Albertelli Construction - Multi-Family
-
Upload
milton-chrissovergis -
Category
Real Estate
-
view
25 -
download
2
Transcript of Albertelli Construction - Multi-Family
![Page 1: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/1.jpg)
Building Legacies Together
www.albertelli.net
![Page 2: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/2.jpg)
Our Story
• Leadership has over 150 years of domestic and international design and construction project experience
• Albertelli Construction Established in 1997
• Corporate Headquarters in Jacksonville, Florida
• Financially Strong • 2015 Revenue – $135MM • Repeat clients – 80%
George Albertelli President
David Albertelli Vice President
![Page 3: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/3.jpg)
Our Story
Delivery Methods • CM, GC, D/B or EPC
Types • Greenfield, Brownfield, Expansions/Renovations
Total Project Solutions • Site Selection, Planning, Multidiscipline
Architecture & Engineering, Building
Safety is Our Priority • Safety Rate: EMR = .83
Key Differentiators • Best-Class Innovation • Speed-to-Market • Customer Driven • Best Value
![Page 4: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/4.jpg)
Design & Engineering
www.albertelli.net
![Page 5: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/5.jpg)
Design & Engineering
Architecture • Programming • Space Planning • Building Design
Engineering • Civil • Structural • Mechanical • Electrical • Plumbing
Planning • Master Planning • Due Diligence • LEED
Permitting • Regulatory Analysis • Jurisdictional Determinations
Quality Assurance • Document Review • Field Inspection
![Page 6: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/6.jpg)
Design & Engineering
• 2D-to-3D Drawing Conversion
• Design-Intent Level of Detail
• Shop Drawing Level of Detail
• Construction Sequencing
• Layout for Self-Perform
• Clash Detection
• Quantity Takeoffs (QTOs)
• Constructability Reviews
![Page 7: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/7.jpg)
Construction & Contracting
www.albertelli.net
![Page 8: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/8.jpg)
Construction & Contracting
Project Management & Administration • Schedule and Budget • Safety and Quality • Communication • Preconstruction Meetings & Reporting • Web Based Tools – Blue Beam & Blue Book • Risk Management & Insurance
![Page 9: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/9.jpg)
Construction & Contracting
Subcontractor Pre-Qualification • Recommendations by Customer • Local Market • National Contractors • Vendor Qualification Form • Subcontractor Risk Evaluation • Credit Rating
Safety Team • EMR - 0.83 (2015) • Pre-Qualified
Subcontractors • Project Specific Safety
Plan
![Page 10: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/10.jpg)
Markets & Industries
www.albertelli.net
![Page 11: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/11.jpg)
Markets & Industries
Industrial Commercial
Multi-Family
![Page 12: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/12.jpg)
Multi-Family
Springs at Stone Oak Villages San Antonio, Texas
• 360 Units • 30 acre site • 369,500 sq-ft • $28.5 million • 16 months
![Page 13: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/13.jpg)
Multi-Family
Aston Gardens Tampa, FL
• 326 Units • 36 acre site • 369,500 sq-ft • $21 million
• Phase 1 - 16 months • Phase 2 - 12 months
![Page 14: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/14.jpg)
Multi-Family
Springs at Essex Farms Charleston, South Carolina
• $22 million • 29 acre site • 284 units • 14 months • 286,100 sq-ft
![Page 15: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/15.jpg)
Multi-Family
Springs at Alamo Ranch San Antonio, Texas
• 235,200 sq-ft • 16 months timeline • $19 million
• 28 acre site • 232 units
![Page 16: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/16.jpg)
Multi-Family
Springs at Tech Ridge Austin, Texas
• 26 acre site • 342 units • 16 month timeline • $28 million
![Page 17: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/17.jpg)
Multi-Family
Springs at Winchester Road Lexington, Kentucky
• $16 million • 252 units • 259,400 sq-ft
• 24 acre site • 12 months timeline
![Page 18: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/18.jpg)
Multi-Family
Springs at Egan Farms Savage, Minneapolis
• 288 units • 32 acre site • 293,400 sq-ft • 15 months timeline • $24 million
![Page 19: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/19.jpg)
Project Delivery
www.albertelli.net
![Page 20: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/20.jpg)
Project Delivery
Design & Engineering • Establish design criteria & outline specification • Prepare preliminary documents & drawings • Utilities & energy management • Sustainability/LEED • Building material selection • Code & Permitting
Construction • Establish project controls:
− Cost, schedule, communication, quality
• Utilize web based communication tools
• Set meetings & reporting procedures
• Preconstruction services & value engineering
• Budget & Schedule Estimate @ 10%
![Page 21: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/21.jpg)
Project Delivery
Design & Engineering • Finalize outline specifications • Constructability validation • Complete construction drawings • Building Integration • Procurement Documents
Construction • Risk management program • Subcontractor bid & award
program • Schedule confirmation • Budget validation • Present GMP
![Page 22: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/22.jpg)
Project Delivery
Design & Engineering • Construction administration • Inspection program • Building Coordination • Utilities Coordination
Construction • Cost Control & Schedule
Management • Subcontractor Coordination • Quality control • Coordination meetings • Safety & security coordination
![Page 23: Albertelli Construction - Multi-Family](https://reader033.fdocuments.us/reader033/viewer/2022052318/589a68281a28ab0b788b45f3/html5/thumbnails/23.jpg)
Building Legacies Together
www.albertelli.net