An Activity Based Bill Of Material, An Activity Based Bill Of Material, A New Concept For Production A New Concept For Production
PlanningPlanningFAIM 2004FAIM 2004
Mehrdad KazerooniMehrdad KazerooniK.N.Toosi University of TechnologyK.N.Toosi University of Technology
Saturday, 10 July 2004
2
Saturday, 10 July 2004FAIM 2004
2
Bill of MaterialBill of Material
Part ListPart ListStructured tableStructured tableHierarchy FormatHierarchy Format
Saturday, 10 July 2004
3
Saturday, 10 July 2004FAIM 2004
3
Data structureData structure
ITEM_MASTER
ITEM_IDMEASURE_UNITPARENT_IDITEM_NAMEITEM_TITLE
GDS_GDS_FK
ITEM_MASTER
ITEM_IDMEASURE_UNITPARENT_IDITEM_NAMEITEM_TITLE
BOM
PARENT_GOODS_IDCHILD_GOODS_IDQTYACTIVITY_MODEPCT_WASTEACTIVITY_IDCHILD_TYPE
BOM_GDS_FK
BOM_GDS_FK_1
GDS_GDS_FK
Saturday, 10 July 2004
4
Saturday, 10 July 2004FAIM 2004
4
Bill of MaterialBill of Material
Design BOMDesign BOMProduction BOMProduction BOM
Saturday, 10 July 2004
5
Saturday, 10 July 2004FAIM 2004
5
Design BOMDesign BOM
ParentParentChildChildQuantityQuantityAlternative ChildAlternative Child
Saturday, 10 July 2004
6
Saturday, 10 July 2004FAIM 2004
6
Production BOMProduction BOM
A production BOM is a design BOM besides more information for planning and manufacturing purposes.
Saturday, 10 July 2004
7
Saturday, 10 July 2004FAIM 2004
7
Production BOMProduction BOM
ParentParentWork CenterWork CenterWarehouseWarehouse
ChildChildwaste percentagewaste percentageQuantityQuantityAlternative ChildAlternative ChildActivity (Process)Activity (Process)
Saturday, 10 July 2004
9
Saturday, 10 July 2004FAIM 2004
9
Work Breakdown StructureWork Breakdown Structure
FWBS
FWBS_IDPARENT_IDNAMETITLEDESCRIPTIONLAST_NODEACTIVITY_MODE
FWB_FWB_FK
ACTIVITY
ACTIVITY_IDNAMEFWBS_IDITEM_IDACTIVITY_TYPEACTIVITY_MODETITLE
ITEM_MASTERS
ITEM_IDNAME
FWBS
FWBS_IDPARENT_IDNAMETITLEDESCRIPTIONLAST_NODEACTIVITY_MODE
ACT_PCB_FK
FWB_FWB_FK
ACT_FWB_FK
Saturday, 10 July 2004
11
Saturday, 10 July 2004FAIM 2004
11
Activity Based BOMActivity Based BOM
BOM
PARENT_GOODS_IDCHILD_GOODS_IDQTYACTIVITY_MODEPCT_WASTEACTIVITY_IDCHILD_TYPE
ACTIVITY
ACTIVITY_IDNAMEFWBS_IDITEM_IDACTIVITY_TYPEACTIVITY_MODETITLE
ITEMS
ITEM_IDNAME
FWBS
FWBS_IDPARENT_IDNAMETITLEDESCRIPTIONLAST_NODEACTIVITY_MODE
ACT_PCB_FK
ACT_FWB_FK
Saturday, 10 July 2004
12
Saturday, 10 July 2004FAIM 2004
12
Calling an existing BOMCalling an existing BOM
Saturday, 10 July 2004
13
Saturday, 10 July 2004FAIM 2004
13
Calling an existing BOMCalling an existing BOM
Saturday, 10 July 2004
14
Saturday, 10 July 2004FAIM 2004
14
Calling an existing BOMCalling an existing BOM
Saturday, 10 July 2004
15
Saturday, 10 July 2004FAIM 2004
15
Adding a new child to a parentAdding a new child to a parent
Saturday, 10 July 2004
18
Saturday, 10 July 2004FAIM 2004
18
Selecting a functionSelecting a function
Saturday, 10 July 2004
19
Saturday, 10 July 2004FAIM 2004
19
Assigning Activity to BOMAssigning Activity to BOM
Saturday, 10 July 2004
20
Saturday, 10 July 2004FAIM 2004
20
Assigning Activity to BOMAssigning Activity to BOM
Saturday, 10 July 2004
21
Saturday, 10 July 2004FAIM 2004
21
Assigning Activity to BOMAssigning Activity to BOM
Each
Saturday, 10 July 2004
22
Saturday, 10 July 2004FAIM 2004
22
ConclusionConclusionUsing the same information (BOM) both Using the same information (BOM) both material requirements and process material requirements and process planning can be accomplished.planning can be accomplished.An infrastructure information for An infrastructure information for concurrent engineering is established.concurrent engineering is established.The proposed BOM system provides a The proposed BOM system provides a base for online production control.base for online production control.
Saturday, 10 July 2004
23
Saturday, 10 July 2004FAIM 2004
23
Conclusion (Cont..)Conclusion (Cont..)The proposed BOM is very useful for The proposed BOM is very useful for manufacturing firms who produce a large manufacturing firms who produce a large number of products and semi finished items.number of products and semi finished items.It saves time, reduces the data complexity, It saves time, reduces the data complexity, makes data entry easy for engineers and makes data entry easy for engineers and increases the speed of data evaluation due to increases the speed of data evaluation due to simple data structure. simple data structure. This structure can be further used for activity This structure can be further used for activity based costing when the activities are assigned based costing when the activities are assigned to work centers. to work centers.