Owner
Project
AL – MANSURYA GAS TURBINE POWER PLANT (Phase I)
Revision History
Rev. Revision Date Created by Checked by Approved by Description
B 12.03.2013 AS HBK/ KSB MN Second Issue
A 14.01.2013 AS HBK/KSB MN First Issue
Description latest Revision:
Cross Checked
Department Name Date Signature
Main contractor
POWER
GAS BUSINESS
Replaces
-
Derived from
-
ALSTOM Document Code
AMA/00/E/----------/CA/104
Responsable dept
URUK/ABBCreated by
ASChecked by
HBK / KSB Approved by
MNFormat
A4Originator
Document Type
CA
Document Status
Electronically releasedTitle, Subtitle
TCHGEAR -
PROTECTION SETTING
Identification number
AMA/00/E/----------/CA/104
Rev Date. Lang. Sheet
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties withoutexpress its strictly forbidden.
ABB AETAD 2013
MV and LV Switchgear -Protection Setting (BoP)
B 12.03.2013 En 1/20
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 2/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 2 of 18 A
AL–MANSURYA GAS TURBINE POWER PLANT (PHASE I)
RELAY SETTINGS
A 2012_12 Emissione
P.B. G.B.
REV
Rev
DATE
Data
DESCRIPTION
Descrizione
PREPARED
Preparato
CHECKED
Controllato
APPROVED
Approvato
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 3/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 3 of 18 A
1 INTRODUCTION 3
2 REFERENCE DRAWING 4
3 MV - LV ELECTRICAL SYSTEM 5
4 SETTINGS PROTECTIONS 7
4.1
Settings 7
4.2 Criterial Settings 8
4.3
Settings protections MV switchgear 9
4.4 Settings protections PMCC switchgear 12
5 COMMENTS 17
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 4/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 4 of 18 A
1 INTRODUCTION
Scope of application:
1. Operators, equipment and network components protection (schwitchboard MV and LV, transformers,motors, cables)
2. Selective tripping of protections devices.
Battery limit and exclusions:
• Incoming lines MV 6,6 kV
• Outgoing lines LV 0,4 kV
App licable Standards:
The study of the plant were made with the utmost respect for the most current regulations and standards inthe field, with particular regard to:
IEC s tandards:
IEC 60617 PROTECTION SYMBOLIZATION
IEC 60255 PROTECTION RELAIS
IEC 60502 POWER CABLES
IEC 60909 SHORT CIRCUIT CURRENT CALCULATION
IEC 60470 CONCTACTOR AC SYSTEM MV AND STARTERS
IEC 60044 TRANSFORMER CURRENT
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 5/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 5 of 18 A
2 REFERENCE DRAWING
DOC. IME NR. 427/12-101 (P22A-EA-200):
MV: SCHWITCHGEARS GENERAL ARRANGEMENTS AND FUNFATION PLANT
DOC. IME NR. 427/12-201:
PMCC: GENERAL ARRANGEMENTS SINGLE LINE DIAGRAMM AND SCHEMATIC DIAGRAMM
DOC. ALSTOM NR. AMA/00/E/……/CA004:
Protection Relay Setting and Coordination for Plant Auxiliaries
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 6/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 6 of 18 A
3 MV - LV ELECTRICAL SYSTEM
MV NETWORK:
• Short circuit max. 31.5kA x 1s
• Neutral system connected to earth trough a resistore of 10 ohm
• Operating Voltage Ve = 6,6kV
• Nominal frequence fn = 50 Hz
MV SWITCHGEAR
The characteristics of the switchboards are as follows
• Operating Voltage Ve = 6,6kV
• Nominal Voltage Vn = 7,2 kV
• Nominal frequence fn = 50 Hz
• Nominale current In = 1250 A
• Maximum Short circuit Icc = 31,5 kA x 1s
• Peak maximum short circuit Ip = 80 kA
TRANSFORMER 90BFT30 – 90BFT40 – 90BFT50
The characteristics of the transformers are as follows
• Insulation Dry, Dyn11
• Nominal Power An = 250 kVA
• Vcc% Vcc% = 6%
• Nominal Voltage V1n V1n = 6,6kV
• Nominal Voltage V2n V2n = 0,4 kV
• Nominal frequence fn = 50 Hz
• inrush 265A for 0.25s
• ansi point IA = 100/vcc% In, tA = 3s
TRANSFORMER 90BFT10 – 90BFT20
The characteristics of the transformers are as follows
• Insulation Dry, Dyn11
• Nominal Power An = 2.200 kVA
• Vcc% Vcc% = 6%
• Nominal Voltage V1n V1n = 6,6kV
• Nominal Voltage V2n V2n = 0,4 kV
• Nominal frequence fn = 50 Hz
• inrush 1600A for 0.8Sec
• ansi point IA = 100/vcc% In, tA = 3s
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 7/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 7 of 18 A
SWITCHBOARD PMCC
The characteristics of the switchboards are as follows
• Operating Voltage Ve = 0,4/0,23kV
• Nominal Voltage Vn = 0,4 kV
• Nominal frequence fn = 50 Hz
• Nominale current In = 4.000 A
• Maximum Short circuit Icc = 50kA x 1s
• Peak maximum short circuit Ip = 105 kA
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 8/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 8 of 18 A
4 SETTINGS PROTECTIONS
4.1 Settings
The selectivity between the protections can be realized in the mode defined below:
• zone selectivity
• directional selectivity• current selectivity
• chronometric selectivity
• current / chronometric selectivity
• logical selectivity
• selectivity test
The choice of the type of selectivity to be taken is linked to the following parameters:limits imposed by the systemprotections functionsshort circuit lelev
The current system adopted foresees the realization of a type of selectivity, chronometric / amp.
The range between the time settings of protection was calculated by the following:
DT = ∆T Te Ta Ti To Tm= + + + +
DT, time margin between two protectionsTe, the sum of the errors in time relaysTa, any time of auxiliary relays (block) interposed on the opening circuitTi, time of openingTo, time of inertia of the upstream protection (overshoot)Tm, margin of safety
Were also undertaken the following key assumptions:
a) The transformers current transformers (CTs) are considered suitable for the detection of short-circuit current in the transitional arrangement.
b) It is assumed the maximum efficiency of protections installed and corrected the links betweenguards and auxiliary current transformers and voltage.
c) DT min (MV) = 150ms, DT min (LV) = 100ms.
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 9/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 9 of 18 A
4.2 Criterial Settings
The settings of the devices have been made considering the following electrical parameters:
1. Short circuit current2. Thermal and dynamic characteristics of MV and LV cables, switchboards, transformers, motors
3. Nominal current4. Start current e start time motor transformers
5. Start current e start time motor
The security functions used by digital type ABB REF 615
1. 50-51: three phase overcurrent
2. 50N-51N: residual earth overcurrent
3. 27: phase undervoltages
4. 59: phase overvoltages
5. 87: transformer differential protection
CT, VT and toroidal transformer (TO)
CT:transformation ratio: 1.000/1A – 400/1A – 50/1Aperformance measures: 15VA cl. 0,5
performance protection: 10VA 5P20 – cl X (transformer differential protection)VT:transformation ratio: 6,6:1,73/110:1,73 – 100/3 Vperformance measures: 30VA cl. 1performance protection: 30VA cl. 6PTO:transformation ratio: 100/1 Aperformance protection: 1VA 5P10
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 10/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 10 of 18 A
4.3 Settings protections MV swi tchgear
MV schwit chgear 6,6kV
SWIITCH CT / VT PROTECTION TYPE ANSI SETTING CATALOGUE NOTE
01 AUX.
TRANSF.90BTF30
250kVA
50/1A10VA 5P20
to 100/1A1VA/5P10
RET 615 ABBVD4
50/51
50N-51N
87T
I>= 0,05 - 5 Int>= 0,05 - 15 sI>>= 0,1 - 40 Int>>= 0,04–200s
I>= 0,01 - 5 Int>= 0,05 - 15 s
restraint mode
2h & 5h &wavHigh operate value
500 – 3000%low operate value
5 – 50%slope section 2
10 – 500%end section 2
100 – 500%start value 2.H
7 – 20%start value 5.H
10 – 50%operation
winding 1 type
Y,YN;D,Z,ZNwinding 2 type
Y,YN;D,Z,ZN
I>=0,45Int>= dipVI (10)K=0,5I>>= 8 Int>>=0,1s
Io>=0,1 Into>=0,1s
2h&5h
1000%
30%
75%
150%
20%
35%
on
D
y
REF 615
02
AUX.TRANSF.
90BTF10
2.200kVA
400/1A10VA cl X
to 100/1A1VA/5P10
RET 615 ABBVD4
50/51
50N-51N
87T
I>= 0,05 - 5 Int>= 0,05 - 15 sI>>= 0,1 - 40 Int>>= 0,04–200s
I>= 0,01 - 5 Int>= 0,05 - 15 s
restraint mode
2h & 5h &wavHigh operate value
500 – 3000%low operate value
5 – 50%slope section 2
10 – 500%end section 2
100 – 500%start value 2.H
7 – 20%start value 5.H
10 – 50%operation
winding 1 type
Y,YN;D,Z,ZNwinding 2 type
Y,YN;D,Z,ZN
I>=0,5InVI
K=0.5
I>>= 4.5 In
t>>=0.9s
Io>=0,1 Into>=0,1s
2h&5h
1000%
30%
75%
150%
20%
35%
on
D
y
REF 615
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 11/20
AL –MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO -SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMPANYFOGLIO Nr.-Sh. N. REV. Nr.
AL –
MANSURYAIRAQ
END USER: MINISTRY OF ELECTRICITY,
IRAQ11 of 18 A
03
INCOMING
FEEDER A
245A
1000/1A 10VA5P20 to100/1A1VA/5P10
REF 615 ABB VD4 50/5150N-51N
I>= 0,05 -5 Int>= 0,05 -15 sI>>= 0,1 -40In t>>=0,04 –200sI>= 0,01 -5 Int>= 0,05 -15 s
I>=0.245InNIK=0.12I>>=1.8t>>=1sIo>=0,2 Into>=0,4s
REF 615
04 6600:1,73 / REU 615 ABB 27U<=0,1 –1,2Un
U< = 0,8 REU 615
MEASUREM
E110:1,73 V 59 tU<=0,1-300 s tU< =1s
NT BUS AU<=0,1 –1,6Un
U> = 1,1
6600:1,73 /tU<=0,05-300s
tU> =1s
110:3 V
05 1000/1A REF 615 ABB 50/51 I>= 0,05 -5 In I>=0.2ln REF 615
BUS TIE 10VA 5P20 VD4 t>= 0,05 -15 s NI
245AI>>= 0,1 -40In
K=0.1
t>>=0,04 –200s
I>>=1.8t>>=1s
to 100/1A 50N-51N I>= 0,01 -5 In Io>=0,2 In
1VA/5P10 t>= 0,05 -15 s to>=0,25s
06 6600:1,73 / REU 615 ABB 27U<=0,1 –1,2Un
U< = 0,8 REU 615
MEASUREM
E110:1,73 V 59 tU<=0,1-300 s tU< =1s
NT BUS BU<=0,1 –1,6Un
U> = 1,1
6600:1,73 /tU<=0,05-300s
tU> =1s
110:3 V07 1000/1A REF 615 ABB 50/51 I>= 0,05 -5 In I>=0.245In REF 615
INCOMING 10VA 5P20 VD4 t>= 0,05 -15 s NI
FEEDER B 50N-51NI>>= 0,1 -40In
245A t>>=0,04 –200s
K=0.12I>>= 1.8In t>>=1s
to 100/1A I>= 0,01 -5 In Io>=0,2 In
1VA/5P10 t>= 0,05 -15 s to>=0,4s
08 400/1A RET 615 ABB 50/51 I>= 0,05 -5 In I>=0,5In REF 615
AUX.
TRANSF.
90BTF20
2200kVA
10VA cl X VD4 t>= 0,05 -15 sI>>= 0,1 -40In t>>=0,04 –200s
VIK=0,5I>>= 4.5 Int>>=0.9s
50N-51N I>= 0,01 -5 In Io>=0,1 In
to 100/1A t>= 0,05 -15 s to>=0,1s
1VA/5P10
87T restraint mode
2h & 5h &wavHigh operate value
500 – 3000%low operate value
5 – 50%slope section 2
10 – 500%end section 2
100 – 500%start value 2.H
7 – 20%start value 5.H
10 – 50%operation
winding 1 type
Y,YN;D,Z,ZNwinding 2 type
Y,YN;D,Z,ZN
2h&5h
1000%
30%
75%
150%
20%
35%OnDy
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 12/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFIC AZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMP ANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF E LECTR ICITY, IRAQ 12 of 18 A
09
AUX.
TRANSF.
90BTF40
250kVA
50/1A10VA 5P20
to 100/1A1VA/5P10
RET 615 ABBVD4
50/51
50N-51N
87T
I>= 0,05 - 5 Int>= 0,05 - 15 sI>>= 0,1 - 40 Int>>= 0,04–200s
I>= 0,01 - 5 Int>= 0,05 - 15 s
restraint mode
2h & 5h &wavHigh operate value
500 – 3000%low operate value
5 – 50%slope section 2
10 – 500%end section 2
100 – 500%start value 2.H
7 – 20%start value 5.H
10 – 50%operation
winding 1 type
Y,YN;D,Z,ZNwinding 2 type
Y,YN;D,Z,ZN
I>=0,45Int>= dipVI (10)K=0,5I>>>= 8 Int>>>=0,1s
Io>=0,1 Into>=0,1s
2h&5h
1000%
30%
75%
150%
20%
35%
on
D
y
REF 615
10
AUX.
TRANSF.
90BTF50250kVA
50/1A10VA 5P20
to 100/1A1VA/5P10
RET 615 ABBVD4
50/51
50N-51N
87T
I>= 0,05 - 5 Int>= 0,05 - 15 sI>>= 0,1 - 40 In
t>>= 0,04–200s
I>= 0,01 - 5 Int>= 0,05 - 15 s
restraint mode
2h & 5h &wavHigh operate value
500 – 3000%low operate value
5 – 50%slope section 2
10 – 500%end section 2
100 – 500%start value 2.H
7 – 20%
start value 5.H10 – 50%operation
winding 1 type
Y,YN;D,Z,ZNwinding 2 type
Y,YN;D,Z,ZN
I>=0,45Int>= dipVI (10)
K=0,5I>>>= 8 Int>>>=0,1s
Io>=0,1 Into>=0,1s
2h&5h
1000%
30%
75%
150%
20%
35%
on
D
y
REF 615
Note:
Tab. 4.3: Settings protections MV switchgear
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 13/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFIC AZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMP ANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF E LECTR ICITY, IRAQ 13 of 18 A
4.4 Settings protections PMCC switchgear
Mv schw itchgear 0,4kV
SWIITCH CT / VT PROTECTION TYPE ANSI RANGE SETTING CATALOGUE NOTE
1D – 1E
INCOMINGLINE 1
2200 kVA3.179A
4000/1A30VA cl 0,530VA cl X
PR123 ABBE4S
LSIG I1= 0,4 - 1 Int1=3-144s (3I1)I2= 0,6 - 10 Int2= 0,05s–0,8 sI3= 1,5 - 15 In
I4 = 0,2-1 Int4 = 0,1-1s
I1= 0,8 Int1 =3s (3I1)I2=2,8 Int2 =0,4sI3=off
I4 = 0,3 Int4 = 0,4s
EMAX
1B -1CTIE
BREAKER2200 kVA
3.179A
4000/1A30VA cl 0,530VA cl X
PR123 ABBE4S
LSIG I1= 0,4 - 1 Int1=3-144s (3I1)I2= 0,6 - 10 Int2= 0,05s–0,8 sI3= 1,5 - 15 In
I4 = 0,2-1 Int4 = 0,1-1s
I1= 0,75 Int1 =3s (3I1)I2=2,5 Int2 =0,25sI3=off
I4 = 0,2 Int4 = 0,25s
EMAX
1D – 1EINCOMING
LINE 2
2200 kVA3.179A
4000/1A30VA cl 0,530VA cl X
PR123 ABBE4S
LSIG I1= 0,4 - 1 Int1=3-144s (3I1)I2= 0,6 - 10 Int2= 0,05s–0,8 sI3= 1,5 - 15 In
I4 = 0,2-1 Int4 = 0,1-1s
I1= 0,8 Int1 =3s (3I1)I2=2,8 Int2 =0,4sI3=off
I4 = 0,3 Int4 = 0,4s
EMAX
2B/2FUEL GASLINE HEAT
TRACING50kW
80A
EKIP ABBXT2S3P 100A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,8 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
2C/3
ADMINISTRATION
BUILDINGSWITCH
BOARD
114kW183A
EKIP ABBXT4S3P 250A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,74 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
2D/3
WASTEWATER
PUMPSSYSTEM
SWITCH
BOARD100kW
160A
EKIP ABBXT4S3P 250A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,65 Int1 =9s (3I1)I2=3 Int2 =0,15sI3=off
TMAX
2E/211 BR V10
UNIT 11 DCTRANSFERT
75kW120A
EKIP ABBXT2S3P 160A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,75 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 14/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFIC AZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMP ANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF E LECTR ICITY, IRAQ 14 of 18 A
2F/2
12 BR V10
UNIT 11 DC
TRANSFERT
75kW
120A
EKIP ABBXT2S3P 160A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,75 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
2G/6
FEEDER TO
ALSTOM
442,9kW
711A
PR331 ABBX1N103P 1000A
LSI I1= 0,4 - 1 Int1=3-144s (3I1)I2= 0,6 - 10 Int2= 0,05s–0,8 sI3= 1,5 - 15 In
I1= 0,72 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
3B/2 AIR
COMPRESSO
R SWITCH
BOARD
INCOMER 1
50kW
80A
EKIP ABBXT2S3P 100A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,8 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
3C/2
UPS SYSTEM
48 VDC
INVERTER
INCOMER 1
15kW
24A
EKIP ABBXT2S3P 63A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,4 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
3D/2
UPS SYSTEM
48 VDC
CHARGER
INCOMER 1
45kW
72A
EKIP ABBXT2S3P 160A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,45 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
3E/2
OTHER
CRANES
SPARE
25kW
40A
EKIP ABBXT2S3P 63A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,64 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
3F/3
UTILITYSPARE 1
100kW
160A
EKIP ABBXT4S3P 250A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,65 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
2G/2
OIL WATER
SEPARATOR
SCHWITCHB
OARD
INCOMER 1
75kW
120A
EKIP ABBXT2S3P 160A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,75 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 15/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFICAZIONE CL IENTE-ID ClientTITOLO-Title: SETTAGGIO P ROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 15 of 18 A
3H/2
132kV GIS
BUILDING
SCHWITCH
BOARD
INCOMER 1
61,1kW
98A
EKIP ABBXT2S3P 160A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,62 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
3I/7
400kV GIS
BUILDING
SCHWITCH
BOARD
INCOMER 1
250kW
401A
PR222 ABBT6S6303P 630A
LSI I1= 0,4 - 1 Int1=3-18s (6I1)I2= 0,6 - 10 Int2= 0,05s–0,5 sI3= 1,5 - 12 In
I1= 0,64 Int1 =9s (6I1)I2=4 Int2 =0,15sI3=off
TMAX
4B/2
PROCESS
SPARE 1
30kW
48A
EKIP ABBXT2S3P 63A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,76 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
4C/2
PROCESS
SPARE 2
30kW
48A
EKIP ABBXT2S3P 63A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,76 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
4D/2PROCESS
SPARE 3
25kW
40A
EKIP ABBXT2S3P 63A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,64 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
4E/2
PROCESS
SPARE 3
25kW
40A
EKIP ABBXT2S3P 63A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,64 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
4G/4
CORE
BUILDING
SWITCHBOARD
INCOMER 1
130kW
208A
PR222 ABBT6S4003P 400A
LSI I1= 0,4 - 1 Int1=3-18s (6I1)I2= 0,6 - 10 In
t2= 0,05s–0,5 sI3= 1,5 - 12 In
I1= 0,52 Int1 =9s (6I1)I2=4 In
t2 =0,15sI3=off
TMAX
4H/7
FIRE
FIGHTING
250kW
401A
PR222 ABBT6S6303P 630A
LSI I1= 0,4 - 1 Int1=3-18s (6I1)I2= 0,6 - 10 Int2= 0,05s–0,5 sI3= 1,5 - 12 In
I1= 0,64 Int1 =9s (6I1)I2=4 Int2 =0,15sI3=off
TMAX
2B/2
GEN. PUR.
SPARE 1
30kW
48A
EKIP ABBXT2S3P 63A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 s
I3= 1 - 10 In
I1= 0,76 Int1 =9s (3I1)I2=4 Int2 =0,15s
I3=off
TMAX
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 16/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFIC AZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 16 of 18 A
2E/2
UNIT 21 DC
TRANSFERT
75kW
120A
EKIP ABBXT2S3P 160A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,75 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
2RF/2
UNIT 22 DC
TRANSFERT
75kW120A
EKIP ABBXT2S3P 160A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 s
I3= 1 - 10 In
I1= 0,75 Int1 =9s (3I1)I2=4 Int2 =0,15s
I3=off
TMAX
2G/6
FEEDER TO
ALSTOM
442,9kW
711A
PR331 ABBX1N103P 1000A
LSI I1= 0,4 - 1 Int1=3-144s (3I1)I2= 0,6 - 10 Int2= 0,05s–0,8 sI3= 1,5 - 15 In
I1= 0,72 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
3B/2
AIR
COMPRESSO
R SWITCH
BOARD
INCOMER 2
50kW
80A
EKIP ABBXT2S3P 100A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,8 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
3C/2
UPS SYSTEM
48 VDC
INVERTER
INCOMER 2
15kW
24A
EKIP ABBXT2S3P 63A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,4 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
3D/2
UPS SYSTEM
48 VDC
CHARGER
INCOMER 245kW
72A
EKIP ABBXT2S3P 160A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 s
I3= 1 - 10 In
I1= 0,45 Int1 =9s (3I1)I2=4 Int2 =0,15s
I3=off
TMAX
2F/2
EOT CRANE
70kW
112A
EKIP ABBXT2S3P 160A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,7 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
3G/4
CORE
BUILDING
SWITCH
BOARD
INCOMER 2
130kW208A
PR222 ABBT6S4003P 400A
LSI I1= 0,4 - 1 Int1=3-18s (6I1)I2= 0,6 - 10 Int2= 0,05s–0,5 sI3= 1,5 - 12 In
I1= 0,52 Int1 =9s (6I1)I2=4 Int2 =0,15sI3=off
TMAX
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 17/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFIC AZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMP ANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF E LECTR ICITY, IRAQ 17 of 18 A
3H/7
400kV GIS
BUILDING
SCHWITCH
BOARD
INCOMER 2
250kW
401A
PR222 ABBT6S6303P 630A
LSI I1= 0,4 - 1 Int1=3-18s (6I1)I2= 0,6 - 10 Int2= 0,05s–0,5 sI3= 1,5 - 12 In
I1= 0,64 Int1 =9s (6I1)I2=4 Int2 =0,15sI3=off
TMAX
4D/2
SEWAGE
TREATMENT
PLANT
SWITCHBOA
RD INCOMER
20kW
32A
EKIP ABBXT2S3P 63A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,0.5 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
4E/2
GATE HOUSE
SWITCH
BOARD
INCOMER
25kW
40A
EKIP ABBXT2S3P 63A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,64 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
2G/2
OIL WATER
SEPARATOR
SCHWITCHB
OARDINCOMER 2
75kW
120A
EKIP ABBXT2S3P 160A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,75 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
3H/2
132kV GIS
BUILDING
SCHWITCH
BOARD
INCOMER 2
61,1kW
98A
EKIP ABBXT2S3P 160A
LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In
I1= 0,62 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off
TMAX
4I/7
FIRE
FIGHTING
SWITCHBOARD
INCOMER
202kW
401A
PR222 ABBT6S6303P 630A
LSI I1= 0,4 - 1 Int1=3-18s (6I1)I2= 0,6 - 10 In
t2= 0,05s–0,5 sI3= 1,5 - 12 In
I1= 0,52 Int1 =9s (6I1)I2=4 In
t2 =0,15sI3=off
TMAX
Note:
Tab. 4.4: Settings protections LV switchgear
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 18/20
AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)
CODICE IDENTIFIC AZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –
RELAY SETTINGSCODICE IDENTIFICAZIONE -ID
427-12-RS-101
IMPIANTO -
PLANTSITO - SITE
CLIENTE-Client: URUK ENGINEERING &
CONSTRACTIONC COMP ANYFOGLIO Nr.- Sh. N. REV. Nr.
AL–
MANSURYA IRAQ END USER: MINISTRY OF EL ECTRIC ITY, IRAQ 18 of 18 A
5 COMMENTS
Comparing the features of dynamic and thermal stress equipment (switchboards, transformers MV/LV.cables), and maximum levels of short-time and current settings of the protections we observe a high level ofnetwork security.
_________________________________________________________________________________________________________________________
Giovanni Pietro Bianchessi
ALBO INGEGNERI BG
NR. 2160
Annex 1: d iagramm Annex 2: veri fi cat ion CT: doc. Nr. 427-12-CTC-101_A_BASE
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 19/20
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)
http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 20/20
±
±
±
I> 2200kVA TRAFO
CB22CB22
I> ALSTOM O/G to URUK
I> URUK 6.6kV I /C
I> 6.6kV Buscoupl er
URUK 6.6kV I /C
6.6kV Buscoupl er
2200kVA TRAFO
ALSTOM O/G to URUK