The World Bank MTEF’s: Concept and Lessons Bill Dorotinsky The World Bank May 2, 2006.
-
Upload
arron-weaver -
Category
Documents
-
view
224 -
download
0
Transcript of The World Bank MTEF’s: Concept and Lessons Bill Dorotinsky The World Bank May 2, 2006.
The World Bank
MTEF’s:MTEF’s:Concept and LessonsConcept and Lessons
Bill DorotinskyBill DorotinskyThe World BankThe World Bank
May 2, 2006May 2, 2006
The World Bank
OutlineOutline
MTEF ConceptMTEF Concept Technical objectivesTechnical objectives Process ViewProcess View
Sequenced decision-makingSequenced decision-making Component View - unbundlingComponent View - unbundling
Major BlocksMajor Blocks More manageable piecesMore manageable pieces
Output ViewOutput View ExperienceExperience
GhanaGhana South AfricaSouth Africa UgandaUganda LessonsLessons
The World Bank
Three Objectives of Public Three Objectives of Public Expenditure Management Expenditure Management
SystemsSystems Macrofiscal discipline and stabilityMacrofiscal discipline and stability
Avoid public finance crisesAvoid public finance crises Support economic growth and stabilitySupport economic growth and stability
Strategic allocation of resourcesStrategic allocation of resources Match government policy with Match government policy with
programs, objectivesprograms, objectives Technical efficiencyTechnical efficiency
Getting the most from each ruble spentGetting the most from each ruble spent
The World Bank
Technical Objectives of Technical Objectives of MTEFMTEF
Improve macrofiscal situationImprove macrofiscal situation lower deficits, improved economic growthlower deficits, improved economic growth more rational approach to retrenchment and more rational approach to retrenchment and
economic stabilizationeconomic stabilization Improve impact of Government policyImprove impact of Government policy
link between government priorities/policies link between government priorities/policies and government programsand government programs
Improve program Improve program performance/impactperformance/impact Shift bureaucracy from administrative to Shift bureaucracy from administrative to
managerial culturemanagerial culture Managerial flexibility & innovation: lower Managerial flexibility & innovation: lower
cost/output; greater effectiveness of cost/output; greater effectiveness of programs/policiesprograms/policies
Improved resource predictabilityImproved resource predictability
The World Bank
MTEF: Improved Budget MTEF: Improved Budget ProcessProcess
Stage 1. Macroeconomic and public sector Stage 1. Macroeconomic and public sector envelopesenvelopes
Stage 2. High-level policy: aligning policies Stage 2. High-level policy: aligning policies & objectives under resource constraints & objectives under resource constraints (top-down)(top-down)
Stage 3. Linking policy, resources, and Stage 3. Linking policy, resources, and means by sector (bottom-up)means by sector (bottom-up)
Stage 4. Reconciling resources with meansStage 4. Reconciling resources with means Stage 5. Reconciling strategic policy and Stage 5. Reconciling strategic policy and
meansmeans
The World Bank
Stage 1. Macroeconomic and public sector Stage 1. Macroeconomic and public sector envelopesenvelopes
Macroeconomic Estimates
Revenue Estimates
Expenditure Estimates(current services)
Fiscal Policy
Expenditure Estimates(current law, normatives)
•Affordable/sustainable Fiscal Envelope•Monetary and Fiscal Policy•Debt and Deficits•Aid flowsAll in multi-year context
The World Bank
Stage 2. High-level policy: aligning policies & Stage 2. High-level policy: aligning policies & objectives under constraintsobjectives under constraints
Fiscal Envelope
Setting Strategic
Policy Priorities
Under Resource
Limits(downsizing, or
expansions)
Sectoral Resource Ceilings
Ministry Resource Ceilings
The World Bank
Stage 3. Linking policy, resources, and means by Stage 3. Linking policy, resources, and means by sectorsector
Sector Policies and Objectives
Sector programs
Reconcile policy, laws, resource limits
Program priorities relative to objectives
Assess modalities for objective
Evaluate Production Function
Sector Budget Request
Again, multi-year
Under ceiling
Above ceiling
The World Bank
Stage 4. Reconciling Stage 4. Reconciling resources with meansresources with means
Sector Ceilings
Sector Requests
Technical Assessment
and Reconciliatio
n
Vetting assumptions, policies, estimates
Challenging modalities, production function
Evaluate performance
Revised requests and/or decision papers
The World Bank
Stage 5. Reconciling strategic Stage 5. Reconciling strategic policy and meanspolicy and means
Policy assessment
and reconciliation
Policy official dialogue
Modify baselines
Finalize decisions
Budget Proposal
Revised Requests,
Unresolved Issues
The World Bank
MTEF Major ComponentsMTEF Major Components
Medium-Term Fiscal FrameworkMedium-Term Fiscal Framework Aggregates, policyAggregates, policy
Medium-Term Budget FrameworkMedium-Term Budget Framework Ceilings and sector strategiesCeilings and sector strategies
Program budgeting/Activity-based costingProgram budgeting/Activity-based costing Within ministries, programs, costing, input-Within ministries, programs, costing, input-
output modelsoutput models Performance measuresPerformance measures
The World Bank
Unbundling MTEFsUnbundling MTEFs
Medium-Term Fiscal FrameworkMedium-Term Fiscal Framework Multi-year Macroeconomic forecastMulti-year Macroeconomic forecast Multi-year revenue, debt sustainability analysis and debt policy, yielding expenditure Multi-year revenue, debt sustainability analysis and debt policy, yielding expenditure
envelope (fiscal policy paper)envelope (fiscal policy paper) Medium-Term Budget FrameworkMedium-Term Budget Framework
Multi-year forecast of spending under current policy or current level of services, by Multi-year forecast of spending under current policy or current level of services, by ministry or program ministry or program
Multi-year ceilings for sector ministries Multi-year ceilings for sector ministries Multi-year sector strategy Multi-year sector strategy
Program budgeting/Activity-based costingProgram budgeting/Activity-based costing Multi-year cost estimates of Multi-year cost estimates of new policies or programsnew policies or programs (recurrent),(recurrent), or expansion of or expansion of
existing programs, prepared by sector ministries existing programs, prepared by sector ministries Multi-year estimates of cost of Multi-year estimates of cost of existingexisting policies, programs, subprograms, or activities policies, programs, subprograms, or activities
prepared by sector ministries prepared by sector ministries Multi-year estimates of cost of Multi-year estimates of cost of new projects (capital)new projects (capital), or expansion of existing projects, , or expansion of existing projects,
prepared by sector ministriesprepared by sector ministries
The World Bank
Unbundling MTEFsUnbundling MTEFsMulti-year Multi-year FeatureFeature
PEM PEM ObjectiveObjective
Intended EffectIntended Effect RequiresRequires ProductProduct
1. 1. Macroeconomic Macroeconomic forecastforecast
Macrofiscal Macrofiscal disciplinediscipline
Provides strategic Provides strategic framework for setting framework for setting fiscal and monetary fiscal and monetary policy, and allows policy, and allows proactive fiscal proactive fiscal adjustment to changing adjustment to changing economic trends.economic trends.
Forecasting model, Forecasting model, capacity, multi-year capacity, multi-year macro variable time macro variable time series, or access to series, or access to multiple non-multiple non-governmental governmental forecastsforecasts
Macroeconomic Macroeconomic Forecast paper, a key Forecast paper, a key topic for a fiscal topic for a fiscal policy paper that policy paper that draws together draws together products from Item products from Item 1, 2, 3, and 41, 2, 3, and 4
2. Multi-year 2. Multi-year revenue, debt revenue, debt sustainability sustainability analysis and analysis and debt policy, debt policy, yielding yielding expenditure expenditure envelopeenvelope
Macrofiscal Macrofiscal disciplinediscipline
Sets upward bound for Sets upward bound for expenditures, limiting expenditures, limiting deficits, inflation, and deficits, inflation, and currency depreciations; currency depreciations; supports sustainable supports sustainable fiscal policy, and fiscal policy, and realistic expenditure realistic expenditure planning within the planning within the expenditure envelope; expenditure envelope; supports focus on supports focus on adequate revenue adequate revenue mobilization.mobilization.
Forecasting models. Forecasting models. Stronger if Stronger if relationships relationships between macro between macro growth, income growth, income distribution, and distribution, and revenues revenues understood and understood and modeled. Debt modeled. Debt sustainability sustainability analysis/model, or analysis/model, or hard rule on hard rule on debt/deficit limits. debt/deficit limits.
Revenue and Tax Revenue and Tax Policy PaperPolicy Paper
Debt Sustainability Debt Sustainability Analysis and Policy Analysis and Policy PaperPaper
(Both key topics for (Both key topics for a fiscal policy paper a fiscal policy paper that draws together that draws together products from Item products from Item 1, 2, 3, and 4.)1, 2, 3, and 4.)
The World Bank
Unbundling MTEFs (2)Unbundling MTEFs (2)Multi-year Multi-year FeatureFeature
PEM PEM ObjectiveObjective
Intended EffectIntended Effect RequiresRequires ProductProduct
3. Multi-year 3. Multi-year forecast of forecast of spending under spending under current policy current policy or current level or current level of services, by of services, by ministry or ministry or program program
Macrofiscal Macrofiscal discipline, discipline, Allocational Allocational efficiency efficiency (sector) (sector)
Broad indicator of Broad indicator of future cost of current future cost of current spending trends, spending trends, identification of identification of potential risk areas, and potential risk areas, and proactive, measured, proactive, measured, more rational fiscal more rational fiscal adjustment. Baseline adjustment. Baseline for evaluating policy for evaluating policy spending choices.spending choices.
MoF provided MoF provided inflators for pay, non-inflators for pay, non-pay, and clear pay, and clear guidance for guidance for projecting costs. Can projecting costs. Can be automated. Can be be automated. Can be budget year only, but budget year only, but more effective over more effective over several years. several years.
Expenditure Expenditure trends paper, a trends paper, a key topic for a key topic for a fiscal policy fiscal policy paper that draws paper that draws together products together products from Item 1, 2, from Item 1, 2, 3, and 4.3, and 4.
4. Multi-year 4. Multi-year ceilings for ceilings for sector ministries sector ministries
Allocational Allocational efficiency efficiency (sector), (sector), Macrofiscal Macrofiscal discipline, discipline, Operational Operational efficiency efficiency
Enabling more realistic Enabling more realistic planning, appropriate planning, appropriate policies; incentive for policies; incentive for reviewing existing reviewing existing programs for programs for effectiveness, effectiveness, reallocations within reallocations within sectors. At center, sectors. At center, explicit trade-offs explicit trade-offs between sectors. between sectors.
More credible if More credible if reflecting policy reflecting policy choices, which choices, which requires some explicit requires some explicit policy directions on policy directions on reallocation. More reallocation. More effective in changing effective in changing behavior if approved behavior if approved by cabinet or by cabinet or parliament. parliament.
Sector ceilings Sector ceilings table, as part of table, as part of fiscal policy fiscal policy paper (which paper (which draws together draws together the Papers and the Papers and forecasts forecasts produced in produced in Items 1, 2, 3 and Items 1, 2, 3 and 4)4)
The World Bank
Unbundling MTEFs (3)Unbundling MTEFs (3)Multi-year Multi-year FeatureFeature
PEM PEM ObjectiveObjective
Intended EffectIntended Effect RequiresRequires ProductProduct
5. Multi-year 5. Multi-year sector strategy sector strategy
Allocational Allocational efficiency efficiency (sector), (sector), Operational Operational efficiency, efficiency, Macrofiscal Macrofiscal discipline discipline
Sector strategic plan Sector strategic plan links links outputs/outcomes with outputs/outcomes with inputs in multi-year inputs in multi-year framework. Effective framework. Effective onlyonly if prepared within if prepared within multi-year sectoral multi-year sectoral resource ceiling. resource ceiling.
Sector ministry Sector ministry strategic planning strategic planning capacity, on capacity, on program program outputs/outcomes outputs/outcomes information, and information, and relationship to relationship to activities and activities and inputs. inputs.
Sectoral plans, starting Sectoral plans, starting with sector ceiling, the with sector ceiling, the spells out objectives, spells out objectives, outcome targets, outcome targets, current outcome trends, current outcome trends, and actions to be taken, and actions to be taken, including priority including priority programs, capital and programs, capital and current spending, etc.current spending, etc.
6. Multi-year 6. Multi-year cost estimates cost estimates of of new policies new policies or programsor programs (recurrent),(recurrent), or or expansion of expansion of existing existing programs, programs, prepared by prepared by sector sector ministriesministries
Operational Operational efficiency, efficiency, Allocational Allocational efficiency efficiency (sector), (sector), Macrofiscal Macrofiscal disciplinediscipline
Identifies multi-year Identifies multi-year implications of new implications of new initiatives relative to initiatives relative to their objectives, and their objectives, and assessment of whether assessment of whether they can be financed they can be financed from within existing from within existing sectoral ceilings or sectoral ceilings or even within aggregate even within aggregate spending ceilings, and spending ceilings, and if they are financially if they are financially sustainable over time.sustainable over time.
Requires Requires guidance/training guidance/training for spending for spending ministry staff, and ministry staff, and spending ministry spending ministry staff capacity; staff capacity; MoF provision of MoF provision of common inflators common inflators for use by for use by ministries (pay ministries (pay rates, non-pay, rates, non-pay, capital costs). capital costs).
Budget tables Budget tables
The World Bank
Unbundling MTEFs (4)Unbundling MTEFs (4)Multi-year Multi-year FeatureFeature
PEM PEM ObjectiveObjective
Intended EffectIntended Effect RequiresRequires ProductProduct
7. Multi-year 7. Multi-year estimates of cost estimates of cost of of existingexisting policies, policies, programs, programs, subprograms, or subprograms, or activities activities prepared by prepared by sector ministriessector ministries
Operational Operational efficiency, efficiency, Allocational Allocational efficiency efficiency (sector), (sector), Macrofiscal Macrofiscal disciplinediscipline
Sensitizes sector Sensitizes sector ministry to cost ministry to cost drivers, drivers, affordability of affordability of existing policy or existing policy or programs, attention programs, attention to different means to different means of attaining of attaining objectives, unit objectives, unit cost.cost.
Can begin at Can begin at program, and later program, and later move to subprogram move to subprogram and activity costing. and activity costing. Requires trained staff Requires trained staff at spending at spending ministries, agencies; ministries, agencies; MoF guidance and MoF guidance and common inflators common inflators (pay rates, non-pay, (pay rates, non-pay, capital costs). capital costs).
Budget tablesBudget tables
8. Multi-year 8. Multi-year estimates of cost estimates of cost of of new projects new projects (capital)(capital), or , or expansion of expansion of existing projects, existing projects, prepared by prepared by sector ministriessector ministries
Operational Operational efficiency, efficiency, Allocational Allocational efficiency efficiency (sector), (sector), Macrofiscal Macrofiscal disciplinediscipline
Many capital Many capital budget processes budget processes already include already include such estimates, such estimates, including the including the recurrent cost recurrent cost implications of new implications of new capital projects.capital projects.
Trained staff at Trained staff at spending ministries, spending ministries, guidance on costing, guidance on costing, understanding of understanding of project design and project design and work flow. work flow.
Budget tablesBudget tables
The World Bank
SummarySummary MTEF is aboutMTEF is about
Process reformProcess reform Integrating planning and budgetingIntegrating planning and budgeting Changing Incentives of Key ActorsChanging Incentives of Key Actors Integrating policy and technical aspects of Integrating policy and technical aspects of
budgetingbudgeting Thinking multi-yearThinking multi-year
MisconceptionsMisconceptions MTEF is only multi-year estimatesMTEF is only multi-year estimates MTEF separate process, document onlyMTEF separate process, document only
Preconditions?Preconditions? Civil service/administrative reform for Civil service/administrative reform for
allocative flexibility?allocative flexibility?
The World Bank
GhanaGhana
MTEF first introduced in 1999MTEF first introduced in 1999 Declared a success at first budgetDeclared a success at first budget ““big-bang” covering all MTEF aspects at big-bang” covering all MTEF aspects at
once, plus IFMIS and Civil Service Reformonce, plus IFMIS and Civil Service Reform Problems encounteredProblems encountered
Limited MDA capacityLimited MDA capacity Data limitationsData limitations EBFsEBFs Weak macroforecasting undermined MTEFWeak macroforecasting undermined MTEF Rigidity of spending inhibited reallocationRigidity of spending inhibited reallocation
The World Bank
Ghana (2)Ghana (2)
Problems encountered (continued)Problems encountered (continued) No visible change in budget formats, No visible change in budget formats,
information provided (e.g. budget speech)information provided (e.g. budget speech) Limited buy-in outside core MoF groupLimited buy-in outside core MoF group
Implemented as ‘project’ versus reform of budget Implemented as ‘project’ versus reform of budget process, as ‘technical’ versus policy-orientedprocess, as ‘technical’ versus policy-oriented
Linking next budget with multi-year Linking next budget with multi-year estimatesestimates
Top-down implemented, but bottom-up not Top-down implemented, but bottom-up not quite in placequite in place
The World Bank
South AfricaSouth Africa
First attempt 1994First attempt 1994 Department of Finance onlyDepartment of Finance only Failed, too internalFailed, too internal
Second attempt 1997Second attempt 1997 Inclusive process, with sectoral working groupsInclusive process, with sectoral working groups All departments at onceAll departments at once Led by policy officialsLed by policy officials MTEF is budget processMTEF is budget process Have MTBPS and sectoral plansHave MTBPS and sectoral plans
But sectoral plans formalBut sectoral plans formal Performance emphasized more recentlyPerformance emphasized more recently
Reprioritization within sectors has happenedReprioritization within sectors has happened Over and under spending reducedOver and under spending reduced
The World Bank
UgandaUganda
Started in 1992 Started in 1992 in MoFPEDin MoFPED With MTFF, major economic classesWith MTFF, major economic classes To address macrofiscal problems and counterpart funding problemsTo address macrofiscal problems and counterpart funding problems
Gradually expandedGradually expanded 1995 sector analysis (Ag, Roads, Health, Education)1995 sector analysis (Ag, Roads, Health, Education) 1997 all sectors (sector working groups)1997 all sectors (sector working groups) 2000 local governments2000 local governments 2001 MTEF required submission to Parliament2001 MTEF required submission to Parliament
Donor-financed investments (PIP) separate processDonor-financed investments (PIP) separate process Limited performance orientation, though expandingLimited performance orientation, though expanding More top-down, with limited detailed costing from the bottom-upMore top-down, with limited detailed costing from the bottom-up MTEF “home-grown” but still not fully integrated with the budget MTEF “home-grown” but still not fully integrated with the budget
processprocess Emphasis on PEAP priority programsEmphasis on PEAP priority programs
The World Bank
Lessons in ImplementationLessons in Implementation
MTEF is designed to improve decision-making, MTEF is designed to improve decision-making, and focuses on budget formulation. It will not and focuses on budget formulation. It will not solve all PEM problems.solve all PEM problems.
MTEF is not a standardized product, per se. The MTEF is not a standardized product, per se. The principles can be implemented in various ways. principles can be implemented in various ways.
MTEF needs to be customized to the country, MTEF needs to be customized to the country, including initial conditions in PEM, human and IT including initial conditions in PEM, human and IT capacity. capacity.
With MTEF, and PEM reform generally, doing too With MTEF, and PEM reform generally, doing too much at once can overload the Government much at once can overload the Government capacity and prevent progress on all reforms. capacity and prevent progress on all reforms.
The World Bank
More lessonsMore lessons Start with a medium-term fiscal frameworkStart with a medium-term fiscal framework MTEFs should not be launched in selected sectors MTEFs should not be launched in selected sectors
until there are medium-term ceilings in placeuntil there are medium-term ceilings in place Integration of capital and recurrent budgets need Integration of capital and recurrent budgets need
not be done immediately not be done immediately Performance information (outcomes, outputs) need Performance information (outcomes, outputs) need
not be incorporated immediately not be incorporated immediately Flexibility for spending ministries to allocate Flexibility for spending ministries to allocate
resources across programs, subprograms, and resources across programs, subprograms, and activities can be introduced gradually activities can be introduced gradually
Pressure on ministries to find resources within Pressure on ministries to find resources within current expenditures may be more successful when current expenditures may be more successful when accounting systems are in place to provide good accounting systems are in place to provide good information on program and activity costs information on program and activity costs