Transcript of ALICE 5 o’clock meeting Wk 49 .
7/12/10 1
ALICE 5 o’clock meeting
Wk 49
http://indico.cern.ch/conferenceDisplay.py?confId=115692
7/12/10 5 o’clock meeting 2
Access requestCavern and surface
• You should submit an ADI and a task procedure
Two persons minimum
Work breakdown structure – risk associated at each step
ADIhttps://edh.cern.ch/Document/ADI
Task procedureTemplate EDMS 1103355
Attach task procedure
7/12/10 5 o’clock meeting 3
ALICE Christmas break schedule
OpenOpenExperimentExperiment
TRDTRDEMCalEMCal CloseClose
ExperimentExperiment
Open L3 doors
Close L3doors
7/12/10 5 o’clock meeting 4
UX25 access
Rules for access restrictions:Removal/installation of shielding (restriction includes RB24 triplets)
• PX24 blocks: no access CR5 and UX25• PX24 beams (35t): no access CR1-5, Expo, and UX-25• All other blocks: no access to UX-25
LHC evacuation test (7/12 after 18:00 and 24/12 tbc) – no access UX25Gas functional test (10/12 - 2 hrs) – no access UX25 and CR1-5AUG test (20/1) (Arrêt Urgence General – General Emergency Stop) – no access UX25DSO test (12-13/1) (Department Safety Officer) – no access UX25
No access SX2 during manipulation of blocks in SX2 (except ACR and WRs)
7/12/10 5 o’clock meeting 5
L3 (and MNF) access
NoVentilation
EMCal EMCal
EMCal
NoVentilation
+AUG
Wks 50 and 4: access (TPC) to be coordinated with TC (transport)
Wks 1-2: no access during EMCal SMs insertion inside L3 (see day-by-day)When moving from low-beta to yellow platform: no access to MNFWhen inserting the module: no access L3 and MNF
Watcher needed in wk 49 and from wk 4 onwards
Wk 6 or 7 (tbd): Kr calibration – TPC T stability (all interventions to be agreed by TC/RC)
24 31
Evac.
Day-by-day schedule
UX25 and MNF - Wk 49
7/12/10 5 o’clock meeting 7
• 18:00: end HI program– Ramp down both magnets. !!! Emergency dump !!!
• 18:00 – 22:00: access system test. No access UX25• 22:00: RPE survey (Jiri + 2nd person)
– Then go to restricted mode
Week 49 - 6/12 MondayProgram
7/12/10 5 o’clock meeting 8
Activities in UX25 - Week 49 - 6/12 Monday
No access UX-25 - possibility of access from 22:00
ITECO
HAULOTTE
TRD team at CERN: 6 to 10/12
7/12/10 5 o’clock meeting 9
• 8:00 - 18:00: UX25 cavern in Restricted mode– No access UX25 (except Transport, VAC, TC and RP)
• 8:30 - 9:30: RP liquid (and gas) sampling (Adeline, Pierre)– Collect RP samples (Fernando, Philippe)
– Survey L3 and Dipole
• 18:00 - 21:00: evacuation test – No access UX25• From 21:00 - Cavern in General mode
• 14:00 - 15:00: Portuguese Press visit. 10 persons
Week 49 - 7/12 TuesdayProgram
7/12/10 5 o’clock meeting 10
• ALTEAD: PX24 shielding blocks – top layer removed– 8:00 to 18:00: no access CR5
• Reinstall crane electronics - Problems (ongoing)• 14:00 to 15:00: put SM16 into the rotator - Ongoing• VAC: Neon injection preparation - Started
– Transport needed (EDH 4472100)
– Remove “green fence” (P2 technician)
• Stop flammable gases i-C4H10 and CH4 (Ar/H2 on 10/12) - Done• 8:30: Lock L3+Dipole power converter + compensator magnet - Done• Test transmission of alarm lift to FB• 8:30: inspection PHOS cooling plant (Arturo, Dominique, Philippe, Sasha) – Done
(will install temporary line)• 15:15: VIC SPD – Done + Gas VIC• DCS: 10:00 – 12:00, interruptions of the GPN link to/from P2 – Done. DCS got stuck.
Investigating why• MCR (Magnet Control Room): HW modifications (Pascal B.) – Started• TRD (after 21:00): Wiener PS back-plane modification and LV consolidation (L3)
Week 49 - 7/12 TuesdayActivities
7/12/10 5 o’clock meeting 11
Activities in UX25 - Week 49 - 7/12 Tuesday
8:00 to 18:00: no access UX25 (except Transport, VAC, TC and RP)
18:00 – 21:00: evacuation test (No access UX25)
VA
C
RP samples
PX24 shielding: blocks
TRD Wiener PS
TRD Wiener PS
7/12/10 5 o’clock meeting 12
• 8:00 - 18:00: UX25 cavern in Restricted mode– No access UX25 (except Transport, VAC, TC and RP)
• From 18:00 - Cavern in General mode
• 18:00: Confined Space Training– Tour in L3 at the end of the course
Week 49 - 8/12 WednesdayProgram
7/12/10 5 o’clock meeting 13
• ALTEAD: PX24 shielding beams (35t)– 8:00 to 18:00: no access CR1-5 and Expo– Stabilizers (after 18:00)– Move nacelle ITECO
• VAC: Neon injection
Activities after 18:00:
• EN-CV: empty TPC tank• TPC: replacement of damaged FECs (C-side)• TRD: Wiener PS back-plane modification and LV consolidation (L3)• SPD: cut inox pipes• Muon TRK: CROCUS firmware upgrade
• Muon TRG: Maintenance Local decision electronics and upgrade FE threshold distributors
• T0: investigation broken amplifier (MNF and L4-rack)
Week 49 - 8/12 WednesdayActivities
7/12/10 5 o’clock meeting 14
Activities in UX25 - Week 49 - 8/12 Wednesday
PX24 shielding:
beams (35t)
VA
C
8:00 to 18:00: no access UX25 (except Transport and VAC)
18:00 to 8:00: access in general mode
MoveTRD Wiener PS
TRD Wiener PS
Cut SPD pipes
Stabilizers
Muon TRG
TP
C F
EC
an
d
TR
D L
V
TPC cooling
Muo
n T
RK
: C
RO
CU
S f
irmw
are
upg
rade
T0
7/12/10 5 o’clock meeting 15
Activities in MNF - Week 49 - 8/12 Wednesday
8:00 to 18:00: no access UX25
18:00 to 8:00: access in general mode
T0
7/12/10 5 o’clock meeting 16
Activities in UX25 - Week 49 - 9/12 Thursday
VA
C
MNF shielding
18:00 to 8:00: access in general mode
8:00 to 18:00: no access UX25 (except Transport and VAC)
TRD Wiener PS
TRD Wiener PS
RAMSES: removal of Data Acquisition modules CR5
Stabilizers
No access CR1-5 during lifting up of 5 big beams
Interruption on auto-transfert network (from 07:00 till 07:05). No access underground
TP
C F
EC
an
d
TR
D L
V
EMCal team at CERN: fit rollers on all SMs
Muo
n T
RK
: C
RO
CU
S f
irmw
are
upg
rade
7/12/10 5 o’clock meeting 17
Activities in MNF - Week 49 - 9/12 Thursday
8:00 to 18:00: no access UX25
18:00 to 8:00: access in general mode
7/12/10 5 o’clock meeting 18
Activities in UX25 - Week 49 - 10/12 Friday
Move if needed
LV156
Gas functional test (2h no access UX25 and CR1-5)
Maintenance PX24 MAD (transparent)
MNF shielding
No access CR1-5 during lifting up of 5 big beams
18:00 to 8:00: access in general mode
8:00 to 18:00: no access UX25 (except Transport)
TRD Wiener PS
TRD Wiener PS
TP
C F
EC
an
d
TR
D L
V
EMCal team at CERN: fit rollers on all SMs
Muo
n T
RK
: C
RO
CU
S f
irmw
are
upg
rade
7/12/10 5 o’clock meeting 19
Activities in MNF - Week 49 - 10/12 Friday
8:00 to 18:00: no access UX25
18:00 to 8:00: access in general mode
7/12/10 5 o’clock meeting 20
Activities in UX25 - Week 49 - 11/12 Saturday
LV156
MNF shielding
18:00 to 8:00: access in general mode
8:00 to 18:00: no access UX25 (except Transport)
TRD Wiener PS
TRD Wiener PS
TR
D L
V
7/12/10 5 o’clock meeting 21
Activities in MNF - Week 49 - 11/12 Saturday
8:00 to 18:00: no access UX25
18:00 to 8:00: access in general mode
7/12/10 5 o’clock meeting 22
Activities in UX25 - Week 49 - 12/12 Sunday
Access in general mode
7/12/10 5 o’clock meeting 23
Activities in MNF - Week 49 - 12/12 Sunday
Access in general mode
Services interruption
7/12/10 5 o’clock meeting 25
Maintenance gas systems
Functional tests
New gas monitoring
13-15/12:• Stop N2, CO2, Neon, Ar and C2H2F4 (24 hours max N2, CO2 and Neon)• TRD backup (N2 bottle in CR5) – HMPID backup (Ar bottle in SG2)
13
7/12/10 5 o’clock meeting 26
Gas system status over Christmas
Albin
• TPC & TRD: ON• TOF: ON – stop from 12 to 21/1 (cooling stop, KNF pump stopped)• HMPID: ON (Ar backup)• PHOS: N2 flushing• PMD: ON (except wks 1-2 – gas stop)• Muon TRK: backup CO2• Muon TRG: backup Ar
• No flammable gases from 7 Dec until 21 Jan PM (after maintenance L3 ventilation)
7/12/10 5 o’clock meeting 27
Maintenance cooling unitsCooling Plants and Primary Network
Cooling towers
Maintenance on production network. No primary water from 12/1 (PM) to 21/1CR1-2-3, the Wiener PS and detector cooling plants affected (plants can RUN, but no cooling power). Part of DCS will be kept running
Maintenanceand
consolidation
17
21
12
TOF/PHOSEMC
HMPID
SPD
TPC
TPC 10
Maintenance on cooling plants. Replacement of pneumatic actuators for TOF/TRD/TPC plants + TOF/PHOS flowmeter. CP will be stopped during maintenance
SSD/SDD
TRD
7/12/10 5 o’clock meeting 28
Maintenance ventilation units
SG2
UX25, Muon
TRK-TRG
17
12
UX25, Muon TRK-
TRG
L3
7/12/10 5 o’clock meeting 29
Safety and electrical systems
PX24 fire detect.20
UX25 fire detect. + red phones
UPS UPS
AUG
UPS
DSO
Evacuation
DSSSNIFFER mainten.Auto-transfert
Evacuation
Evacuation
Early morning/late evening (tbc)
7/12/10 5 o’clock meeting 30
• LHC evacuation tests (7/12 after 18:00 and 24/12 tbc)
– no access UX25
• EN/EL: interruption on auto-transfert network (9/12 from 07:00 till 07:05):
– All 'normal power‘ will be cut for 5 minutes: wall outlets, non-UPS in the ACR, SXL2, non-UPS power for the cooling plants, gas systems
– It will not affect the 'machine network‘ (all racks will remain powered (part of the 'EXD', machine, network)
– This network also provides the power to the UPSes, so they will run on battery for the time of this cut
– See https://edms.cern.ch/file/1106913/1/ENNC_2010_196.pdf
• EN/EL: AUG Test (20/1) (Arrêt Urgence General – General Emergency Stop)
– Major electrical perturbation. Also ACR affected
• DSS modification (13/1)
– Will stop the full DSS, trigger all interlocks, including stopping power to all racks
Safety and electrical systemsImpact on ALICE
7/12/10 5 o’clock meeting 31
DAQ upgrade plans• 21st Dec PM till the 04th Jan included
– The DAQ will be OFF during the CERN closure.– The ACR PCs will be left ON to give access to the DCS for the detectors teams
who need it.• 5th to the 11th of January included
– DAQ restarted on the first working day for 1 week. The DAQ will be switched ON with the present version of all software. Allow a quick commissioning after the installation of new detector modules or the intervention on existing detectors.
• 12th to the 23rd Jan included– The DAQ will be OFF during the cooling interruption at P2.– DAQ renovated (see TB December)
• 24th January– The DAQ will be ON again. It will run under SLC5 64 bits unless there would be
an unexpected key problem.
• The electronic logbook will remain available during the whole period. When the DAQ will be OFF, it will be running in the DAQ lab in Meyrin. There will be a few hours of interruption to switch from P2 to Meyrin and back.
Pierre/Uli
7/12/10 5 o’clock meeting 32
DCS plans
• Baseline: DCS will be operational all times where technically possible– With ‘best effort’ support– With access restrictions during CERN End-of-Year closure (22/12 – 4/1)
• Many activities and upgrades are planned– Will be coordinated with individual detectors to minimise impact– For central systems, as much as possible in shadow of other perturbations (e.g.
cooling stop)– Perturbations (e.g. for reboots etc.) cannot be excluded
• Detectors are invited to communicate ‘critical periods’, with services needed– Will try to cater for detector needs as much as possible
• Known perturbations:– Tue 7/12 10:00 – 12:00, interruptions of the GPN link to/from P2
• Upgrade of router, test impact on ALICE
– Wk50 (13-17/12) – major updates to all PC (many perturbations to be expected) – 12/1 – 21/1 (cooling stop), only minimal central services. All detector DCS
switched off, except for special requests and if cooling power allows
• More detailed planning at weekly and daily meetings
André / Peter
7/12/10 5 o’clock meeting 33
DCS plans
• Wk 49– Tue 7/12 10:00 – 12:00: interruptions of the GPN link to/from P2
• No connectivity on GPN (mail on laptops etc.); could have impact on running systems (is the main reason for this test: try to spot dependencies)
• Done – switch upgraded to 10x higher bandwidth; experienced blockage of DCS; to be investigated more tests needed later.
– Wed 8/12 – Fri 10/12 (daytime): SW upgrades and patches to central systems, to detectors on request only (Operating system and PVSS)
• Systems unavailable for short (~hrs) periods, frequent reboots
• Wk 50– Mon 13/12 – Tue 14/12 (daytime): Force upgrades and patches to all remaining
systems• Systems unavailable for short (~hrs) periods, frequent reboots
– Support to detectors restarting/testing their systems after upgrades• Detectors shall test functionality as much as possible
• Wk 51– Tue 21/12 PM: Limit access to DCS cluster during end-of-year closure
• Register with your SRC if you require access (see message Peter 2/12/2010)
André / Peter
7/12/10 5 o’clock meeting 34
Magnet control upgrade
• Wk 49: nous devons intervenir dans la MCR pour:– changement des alimentations 24V et 48 V des systèmes MSS et MCR (préventif)– changement des modules convertisseurs PT100 des hots points du Solénoïde (correctif suite à deux
incidents ayant entrainés l'arrêt du Solénoïde) et en UX25, comme Philippe Bouvier l'a déjà signalé:– recâblage des AU du dipôle et du Solénoïde– signalisation du champ magnétique du dipôle et du Solénoïde
• Nous étudions toujours une solution pour le monitoring des températures du Solénoïde.• L'arrêt de fin d'année va permettre de faire une meilleure approche de ce qui est existant en
UX25.
• En ce qui concerne l'alimentation électrique de la MCR, nous dépendons actuellement d'une seule source de courant sous UPS avec secours diesel.
• Afin d'établir une redondance pour l'alimentation de la MCR je souhaiterais installer une seconde source d'alimentation sous UPS.
• Je sais qu'une étude est faite à ALICE pour augmenter la puissance des UPS existants en 2012.• Je souhaiterais que cette demande soit incluse pour le calcul de puissance des nouveaux UPS
(besoin pour la MCR: 16A en monophasé)
Pascal
7/12/10 5 o’clock meeting 35
AOB
• SLIMOS