22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
ALICE RF System Andy Moss & Alan Wheelhouse,ASTeC, Daresbury Laboratory
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
RF System
• Main Menu
• RF Operation– Switching on the IOTs– RF Control
• Monitoring Systems– IOTs– Linac & Booster Cavities– Buncher Cavity– Pressure Monitoring
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
Main MenuRF Drop Down Menu RF Buncher RF Booster 1 RF Booster 2 RF Linac 1 RF Linac 2 RF PSU Linac Module Booster Module RF Buncher Adhoc RF Gain Tuner Motor Test
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
RF Operation
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
RF PSU Control
• Analogue Monitoring
• Control Area• IOT Monitoring
Main Menu → RF → RF PSU
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
Switching On The IOTs
• Press (Hold down)– Aux ON– SB ON
• Filaments need 10 minutes
• Check ion current is <1µA
• HV ON– HV will slowly rise to
27kV, ~600mA• Check ion current is
<1µA• Allow 10 minutes for the
quiescent currents to stabilise
• Switch RF ON
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
RF On• Trace seen on
oscilloscope• RF raised on each IOT to
provide the required gradient for each of the Linac and Booster cavities
• Check ion current is <1µA• Ditto for the solid state
amplifier on the Buncher cavity
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
RF Control – Linac & Booster Cavities
• RF power adjusted using the gradient
• RF phase adjustment (station phase)
• All other controls are fixed
Main Menu → RF → RF Linac 1
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
RF Control – Buncher Cavity
• RF power adjusted using the gradient
• RF phase (station phase)
• All other controls are fixed
Main Menu → RF → RF Buncher
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
Operation
• Quench– RF should switch off– If not immediately switch off rf press HV ON
• Trips– Re-apply
• Constant trips seek assistance– IOT arc detector trips need to be reset at the PLC
• An additional screen will be added in the future
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
Monitoring Systems
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
IOT Readings
• All IOT limits are set within the PLC
• Power measurements– Drive – Output– Additional voltage
readings
Main Menu → RF → RF PSU → LC IOT5
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
Booster & Linac Readings
• Power Measurements– Waveguide power– Cavity probe power
Main Menu → RF → RF PSU → Linac
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
Buncher Readings
Main Menu → RF → RF PSU → Buncher
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
Calibration Readings
• Calibration readings for all the power measurements
• DO NOT TOUCH
Main Menu → RF → Adhoc RF Gain
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
SC Module Monitoring
• Monitoring for Booster and Linac Cavities– Cavity power and
gradient– Waveguide powers– Cavity pressure– Cold & warm
window temperatures
Main Menu → RF → Linac Module
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
Machine Vacuum MonitoringMain Menu → Machine → Vacuum
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
Injector Vacuum MonitoringMain Menu → Injector → Vacuum
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
Monitoring
• Radiation monitoring• Pressure monitoring
Main Menu → General → Monitoring
22nd July 2008 ALICE RF System Andy Moss/Alan Wheelhouse
Monitoring - GraphsMain Menu → Injector → Injector Vacuum → Log Pressure 1hr