Analysing the status quo of CDM projects...marketing of CERs and for identifying international...

16
Analysing the status quo of CDM projects PMR 13 th Meeting of the Partnership Assembly (PA13) 29 OCTOBER, 2015 – SWEIMEH (DEAD SEA), JORDAN Carsten Warnecke, NewClimate Institute Noémie Klein, Ecofys

Transcript of Analysing the status quo of CDM projects...marketing of CERs and for identifying international...

Page 1: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

Analysing the statusquo of CDM projects

PMR 13th Meeting of the Partnership Assembly (PA13)

29 OCTOBER, 2015 – SWEIMEH (DEAD SEA), JORDAN

Carsten Warnecke, NewClimate Institute

Noémie Klein, Ecofys

Page 2: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

Insights from BMUB research

CDM portfolio analysis

Aug 2013 – Oct 2015

Institutions: NewClimate Institute,

Ecofys, TÜV SÜD

Publications:

Status Report released in May 2015

3 Focus Studies in preparation

29.10.2015 www.newclimate.org 2

Page 3: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

Background & Objectives

Registered CDM projects face substantial challenges due to record low CER prices

Implemented projects may no longer be able to cover their operational costs and/or transaction costs

Projects might not be implemented, shut down or modified for continuation outside the CDM

Solid up-to-date information required to design tailored approaches for efficient and effective support

Empirical analysis of the situation of CDM project activities on different levels: globally, project types and host countries

Creation of a database with great value for tailor-made recommendations and support

29.10.2015 www.newclimate.org 3

Page 4: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

Approach

29.10.2015 www.newclimate.org 4

Definition of research population

(5656 projects in selected project

types & countries)

Sampling

(1310 selected project cases)

Compilation of project

status database /

Questionnaire

Status inquiry / evaluation of projects

(Analysis of data sources, direct communication, secondary contacts)

Data analysis

Establishinga contact database

CDM Projects

(7338 projects with registration date in 2012)

Conclusions &Recommen-

dations

Stratified sampling for a selection of22 host countries and 26 project (sub-)types

Page 5: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

Data collection

Evaluation period: March – October 2014

>30 questions related to project status, CER marketing, barriers, costs,

and support

Overall response rate 82% (1075/1310)

50% of responses provided detailed information

Project team covered 8 nationalities

Questionnaires in English, Spanish, Chinese and Portuguese

Substantial effort in project-by-project approach

Substantial data beyond the survey collected

(e.g. >50 interviews)

29.10.2015 www.newclimate.org 5

Page 6: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

Responses

29.10.2015 www.newclimate.org 6

Projects in sample

Information received

Brazil 113 65 %

Chile 59 100 %

China 274 74 %

Colombia 31 100 %

India 244 85 %

Indonesia 78 76 %

Israel 25 92 %

Malaysia 76 89 %

Mexico 80 89 %

Peru 31 94 %

S. Africa 50 84 %

S. Korea 52 44 %

Thailand 64 81 %

Vietnam 57 100 %

C. America1 47 100 %

SS Africa2 29 100 %

Per project types

Agric. / Forest Residue84 %

Hydro 2<20MW88 %

Bagasse power 81 % Landfill gas flaring 83 %

Palm oil waste 82 % Landfill gas power 88 %

Clinker replacement 53 % Methane Flaring 73 %

CMM 78 % Methane power 86 %

Household Stoves 96 % Composting 83 %

Household Lighting 76 % Domestic manure 100 %

EE Industry 73 % Adipic acid 100 %

Coke oven gas / Iron Steel heat

86 %Nitric acid

79 %

Cement heat 77 % HFC23 67 %

Oil to NG fuel switch 67 % Solar PV 73 %

New NG plant 88 % Solar water heating 86 %

Micro Hydro 83 % Wind 83 %

1 includes: Guatemala, Costa Rica, Honduras, Panama2 includes: Kenya, Rwanda, Senegal, Uganda Marked in Red = PMR Implementing Country Participants

Page 7: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

Projects implemented

Up to 85% of registered CDM projects with registration date in or before 2012 have full technical implementation

Excl. China and India just up to 68% of projects are fully implemented

29.10.2015 www.newclimate.org 7

85%

6%

1%1%2%

5%

<1%

Projectimplementation

status

Fully implemented

Implementation / construction started

Investment decision made

Planning phase

No implementation planned

Dismantling of implemented activity

I do not know.

What is the technical

implementation status of

the CDM GHG mitigation

activity?

Page 8: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

Projects operational

Up to 79% of registered CDM projects are in regular operation

Excl. China and India just up to 53% of projects are operational

The rate of operational projects globally could decline by 5% within the next 12 months

29.10.2015 www.newclimate.org 8

79%

3%

1%1% 15%

CDM component operational

status

In regular operation

Regular operation temporarily stopped

Regular operation permanently stopped

Regular operation not started, no GHGmitigationNo CDM-conformant operation, alternativeGHG mitigation equipment operatingI do not know

What is the operational

status of the CDM

component of the GHG

mitigation activity?

Page 9: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

Variations are significant

Asian countries forecast a decline in operational projects over the next 12 months, whilst other regions forecast an increase

Low regular operation in Sub-Saharan Africa group (36%), whilst the Central America group reports 69%

High operational status demonstrated for EE own generation (93%), FF switch (81%) and RE generation projects (wind 92%, hydro 81% and solar 80%)

Low operational status especially for LFG (54%), other methane avoidance activities (48%), EE households (58%) and N2O (49%)

LFG and methane avoidance projects report a high dismantling rate in 12 months, with 14% and 19% of projects

29.10.2015 www.newclimate.org 9

Page 10: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

Operational projects in 2014

29.10.2015 www.newclimate.org 10

Share per county

China 89%

India 81%

Vietnam 73%

South Korea 73%

Thailand 71%

Central America 69%

Malaysia 58%

Indonesia 58%

Chile 55%

Peru 53%

Israel 53%

Colombia 45%

Brazil 39%

Sub-Saharan Africa 36%

South Africa 35%

Mexico 26%

Share per project type

EE own generation 93%

Wind 92%

Fossil fuel switch 81%

Hydro 81%

Solar 80%

Cement 74%

EE industry 72%

CMM 71%

HFCs 69%

Biomass energy 63%

EE households 58%

Landfill gas 54%

N2O 49%

Methane avoidance 48%

Page 11: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

50%

CER revenues still sufficient

CDM still required to overcome non-financial barriers

A stop of the GHG mitigation equipment does not result in cost savings

The investment (decision) is irreversible.

Continuation is required due to binding legal contracts.

Continuation is required by national laws or regulations.

Project activity / emission source will be covered under an ETS

Expectations exist to receive alt. support or convert to alt. project scheme

Other reason.

Responses: 543 Error margin: 10%

Project continuation

CER revenues are sufficient for fewer than 3% of implemented projects

High rate of irreversible investments (N2O lowest)

Expectations for altern. support

63% of N2O discontinue before the end of the CP, 10% continue outside the CDM

29.10.2015 www.newclimate.org 11

Despite the recent drop in CER prices, what

are the reasons to continue with the CDM

GHG mitigation activity?

Page 12: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

Price requirements

For 53% CER prices below €5 are sufficient to continue VI activities

Low price requirements might include acceptance of sunk costs

Asian countries show trend for being able to continue with lower prices

N2O, HFC and wind with lowest price requirements

29.10.2015 www.newclimate.org 12

What CER price level is required by the

project to continue verification &

issuance activities?

Page 13: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

Support

55% report CER purchase facilities are unknown, only 7% in SSA group

Most commonly reported immediate support required are support for direct marketing of CERs and for identifying international support

Low CER prices and high costs of CDM procedures are the major barriers

29.10.2015 www.newclimate.org 13

Does the project take into

consideration to marketing

CERs to a CER purchase facility

or governmental fund that

purchases credits above market

prices? 55%38%

2%

5%

Purchasefacility

application

Such possibilities are unknown.

Such possibilities are known but anapplication was not considered.

An application is being consideredor is in preparation.

An application was submitted.

Responses: 535Error margin: 11%

Page 14: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

Registration cancellation

Significant regional variation to consider cancellation of CDM registration (81%-24%)

China 67%; India 39%, Brazil 38%

29.10.2015 www.newclimate.org 14

Would you consider a cancellation of

the CDM registration in case feasible

and a precondition to receive support

or participate in alternative project

schemes?56%26%

18%

Cancellation ofregistrationconsidered

Yes.

No.

I do not know.

Page 15: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

Summary

Substantial risk that loss in capacity, institutions and investor confidence becomes irreversible

Complexities and costs of CDM still need to be tackled and along with restoration of demand

Short-term demand and long-term ambition equally important to build a perspective for the CDM

CDM’s positive impact for the climate still continues but significant risk of reduction in mitigation activity

Some low “hanging fruits” are at high risk to emit again

Mitigation potential used for countries INDC’s as of 2020?

Nitric acid emissions could reach 200-300 MtCo2e (2016-2020)

29.10.2015 www.newclimate.org 15

Page 16: Analysing the status quo of CDM projects...marketing of CERs and for identifying international support Low CER prices and high costs of CDM procedures are the major barriers 29.10.2015

Thank you for your attention!

Carsten Warnecke, NewClimate Institute

[email protected]

Noémie Klein, Ecofys

[email protected]

Sources:

Warnecke, C., Day, T. & Klein, N., 2015. Analysing the status quo of CDM projects: Status and prospects. http://newclimate.org/2015/05/16/analysing-the-status-quo-of-cdm-projects

29.10.2015 www.newclimate.org 16