NEWEA/NYWEAJointSpringMee3ngGroton,Connec3cut
June7,2016
TheCityofGroton,CT’sPublicAwarenessCampaignSuppor3ngWWTFImprovements
andTheMashantucketPequotTribalNa3on’s
WWTFWaterReuseSuccessStory
PresentersStephenSeigalP.E.,BCEE,Tighe&Bond
DavidDrobiak,MashantucketPequotTribalNa3on
CityofGrotonWWTFUpgradeProjectBackground
Sludge Holding Tanks
Grit /Screenings Room
Covered Primary Clarifiers
Chlorine Contact Tank
Blower Building
Aeration Tanks
Secondary Clarifiers
Digesters
CityofGrotonWWTFUpgradeProjectGoals
■ Reduce unexpected repairs and operating budget impacts
■ Identify equipment and structures in need of rehab or replacement
■ Develop a phased capital improvement plan
CIPNeeds–Immediate/ShortTerm
Es$matedCost
$770,000
IssueRepairprimaryclarifiertanksandhatches
CIPNeeds–Immediate/ShortTerm
Es$matedCost
$1,400,000
IssueReplaceprimaryclarifierequipment
CIPNeeds–Immediate/ShortTerm
Es$matedCost
$408,000
IssueRepairconcreteatprimarypumpwetwellandflowdistribu3onstructures
CIPNeeds–Immediate/ShortTerm
Es$matedCost
$497,000
IssueReplacefinalclarifierequipment
CIPNeeds–Immediate/ShortTerm
Es$matedCost
$560,000
IssueReplaceboilerandheatexchanger
CIPNeeds–Immediate/ShortTerm
Es$matedCost$1,102,000
IssueReplaceelectricalservice/transformers,motorcontrolcenters,feeders,andligh3ng
CIPNeeds–Immediate/ShortTerm
IssueRenovateBlowerBuildingandRelocateLaboratory
Es$matedCost
$380,000
BlowerBuilding
ProjectCostSummary
Work performed by General Contractor $ 4.5 Million
Work performed by City, Engineering, $1.6 Million and Contingency TOTAL ESTIMATED PROJECT COST $6.1 Million
Groton’sPublicEduca3onCampaign
■ Mul3pleStepProgram
– EducateCityLeadersaboutNeedforProject
tpo TREATMENT PLANT OPERATOR
EducateCityLeadersabouttheProject
Groton’sPublicEduca3onCampaign
■ Mul3pleStepProgram
– EducateCityLeadersaboutNeedforProject
– EducatethePublic
EducatethePublic
■ City’sWebsite
EducatethePublic
■ City’sWebsite
■ Newspapers
EducatethePublic
EducatethePublic
■ City’sWebsite
■ Newspapers
■ FacilityTours
EducatethePublic
■ City’sWebsite
EducatethePublic
■ City’sWebsite
■ Newspapers
■ FacilityTours
■ Video
TheMashantucketPequotReclaimedWaterProcess;
ThePro&Cons
DavidDrobiak,Superintendent,MPTNWWTP102TrolleyLineBoulevardMashantucket,CT06338
* 1993-MashantucketPequotTribalNation(MPTN)buysLakeofIsles(LOI)property
* 1998-MajorexpansionatWastewaterTreatmentPlant
* 2000-MPTNbuildstwo18holechampionshipgolfcoursesusingreclaimedwaterirrigation
ReclaimedWaterHistory
* ModificationstotheexistingWWTFincluded:
* addSBRtank(SBR4)* retractablediffuserstoSBR3&4* UVdisinfectionsystemupgrade
* centrifugeforsolidshandling
ReclaimedWaterHistory2003SystemUpgrade
* TheLOIGolfCourseusesan800,000gallonreclaimedwaterstoragetank
* Wateringoccursbetweenthehoursof9PM-3AM
* Variablespeedpumpsfillthestoragetankonacontinuousbasis
SystemOperation
MPTNWWTPProcess
* TheMPTNWWTPProcessincludes:
* InfluentScreening
* SequencingBatchReactors
* PostEqualizationTanks
MPTNWWTPProcess
* PostEffluentFiltration
* Eachfilterhasanaveragecapacityof1.5mgd
* Mediaisa10micronnylonpilecloth
MPTNWWTPProcess
* UVDisinfection
* TrojanUV3000Pluswith3banksof80bulbseach
* Provides≥100mw/cm2<70%transmittanceatapeakcapacityof5.7mgd
MPTNWWTPProcess
MPTNWWTPProcess
* FinalEffluentStorageDisinfectedorDisposalto:
* RapidInfiltrationBeds
* ReclaimedWaterStorageTank
* WasteActivatedSludgeHoldingTanks
* SludgeHandlingFacility
* UltimateDisposal-Incineration
* ReuseispermittedfromApril1throughOctober30
* NosprayapplicationofReclaimedwaterduringrainfall,afterleaffall,orexcessivewindyperiods
* Syringingofgreenswithhandheldhosewhennooneotherthanmaintenancepersonnelarewithin50ft
DischargePermitHighlights
* PermitLimits:* BOD–10mg/l
* TSS–5mg/l
* TotalNitrogen–10mg/l
* TotalPhosphorus–1mg/l
* Turbidity–<2.0NTU
* MaxDailyFlow–1,200,000gpd
* ChlorineResidual–0.2–1.5mg/l
* FecalColiforms–Nottoexceed2.2col/100mL
* UVDosage–Needtomaintainatleast100mWsec/cm2
DischargePermitHighlights
5parametersthatrequireceasingreclaimedwater:
* TheUVdoseisnotmet
* Turbidityexceeds2NTU
* Chlorineresiduallimitinnotmet
* Fecalcoliformexceeds2.2col/100mL
* Totalphosphorusexceeds1.0mg/l
DischargePermitHighlights
* Pros—
* It’sbenefitstotheenvironmentaresubstantial
* Itextendsthelifeexpectancyoftherapidinfiltrationbeds
* Thecostsavingsissubstantial.Potablewaterversusreclaimedwateris6timesthecost
ReclaimedWaterSystemPros&Cons
* Cons–* Thestringentdischargepermitnecessitates:
* Constantmonitoring
* Dailyadjustments
* Repairs
* ReplacementofEquipment
* Maintenance
* Troubleshooting
SystemPerformancePros&Cons
* Forthepast6yearsthesystemhaslargelyoperatedasintended
* Suppliedover160milliongallonsofreclaimedwatertoLakeofIsles,withover300milliongallonssince2006
Summary
Thankyouto:MichaelBoland–MPTN,Directorof
NaturalResourcesJenniferPorter–MPTN,Admin
AssistantIIforUtilities&Wastewater