![Page 1: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/1.jpg)
Alternative Concept of Operations Realized: Rugby Relocation
PRESENTED BY:
Erik Johannessen
Presented to:
ILA 36Orlando FL15 October, 2007
![Page 2: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/2.jpg)
Megapulse Incorporated November, 2006
Getting Started
Corporation of Trinity House London issues Contract Notice December 1, 2006 for a services contract for the provision of UK eLoran signal-in-space, as part of European eLoran service.
Invitations to Tender issued in January 2007. The General Lighthouse Authorities (GLAs) today (31 May 2007)
announces the award of a prestigious fifteen-year contract to VT Communications (part of VT Group plc) for the provision of a state-of-the-art enhanced Loran (eLoran) radionavigation service to improve the safety of mariners in the UK and Ireland.
http://www.trinityhouse.co.uk/media_centre/press_releases/press_release.html?id=15001
VT Communications awarded subcontracts to R.G. Nash & Associates, reelektronika, and Megapulse.
![Page 3: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/3.jpg)
Megapulse Incorporated November, 2006
![Page 4: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/4.jpg)
Megapulse Incorporated November, 2006
![Page 5: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/5.jpg)
Megapulse Incorporated November, 2006
![Page 6: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/6.jpg)
Megapulse Incorporated November, 2006
Other Service
MSF Service
eLoran Service
![Page 7: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/7.jpg)
Megapulse Incorporated November, 2006
Interface Specification (ICDs) Engineering Issues
Induced Voltages into T antenna and SSX Monitor Performance in presence of other signals
Specifications developed for interfaces at: Prime Power Input Antenna Matching and Feed Grounding Mechanical Mounting Clearances Required Lighting & HVAC
216 line items specified for fab, build, or buy
![Page 8: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/8.jpg)
Megapulse Incorporated November, 2006
General site survey Antenna farm location survey and orientation tests - Day 1
2 pre-tuned NF-6 notch filter boxes and engineering antenna preamp - provided by Megapulse;
spectrum analyzer, scope, van, etc. - provided by VTC; 2 locations surveyed; several antenna orientations tried; preamp overloading caused multiple harmonics in Loran band;
Antenna farm location survey and orientation tests - Day 2 preamp gain reduced, antenna orientation adjusted - successful
reception of Lessay; Container "survey" (1/3 of the future building)
Site Survey
![Page 9: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/9.jpg)
Megapulse Incorporated November, 2006
![Page 10: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/10.jpg)
Megapulse Incorporated November, 2006
![Page 11: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/11.jpg)
Megapulse Incorporated November, 2006
![Page 12: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/12.jpg)
Megapulse Incorporated November, 2006
![Page 13: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/13.jpg)
Megapulse Incorporated November, 2006
![Page 14: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/14.jpg)
Megapulse Incorporated November, 2006
![Page 15: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/15.jpg)
Megapulse Incorporated November, 2006
![Page 16: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/16.jpg)
Megapulse Incorporated November, 2006
Summary
VT Contract Announced by GLAs Kick off Meeting with Megapulse Rugby De-commissioning Engineering and Fabrication Monitor System Site Survey Site Works Off Airs for Antenna Measurement Testing into Dummy Antenna Testing into Antenna On-air 8940M
May 31, 2007 Jun 28-29 Jul 2- Jul 6 Jul 1- Sep 4 Aug 14-15 Sep 11- Sep 20 Sep 25-26 Sep 27-28 Sep 30
![Page 17: Alternative Concept of Operations Realized: Rugby Relocation PRESENTED BY: Erik Johannessen Presented to: ILA 36 Orlando FL 15 October, 2007.](https://reader035.fdocuments.us/reader035/viewer/2022062809/56649f2f5503460f94c48d23/html5/thumbnails/17.jpg)
Megapulse Incorporated November, 2006
Questions?