AlbuquerqueRapid Transit (ART)
ProposedConcept of Operations
Tom ShookLaycee Kolkman, PE, PTOE
ITE Western AnnualConference
July 11, 2016
What is a Concept ofOperations?
What is Bus Rapid Transit?
Why Bus Rapid Transit inAlbuquerque?
Concept of Operations forAlbuquerque Rapid Transit
What is a Concept of Operations (ConOps)?
What is Bus Rapid Transit?
Enhanced Stations
Larger Vehicles
Transit Way
Safe Access
Better ServicePriority Treatments
Benefits of Bus Rapid Transit
Faster Service
Improved Reliability
Higher Capacity
Legibility
Leverage Investment
ART Project Goals
Improved Service
Revitalized Corridor
Better Quality of Life
Mixed Flow
Exclusive Center RunningBi-Directional Lanes
ART Operating Environment
Reversible Lane
Transit Signal Priority (TSP) System
General Intersection Operations
• GPS Technology• Block Signals• Detection Logic• Queue Jumps• Peer-to-Peer Communication
Transit Signal Priority
ART Station Door Deactivation
Bi-Directional Detection Logic
Part Time Warning Signs
Part TimeWarning Signs
ART Lane
Proposed Stakeholder Coordination
Proposed TSPImplementation
Category 1 – Bench TestingCategory 2 – Field Test (No Service)Category 3 – Simulated ServiceCategory 4 – Fine Tuning
© 2014 HDR Architecture, Inc., all rights reserved.© 2014 HDR Architecture, Inc., all rights reserved.© 2014 HDR Architecture, Inc., all rights reserved.© 2014 HDR, Inc., all rights reserved.© 2014 HDR, Inc., all rights reserved.© 2014 HDR, Inc., all rights reserved.© 2014 HDR, Inc., all rights reserved.© 2014 HDR, all rights reserved.