AMTPJ-Critical Path-Lvl1-Feb 2011

1
Activity ID Activity Name Area Critical Longest Path Total Float Start Finish ArcelorMittal Tubular Products Al-Jubail (KSA) 0 09-Jan-11 24-Jan-13 5095 Mobilize Shoring Subcontractor 1 09-Jan-11* 31-Jan-11 5105 Shoring of Scale Pit (Area 300) 1 20-Jan-11 14-Feb-11 5115 Excavate/Dewatering 1 15-Feb-11 28-Mar-11 5125 Pour Lean Concrete 1 29-Mar-11* 04-Apr-11 5135 Water Proofing 1 05-Apr-11 12-Apr-11 5145 Floor Fdtns (Form/Rebar/Pour) 1 13-Apr-11 30-Apr-11 5155 Walls(Form/Rebar/Pour Concr... 1 01-May-11 09-Jun-11 5175 External Water Proofing 1 12-Jun-11 06-Jul-11 5185 BackFilling ( All Foundation Are... 1 13-Jul-11 13-Aug-11 1975 Strip/Cure-All Misc Fdtns (Area... 1 31-Jul-11 13-Aug-11 2005 General SS-Staircase/Equipme... 1 14-Aug-11 07-Sep-11 2025 Scale Pit-Handrails/Misc Supp... 1 08-Sep-11 28-Sep-11 2035 Sedimentation (CPS 3/A/B) Pu... 1 28-Sep-11 24-Oct-11 2055 Oil Lift Pumps(CPM 3/A/B) 1 24-Oct-11 13-Nov-11 3015 Field Instruments 0 10-Nov-11* 18-Dec-11 2065 Flushing Pumps (CPS31A/B) I... 1 13-Nov-11 01-Dec-11 2075 Oil Skimmer Pkg(COS 30) 1 19-Nov-11 03-Dec-11 2095 Pipe Shop Fab Spools-LB 1 03-Dec-11* 14-Jan-12 3025 Panel Instruments 0 18-Dec-11 17-Jan-12 2115 Install LB Spools 1 12-Jan-12 16-Feb-12 3035 Control Valves 0 17-Jan-12* 07-Feb-12 2125 Install SB Spools 1 26-Jan-12 27-Feb-12 3045 PLC(700) 0 07-Feb-12 16-Feb-12 3055 I/O & Graphics MInterfaces Ins... 0 16-Feb-12 04-Mar-12 2155 Hydrotest Area piping 1 22-Feb-12 07-Mar-12 2165 QA Checks-Systems 1 23-Feb-12 28-Mar-12 2145 Pipe Tie Ins-Area 300(To Area ... 1 26-Feb-12 06-Mar-12 3125 Pre-Commission/Cold Tests/T/O 0 13-Mar-12 21-May-12 2175 M/C Piping Systems 1 28-Mar-12 2385 Pre-Commissioning/T/O(300) 1 28-Mar-12 20-May-12 1765 Area 300 M/C(Scale Pit) 1 20-May-12 2565 Area 700 M/C(Quench Systems) 0 21-May-12 A1100 HOT MILL M/C (Priority 1)-FIR... 0 21-May-12 A1120 HOT MILL (PRIORITY 1)-Pow... 0 07-Jun-12 A1130 HOT MILL (Priority 1)-Commis... 0 07-Jun-12 A1430 COMMISSION & START UP-(... 0 07-Jun-12 11-Oct-12 A1450 COMMISSION-PRIORITY 2 2 05-Aug-12 29-Nov-12 A1460 FIRST COMMERCIAL PIPE (... 2 29-Nov-12 22-Jan-13 A1140 HOT MILL (Priority 1)-FIRST P... 0 09-Dec-12 A1150 Total Plant M/C (Priority 2)-TO... 0 24-Jan-13 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 2011 2012 2013 Mobilize Shoring Subcontractor Shoring of Scale Pit (Area 300) Excavate/Dewatering Pour Lean Concrete Water Proofing Floor Fdtns (Form/Rebar/Pour) Walls(Form/Rebar/Pour Concrete) External Water Proofing BackFilling ( All Foundation Area 300) Strip/Cure-All Misc Fdtns (Area 300) General SS-Staircase/Equipment Supports Scale Pit-Handrails/Misc Supports Sedimentation (CPS 3/A/B) Pumps Install Oil Lift Pumps(CPM 3/A/B) Field Instruments Flushing Pumps (CPS31A/B) Install Oil Skimmer Pkg(COS 30) Pipe Shop Fab Spools-LB Panel Instruments Install LB Spools Control Valves Install SB Spools PLC(700) I/O & Graphics MInterfaces Install(700) Hydrotest Area piping QA Checks-Systems Pipe Tie Ins-Area 300(To Area 100) Pre-Commission/Cold Tests/T/O M/C Piping Systems Pre-Commissioning/T/O(300) Area 300 M/C(Scale Pit) Area 700 M/C(Quench Systems) HOT MILL M/C (Priority 1)-FIRST PIPE HOT MILL (PRIORITY 1)-Power On HOT MILL (Priority 1)-Commission Start COMMISSION & S COMMIS HOT M PROCURED EQUIPMENT Level 3 Final Development NEEDS all Major Equipment TRACKED from the Latest Manufacturers Delivery Schedule. This is a MUST for all LOGIC and Construction to Make the PLAN WORK. Project:ArcelorMittal Tubular Products Al-Jubail (KSA) Data Date:31-Dec-10 AMTPJ Seamless Tube Mill Project Issue Date:01-Feb-11 16:13 P6-File:Det. Plan (working) Actual Work Remaining Work Critical Remaining Work Milestone For Constructability Reviews CRITICAL PATH (Less Than 2 Days TF) Layout:Critical Path-Feb 1st 11-TF Less than 15;Filter:TASK filter: Critical_1. Page 1 of 1

Transcript of AMTPJ-Critical Path-Lvl1-Feb 2011

Page 1: AMTPJ-Critical Path-Lvl1-Feb 2011

Activity ID Activity Name Area Critical LongestPath

TotalFloat

Start Finish

ArcelorMittal Tubular Products Al-Jubail (KSA)ArcelorMittal Tubular Products Al-Jubail (KSA)ArcelorMittal Tubular Products Al-Jubail (KSA)ArcelorMittal Tubular Products Al-Jubail (KSA)ArcelorMittal Tubular Products Al-Jubail (KSA) 0 09-Jan-11 24-Jan-135095 Mobilize Shoring Subcontractor 1 09-Jan-11* 31-Jan-115105 Shoring of Scale Pit (Area 300) 1 20-Jan-11 14-Feb-115115 Excavate/Dewatering 1 15-Feb-11 28-Mar-115125 Pour Lean Concrete 1 29-Mar-11* 04-Apr-115135 Water Proofing 1 05-Apr-11 12-Apr-115145 Floor Fdtns (Form/Rebar/Pour) 1 13-Apr-11 30-Apr-115155 Walls(Form/Rebar/Pour Concr... 1 01-May-11 09-Jun-115175 External Water Proofing 1 12-Jun-11 06-Jul-115185 BackFilling ( All Foundation Are... 1 13-Jul-11 13-Aug-111975 Strip/Cure-All Misc Fdtns (Area... 1 31-Jul-11 13-Aug-112005 General SS-Staircase/Equipme... 1 14-Aug-11 07-Sep-112025 Scale Pit-Handrails/Misc Supp... 1 08-Sep-11 28-Sep-112035 Sedimentation (CPS 3/A/B) Pu... 1 28-Sep-11 24-Oct-112055 Oil Lift Pumps(CPM 3/A/B) 1 24-Oct-11 13-Nov-113015 Field Instruments 0 10-Nov-11* 18-Dec-112065 Flushing Pumps (CPS31A/B) I... 1 13-Nov-11 01-Dec-112075 Oil Skimmer Pkg(COS 30) 1 19-Nov-11 03-Dec-112095 Pipe Shop Fab Spools-LB 1 03-Dec-11* 14-Jan-123025 Panel Instruments 0 18-Dec-11 17-Jan-122115 Install LB Spools 1 12-Jan-12 16-Feb-123035 Control Valves 0 17-Jan-12* 07-Feb-122125 Install SB Spools 1 26-Jan-12 27-Feb-123045 PLC(700) 0 07-Feb-12 16-Feb-123055 I/O & Graphics MInterfaces Ins... 0 16-Feb-12 04-Mar-122155 Hydrotest Area piping 1 22-Feb-12 07-Mar-122165 QA Checks-Systems 1 23-Feb-12 28-Mar-122145 Pipe Tie Ins-Area 300(To Area ... 1 26-Feb-12 06-Mar-123125 Pre-Commission/Cold Tests/T/O 0 13-Mar-12 21-May-122175 M/C Piping Systems 1 28-Mar-122385 Pre-Commissioning/T/O(300) 1 28-Mar-12 20-May-121765 Area 300 M/C(Scale Pit) 1 20-May-122565 Area 700 M/C(Quench Systems) 0 21-May-12A1100 HOT MILL M/C (Priority 1)-FIR... 0 21-May-12A1120 HOT MILL (PRIORITY 1)-Pow... 0 07-Jun-12A1130 HOT MILL (Priority 1)-Commis... 0 07-Jun-12A1430 COMMISSION & START UP-(... 0 07-Jun-12 11-Oct-12A1450 COMMISSION-PRIORITY 2 2 05-Aug-12 29-Nov-12A1460 FIRST COMMERCIAL PIPE (... 2 29-Nov-12 22-Jan-13A1140 HOT MILL (Priority 1)-FIRST P... 0 09-Dec-12A1150 Total Plant M/C (Priority 2)-TO... 0 24-Jan-13

Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan2011 2012 2013

Mobilize Shoring SubcontractorShoring of Scale Pit (Area 300)

Excavate/DewateringPour Lean Concrete

Water ProofingFloor Fdtns (Form/Rebar/Pour)

Walls(Form/Rebar/Pour Concrete)External Water Proofing

BackFilling ( All Foundation Area 300)Strip/Cure-All Misc Fdtns (Area 300)

General SS-Staircase/Equipment SupportsScale Pit-Handrails/Misc Supports

Sedimentation (CPS 3/A/B) Pumps InstallOil Lift Pumps(CPM 3/A/B)

Field InstrumentsFlushing Pumps (CPS31A/B) InstallOil Skimmer Pkg(COS 30)

Pipe Shop Fab Spools-LBPanel Instruments

Install LB SpoolsControl Valves

Install SB SpoolsPLC(700)

I/O & Graphics MInterfaces Install(700)Hydrotest Area piping

QA Checks-SystemsPipe Tie Ins-Area 300(To Area 100)

Pre-Commission/Cold Tests/T/OM/C Piping Systems

Pre-Commissioning/T/O(300)Area 300 M/C(Scale Pit)Area 700 M/C(Quench Systems)HOT MILL M/C (Priority 1)-FIRST PIPE

HOT MILL (PRIORITY 1)-Power OnHOT MILL (Priority 1)-Commission Start

COMMISSION & START UP-(Priority 1)COMMISSION-PRIORITY 2

HOT MILL (Priority 1)-FIRST PIPE

PROCURED EQUIPMENT

Level 3 Final DevelopmentNEEDS all Major Equipment TRACKEDfrom the Latest Manufacturers DeliverySchedule. This is a MUST for all LOGICand Construction to Make the PLAN WORK.

Project:ArcelorMittal Tubular Products Al-Jubail (KSA)

Data Date:31-Dec-10

AMTPJ Seamless Tube Mill Project Issue Date:01-Feb-11 16:13

P6-File:Det. Plan (working)

Actual Work

Remaining Work

Critical Remaining Work

Milestone

For Constructability Reviews

CRITICAL PATH (Less Than 2 Days TF)

Layout:Critical Path-Feb 1st 11-TF Less than 15;Filter:TASK filter: Critical_1.

Page 1 of 1