AMDS Selection. Contents. Introduction Selection Consideration Selection Process Software Demonstration. Introduction. Sample of Installation. Selection Consideration. Unit & Piping Selection. Main Factors to consider during Piping Selection Location of equipment Indoor Unit - PowerPoint PPT Presentation

Transcript of AMDS Selection

Page 1

AMDS SelectionAMDS Selection

Page 2

Contents

• Introduction

• Selection Consideration

• Selection Process

• Software Demonstration

Page 3

Introduction

Page 4

Sample of Installation

Page 5

Selection Consideration

Page 6

Main Factors to consider during Piping SelectionMain Factors to consider during Piping Selection

• Location of equipmentLocation of equipment

• Indoor UnitIndoor Unit

• Outdoor UnitOutdoor Unit

• Refnet & Distributor JointRefnet & Distributor Joint

Unit & Piping Selection

These item will influence the piping layout and length of the design

Page 7

Some other factors to consider during Piping SelectionSome other factors to consider during Piping Selection

• Equivalent Piping LengthEquivalent Piping Length

• Type of Joint for branchesType of Joint for branches

• Outdoor capacity factorOutdoor capacity factor

• Piping length & height factorPiping length & height factor

• Refrigerant Pipe SpecificationRefrigerant Pipe Specification

Unit & Piping Selection

Page 8

Equivalent length is the converted length and includes parts such as elbow, which has pressure losses in the pipe. The formula is as follow:

Equivalent length= Real length of tubing + No. of elbow × Equivalent length of each elbow + No. of oil trap ×Equivalent length of each oil trap

Equivalent Piping Calculation

Elbow Oil Trap9.52 0.18 1.30

12.70 0.20 1.5015.88 0.25 2.0019.05 0.35 2.4022.02 0.40 3.0025.40 0.45 3.4028.58 0.50 3.7031.80 0.55 4.00

Diameter of Pipe

Equivalent Length

Page 9

Restriction of Piping Length

3~5 Hp 6 Hp 8~10 Hp 12~32 Hp100 125 250 350

Actual piping length 50 70 125 150Equivalent length 60 80 150 200

25 30

Outdoor above 20 30Indoor above 20 30

15

40

5040

Length (m)

Piping

Height

Maximum equivalent length from first branch to furthers unit

Maximum height between indoor unit

Maximum length of longest branch

Between further indoor and outdoor

Total equivalanet length

Page 10

Important Factor to Consider

Example:Outdoor Model : MDS100BRPipe Diameter : 28.6 mmMain Pipe : 80mBranch Length: 20mElbows: 10 unitsOil traps: 3 units

Elbow Oil Trap9.52 0.18 1.30

12.70 0.20 1.5015.88 0.25 2.0019.05 0.35 2.4022.02 0.40 3.0025.40 0.45 3.4028.58 0.50 3.7031.80 0.55 4.00

Diameter of Pipe

Equivalent Length

Equivalent Length

= Real length of tubing + No. of elbow × Equivalent length of each elbow + No. of oil trap ×Equivalent length of each oil trap= (80 + 20) + (10 X 0.5) + (3 X 3.7) = 116.1 m

Page 11

When the equivalent length is more than 90% of the maximal real length of the main tubing , the gas pipe need to be increase to one size bigger (diameter).

After expanded the gas pipe to a larger diameter, the equivalent length need to be recalculate. The formula is as follow:

Expanded Equivalent Length

= Equivalent length of main piping X 0.5 + equivalent length of the branch

Criteria 1

Criteria 2

Important Factor to Consider

Page 12

Important Factor to Consider

3~5 Hp 6 Hp 8~10 Hp 12~30 Hp100 125 250 350

Actual piping length 50 70 125 150Equivalent length 60 80 150 200

25 30

Outdoor above 20 30Indoor above 20 30

Length (m)

Piping

Height

Maximum equivalent length from first branch to furthers unit

Maximum height between indoor unit

Maximum length of longest branch

Between further indoor and outdoor

Total equivalanet length

15

40

5040

Maximum allow actual length for 10Hp is 125mCalculated Equivalent Length is 116.1mRatio of Equivalent Length over Maximum allow Actual Length= 92.88%

Equivalent length is more than 90% of the maximal real length.Hence the gas Pipe of MDS100BR need to change.

Example:

Page 13

Refrigerant Copper Pipe Specification : MDS-B

Unit & Piping Selection

Page 14

Important Factor to ConsiderExample:Hence the gas Pipe of MDS100BR need to change from 28.6 mm to 39.40 mmAfter expanded the gas pipe to a larger diameter, the equivalent length need to be recalculate.

Expanded Equivalent Length = Equivalent length of main piping X 0.5 + equivalent length of the branch

Main Pipe : 80mBranch Length: 20mElbows: 10 unitsOil traps: 3 units

Equivalent Length

= Real length of tubing + No. of elbow × Equivalent length of each elbow + No. of oil trap ×Equivalent length of each oil trap= (80 + 20) + (10 X 0.5) + (3 X 3.7) = 116.1 m

Expanded Equivalent Length = [80 + (10 X 0.5) + (3 X 3.7)] X 0.5 + 20

Expanded Equivalent Length = 68.05 m

Page 15

• Type of Joint for branchesType of Joint for branches

• Influence the piping layout designInfluence the piping layout design

• Outdoor capacity factorOutdoor capacity factor

• Influence by the design ambient temperature and Influence by the design ambient temperature and indoor temperatureindoor temperature

• Piping length & height factor Piping length & height factor

• Influence by the location of outdoor and the total Influence by the location of outdoor and the total piping lengthpiping length

• Refrigerant Pipe SpecificationRefrigerant Pipe Specification

• Use to determine the branches diameterUse to determine the branches diameter

Unit & Piping Selection

Page 16

Selection of branch joint / distributors for MDS

Unit & Piping Selection

ModelMDS-Y1MDS-Y2MDS-Y3MDS-Y4MDS-Y6MDS-Y7MDS-C1MDS-C2MDS-C3

Refnet Joint (2 Branches)

Distributors Header (4 Branches)

Page 17

MDS-Y1~Y4 dimensional drawing

A B C D E

(outer diameter)

F G H I

(outer diameter)

J K L M N

(outer diameter)

O P Q R

MDS-Y1 553 172 293 120 28.6 28.9 25.7 22.5 28.6 28.9 25.7 22.5 19.3 22.2 19.3 16.1 12.9 9.7MDS-Y2 420 142 223 80 15.88 16.1 12.9 9.7 12.7 12.9 9.7 6.5 12.7 12.9 9.7 6.5MDS-Y3 420 142 223 80 15.88 16.1 12.9 9.7 12.7 12.9 9.7 6.5 15.88 16.1 12.9 9.7MDS-Y4 493 142 223 80 22.2 22.5 19.3 16.1 19.1 19.3 16.1 12.9 9.7 19.1 19.3 16.1 12.9

Diameter (mm)Refnet model

Length(mm) Diameter (mm) Diameter (mm)

Unit & Piping Selection

Page 18

MDS-Y6 dimensional drawing

Unit & Piping Selection

Page 19

MDS-Y7 dimensional drawing

Unit & Piping Selection

Page 20

MDS-C1 dimensional drawing

Unit & Piping Selection

Page 21

MDS-C2~C3 dimensional drawing

Unit & Piping Selection

Page 22

Using Distribution Header may lead to imbalance refrigerant flow.

Unit & Piping Selection

Page 23

Connection Type of Refnet Joint/Distributors

Refnet Joint

Refrigerant Pipe Work

Page 24

Connection Type of Refnet Joint/Distributor

Distributor

Refrigerant Pipe Work

Page 25

Connection Type of Refnet Joint/Distributors

Refnet Joint Distributor

Refrigerant Pipe Work

Page 26

Connection Type of Refnet Joint/Distributors

Refnet Joint Distributor

Refrigerant Pipe Work

Page 27

Cooling Capacity Correction Factor

Unit & Piping Selection

Page 28

Heating Capacity Correction Factor

Unit & Piping Selection

Page 29

Cooling cap. factor

Cooling Capacity Correction Factor

Unit & Piping Selection

Page 30

Heating Capacity Correction Factor

Unit & Piping Selection

Page 31

Refrigerant Pipe Specification : MDS-A

Unit & Piping Selection

Page 32

Refrigerant Pipe Specification : MDS-B

Unit & Piping Selection

Page 33

Selection Process

Page 34

Example

C

A B

D

E

F

Building Type: Bungalow

Unit & Piping Selection

Page 35

RequirementRequirementCooling only modelCooling only model

• Ambient temperature : 40.0 Ambient temperature : 40.0 °C°C

• Indoor temperature : 21.0 Indoor temperature : 21.0 °C°C

Other InformationOther Information

• Piping lengthPiping length :: 70m70m

• Height between I/OHeight between I/O :: 4m4m

• Outdoor Unit located below indoorsOutdoor Unit located below indoors

Unit - AWall

Mounted

Unit - BWall

Mounted

Unit - CWall

Mounted

Unit - DWall

Mounted

Unit - ECeiling

Cassette

Unit - FCeiling

Concealed

2.7 2.7 5.0 5.4 8.8 6.4

Required Cooling Capacity

(kW)

Unit & Piping Selection

Example

Page 36

Indoor RequirementWall Mounted

WMD 09G WMD 10G WMD 15G WMD 20G WMD 25GBtu/h 8,500 9,600 12,300 19,100 22,200kW 2.5 2.8 3.6 5.6 6.5

Ceiling CassetteCKD 10C CKD 15C CKD 20C

Btu/h 9,600 12,300 19,100kW 2.8 3.6 5.6

Ceiling CassetteCKD 20A CKD 25A CKD 30A CKD 40A CKD 50A

Btu/h 19,100 22,200 30,700 38,200 47,800kW 5.6 6.5 9.0 11.2 14.0

Ceiling ConcealedCCD 10C CCD 15C CCD 20C CCD 25C CCD 28C

Btu/h 9,600 12,300 19,100 22,200 27,300kW 2.8 3.6 5.6 6.5 8.0

Ceiling ConcealedCCD 30C CCD 38C CCD 40C CCD 50C CCD 60C

Btu/h 30,700 34,100 38,200 47,800 56,000kW 9.0 10.0 11.2 14.0 16.4

COOLING ONLY MODEL

NOMINAL CAPACITY

COOLING ONLY MODEL

COOLING ONLY MODEL

COOLING ONLY MODEL

NOMINAL CAPACITY

COOLING ONLY MODEL

NOMINAL CAPACITY

NOMINAL CAPACITY

NOMINAL CAPACITYUnit - A Wall Mounted 2.7Unit - B Wall Mounted 2.7Unit - C Wall Mounted 5.0Unit - D Wall Mounted 5.4Unit - E Ceiling Cassette 8.8Unit - F Ceiling Concealed 6.4

Required Cooling Capacity(kW)

Unit & Piping Selection

Page 37

Example

A B C D E F

Capacity, kW 1.8 2.0 2.2 4.0 5.0 5.8

Model 10 10 20 20 30 25

HP of indoor unit 2.8 2.8 5.6 5.6 9.0 6.5

• Total Indoor capacity is 32.3 kW

Unit & Piping Selection

Page 38

Example

Selection CriteriaSelection Criteria

• Total Indoor capacity must be range between 50% ~ Total Indoor capacity must be range between 50% ~ 120% of the outdoor capacity.120% of the outdoor capacity.

• We recommend that the outdoor capacity equals to the We recommend that the outdoor capacity equals to the total indoor capacity or a little larger than the indoor total indoor capacity or a little larger than the indoor capacitycapacity

Unit & Piping Selection

Page 39

Example

Selected Outdoor Selected Outdoor : : MDS120BMDS120B

Cooling CapacityCooling Capacity : 32.5kW: 32.5kW

%38.99

%1005.323.32

%100

/

CapacityOutdoorCapacityIndoorTotal

RatioOI

Comply to selection criteria

Unit & Piping Selection

Page 40

Example• Selected Outdoor and Indoor ModelSelected Outdoor and Indoor Model

Outdoor Model MDS 120B 32.5 kW

Indoor A WMD 10G 2.8 kW

Indoor B WMD 10G 2.8 kW

Indoor C WMD 20G 5.6 kW

Indoor D WMD 20G 5.6 kW

Indoor E CKD 30A 9.0 kW

Indoor F CCD 25C 6.5 kW

Unit & Piping Selection

Page 41

ExampleOutdoor Capacity factorOutdoor Capacity factor

• Cooling only modelCooling only model

• Ambient temperature : 40.0 Ambient temperature : 40.0 °C°C

• Indoor temperature : 22.0 Indoor temperature : 22.0 °C°C1.03

Unit & Piping Selection

Page 42

ExamplePiping length & height factorPiping length & height factor

• Piping lengthPiping length :: 70m70m

• Height between I/OHeight between I/O :: 4m4m

• Outdoor Unit located below indoorsOutdoor Unit located below indoors

91%

Unit & Piping Selection

Page 43

Example

Total Capacity Total Capacity

• = Outdoor Capacity X Outdoor Capacity Factor = Outdoor Capacity X Outdoor Capacity Factor

• X Piping length & height FactorX Piping length & height Factor

• = 32.5 kW X 1.03 X 94%= 32.5 kW X 1.03 X 94%

• = 31.47 kW= 31.47 kW

Unit - A Wall Mounted 2.7Unit - B Wall Mounted 2.7Unit - C Wall Mounted 5.0Unit - D Wall Mounted 5.4Unit - E Ceiling Cassette 8.8Unit - F Ceiling Concealed 6.4Total Required Capacity 31.0

Required Cooling Capacity(kW)

Comply to requirement

Unit & Piping Selection

Page 44

Example

C

A B

D

E

F

Unit & Piping Selection

Building Type: Bungalow

Page 45

Example 1.1. Selection pipe diameterSelection pipe diameter

A B C

D E

MDS120B

CCD 25C WMD 20G WMD 10G

WMD 20GCKD 30A WMD 10G

6.5 kW5.6 kW 2.8 kW

5.6 kW9.0 kW

2.8 kW

Unit & Piping Selection

Page 46

Refrigerant Pipe Specification : MDS-B

Unit & Piping Selection

Page 47

Example

A B C

D E

MDS120B

CCD 25C WMD 20G WMD 10G

WMD 20GCKD 30A WMD 10G

6.5 kW5.6 kW 2.8 kW

5.6 kW9.0 kW

2.8 kW

Main pipeMain pipe diameter : diameter : ø ø 15.8815.88mm / ø mm / ø 28.628.6mmmm

Downstream capacityDownstream capacity

Point APoint A A-B-C : 14.9 kWA-B-C : 14.9 kWA-D-E : 17.4 kW A-D-E : 17.4 kW

Point BPoint B B-C : 8.4 kWB-C : 8.4 kWD-E : 8.4 kWD-E : 8.4 kW

Unit & Piping Selection

Page 48

Refrigerant Pipe Specification : MDS-B Point APoint A A-B-C : 14.9 kWA-B-C : 14.9 kW A-D-E : 17.4 kWA-D-E : 17.4 kW

Unit & Piping Selection

Page 49

Example

A B C

D E

MDS120B

CCD 25C WMD 20G WMD 10G

WMD 20GCKD 30A WMD 10G

6.5 kW5.6 kW 2.8 kW

5.6 kW9.0 kW

2.8 kW

Main pipeMain pipe diameter : diameter : ø ø 15.8815.88mm / ø mm / ø 28.6028.60mmmm

A-D diameter : ø 12.70mm / ø 22.23mm

A-B diameter : A-B diameter : ø ø 9.529.52mm / ø mm / ø 19.0519.05mmmm

Unit & Piping Selection

Page 50

Example

A B C

D E

MDS120B

CCD 25C WMD 20G WMD 10G

WMD 20GCKD 30A WMD 10G

6.5 kW5.6 kW 2.8 kW

5.6 kW9.0 kW

2.8 kW

Point BPoint BB-C : 8.4 kWB-C : 8.4 kWB-CCD25C : 6.5 kWB-CCD25C : 6.5 kW

Unit & Piping Selection

Page 51

Refrigerant Pipe Specification : MDS-B Point BPoint B B-C : 8.4 kWB-C : 8.4 kW B-CCD25C : 6.5 kW (follow indoor pipe size)B-CCD25C : 6.5 kW (follow indoor pipe size)

Unit & Piping Selection

Page 52

Example

A B C

D E

MDS120B

CCD 25C WMD 20G WMD 10G

WMD 20GCKD 30A WMD 10G

6.5 kW5.6 kW 2.8 kW

5.6 kW9.0 kW

2.8 kW

A-B: A-B: ø ø 9.529.52

/ ø / ø 19.0519.05

B-CCD25C: B-CCD25C: ø 9.52 / ø1ø 9.52 / ø15.885.88

B-C: B-C: ø 9.52 / ø1ø 9.52 / ø15.885.88

Unit & Piping Selection

Page 53

Example

Inlet Outlet Inlet OutletTo B & C 14.90 9.52 19.05To D & E 17.40 12.70 22.23To CCD25C 6.50 9.52 15.88To C 8.40 9.52 15.88To WM D20G 5.60 6.35 15.88To WM D10G 2.80 6.35 9.52To CKD30A 9.00 9.52 15.88To E 8.40 9.52 15.88To WM D20G 5.60 6.35 15.88To WM D10G 2.80 6.35 9.52

15.88

28.60

19.05

15.88

Point E

15.88

9.52

9.52

12.70

9.52

Point A

Point B

Point C

Point D 22.23

Liquid pipe (ø, mm) Gas pipe (ø, mm)Location

Capacity (kW)

Branch

Unit & Piping Selection

Page 54

Example

A B C

D E

MDS120B

CCD 25C WMD 20G WMD 10G

WMD 20GCKD 30A WMD 10G

6.5 kW5.6 kW 2.8 kW

5.6 kW

9.0 kW

2.8 kW

Main Pipe: ø Main Pipe: ø 15.8815.88 / ø / ø 28.628.6

B-C: ø 9.52 / ø1B-C: ø 9.52 / ø15.885.88

A-B: ø 9.52 / ø1A-B: ø 9.52 / ø19.059.05

A-D: ø12.7 / ø22.23A-D: ø12.7 / ø22.23 D-E: ø9.52 / ø1D-E: ø9.52 / ø15.885.88

Unit & Piping Selection

Page 55

Example Selection of branchSelection of branch

Select the refnet joint of point ASelect the refnet joint of point A

A (liquid) A (liquid) : MDS-: MDS-Y2Y2

A (gas) A (gas) : MDS-: MDS-Y1Y1

A B C D E

(outer diameter)

F G H I

(outer diameter)

J K L M N

(outer diameter)

O P Q R

MDS-Y1 553 172 293 120 28.6 28.9 25.7 22.5 28.6 28.9 25.7 22.5 19.3 22.2 19.3 16.1 12.9 9.7MDS-Y2 420 142 223 80 15.88 16.1 12.9 9.7 12.7 12.9 9.7 6.5 12.7 12.9 9.7 6.5MDS-Y3 420 142 223 80 15.88 16.1 12.9 9.7 12.7 12.9 9.7 6.5 15.88 16.1 12.9 9.7MDS-Y4 493 142 223 80 22.2 22.5 19.3 16.1 19.1 19.3 16.1 12.9 9.7 19.1 19.3 16.1 12.9

Diameter (mm)Refnet model

Length(mm) Diameter (mm) Diameter (mm)

A-D diameter : A-D diameter : ø 12.70 / ø 22.23ø 12.70 / ø 22.23

A-B diameter : A-B diameter : ø 9.52 / ø 19.05ø 9.52 / ø 19.05

All unit in mm

AA

Main Pipe diameter : Main Pipe diameter : ø 15.88 / ø 28.60ø 15.88 / ø 28.60

Unit & Piping Selection

Page 56

Example

A B C

D E

MDS120B

CCD 25C WMD 20G WMD 10G

WMD 20GCKD 30A WMD 10G

6.5 kW5.6 kW 2.8 kW

5.6 kW9.0 kW2.8 kW

Main Pipe: ø Main Pipe: ø 15.8815.88 / ø / ø 28.628.6

B-C: B-C: ø 9.52 / ø1ø 9.52 / ø15.885.88

A-B: ø 9.52 / ø1A-B: ø 9.52 / ø19.059.05

A-D: ø12.7 / ø22.23A-D: ø12.7 / ø22.23 D-E: ø9.52 / ø1D-E: ø9.52 / ø15.885.88

Liquid GasWMD 10G 6.35 9.52WMD 20G 6.35 15.88CCD 25C 9.52 15.88CKD 30A 9.52 15.88

ModelIndoor Valve Size (Ø, mm)

Unit & Piping Selection

Page 57

Example

A B C

D E

MDS120B

CCD 25C WMD 20G WMD 10G

WMD 20GCKD 30A WMD 10G

6.5 kW5.6 kW 2.8 kW

5.6 kW9.0 kW

2.8 kW

Liquid GasTo B & CTo D & ETo CCD25CTo CTo WMD20GTo WMD10GTo CKD30ATo ETo WMD20GTo WMD10G

MDS-Y2 MDS-Y3

MDS-Y2 MDS-Y1

MDS-Y2 MDS-Y4

Refnet Joint

MDS-Y2 MDS-Y4

MDS-Y2 MDS-Y3

Point E

Point A

Point B

Point C

Point D

Location Branch

Unit & Piping Selection

Page 58

Example

Formula:

G = ∑ Li* Gi

Using liquid tube length to calculate required refrigerant. Add in refrigerant.

G : Refrigerant charge amountLi : The each section of liquid tube length in all (m)Gi : Charge amount per length ( g/m)

Unit & Piping Selection

Page 59

Example

A B C

D E

MDS120B

CCD 25C WMD 20G WMD 10G

WMD 20GCKD 30A

WMD 10G

6.5 kW5.6 kW 2.8 kW

5.6 kW9.0 kW 2.8 kW

ø ø 15.88 (10m)15.88 (10m)

ø ø 9.52 (5m)9.52 (5m)

ø ø 9.52 (2m)9.52 (2m)

ø ø 9.52 (4m)9.52 (4m)ø ø 6.35 (2m)6.35 (2m)

ø ø 6.35 (5m)6.35 (5m)

ø ø 6.35 (5m)6.35 (5m)

ø ø 6.35 (2m)6.35 (2m)

ø ø 9.52 (5m)9.52 (5m)

ø ø 9.52 (5m)9.52 (5m)

ø ø 12.7 (25m)12.7 (25m)

Total Piping Length15.88mm – 10m12.7mm – 25m9.52mm – 21m6.35mm – 14m

Unit & Piping Selection

Page 60

Example

Additional charge amount :

= ∑ Li* Gi

= (Piping Length for 15.88mm X Refrigerant Charge Amount)

+ (Piping Length for 12.7mm X Refrigerant Charge Amount)

+ (Piping Length for 9.52mm X Refrigerant Charge Amount)

+ (Piping Length for 6.35mm X Refrigerant Charge Amount)

= (10 X 180) + (25 x 120) + (21 x 80) + (14 x 50)

= 7180 g

Liquid tube diameter (mm) 6.35 9.52 12.7 15.88

Refrigerant charge amount (g/m)

50 80 120 180

Total Piping Length15.88mm – 10m 12.7mm – 25m9.52mm – 21m 6.35mm – 14m

Unit & Piping Selection

Page 61

EXV BoxEXV BoxEXV BoxEXV Box

Electronic Expansion Valve

Unit & Piping Selection

Page 62

Indoor Unit EXV Box ModelCCD 10/15CKD 10/15WMD 10/15 MEX-16-2SAP-B

CCD 20CKD 20CED20WMD 20 MEX-20-2SAP-BCCD 25CKD 25

CED 25/28WMD 25 MEX-20-3SAP-B

CKD 30/40/50CCD 30/40/50/60

CED 40/50/62

MEX-16-2SAP-A

MEX-20-3SAP-A

MEX-20-2SAP-A

MEX-25-3SAP-A

Electronic Expansion Valve

2 units

1 unit

1 unit

2 units

Unit & Piping Selection