ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown...

25
20/12/10 1 ALICE 5 o’clock meeting Wk 51

Transcript of ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown...

Page 1: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 1

ALICE 5 o’clock meeting

Wk 51

Page 2: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 2

INDICO

• You’ll find this meeting here:– http://indico.cern.ch/categoryDisplay.py?categId=2957

• The full shutdown planning is here:– http://indico.cern.ch/conferenceDisplay.py?confId=117669

Page 3: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 3

Access requestCavern and surface

• You should submit an ADI and a task procedure

Two persons minimum

Work breakdown structure – risk associated at each step

ADIhttps://edh.cern.ch/Document/ADI

Task procedureTemplate EDMS 1103355

Attach task procedure

Page 4: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 4

ALICE Christmas break schedule

OpenOpenExperimentExperiment

TRDTRDEMCalEMCal

CloseCloseExperimentExperiment

Open L3 doors

Close L3doors

Page 5: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 5

UX25 access

Rules for access restrictions:Removal/installation of shielding (restriction includes RB24 triplets)

• PX24 blocks: no access CR5 and UX25• PX24 beams (35t): no access CR1-5, Expo, and UX-25• All other blocks: no access to UX-25

LHC evacuation test (7/12 after 18:00 and 24/12 tbc) – no access UX25Gas functional test (10/12 - 2 hrs) – no access UX25 and CR1-5AUG test (20/1) (Arrêt Urgence General – General Emergency Stop) – no access UX25DSO test (12-13/1) (Department Safety Officer) – no access UX25

No access SX2 during manipulation of blocks in SX2 (except ACR and WRs)

Page 6: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 6

L3 (and MNF) access

EMCal EMCal

EMCal

NoVentilation

Wks 50 and 4: access (TPC) to be coordinated with TC (transport)

Wks 1-2: no access during EMCal SMs insertion inside L3 (see day-by-day)When moving from low-beta to yellow platform: no access to MNFWhen inserting the module: no access L3 and MNF

Watcher needed in wk 49 and from wk 4 onwards

Wk 6 or 7 (tbd): Kr calibration – TPC T stability (all interventions to be agreed by TC/RC)

31

Evac.

NoVentilation

243NoVentilation

13 7

Page 7: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

Day-by-day schedule

UX25 and MNF - Wk 51

Page 8: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 8

GS/ASE: UX25 fire detection maintenance

ALTEADL unload in SXL2 2 EMCal modules

Activities:• TRD: installation BBF rails SR16-15• Survey: TRD and EMCal survey• TPC: replacement 1 FE card (A-side)• PMD+Pieter: move detector in parking position

Week 51 - 20/12 Monday

Page 9: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 9

Activities in UX25 - Week 51 - 20/12 Monday

TR

D a

nd

EM

Ca

l Sur

vey

Prepare TRD 16 installation

EM

Ca

l Sur

vey

(1/2

day

)

TP

C F

EC

TP

C F

EC

Page 10: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 10

Activities in MNF - Week 51 - 20/12 Monday

Mo

ve P

MD

in

p

arki

ng

p

osi

tio

n

Page 11: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 11

Google Streetview visit (5 people). 16:15

GS/ASE: UX25 fire detection maintenance

DAQ: switch off DAQ. The ACR PCs will be left ON to give access to the DCS for the detectors teams who need it

DCS: the access restrictions to the DCS network will be enforced from December 21st towards the end of working hours

Activities:• TRD: install TRD16• Philippe+Didier: removal ladder BKF• PMD: replacement electronics chains

Week 51 - 21/12 Tuesday

Page 12: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 12

Activities in UX25 - Week 51 - 21/12 Tuesday

Install TRD 16

Page 13: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 13

Activities in MNF - Week 51 - 21/12 Tuesday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

Page 14: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 14

Activities in UX25 - Week 51 - 22/12 Wednesday

TR

D S

urve

y

Prepare TRD 15 installation

Connect TRD 16

Visit: RIKEN RIBF Accelerator technical coordination group. Ken Oyama

Page 15: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 15

Activities in MNF - Week 51 22/12 Wednesday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

Page 16: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 16

Activities in UX25 - Week 51 - 23/12 Thursday

Install TRD 15 Connect TRD 16

TR

D S

urve

y

Page 17: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 17

Activities in MNF - Week 51 - 23/12 Thursday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

Page 18: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 18

Activities in UX25 - Week 51 - 24/12 Friday

LHC evacuation test. no access UX25

Page 19: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 19

Activities in MNF - Week 51 - 24/12 Friday

LHC evacuation test. no access UX25

Page 20: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 20

Activities in UX25 - Week 51 - 25/12 Saturday

Christmas day

Page 21: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 21

Activities in MNF - Week 51 - 25/12 Saturday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

Page 22: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 22

Activities in UX25 - Week 51 - 26/12 Sunday

TRD team at CERN: 26 to 30/12

Page 23: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 23

Activities in MNF - Week 51 - 26/12 Sunday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

Page 24: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 24

DCS plans

• Wk 51– Contingency for system upgrades

– Support to detectors restarting/testing their systems after upgrades• Detectors shall test functionality as much as possible

– Tue 21/12 PM: Limit access to DCS cluster during end-of-year closure• Register with your SRC if you require access (see message Peter

2/12/2010)

• Wk 52 – Wk 01– Only ‘best effort’ support during CERN closure

André / Peter

Page 25: ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.

20/12/10 5 o’clock meeting 25

AOB

• -