfrastructureBG MG NG Total

    Route K.M.760 12 88 860

    Single Line 520 12 88 620Double Line 240 — — 240

    Track K.M. 1477 12 109 1598 No. of Railway station: (Comm.Classification, No and Name)

    Total : 132A1 - 1 (New Jalpaiguri),A - 6 (Katihar, Kishanganj, Siliguri Jn, Jogbani,

    Raiganj, Purnia)B - 7 (Barsoi, Forbesganj, Aluabari, Araria Court,

    Jalpaiguri Road, Dalkola, Samsi)D - 15,E - 60,F - 43)

    Workshop : 1 (Tindharia)

    Diesel Sheds : 2 (Malda - 75 Locos,Siliguri Jn 172 Locos)

    Major Depots Coaching maintenance Depot : Katihar & NJP Wagon maintenance Depot : NJP ROH Depot : NJP DEMU Maintenance Depot : Siliguri Stores Depot : NJP, KIR, MLDT & SGUJ Ballast Depot : NJP & Harishchandrapur

    Printing Press :Kurseong Crew lobby : 3 (Katihar, NJP, MLDT)

    Running Rooms :5 (NJP, KIR, Jogbani,Radhikapur & Balurghat )

  • 7

    ANNUAL PERFORMANCE REPORT - 2014-15 Major fuelling points : 2 (Katihar, NJP)

    Heritage line : NJP – DJ (DarjeelingHimalayan Railways)

    B. Freight & Parcel Business

    (a) Goods Goods sheds/Sidings : 11 (NJP, BORA/BPMS,

    KNE, RNI, PRNA, JPG, KIR,JBN, DLK, MLFC, SJKL)

    TOTAL DIVISIONAL OUTWARD LOADING

    2012-13 2013-14

    Rake Wagon Rake Wagon96 4337 99 4379

    2014-15 2014-15 TARGET ACTUAL

    - - 105 4798

    TOTAL DIVISIONAL INWARD LOADING

    2012-13 2013-14Rake Wagon Rake Wagon

    157 6652 174 7265 2014-15 2014-15 TARGET ACTUAL

    - - 194 8119 Earnings

    Year 2012-13 : ` 666.44 Cr.Year 2013-14 : ` 774.44 Cr.Year 2014-15 (Target) : ` 1052.26 Cr.Year 2014-15 (Actual) : ` 870.12 Cr.

    (b) Parcel

    No. of Parcel Stations : 90 Nos.

  • 8

    NORTHEAST FRONTIER RAILWAY Loading

    Year 2012-13 : 43065 TonYear 2013-14 : 43113 TonYear 2014-15(Target) : --Year 2014-15 (Actual) : 45433 Ton

    Earnings

    Year 2012-13 : ` 8.47 Cr.Year 2013-14 : ` 7.75 Cr.Year 2014-15(Target) : --Year 2014-15 (Actual) : ` 10.99 Cr.

    C. Passenger Business Passengers originating

    Year 2012-13 : ` 4.12 Cr.Year 2013-14 : ` 4.04 Cr.Year 2014-15(Target) : ` 3.30 Cr.Year 2014-15 (Actual) : ` 3.72 Cr.

    Passengers Earning originatingYear 2012-13 : ` 313.25 Cr.Year 2013-14 : ` 377.82 Cr.Year 2014-15(Target) : ` 557.53 Cr.Year 2014-15 (Actual) : ` 406.03 Cr.

    D. Sundry Earnings Total

    Year 2012-13 : ` 16.67 Cr.Year 2013-14 : ` 19.31 Cr.Year 2014-15(Target) : ` 10.55 Cr.Year 2014-15 (Actual) : ` 21.39 Cr.

    Commercial PublicityYear 2012-13 : ` 43.08 LakhsYear 2013-14 : ` 45.61 LakhsYear 2014-15(Target) : ` 61.50 LakhsYear 2014-15 (Actual) : ` 45.57 Lakhs

  • 9

    ANNUAL PERFORMANCE REPORT - 2014-15E. Personnel Staff strength on roll : Gaz 115, Non.Gaz -13574,

    Total - 13689

    Total No. of Rly. quarters : 11544

    Railway Schools : 3 (NJP, Siliguri, Barsoi) Railway Hospitals : 3 (NJP, Katihar, Tindharia)

    Health unit - 09Subsidiary Dispensary - 01

    F Passenger Amenity Adarsh stations : 36

    Clean Train Stations : 2 (Katihar & NJP)

    Watering Stations : 7 (KIR, NJP for all trains)(SGUJ, HDB, RDP, BLGT &JBN for terminal trains)

    24 Coach/ stations : 15 (KIR, NJP, KNE, BOE,SGUJ, AUB, ADQ, TKG,NAK, EKI, DLK, LAV, MFA,RDP & JBN)

    Departmental linen Depot : 2 ( Katihar & NJP)

    Catering - Food plaza : 2 (NJP, Katihar), Jan Ahar 1(NJP)

    Mobile Pantry Services : Nil

    Total PRS : 37Total UTS : 82UTS cum PRS - : 31Non - rail Head PRS : 15

    JTBS : 07(KIR-3,NJP-1,BOE-1,JBN-1, ARQ-1)

    RTSA : 01

    Retiring Room Stations : 13 (KIR, NJP, SGUJ, KNE,BOE, PRNA, FBG, JBN, DLK,JPG, RGJ, SM, AUB)

  • 10

    NORTHEAST FRONTIER RAILWAY

    ALIPURDUAR –DIVISIONA. Infrastructure

    BG MG TotalRoute Km.

    587.98 61.72* 649.70

    Single Line 494.99 61.72* 556.71

    Double Line 92.99 — 92.99Track Km. 886.90** 71.04* 957.94

    * Under gauge conversion.

    No. of Railway Stations

    Total : 72A1 : NilA : 04 (NCB, APDJ, COB, NOQ)B : 05 (KOJ, HSA, DHH, DQG, NMZ)D : 11E : 45F : 05

    Workshop : Nil

    Diesel Shed : Nil

    Major Depots

    Coaching Maintenence Depot : 01(Alipurduar Jn.) Wagon Maintenence Depot : Nil ROH Depot : Nil Ballast Depot : 01 (JOQ) DEMU Maintenence Depot : Nil Stores Depot : Nil

    Printing Press : Nil

    Crew Lobby : 02 Alipurduar Jn. & NewCoochbehar

    Running Rooms : 01 (New coochbehar)

    Major Fuelling Points : Nil

  • 11

    ANNUAL PERFORMANCE REPORT - 2014-15

    Heritage Line : Nil

    B. Freight & Parcel Business(a) Goods

    Goods Sheds/Sidings : 14(BNV,DLO,HSA,NOQ,GOGH,FKM,KOJ,BSGN,NCB, SXX, FLK, FLK/PCAL, SLKX/NTPC & DQG

    Outward /Inward loading

    TOTAL DIVISIONAL OUTWARD LOADING

    2012-13 2013-14Rake Wagon Rake Wagon

    33 1711 46 2366 2014-15 2014-15 TARGET ACTUAL

    - - 49 2493.41TOTAL DIVISIONAL INWARD LOADING

    2012-13 2013-14Rake Wagon Rake Wagon

    43 1877 38 1661

    2014-15 2014-15 TARGET ACTUAL

    - - 37 1593.91

    Earnings

    Year 2012-2013 : ` 123.13 Cr.Year 2013-2014 : ` 160.40 Cr.Year 2014-2015 (Target) : ` 280.32 Cr.Year 2014-2015 (Actual) : ` 203.75 Cr.

  • 12

    NORTHEAST FRONTIER RAILWAYa) Parcel -

    No. of Parcel stations : 23

    Loading

    Year 2012-2013 : 26557 TonYear 2013-2014 : 41957 Ton.Year 2014-2015 (Target) :Year 2014-2015 (Actual) : 53615 Ton.

    b) Earnings

    Year 2012-2013 : ` 5.61 Cr.Year 2013-2014 : ` 8.31 Cr.Year 2014-2015 (Target) : Year 2014-2015 (Actual) : ` 13.13 Cr.

    C) Passenger BusinessPassengers Originating

    Year 2012-2013 : ` 1.40 Cr.Year 2013-2014 : ` 1.24 Cr.Year 2014-2015 (Target) : ` 11.00 Cr.Year 2014-2015 (Actual) : ` 1.20 Cr.

    Passenger earnings originating

    Year 2012-2013 : ` 134.49 Cr.Year 2013-2014 : ` 158.86 Cr.Year 2014-2015 (Target) : ` 175.86 Cr.Year 2014-2015 (Actual) : ` 172.78 Cr.

    D) Sundry EarningsYear 2012-2013 : ` 8.95 Cr.Year 2013-2014 : ` 9.99 Cr.Year 2014-2015 (Target) : ` 8.54 Cr.Year 2014-2015 (Actual) : ` 9.26 Cr.

    Commercial Publicity -

    Year 2012-2013 : NIL.Year 2013-2014 : ` 0.03 Cr.Year 2014-2015 (Target) : ` 0.07 Cr.Year 2014-2015 (Actual) : ` 0.02 Cr.

  • 13

    ANNUAL PERFORMANCE REPORT - 2014-15E) PersonnelStaff strength : 45+6(CMP)

    Non-Gaz.–Sanctioned: 8194 Actual: 6847(including Security & Accounts)Total – Sanctioned::8194Actual: 6892+ 6 (CMP)(including Security& Accounts)

    Total No. of Railway Quarters : 6333

    Railway Hospital : 01 (Alipurduar Jn.)Health Unit - 07

    Railway School : 02 ( RHSS/ Boys & Girls/Alipurduar Jn.)

    F) Passenger Amenity Adarsh stations : 30 stations.

    Clean Train Stations : Nil.

    Watering Stations : 03 (APDJ, NCB & NOQ)

    24 Coach/Stations : 14 (NOQ, NCB, FLK, DQG, NMX,JPE , GOGH, FKM, KOJ, APDJ,HSA, DLO, BNV & NMZ)

    Departmental Linen Depot : Nil

    Catering – Food plaza : Nil.Mobile Pantry Services : 01 (S. Mahananda Exp.)

    PRS Centres : 13 (Exclusive PRS)Non-Rail Head PRS : 02UTS-cum-PRS : 11Total UTS : 62 (Inclusive of UTS-cum-PRS)

    JTBS : Nil.RTSA : Nil.

    Retiring Room Stations : 12 ( APDJ, NOQ, NCB, FKM,FLK, DQG, KOJ, NMZ, HSA, BNV,NMX & COB)

  • 14

    NORTHEAST FRONTIER RAILWAYRANGIYA –DIVISION

    A. InfrastructureBG MG(Under G.C.) Total

    Route K.M. 757.80 106.88 864.68Single Line 757.80 106.88 864.68

    Double Line — — —Track K.M. 858.89 187.92 1046.81

    Number of Rly Stations:Total-84A1 : NIL

    A3 : 3 (BNGN, BPRD & RNY )

    B1 : 1 (New Bongaigan)

    D : 8

    E : 53

    F : 14, New stations-DKGN,GMTO, NHLN, NOLB & MNDP

    Workshop : New Bongaigaon,Engineering Workshop/Bongaigaon

    Major Depots : P. WAY-TD/Bongaigaon

    Crew lobby : 2(NBQ & RPAN) Running Rooms : 3 (RNY, NBQ & NLP)

    Major fueling points : 1 (New Bongaigaon)

    B. Freight & Parcel Business(a) Goods - Goods sheds/Sidings : 24 (CGS, BIZ, RNY, GOE, NLV,

    PTLD, BPRD, SBE, CPQ,NBQ, BPRL,JPZ, PNVT,GLPT, DDNI, BMGN, AZA,DKGN,MNDP, HMY, TNL,BKTBi, TBH, NLP)

  • 15

    ANNUAL PERFORMANCE REPORT - 2014-15 Outward /Inward loading

    (Rakes per month/Wagons per month)

    TOTAL DIVISIONAL OUTWARD LOADING2012-13 2013-14

    Rake Wagon Rake Wagon109 4836 134 6072

    2014-15 2014-15TARGET ACTUAL

    - - 88 4138Total Divisional Inward Unloading

    2012-13 2013-14Rake Wagon Rake Wagon

    72 2868 72 31142014-15 2014-15

    TARGET ACTUAL65 2852 82 3474

    Goods EarningsYear 2012-13 : ` 485.12 CrYear 2013-14 : ` 592.89 CrYear 2014-15 (Target) : ` 675.34 CrYear 2014-15 (Actual) : ` 410.24 Cr

    B. Parcel :No. of Parcel Stations : 8 (NBQ, BNGN, BPRD,NLV

    RNY,TNL,DKGN& RPAN) Loading

    Year 2012-13 : 8080 TonYear 2013-14 : 10370 TonYear 2014-15 (Target) : -Year 2014-15 (Actual) : 22560.4 Ton

    EarningsYear 2012-13 : ` 1.19 Cr.Year 2013-14 : ` 2.02 Cr.Year 2014-15 (Target) :Year 2014-15 (Actual) : ` 3.50 Cr.

  • 16

    NORTHEAST FRONTIER RAILWAYC. Passenger Business: Passenger originating

    Year 2012-13 : ` 99.05 LakhsYear 2013-14 : ` 115 LakhsYear 2014-15 (Target) : ` 60 LakhsYear 2014-15 (Actual) : ` 134 Lakhs

    Passenger earning originatingYear 2012-13 : ` 105.74 Cr.Year 2013-14 : ` 119.73 Cr.Year 2014-15 (Target) : ` 93.21 Cr.Year 2014-15 (Actual) : ` 155.79 Cr.

    D. Sundry EarningsYear 2012-13 : ` 5.21 Cr.Year 2013-14 : ` 15.46 Cr.Year 2014-15 (Target) : ` 4.21 Cr.Year 2014-15 (Actual) : ` 7.24 Cr

    Commercial PublicityYear 2012-13 : ` 16.15 LakhsYear 2013-14 : ` 9.08 LakhsYear 2014-14 (Target) : ` 25.00 LakhsYear 2014-15 (Actual) : ` 5 Lakhs

    E. Personnel Staff strength on roll : Gaz. - 51, Non.Gaz - 7869,

    : Total - 7920 Total No. of Railway Quarters : 6299 Railway Hospitals : 2 (New Bongaigaon,

    Rangapara North)Health unit - 9

    F. Passenger Amenity Adarsh stations : 10 Watering Stations : 2 (New Bongaigaon,

    Rangapara North) PRS : 22 (RH-9,NRH-13)

    UTS : 63UTS cum PRS : 18

    JTBS : 01 Retiring Room Stations : 06

  • 17

    ANNUAL PERFORMANCE REPORT - 2014-15

    LUMDING –DIVISIONA. Infrastructure

    BG MG Total

    Route K.M. 638 400 1038Single Line 615 400 1015

    Double Line 23 — 23Track K.M. 622 698 1320

    Number of Rly StationsTotal-147A1 : 1 (GHY)A : 4 (KYQ, LMG, DMV, SCL)B : 4 (HJI, DPU, HBN, AGTL)D : 14E : 104F : 20

    Workshops : Nil

    Diesel Sheds : 02 (New Guwahati-(BG)-103,Lumding-(MG)-63

    Fueling points : Lumding,Karimganj, Guwahati,New Guwahati & Kamakhya.

    Crew Lobbies : Lumding,Badarpur, Guwahati &New Guwahati

    Running Rooms : 07 at Lumding, New Guwahati, Guwahati,Shilghat, Mairabari, Agartala & Karimganj)

    Rest Rooms : 01 at Chaparmukh

    B.Freight & Parcel Business Goods Sheds – 21 Nos

    (BG – 06 Nos + MG – 15 Nos.)Goods Sheds Siding – 12 Nos

    (IOC Siding – 05 + FCI Siding–05 + HPC Siding – 02).

  • 18

    NORTHEAST FRONTIER RAILWAY

    (a) Goods –

    Outward/Inward loading

    (Rakes/Wagons per month)

    TOTAL DIVISIONAL OUTWARD LOADING

    2012-13 2013-14

    Rake Wagon Rake Wagon

    343 14391 438 18411

    2014-15 2014-15TARGET ACTUAL

    696 29381 686 28835

    TOTAL DIVISIONAL INWARD LOADING

    2012-13 2013-14

    2474 103909 2623 110161

    2014-15 2014-15TARGET ACTUAL

    - - 2842 119387

    EarningsYear 2012-13 : ` 117.21 CrYear 2013-14 : ` 135.38 CrYear 2014-15 (Target) : ` 210.36 CrYear 2014-15 (Actual) : ` 176.86 Cr

    (b) Parcel No. of Parcel Stations : 60 Nos.

    LoadingYear 2012-13 : 143636 TonYear 2012-13 : 129213 TonYear 2014-15 (Target) : Year 2014-15 (Actual) : 131721 Ton

  • 19

    ANNUAL PERFORMANCE REPORT - 2014-15 Earnings

    Year 2012-13 : ` 39.53 CrYear 2013-14 : ` 41.17 CrYear 2014-15 (Target) : -Year 2013-14 (Actual) : ` 52.95 Cr

    C. Passenger Business

    Passengers originatingYear 2012-13 : ` 2.67 CrYear 2012-13 : ` 2.75 CrYear 2014-15 (Target) : ` 3.70 CfYear 2013-14 (Actual) : ` 2.33 Cr

    Passengers Earning originating

    Year 2012-13 : ` 381.34 CrYear 2013-14 : ` 450.90 CrYear 2014-15 (Target) : ` 598.20 CrYear 2014-15 (Actual) : ` 487.31 Cr

    D. Sundry Earnings

    Total

    2012-13 : ` 17.19 Cr.2013-14 : ` 18.54 Cr.2014-14 (Target) : ` 2.40 Cr.2014-15 (Actual) : ` 23.79 Cr.

    Commercial Publicity

    Year 2012-13 : ` 52.08 LakhsYear 2013-14 : ` 71.40 LakhsYear 2014-15 (Target) : ` 84.00 LakhYear 2014-15 (Actual) : ` 34.33 Lakhs

  • 20

    NORTHEAST FRONTIER RAILWAYE. Personnel

    Staff Strength : Gaz. - 112,Non-Gaz -16539,Total -16651

    Total Number of Qrs. : 18975

    Total Rly. Hospitals/Dispensaries : 2

    Total No of Health Unit : 13

    Total Railway Schools : 3

    F. Passenger Amenity

    Adarsh Stations : 06 Nos.

    Clean Train Station : 01 No.

    Watering Stations : 04 Nos.

    Departmental Linen Depot : 01 at KYQ

    Catering - Jan Ahar : 01(Guwahati)

    PRS : 17

    UTS : 110

    Non rail Head PRS : 34

    Retiring Room Stations : 13

  • 21

    ANNUAL PERFORMANCE REPORT - 2014-15

    TINSUKIA-DIVISIONA. Infrastructure

    BG MG NG Total

    Route K.M. 534 20.58(closed) — 555

    Single Line 534 20.58(closed) — 555

    Double Line — — — —

    Track K.M. 734 — — 734

    Number of Rly Stations:Total : 72A1 : NILA : 3 (TSK, JTTN, DBRT)B : 3 (MXN, NTSK, DBRG)D : 14E : 27F : 25

    Workshop : 1 (Dibrugarh Town)

    Diesel Shed : NIL

    Major Depots : 3 (DBRG-Coaching,NTSK-Wagon-coaching& DBWS - Stores)

    Crew lobbys : 3 (Mariani, New Tinsukia,Dibrugarh)

    Running Rooms : 7 (MXN, NTSK, DBRT,LLO, SLGR, NLR & FKG)

    Major fuelling points : 1 (New Tinsukia)

    B. Freight & Parcel Business(a) Goods

    Goods sheds/Sidings : 17 nos.(G.Shed=9,Sdg=8)

  • 22

    NORTHEAST FRONTIER RAILWAY

    Outward /Inward loading

    (Rakes per month/Wagons per month)

    TOTAL DIVISIONAL OUTWARD LOADING

    2012-13 2013-14Rake Wagon Rake Wagon

    54 2363 46 2068

    2014-15 2014-15 TARGET ACTUAL

    - 50 - 2214

    TOTAL DIVISIONAL INWARD LOADING2012-13 2013-14

    Rake Wagon Rake Wagon52 2008 49 1330

    2014-15 2014-15TARGET ACTUAL

    - 56 - 2636

    Goods EarningsYear 2012-13 : ` 351.67 Cr.Year 2013-14 : ` 271.96 Cr.Year 2014-15 (Target) : ` 248.84 Cr.Year 2014-15 (Actual) : ` 295.26 Cr.

    (b) Parcel

    No. of parcel Stations : 31 nos.

    LoadingYear 2012-13 : 36664 TonYear 2013-14 : 25757.8 TonYear 2014-15 (Target) : -Year 2014-15 (Actual) : 11808 Ton

  • 23

    ANNUAL PERFORMANCE REPORT - 2014-15 Earnings

    Year 2012-13 : ` 14.04 Cr.Year 2013-14 : ` 11.04 Cr.Year 2014-15 (Target) : -Year 2014-15 (Actual) : ` 5.02 Cr.

    C. Passenger Business Passenger originating

    Year 2012-13 : ` 86.26 LakhsYear 2013-14 : ` 84.71 LakhsYear 2014-15 (Target) : ` 130.00 LakhsYear 2014-15 (Actual) : ` 80.26 Lakhs

    Passengers Earning originating

    Year 2012-13 : ` 141.76 Cr.Year 2013-14 : ` 154.52 Cr.Year 2014-15 (Target) : ` 212.61 Cr.Year 2014-15 (Actual) : ` 170.82 Cr.

    D. Sundry Earnings Total

    Year 2012-13 : ` 11.22 Cr.Year 2013-14 : ` 20.39 Cr.Year 2014-15 (Target) : ` 1.10 Cr.Year 2014-15 (Actual) : ` 16.97 Cr.

    Commercial PublicityYear 2012-13 : ` 16.27 LakhsYear 2013-14 : ` 17.20 LakhsYear 2014-15 (Target) : ` 23.00 LakhsYear 2014-15 (Actual) : ` 16.51 Lakhs

    E. Personnel Staff strength on roll : Gaz-47, Non.Gaz-6401

    Total - 6448

    Total No. of Railway Quarters : 7351

    Railway Hospitals : 2 (New Tinsukia ,Dibrugarh Town),

    Dispensary/H. Unit : 6

  • 24

    NORTHEAST FRONTIER RAILWAY

    Railway Schools : 3 (NTSK, MXN &DBRT-2)

    F. Passenger Amenity Adarsh stations : 01 (Jorhat Town)

    Watering Stations : 05

    24 Coach stations : 07

    Catering - Food plaza : 02 NTSK & JanAhar(IRCTC) NTSK

    PRS : 09UTS : 46UTS cum PRS : 14Non rail Head PRS : 07 (Majuli, Dinjan,

    Sadiya, Tezu,Along, Roing &Hayuliang)

    Retiring Room Stations : 10

  • 25

    ANNUAL PERFORMANCE REPORT - 2014-15

    KEY PERFORMANCE PARAMETERSSAFETY

    Category wise analysis of consequential Accidents

    * Z-Zonal T-Total

    Category 2012-2013 2013-14 2014-15Apr.-Mar

    RB Z T RB Z T RB Z T

    1. Collision 1 0 1 0 0 0 1 0 1

    2. Derail- a) Station 0 1 1 0 0 0 0 0 0ment

    b) Mid-Section 2 1 3 2 0 2 2 0 2

    3. L. Xing a) Manned 0 0 0 0 0 0 0 0 0

    b) Un-Manned 3 1 4 3 0 3 0 0 0

    4. Fire in Trains 0 0 0 1 0 1 1 0 1

    5. Misc 0 0 0 0 0 0 0 0 0

    TOTAL 6 3 9 6 0 6 4 0 4

  • 26

    NORTHEAST FRONTIER RAILWAY

    Summary of All Accidents

    Accidents at Level Crossing

    0

    2

    4

    6

    8

    10

    2012-13 2013-14 2014-15

    6 6

    43

    0 0

    9

    6

    4

    RB Zonal Total

    0

    1

    2

    3

    4

    2012-13 2013-14 2014-15

    0 0 0

    4

    3

    0

    Manned Un-manned

  • 27

    ANNUAL PERFORMANCE REPORT - 2014-15

    Manning Of Level Crossing

    Number Of Unauthorised X-ings

    0

    10

    20

    30

    40

    50

    60

    70

    80

    Target Progress Target Progress Prop. Target

    Progres

    2012-13 2013-14 2014-15

    75

    3

    6065

    40

    30

    6 49

    111

    121

    263 ALIPURDUARKATIHAR

    LUMDING

    RANGIYA

    TINSUKIA

  • 28

    NORTHEAST FRONTIER RAILWAY

    Freight Loading (MT)Target 2014-15 = 12.5(MT)

    FRIEGHT LOADING & EARNINGS

    Loading dropped due to ban imposed by National GreenTribunal for transportation of Coal in Meghalaya

    Loading is affected due to closure of LMG-BPB-SCL-AGTLmeter gauge section for gauge conversion. MG POL loading,Stone-chips and Bamboo loading, Rebooking of Foodgrainfor MG terminals are affected.Change of freight class rate of Bamboo traffic from LR-4 toLR-3

    9.5

    10

    10.5

    11

    11.5

    12

    12.5

    2012-13 2013-14 2014-15 Target

    2014-15

    10.536

    12.149

    12.5

    11.527

  • 29

    ANNUAL PERFORMANCE REPORT - 2014-15

    Loading On B.G. (In Wagons/Day)0.4% Improvement in comparison to same period of last year

    440

    450

    460

    470

    480

    490

    500

    510

    520

    530

    2012-13 2013-14 2014-15

    472

    521 523

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    2012-1 3 2013-14 up to Sept 2013-14

    up to Sept 2014-15

    46

    8 1

    58 56

    Gauge conversion work for LMG-BPB-SCL section started from 1st Oct/2014, thus MG section closed for traffic on 30th. Sept’2014.

    Loading On M.G. (In Wagons/Day)

  • 30

    NORTHEAST FRONTIER RAILWAY

    Transhipment via LMG (Wagons/Day)

    Induction of FCI FG via LMG

    38

    39

    40

    41

    42

    43

    44

    45

    46

    47

    2012-13 2013-14 2013-14 (Up to Sept)

    2014-15 (Up to Sept)

    42

    41

    47

    41

    0

    100000

    200000

    300000

    400000

    500000

    600000

    700000

    800000

    2012-13 2013-14 2013-14 (Up to Sept)

    2014-15 (Up to Sept)

    672480724680

    412056

    326592

    (in thousand ton)

    Gauge conversion work for LMG-BPB-SCL secion started from 1stOct/2014, thus MG section closed for traffic on 30th Sept’2014

  • 31

    ANNUAL PERFORMANCE REPORT - 2014-15

    Freight earnings (Originating) Rs. in Crs.

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    1800

    2000

    2012-13 2013-14 2014-15 Target

    2014-15 (Actual)

    1314.111459.41

    1985.59

    1449.52

    104

    106

    108

    110

    112

    114

    116

    118

    120

    122

    2012-13 2013-14 2013-14 (up to Sept)

    2014-15 (up to Sept)

    113

    118

    121

    110

    Gauge conversion work for LMG-BPB-SCL secion started from 1st Oct/2014, thusMG section closed for traffic on 30th. Sept’2014

    M.G. Throughput (Wagons/Day)

  • 32

    NORTHEAST FRONTIER RAILWAY

    Comparative Originating Earnings

    Comparative Apportioned Earnings

    3108

    .91

    3425

    .41

    3067

    .87

    3325

    .66

    0500

    10001500

    200025003000350040004500

    2012-13 2013-14 2014-15 (Target)

    2014-15 (Actual)

    Passenger Other Coaching Goods Sundry Total

    1052

    .76

    127.

    2613

    14.1

    1 3108

    .91

    614.

    78 122

    2.13

    137.

    7414

    59.4

    160

    6.13

    3425

    .41

    1473

    .07

    152.

    1619

    85.5

    963

    0.00

    4240

    .82

    1400

    .88

    155.

    5414

    49.5

    267

    3.89

    3679

    .83

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    4000

    2012-13 2013-2014 2014-15 (Target)

    2014-15 (Actual )

    Passenger Other Coaching Goods Sundry Total

    782.

    8912

    8.73

    1541

    .47 3

    067.

    8761

    4.78 904.

    9614

    2.15

    1672

    .42

    606.

    1333

    25.6

    6

    1021

    .00

    153.

    0019

    04.3

    263

    0.00 10

    23.0

    315

    5.70

    1871

    .88

    673.

    89

    3708

    .32

    3724

    .5

  • 33

    ANNUAL PERFORMANCE REPORT - 2014-15

    Punctuality Performance(%) Of Mail/Exp. Trains (BG)

    Remarks :-• Punctuality performance of Mail/Exp trains has deteriorated for the period

    from April/14 to Mar/15 as compared to corresponding period of previousyear mainly due to -

    • Trains taken over excessively late from other Railways became out ofpath (617 trains lost).

    • Re-scheduling of link trains for late arrival of trains (769 trains lost).• Imposition of SR in APDJ-SGUJ section for wild Elephant movement

    (370 trains lost).• Piloting and running of trains in convoy in entire Assam area, part of

    North Bengal upto NJP & from KIR to KNE for security reason inconnection with Independence Day, 2014 (118 trains lost ).

    • Restriction imposed in flood affected KYQ-GLPT-NBQ section of RNYDiv & Sinkage of bank between AJRE-SNBR stations of LMG Div. due toheavy rain. Trains diverted due to breach and thereby creating congestionin KYQ-RNY-NBQ section. Excessive engineering loss for PQRS work inTSK Div. (310 trains lost).

    • NI work for patch doubling between ABFC-BLK section of KIR Div. (85trains lost).

    • Over saturated BLK-SMTA 137 Kms single line section (utilization 189/157%). In addition, sections are congested because of diversion of freighttrains due to 25 Kmph SR in APDJ-SGUJ Elephant corridor.

    • Frequent Rail Roko/Agitation/Bundh called by different organizations (135trains lost).

    • Excessive failure of S&T gears/Locomotives (332/255 trains lost).• For want of line clear/keeping outside signal by Eastern Railway (260

    trains lost).• Fog mostly in KIR & APDJ Divisions (494 trains lost).

    8 1

    8 2

    8 3

    8 4

    8 5

    8 6

    8 7

    8 8

    8 9

    9 0

    2 0 1 2 -1 3 2 0 1 3 -1 4 2 0 1 4 -1 5 2 0 1 4 -1 5 (Targ e t)

    8 7

    8 6

    8 4

    9 0Figure in %

  • 34

    NORTHEAST FRONTIER RAILWAY

    Punctuality Performance(%) Of Passenger Trains (BG)

    87

    88

    89

    90

    91

    92

    93

    94

    95

    2012-13 2013-14 2014-15 2014-15 (Target)

    95 95

    92

    90

    Figure in %

  • 35

    ANNUAL PERFORMANCE REPORT - 2014-15

    Induction of FCI via LMG

    0

    100000

    200000

    300000

    400000

    500000

    600000

    700000

    800000

    2012-13 2013-14 2013-14 up to Sept

    2014-15 up to Sept

    6724

    80

    7246

    80

    4120

    56

    3265

    92

    In Tonnes

    Induction of FG for NE States

    2 8 0 0 0 0 0

    2 9 0 0 0 0 0

    3 0 0 0 0 0 0

    3 1 0 0 0 0 0

    3 2 0 0 0 0 0

    3 3 0 0 0 0 0

    3 4 0 0 0 0 0

    3 5 0 0 0 0 0

    3 6 0 0 0 0 0

    3 7 0 0 0 0 0

    2 0 1 2 -1 3 2 0 1 3 -1 4 2 0 1 4 - 1 5

    12.9% improvement in current year

    3663

    828

    3118

    290

    3523

    212

    In Tonnes

    12.9% improvement in current year

    Gauge conversion work for LMG-BPB-SCL secion started from 1stOct/2014, thus MG section closed for traffic on 30th Sept’2014

  • 36

    NORTHEAST FRONTIER RAILWAY

    Nature of complaints:-

    Type of complaints % (Nos.)i) Improper behavior, passenger booking

    /Resevation 21.63% 53ii) Theft and pilferages, Bribary and

    Corruption 4.08% 10 iii) Cleanliiness at station 4.08% 10

    PASSENGER COMPLAINTS

    SL Month 2013-14 2014-15 ImprovementNo. (in %)

    1. April 19 19 --

    2. May 34 16 -52.94

    3. June 28 21 -25.00

    4. July 27 24 -11.11

    5. August 22 32 +45.45

    6. September 25 25 --

    7. October 24 19 -20.83

    8. November 23 26 +13.04

    9. December 27 16 -40.74%

    10. January 20 17 -15%

    11. Febrruary 15 12 -20%

    12. March 17 18 +5.88

    Total 281 245 -12.81

  • 37

    ANNUAL PERFORMANCE REPORT - 2014-15

    FINANCIAL REVIEWEARNINGS 2014-15Originating Earnings

    Originating Earnings

    3108

    .91

    3425

    .41

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    4000

    4500

    2012-13 2013-2014 Revised Target 2014-15

    2014-15

    Passenger Other Coaching Goods Sundry Total

    1052

    .76

    127.

    2613

    14.1

    1 3108

    .91

    614.

    78 122

    2.13

    137.

    7414

    59.4

    160

    6.13

    3425

    .41

    1473

    .07

    152.

    1619

    85.5

    963

    0.00

    4240

    .82

    1400

    .88

    155.

    5414

    49.5

    267

    3.89

    3679

    .83

    Earnings Actual Actual Revised Actual Variation Variation2012-13 2013-14 Target 2014-15 with with

    2014-15 Target last year(1) (2) (3) (4) (5) (6=5-4) (7=5-3)

    Passenger 1052.76 1222.13 1473.07 1400.88 -72.19 178.75

    Other127.26 137.74 152.16 155.54 3.38 17.80

    Coaching

    Goods 1314.11 1459.41 1985.59 1449.52 -536.07 -9.89

    Sundries 614.78 606.13 630.00 673.89 43.89 67.76

    Total 3108.91 3425.41 4240.82 3679.83 560.99 254.42

  • 38

    NORTHEAST FRONTIER RAILWAY

    Apportioned Earnings(Figs in Crs of `)

    3067

    .87

    3325

    .66

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    4000

    Actual 2012-13 Actual 2013-2014 Revised Target 2014-15

    Actual 2014-15

    Passenger Other Coaching Goods Sundry Total

    Apportioned Earnings

    782.

    8912

    8.73

    1541

    .47 3

    067.

    8761

    4.78 90

    4.96

    142.

    1516

    72.4

    260

    6.13

    3325

    .66

    1021

    .00

    153.

    0019

    04.3

    263

    0.00 10

    23.0

    315

    5.70

    1871

    .88

    673.

    89

    3708

    .32

    3724

    .5

    Earnings Actual Actual Revised Actual Variation Variation2012-13 2013-14 Target 2014-15 with with

    2014-15 Target last year (1) (2) (3) (4) (5) (6=5-4) (7=5-3)

    Passenger 782.89 904.96 1021.00 1023.03 2.03 118.07

    Other128.73 142.15 153.00 155.70 2.70 13.55

    Coaching

    Goods 1541.47 1672.42 1904.32 1871.88 -32.44 199.46

    Sundries 614.78 606.13 630.00 673.89 43.89 67.76

    Total 3067.87 3325.66 3708.32 3724.50 16.18 398.84

  • 39

    ANNUAL PERFORMANCE REPORT - 2014-15

    (Fig in ` Cr)ANALYSIS OF REVENUE EXPENDITURE

    Earnings Actual Actual Final Actual Variation Variation2012-13 2013-14 Grant 2014-15 with with

    2014-15 FG last year (1) (2) (3) (4) (5) (6=5-4) (7=5-3)

    Dem-3(Genl. Sup.& Services) 294.04 316.30 342.27 341.26 -1.01 24.96

    Dem-4(Repairs& Main P/Way 617.79 617.30 706.03 698.23 -7.80 80.93and works)

    Dem-5(Repairs& Main Motive 136.57 165.25 204.34 178.61 -25.73 13.36Power)

    Dem-6(Repairs& Main Carriage 446.05 480.62 553.34 538.44 -14.90 57.82& Wagaon)

    Dem-7(Repairs& Plant & 215.36 224.83 264.35 246.17 -18.18 21.34Equipment)

    Dem-8 (OperatingExpanses Rolling 260.10 286.91 342.19 316.28 -25.91 29.37Stk. & Equipment)

    Dem-9 (Opera-ting Expanses 443.90 413.59 521.38 497.45 -23.93 83.86Traffic)

    Dem-10 (Operating857.13 1345.10 1307.59 1230.66 -76.93 -114.44Expanses Fuel)

    Dem-11 (StaffWelfare & 307.28 326.87 366.75 366.13 -0.62 39.26Amenities)

    Dem-12 (Misc. 245.44 253.03 288.99 285.21 -3.78 32.18Working Expences)

    Dem-13 (PF,Pen & Other 30.19 43.28 56.00 53.41 -2.59 10.13Retirementbenefits)

    Total 3853.85 4473.08 4953.23 4751.85 -201-38 278.77

  • 40

    NORTHEAST FRONTIER RAILWAY

    CAPITAL EXPENDITURE PLANHEAD WISE(Fig in ` Cr)

    PLAN - HEAD Actual Actual Final Actual Utiliza-2012-13 2013-14 Grant 2014-15 tion

    (in %)1100 new Lines 1651.32 1801.51 3080.23 3081.18 100.03

    1400 Guage Conversion 1075.33 12596.52 2107.85 2104.31 99.83

    1500 Doubling 12.69 103.19 217.04 217.58 100.25

    1600 Traffic Facilities 18.07 23.25 31.35 29.24 93.27

    1700 Computerisation 2.10 2.35 9.61 2.95 30.70

    2100 Rolling 289.58 54.71 395.69 406.41 102.71

    2200 Leased Assets 114.58 144.01 174.58 174.97 100.22

    2900 Safety Works LC 56.50 22.76 20.75 22.09 106.46

    3000 Safety Works 7.77 21.94 45.01 44.93 99.82RUB/ROB

    3100 Track Renewals 208.48 104.34 155.00 149.23 96.28

    3200 Bridge Works 15.91 -0.56 19.87 18.52 93.21

    3300 S & T Works 39.09 35.34 33.43 33.34 99.73

    3600 Other Elec. Woeks 6.95 8.29 11.42 8.33 72.94

    4100 Plant & Machinery 11.70 16.26 11.22 15.98 142.42

    4200 Workshops 20.19 19.73 40.10 26.26 65.49

    5100 Staff Quarters 18.76 28.12 25.47 24.67 96.86

    5200 Amenities for Staff 20.96 23.87 27.07 21.66 80.01

    5300 Pass. Amenities 64.82 41.89 52.62 44.71 84.97

    6400 Other Specified 28.58 28.03 31.45 25.62 81.46Works

    Gross Exclu. Susp) 3663.38 4075.55 6489.76 6451.98 99.42

  • 41

    ANNUAL PERFORMANCE REPORT - 2014-15

    0

    2000

    4000

    6000

    8000

    10000

    12000

    14000

    Actual2012-13

    Actual2013-14

    Target 2014-15

    Actual2014-15

    COAL POL FOOD GRAINS DOLOMITE OTHERS TOTAL

    OPERATING RATIO (%)

    COMMODITIES WISE LOADING

    Figs in “000” Tonnes20

    54 247

    613

    4610

    3826

    2210

    536

    1970

    3623

    1493

    1264

    3799

    1214

    9

    2100 3

    410

    1570

    910

    4510

    1250

    0

    1310

    3486

    1340

    3804

    1587

    1152

    7

    170

    175

    180

    185

    190

    195

    2012-13 2013-14 2014-15(Target)

    2014-15(Actual)

    178.39

    193.08 193.33

    187.08

    Actual Actual Target Actual2012-13 2013-14 FG 2014-15 2014-15

    178.39% 193.08% 193.33% 187.08%

  • 42

    NORTHEAST FRONTIER RAILWAY

    Number of Originating passengers in 2014-15 has decreased by 6.95%over 2013-14 and decreased by 9.16% over the target.

    Originating Passenger earnings in 2014-15 has increased by 14.63% over2013-14 and decreased by 4.90% over the target

    84

    86

    88

    90

    92

    94

    96

    98

    100

    102

    2012-13 2013-14 2014-15 (Target)

    2014-15 (Actual)

    100.56

    97.62

    100

    90.84

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    2012-13 2 013-14 2014-15 (Target)

    2014-15 (Actual)

    1052.76

    1222.13

    1473.071400.88

    NUMBER OF ORIGINATING PASSENGER (FIGS. IN MILLION)

    ORIGINATING PASSENGER EARNINGS(FIGS. IN MILLION)

  • 43

    ANNUAL PERFORMANCE REPORT - 2014-15

    0200400600800

    100012001400160018002000

    2012-13 2013-14 2014-15(Target)

    2014-15(Actual)

    1314.111459.41

    1985.59

    1449.52

    ORIGINATING FREIGHT EARNINGS 2014-15

    (` In Crs.)

  • 44

    NORTHEAST FRONTIER RAILWAY

    PERFORMANCE REVIEW

    OPERATING DEPARTMENT

    BG Loaded Receipt (in wagons/day)

    14.6% improvement in current year in comparison to sameperiod of last year

    0

    200

    400

    600

    800

    1000

    1200

    2012-13 2013-14 2014-15

    845 9001031

  • 45

    ANNUAL PERFORMANCE REPORT - 2014-15

    BG Release (No. Of Wagons/Day)

    MG Release (No. Of Wagons/Day) LMG Division

    8.7% improvement in comparison to same period of last year

    1.6% improvement in comparison to same period of last year

    650

    700

    750

    800

    850

    900

    2012-13 2013-14 2014-15

    755

    803

    873

    110

    115

    120

    125

    130

    135

    2012-13 2013-14 2014-15

    118

    134131

  • 46

    NORTHEAST FRONTIER RAILWAY

    Interchange with ER (No. Of Trains/Day)8.6% improvement in comparison to same period of last year

    Interchange With ECR (No. Of Trains)7.3% improvement in comparison to same period of last year

    05

    10

    1520

    25

    30

    35

    2012-13 2013-14 2014-15

    25.429.2

    31.4

    Figure in %

    18

    19

    20

    21

    22

    23

    24

    2012-13 2013-14 2014-15

    23.5

    20.6

    22.1

    Figure in %

  • 47

    ANNUAL PERFORMANCE REPORT - 2014-15

    BG Diesel KM/Day

    MG Diesel KM/Day(LMG Div)

    Diesel KM has been affected due to speed restrictions imposed for movement of elephanson NJP-APDJ section due to congestion on NJP-ROJ-NCB ad KYQ-GHY line. Utilizationis also affected due to locos held up on ballast rakes to secttion under gauge conversion

    200202204206208210212214216

    2012-13 2013-14 2014-15

    205

    215 215

    460480

    500520

    540

    560580

    600

    2012-13 2013-14 2014-15

    589 586

    509

  • 48

    NORTHEAST FRONTIER RAILWAY

    (Fig

    ure

    in `

    lakh

    s)

    Com

    mer

    cial

    Ear

    ning

    s(O

    rigin

    atin

    g)

    COMMERCIAL DEPARTMENT

    4361

    .02

    6718

    .53

    5484

    .98

    5594

    .57

    Ope

    ning

    Bal

    ance

    as o

    n 01

    .04.

    2014

    Acc

    rual

    2014

    -15

    Cle

    aran

    ce20

    14-1

    5C

    losi

    ng B

    alan

    ce31

    .03.

    2015

    Stat

    ion

    Out

    stan

    ding

    (Goo

    ds &

    Coa

    chin

    g)(F

    igur

    e in

    ` la

    khs)

    Ear

    ning

    Par

    ticul

    ars

    Achi

    vem

    ent

    2012

    -13

    2013

    -14

    Targ

    et 2

    014-

    2015

    Act

    ual 2

    013-

    2014

    Act

    ual

    2014

    -201

    5O

    ver

    Targ

    etO

    ver l

    ast

    year

    Par

    cel &

    6961

    .75

    7040

    .17

    7988

    7040

    1788

    38.9

    0(-)

    4.5

    2(+

    ) 18.

    59Lu

    ggag

    eTi

    cket

    1933

    .15

    2252

    .64

    Trg.

    not

    rec

    2252

    .64

    2830

    .54

    -(+

    ) 25.

    65C

    heck

    ing

    from

    Rly

    Bd.

    Com

    mer

    cial

    127.

    5814

    6.72

    200.

    0014

    6.72

    120.

    62(-)

    39.

    69(-)

    17.

    79Pu

    blic

    ity

  • 49

    ANNUAL PERFORMANCE REPORT - 2014-15

    0

    50

    100

    150

    200

    2012-13 2013-14 2014-15(Target)

    2014-15(Actual)

    132.05155.6 159.5 163.43

    02

    468

    10

    2012-13 2013-14 2013-14 2014-15(Target)

    2014-15(Actual)

    4.4 4 4.1

    8.5

    3.72

    3.5 3.32

    3.9

    7.74 8.38.67

    10 9.27

    BG Coach BG Wagon BG Loco

    MECHANICAL DEPARTMENT

    Diesel Loco availibility (BG&MG)

    Ineffective % (Loco/Coach/Wagon)N

    umbe

    r/Mon

    thN

    umbe

    r/Mon

    th

  • 50

    NORTHEAST FRONTIER RAILWAY

    0

    2

    4

    6

    8

    10

    2012-13 2013-14 2014-15

    8.227.13

    6.15

    0

    1000

    2000

    3000

    4000

    5000

    2012-13 2013-14 2014-15(Target)

    2014-15(Actual)

    Coach Wagon ROH

    Workshop Out Turn (Coaching/Wagon)

    Diesel Loco Reliabilty

    Num

    bers

    /Mon

    thFa

    ilure

    /100

    loco

    /mon

    th

  • 51

    ANNUAL PERFORMANCE REPORT - 2014-15

    0

    1

    2

    3

    4

    5

    2012-13 2013-14 2014-15(Target)

    2014-15(Actual)

    4.17 4.06 4.04 4.01

    1.94 1.98 1.9 1.89

    Passenger Goods

    Specific Fuel Consumption

    Ltrs

    ./100

    0 G

    TKM

  • 52

    NORTHEAST FRONTIER RAILWAY

    ELECTRICAL DEPARTMENTTarget

    SN Item/Activity 2012-13 2013-14 2014-15 2014-15A Train lighting & Air conditioning1 Certified Non-AC cases (Nos) 0 0 5 12 Punctuality loss (AC & Non-AC) 30 29 45 43

    (Nos)3 Provision of Emergency Light 163 135 150 58

    (Nos)4 Modification of Fuse Distribution

    Board in GS & SCN Coaches 450 402 450 170B Electrical Power1 Electric energy consumption in 137.65 139.33 136.90 143.23

    non traction area in MU2 Electrification of Railway 190 250 30 126

    Quarters (Nos)3 Provision of energy efficient 60 1975 1740 1590 1597

    Woeiling fans (Nos)4 Use of CFL fittings at corridors,

    staircases, toilet and bathroom 4335 4199 775 5565in place of incandescent lamps(Nos)

    5 Rewiring of Staff quarters (Nos) 1613 1388 590 11716 Replacemnt of Convertional KW

    meters by electronic KWh 3102 1998 1500 1716meters (Nos)

    7 HSD oil consumption in DG set 795.19 574.48 604 571in KL

    8 Provision of electric fan regula-tors in place of conventional fan 2131 2111 2250 2025regulators in ceiling fan (nos)

    9 Use of solar street lights for(a) Remote places & colories(b) Training Institute 30 16 76 122(c) Retiring room(d) Officers rest house

    10 Electrification of manned LC 52 63 9 57gates

  • 53

    ANNUAL PERFORMANCE REPORT - 2014-15

    0

    50

    100

    150

    200

    2012-13 2013-14 2014-15(Target)

    2014-15(Actual)

    163135

    150

    58

    Emergency Light

    0

    10

    20

    30

    40

    50

    2012-13 2013-14 2014-15(Target)

    2014-15(Actual)

    30 29

    45 43

    Punctuality Loss Cases of Train Lighting & AC

    0

    100

    200

    300

    400

    500

    2012-13 2013-14 2014-15(Target)

    2014-15(Actual)

    450402

    450

    170

    Modification of FBD covers

  • 54

    NORTHEAST FRONTIER RAILWAY

    0500

    100015002000250030003500

    2012-13 2013-14 2014-15(Target)

    2014-15(Actual)

    3102

    19981500 1716

    134

    136

    138

    140

    142

    144

    2012-13 2013-14 2014-15Target

    2014-15(Actual)

    137.65

    139.33 139.9

    143.23

    Electric energy consumption in non traction area in MUElectric Energy Consumption in MU

    0

    500

    1000

    1500

    2000

    2012-13 2013-14 2014-15(Target)

    2014-15(Actual)

    16131388

    590

    1171

    Rewiring of staff quarter

    Replacement of Conventional KWH meter by Electronic KWH meters

  • 55

    ANNUAL PERFORMANCE REPORT - 2014-15

    ENGINEERING DEPARTMENTSN Item Unit 2012-13 2013-14 2014-15

    Target Progress

    1 Track renewal CTR 75.97 75.55 27.5 34.09

    2 Ballast Supply ‘000 387.88 400.00 360 407.76cum

    3 Rail/Weld failure No. 61 34 - 53

    4 Insertion of PSC Eq. 65 94.50 80.25 61Turnout sleeper Set

    5 Scrap Offered MT 14082 10055.25 8800 9121.375

    6 Removal of PSR No. 1 19 6 57

    7 manning of UMLCs No. 3 65 40 30

    8 Closure of LCs No. 25 23 40 18

    9 Sundry Earnings Cr. of 28.80 29.39 30 44.21Rs.

    10 USFD testing KM 12359 12936.36 11700 13582.25

    11 Rehabilitation of Br. No. 32 28 30 55

    12 CSM (incl. TEX & DOU) Km 2796 4017.08 3506 3385.28

    13 ISD Km 79.029 93.30 60 65.298

  • 56

    NORTHEAST FRONTIER RAILWAY

    ASSET RELIABILITY

    Introduction of 30 Kmph Loopline

    0

    50

    100

    150

    200

    2012-13 2013-14 2014-15 Total

    7 0 5

    173

    RailWeld

    Total

    0

    20

    40

    60

    80

    2012-13 2013-14 2014-15

    24 18 18

    37

    1635

    61

    34

    53

    Rail Weld Total

  • 57

    ANNUAL PERFORMANCE REPORT - 2014-15

    SIGNAL & TELECOM DEPARTMENTSN

    ITEM

    1 2 3 4 5 6 7

    RRI/P

    I/EI

    Tota

    l Tra

    ck C

    ircui

    ting

    (No.

    of L

    ocat

    ins)

    Blo

    ck P

    rovi

    ng b

    y Ax

    leC

    ount

    er (B

    PAC

    )

    LED

    Lit

    Sign

    al(N

    os. o

    f Sta

    tions

    )

    Dat

    a Lo

    gger

    s

    Leve

    l Cro

    ssin

    gIn

    terlo

    ckin

    g

    Fina

    ncia

    l Exp

    endi

    ture

    Cro

    res

    ` (P

    H 3

    3)

    14 20 16 - 5 5 34.6

    8

    30 120

    33 29 53 31 35.6

    7

    2013

    -14

    Targ

    etAc

    hive

    -m

    ent

    Targ

    et

    12 17 12 2 2 2 37.3

    3 20 14 4 2 14 39.2

    4

    2012

    -13

    Achi

    ve-

    men

    t

    8 22 30 - 12 6 35.0

    0

    Targ

    et

    2013

    -14

    Achi

    ve-

    men

    tU

    pto - - - - - - -

    2013

    -14

    Prop

    or-

    tiona

    teTa

    rget

    Upt

    o - - - - - - -

    Achi

    ve-

    men

    t

    1

    8

    6

    8

    3

    4

    1

    6

    1

    6

    2

    0 34.2

    7

  • 58

    NORTHEAST FRONTIER RAILWAY

    Total Signal Failure

    Total Actual Actual Target Actual %Signal 2012-13 2013-14 2014-15 14-15 Improvement

    Failures in comparisionto 2013-14

    5070 4725 4489 4538 3.96%

    ASSET RELIABILITY: (S&T)

    4000

    4200

    4400

    4600

    4800

    5000

    5200

    2012-13 2013-14 2014-15(Target)

    2014-15(Actual)

    5070

    4725

    4489 4538

  • 59

    ANNUAL PERFORMANCE REPORT - 2014-15

    INS

    UR

    GE

    NC

    Y -

    R

    EL

    AT

    ED

    C

    RIM

    E

    year

    Sabo

    tage

    /Tr

    ack-

    Tem

    perin

    g

    Apr.’

    12to

    21

    81

    11

    014

    Mar

    ,’13

    Apr.’

    13to

    63

    51

    32

    525

    Mar

    ,’14

    Apr.’

    14to

    51

    80

    22

    119

    Mar

    ,’15

    Tota

    l13

    521

    26

    56

    58

    Rec

    over

    yof

    Expl

    osiv

    eB

    omb

    Expl

    osio

    nAm

    bush

    /At

    tack

    Kid

    nap

    ping

    Thre

    atto

    Exct

    ortio

    n

    Mis

    cell-

    aneo

    usIn

    cide

    ntTo

    tal

  • 60

    NORTHEAST FRONTIER RAILWAY

    INCIDENCE OF AGITATIONS : State-wiseFinancial

    State BundhRail- Obstruction/

    Total Year Roko Dharna

    Assam 65 18 38 121

    Apr’12 Bengal 7 1 16 24

    to Bihar 4 0 6 10

    Mar,’13 Manipur 1 0 0 1

    Tripura 1 0 0 1

    Total 78 19 60 157

    Assam 130 42 31 203

    Bengal 7 4 6 17

    Apr’13 Bihar 8 3 1 12

    to Tripura 1 0 0 1

    Mar,’14 Nagaland 2 0 0 2

    Manipur 1 0 0 1

    Total 149 49 38 236

    Assam 69 59 34 162

    Bengal 5 13 6 24

    Apr’14 Bihar 11 3 5 19

    to Mizoram 1 4 1 6

    Mar,’15 Tripura 1 0 0 1

    Arunachal 1 0 0 1

    Total 88 79 46 213

  • 61

    ANNUAL PERFORMANCE REPORT - 2014-15

    STORE DEPARTMENT

    To m

    eet B

    oard

    ’s ta

    rget

    , Eng

    g. S

    crap

    aris

    ing

    shou

    ld h

    ave

    been

    app

    rox

    3500

    0 M

    T.H

    owev

    er E

    ngg.

    Dire

    ctor

    ate,

    Rai

    lway

    Boa

    rd fi

    xed

    targ

    et fo

    r P-w

    ay fo

    r FY

    2014

    -15

    as 8

    800

    MT

    (N. F

    . Rai

    lway

    ) & 4

    000

    MT

    (N. F

    . Rai

    lway

    Con

    stru

    cttio

    n O

    rgan

    izat

    ion)

    onl

    y

    2012

    -13

    2013

    -14

    2014

    -15

    2014

    -15

    Varia

    tion

    (Tar

    get)

    (Act

    ual)

    ASc

    rap

    disp

    osal

    (in `

    Cr.)

    ` 10

    3.58

    ` 82

    .57

    ` 84

    Cr.

    ` 55

    .33

    -34%

    Fina

    ncia

    l Yea

    r 201

    4-15

  • 62

    NORTHEAST FRONTIER RAILWAY

    0

    20

    40

    60

    80

    100

    120

    2012-13 2013-14 2014-15(Target)

    2014-15

    103.58

    82.27 84

    55.33

    28.1

    8%

    18.5

    8%

    (Figure in ` Cr.)

    Earnings from Scrap Disposal

    -10%0%

    10%20%30%40%50%60%

    Without Fuel

    With Fuel Without Fuel

    With Fuel Without Fuel

    With Fuel

    2012-13 2013-14 2014-15 (upto Oct'14)

    Target Achievement

    26 %

    18.8

    2 %

    19 %

    17.2

    8 %

    28 %

    28.1

    8 %

    18.4

    0 %

    18.5

    8 %

    13 %

    49 %

    17 %

    30 %

    Turn over Ratio with Fuel and without Fuel

  • 63

    ANNUAL PERFORMANCE REPORT - 2014-15

    MAN POWER PLANNING

    MANPOWER - SALIENT FEATURES

    Gazetted Cadre ('A' & 'B') Sanctioned - 1161

    On-roll - 988 (including NFR Con. Org.)

    Non-Gazetted Cadre

    Sanctioned - 73016 On-Roll - 63741Total Vacancies - 9275

    Safety Category Vacancies - 3504 (11.18%) [Cadre of 31,351].

    Man Power Planning

    Surrenders- 1442(in redundant & diminishing categories)

    Creations - 303 (In Safety and operational categories for NewAssets/Activities)

    Indents for Recruitment (Placed/Under Process):

    With RRBs - 6010 With RRCs - 1230 posts

    415 Court cases pending (as on 01.04.2015). Winningpercentage of Court case is 75% (114 cases won duringApr’14 to Mar’15).

    Single unified wage period successfully implemented.

    99.32% disbursement of salary through banks.

  • 64

    NORTHEAST FRONTIER RAILWAY

    ACHIEVEMENTS/SYSTEM/IMPROVEMENT

    Operating :A) 1 Instroduction of new trains :-

    i) 55613/55614 Passenger between Dekargaon and Naharlagun(Daily) w.e.f. 07.04.14.

    ii) 13063/13064 Exp. between Howrah-Balughat (Bi-weekly) w.e.f.13.10.14.

    iii) 55820/55819 Passenger between Guwahati and Mendipatharw.e.f. 29.11.14.

    iv) 22504/22503 Premium Exp. between Kamakhya and BangaloreCantt. (weekly) w.e.f. 29.01.15.

    v) 18629/18630 Exp between Ranchi-New Jalpaiguri (weekly)owned by SER w.e.f. 19.02.15.

    vi) 12528/12527 Kamakhya-MAS. Premium (AC) Exp introducedw.e.f. 18.01.2015.

    vii) 22411/22412 AC Exp. between Naharlagun-New Delhi (weekly)w.e.f. 20.02.15.

    viii) 15617/15618 I/C Exp. between Guwahati-Naharlagun (Daily)w.e.f. 20.02.15.

    2 Extension of trains :- i) 55909/55910 (SLGR-DBRG) Pass. To DBRT w.e.f. 22.5.2014.

    ii) 15609/15610 A. A. Exp from GHY to NTSK w.e.f. 21.6.14 & newNo. is 15909/15910 w.e.f.29.8.14.

    iii) 15605/15606 (KYQ-JTTN-MXN) I/C Exp to DBRG via MRHTw.e.f. 01.11.14.

    3. Speeding Up :-i) By speeding up of 15611 LTT-KYQ Exp. to 65 mts the

    pairing train 15612/15611 has been upgraded to SuperfastExp by renumbering as 22512/22511.

  • 65

    ANNUAL PERFORMANCE REPORT - 2014-15B) Clearance of extra rush for tourists and other passengers.

    No of Spl Trains No of Trips Total Seat/Berth

    32 1770 22,45,328

    C) Coaches Augmented:-i) 3867 coaches augmented temporarily with provision of

    3,17,078 seat/berths.ii) 21 coaches augmented permanently with provision of 1872

    berths.

    D) Parcel Cargo Exp. :-91 rakes of Parcel Cargo Exp. were runduring 2014-15 between NGC-PTNR-NGC via CP with earningsof more than Rs.17.6 crore (approx).

    E) Premium Special :- 67 trips Premium special trains were runduring 2014-15 between KYQ-NDLS, KYQ-BNC, KYQ-PUNE,KYQ-MAS & NJP-MAS respectively with earnings of Rs.12.9crore. (approx).

    F) Piecemeal Demand VPs:- 2132 VPs were loaded during 2014-15 with earnings of Rs. 20.5 Cr.(Approx).

    To increase freight loading, the following new loading points wereopened for booking of all goods traffic –

    (i) Dekargaon (DKGN) (ii) Harmuti (HMY)(iii) Tetelia (TTLA) (iv) Jalalgarh (JAG)(v) Naharlagun (NHLN) (vi) Senchoa (SCE)(vii) Tangla (TNL) (viii) Raiganj (RGJ)

    (ix) Surajkamal (SJKL) New automatic freight incentive scheme. Cement and Clinker

    are being loaded from terminals of NGC, TTLA, CGS andDolomite from Dalgaon. Upto March’15, 78 rakes have beenloaded. Due to capturing of this additional traffic, there has beenincrease of 94.3%, 25.6% and 20.7 % loading in Cement,

    Interchange has increased by 11.1%. Loaded Inward hasincreased by 14.6 % & Release has increased by 8.7%.

  • 66

    NORTHEAST FRONTIER RAILWAY Terminal Management System (TMS) has been commissioned

    at Dekargaon (DKGN), Bindukuri (BKTB) , Harmuti (HMY) newlyGauge converted section of RNY-RPAN-MZS Section andJalalgarh (JAG), Ranipatra (RNX) at KIR Division, in addition toexisting locations. On NFR 69 (Sixty nine) location have TMSand 23 number are likely to be provided shortly.

    First Goods train carrying Potato was run on 27.03.15 fromDhupguri to Salchapra on newly constructed BG section of LMG-BPB-SCL.System Improvement in Coaching OperationDecongestion of GHY yard by integration of rakes viz.

    • 12507 (TVC-GHY) Exp. & 15636 (GHY-Okha) Exp. lie over utilizedto run special trains.

    • 15644/15643 KYQ-PURI Exp & 15640/15639 GHY-PURI Exp lieover utilized to run special trains.

    • 15651/15652 Lohit Exp &15653/15654 Amarnath Exp integratedlie over used to run special trains.

    • Using of rake of 15645 LT(T)-GHY to run 12501 GHY-NDLSSampark Kranti Exp for late running of link rake.

    ENGINEERING1.1 Problems of ERCs coming out of the Xing body inserts due to

    elongation of insert eye holes was encountered in yards. Acylindrical ferrule type liner of thickness like 0.5 to 1 mm wasdeveloped and used in yard which is successfully working.

  • 67

    ANNUAL PERFORMANCE REPORT - 2014-15

    1.2 Gauges for checking moulds for PSC BG line sleepers:No specific standard tool for measuring the defects in moulds formanufacturing of PSC BG line sleepers was available. Only variousdimensions at different locationsare given. The prevail ingpractice is to check the differentdimensions by inserting go/nogo measuring plates at variouslocation, which was t imeconsuming. A comprehensivegauge has been developed atCSP Mirza for checking themould dimensions in one go ofmould. This has resulted inimproving quality of f inishedPSC sleepers. This has beenextensively used and found to bevery handy.

    1.3 TWR by in situ flash butt welding

    TWR by MFBW has been started in N. F. Railway and during the year,1233 joints have been welded in situ. In stretches where this work hasbeen executed, the work has beenplanned and executed in a way thatall Thermit Welds, Defective/Wheelburnt Rails, Fishplated joint etc.hav e been el iminated.Simultaneously, SEJs/Glued jointsetc hav e been renewed. Apresentation was made at IRICEN/Pune by CTE/NFR during CTEsSeminar. Further, Tenders for19575 nos joints for TWR by FBWhave been invited and are underfinalization.

  • 68

    NORTHEAST FRONTIER RAILWAY1.4 Rail Wheel Burns :At locations where Train engines stop and start, often rail table isdamaged due to wheel slipping, resulting in wheel burns, causing pits

    upto 2mm/3mm depth atwheel contact. Trialhave been made inone such location inSSE/P.Way sectionby grinding thewheel burnlocations with railprofile grinder withproper ramping ofdepth of burn andobtaining near newrail finish.

    1.5Mechanical Workshop and Dangtal Colony in New Bongaigaonfall physically within the jurisdiction of Rangiya Division but beingmaintained partly by Alipurduar and partly by Rangiya Division. Thiswas causing some managerial and maintenance problems. In orderto have smooth functioning and proper maintenance, re-organizationhas been done and all assets at NBQ have been transferred toRangiya division.

    1.6 Web and SMS based system of complaint redressal formaintenance of quarters has been started at Katihar by Katihardivision.

    1.7 A USFD Rail Museum has been set up in Alipurduar divisionwhere Rail/Weld failure pieces have been kept to educate the P.Way Supervisors and trackmen regarding rail/weld failures andrelated issues.

  • 69

    ANNUAL PERFORMANCE REPORT - 2014-15

    0100000200000300000400000500000600000700000

    2010-11 2011-12 2012-13 2013-14 2014-15

    505860601331

    420925359935

    679284

    Production of BG line Sleepers in Nos.

    2.1 Production of BG line Sleepers:

    Despite contracts of two CSPs having been terminated, theproduction of PSC sleepers has been all time high during the FY.

    2.2 Removal of Permanent Speed Restrictions:-

    57 Nos. PSR has been removed against the annual target of 6.This is the best ever achievement in the history of the NFR.

    010

    203040

    5060

    2010-11 2011-12 2012-13 2013-14 2014-15

    167

    1

    19

    57

    Removal of PRS (in Nos.)

  • 70

    NORTHEAST FRONTIER RAILWAY2.3 Sundry Earning:-

    Sundry Earning of Rs.44.2 Crores have been made against Annualtarget of Rs.30 Crore, which is best in last five years.

    2.4 USFD Testing:-

    13582.25 Km of USFD has been done against the Annual target of 11700Kms . This is the highest achievement in last five years.

    0

    10

    20

    30

    40

    50

    2010-11 2011-12 2012-13 2013-14 2014-15

    20.93 22.4426.96 28.59

    44.2

    Sundry Earnings (in ̀ Crs.)

    020000400006000080000

    100000

    120000

    2010-11 2011-12 2012-13 2013-14 2014-15

    10207.97 10569.37 11244.65

    116614.4

    13582.25

    USFD (In Kms)

  • 71

    ANNUAL PERFORMANCE REPORT - 2014-152.5 Encroachment Removal:-

    Despite resistance of public 1939 Nos. of encroachments havebeen removed and consequently 21.321 hectares of Railway Landcould be realized up to the month. This is the highest achievementin last five years.

    2.6 Construction of LHS/RUB by Pre-cast Segmental method and MegaTraffic Blocks has been started in this Railway, 21 LHS had beenconstructed in 2013-14. In 2014-15, 53 LHS have been constructedso far. This has been achieved despite serious problem of waterlogging, high water table, less working season due to high rainfallarea etc.

    0

    500

    1000

    1500

    2000

    2010-11 2011-12 2012-13 2013-14 2014-15

    88

    624

    42

    1191

    1939

    Removal of Encroachment (In Nos.)

  • 72

    NORTHEAST FRONTIER RAILWAY

    3 2 03 4 03 6 03 8 04 0 04 2 0

    A n n u alTa r g e t

    P r o g r e ss2 0 1 4 -1 5

    3 6 0

    4 0 7 .7 6

    01 0

    2 03 0

    4 0

    A n n ua lTar g e t

    P r o g r e ss2 0 1 4 -1 5

    2 2 .5

    3 4 .0 9

    1 3 61 3 81 4 01 4 21 4 41 4 6

    A n nu a lta r g e t

    P r o g r e ss2 0 1 4 -1 5

    1 3 9

    1 4 4 .9 4

    2.7 Deep Screening:-

    144.94 Km of track has been deep screened (88.64 Km by Machineand 56.30 Km Manually) which is 4.27% higher than the annualtarget.

    2.8 Track Renewal:34.09 CTR units (both Primary and Secondary) have been achievedupto the month against the annual target of 27.5 CTR units thusexceeding the target by 23.96%.

    2.9 Ballast Supply:-407,760 cums of ballast has been supplied against the target of360,000 cums upto the month. Progress is 13.26% higher thanthe Annual Target.

  • 73

    ANNUAL PERFORMANCE REPORT - 2014-15

    0

    200

    400

    600

    800

    1000

    Greasing ofERC (in km)

    Painting of rail corrosion prone

    area (in km)

    Shifting of liner contact area

    by destressing (in km)

    750

    225 275

    968.52

    313.98 407.07

    Annual Target Progress 2014-15

    2.10 Prevention of Rail Corrosion:-To prevent corrosion of rail, precautionary measures like Greasingof ERCs (968.52 Km), Painting of rails (313.98 Km), Shifting ofliners (407.07 Km) etc. has been adopted. We have exceededannual targets in all these activities.

    2.11 Raising of Speed on Simaluguri – New Tinsukia Jn. (101.25Km) of Tinsukia Division increased from 75 Kmph to 100 Kmphfor WDG3A, WDP4B & WDP4D locos.

    2.12 Raising of Speed on loop lines increased from 15 Kmph to 30Kmph on looplines in Katihar – Mukuria section (5 stations) ofKatihar Division.

    2.13 Major Restoration Works: Due to incessant rain on 21.09.2014,the railway track between Krishnai (Km 60/7-8) to Boko (Km 119/2-3) of New Bongaigaon-Goalpara town-Kamakhya section gotwashed out in many locations. There were breaches at 18locations. At km 64/7-8 between Krishnai - Dudhnoi, 70 m (approx)of embankment got washed out. Train running was suspendedfrom 22.09.2014 to 30.09.2014. All trains of New Bongaigaon-Goalpara town-Kamakhya section were diverted throughKamakhya-Rangiya- New Bongaigaon section. Due to untiringefforts of the Railway, the train running resumed on 01.10.2014on restricted speed after restoration of track.

    2.14 Performance of Track Machines:-(i) CSM/TEX/DUO:- 3334 Kms of Track has been tamped by CSM/

    TEX/Duomatic machines against the Annual target of 3506 Kmsi.e. 95.01% of Annual target has been achieved.

    (ii) PQRS:- 66.42 Km of progress of ISD work has been achievedagainst annual target of 69 Km, i.e. 96% of Annual target hasbeen achieved.

  • 74

    NORTHEAST FRONTIER RAILWAY

    (i) Closure of Level Crossing:-

    I) Painting of rails has been done in a length of 313.98 Kmagainst target of 225 Km.

    II) Greasing has been done in a length of 968.52 Km againsttarget of 750 Km.

    3.0 MEDICAL:3.1. 302 numbers of Multipurpose Healtth checkup camps were

    organised in all the division of N. F. Railway & 6962 no’s ofbeneficiaries were covered during this period

    3.2. Special cleanliness drive was undertaken in taken in all A-1, A&Bcategory Rly Station in the month of June/2014.

    3.3. 497 no. of registration & 98 no. of food licences under food safety& standad Act/2006 have been issued. More over 70 no. of foodsamples under food safety & standard Act/20006 have beencollected & sent to Food Analysist/GHY & Kolkatta where 15 no.of Food samples have beenn declared unsafe substandard &misbranded which have been put under Adijudication &prosecution in the Court of Law.

    3.4. Two round pulspolio vaccination campign was organized in theentirre N. F. Railway on 18.01.15 to 20.01.15 to 25.02.15 & 21766

    2.15 SAFETY MEASURES:- (i) Manning of Unmanned Level Crossing:-

    Year Target Progress2012-13 75 32013-14 60 652014-15 40 30

    Unmanned level Crossing

    Year Low TVU LHS Divisions Manned Total

    Tar Prog Tar Prog Tar Prog Tar Prog Tar Prog

    ‘12-13 0 1 16 2 5 17 5 5 26 25

    ‘13-14 2 7 25 10 8 5 4 1 39 23

    ‘14-15 3 0 25 6 7 7 5 5 40 18

  • 75

    ANNUAL PERFORMANCE REPORT - 2014-15& 26277 nos (both Rly non Rly) of children between age group of(0-5) years were immunized.A seminarr on CKD -Cum-Abdomen perit9oneal Dialysis wasorganized at DBRT Railway Hospital on 2103-2015.

    4.0 MECHANICAL:4.1. Steam condensate recovery system for saving boiler operation

    cost of Kamakhya laundry was adjudged as 2nd best innovationat Railway Board’s level and an award of Rs. 2 lakhs has givenby Board.

    4.2. Trial for 12 coach DEMU formation has been successfullyconducted in KIR division. It will mitigate the woes of commutersdue to rampant overcrowding of trains in that area.

    4.3. NFR has achieved 2nd best Goods SFC figure(1.78 litre/1000GTKM) amongst 16 Zonal Railways. This has been possible bystrict enforcing of trip ration and focused maintenance of DieselLocomotives in NFR Sheds.

    4.4. First ever multi formation of WDG4 loco was done by SiliguriDiesel Shed on 16-12-2014 for movement of ballast train inextremely difficult terrain of LMG-BPB section having gradient of1 in 60. Goods trains are regularly running on LMG-BPB-SCLsection hauled by WDG4 multi locomotives.

    4.5. New 2(two) bedded Running Room as per Railway Board’s normshas been commissioned at New Jalpaiguri for providing improvedcomfort and un-disturb rest of Running staff. 55 (fifty five ) sets ofcrew can take rest at any given time in this Running Room.

    4.6. Restoration of train services has been done in sections affectedby landslide in DHR. Now NG trains are running from Siliguri toDarjeeling on trial basis wef 25.12.2014.

    4.7. High speed self propelled accident relief train (HS-SPART) ofRangiya division has been commissioned in August-2014 and isworking satisfactorily. This is the First HS-SPART of N.F.Railway

    4.8. A model of bio-toilet from Coaching Depot/GHY was exhibited intechnical exhibition cum presentation at IIT/GHY which was heldw.e.f 05-09-14 to 07-09-14. At this exhibition, the working of Bio-Toilet and its components was described to the enthusiasticviewers, which was well appreciated by them.