AJKWA Shoreline Protection-U1

download AJKWA Shoreline Protection-U1

of 3

Transcript of AJKWA Shoreline Protection-U1

  • 8/19/2019 AJKWA Shoreline Protection-U1

    1/3

    P .F IT REEPORT NDONESIA Affiliate of Freeport - McMoran Copper & Gold 

    REFF. DWG. NO.: 

    GENSUPT ARC-CVLSTR-MECHAPPROVAL BY :

    GENSUPT ELECT & INSTAPPROVAL BY :

    GENSUPT FIRE SUP SYS ENGAPPROVAL BY :

    DEPARTMENT HEADAPPROVAL BY :

    DRAWING TITLE

    GENERAL LOWLAND

     AJKWA BRIDGE MP-34NEW BRIDGE PLATFORM &

    EXISTING PIER PROTECTION

    Project Engineer Approval :   Surya Tanjung   Date :   August 15 - 2008

    Designed

    Drawn

    Checked

    Approved

    : SDT

    : SDT

    : SDT / FS

    : FS

    Date : Aug 15 - 2008

    Date

    Date

    Date

    : Aug 15 - 2008

    : Aug 15 - 2008

    : Aug 15 - 2008

    DRAWING NUMBER

    SCALE : AS SHOWN

    REV.

     A3

    CENTRAL SERVICES ENGINEERING

    CSELast EditEdit DateFile Name

    : BoE: August 15 - 2008:

    Rev. No.

    -

    DATE

    -

    REVISION NOTES BY

    SKETCH - 03

    ISSUED FOR CONSTRUCTION

    1 5 1 3 A 7 - X - 2 3 3 0 0 3

    PIER-1

    ABUTMENT-1

    PIER-2   ABUTMENT-2

    CONTAINERS

    50 UNITS

    BOULDERS

    BOULDERS

    CONTAINERS

    36 UNITS

    BOULDERS

    ON EXISTING RIVER BEDSTACK BASED

    CONTAINERS BASE

    STACK BASED ON 2 METERS BELOW EXISTING RIVER BED

    TOP OF CONTAINERSSHALL BE 1 METER  ABOVE CAISSON CAP’S LEVEL

    RIVER’S

    SHORELINES

    RIVER’S

    SHORELINES

    CONTAINERS

    50 UNITSTOP OF CONTAINERSSHALL BE 1 METER  ABOVE CAISSON CAP’S LEVEL

    CONTAINER BASE

    RIVER’S

    SHORELINES

    V I E W O F K K- S I D E V I E W O F T P R A- S I D E

     P L A N V I E W

    7   M  E  T  E  R  S  E   X  P   A N  S I  O N  

    STACK BASED ON 2 METERS BELOW EXISTING RIVER BED

    PHASE-1

    EXISTING DAM

    BY 30 CONTAINERS

    PILES

    STRENGTHENING

    PHASE-1

    STEEL PIER

    DOWNSTREAM SIDE

    UC-250

    BRACED SUPPORT

     PIERIMPROVEMENT 

    B

    CONTAINERS

    36 UNITS

    ( PEAK FLOW PLAN )

    PHASE-2 

    PHASE-2 

     PLEAS E SEE SKETC H 04

    FOR MORE OF CONTA INERSECTION & DETAIL

    CONTAINERS NEEDFOR SHOREL INES :

     PHAS E-1 = 56 Containers PHAS E-2 = 30 Contai ners

    DEADMEN  DEADMEN

  • 8/19/2019 AJKWA Shoreline Protection-U1

    2/3

    P .F IT REEPORT NDONESIA Affiliate of Freeport - McMoran Copper & Gold 

    REFF. DWG. NO.: 

    GENSUPT ARC-CVLSTR-MECHAPPROVAL BY :

    GENSUPT ELECT & INSTAPPROVAL BY :

    GENSUPT FIRE SUP SYS ENGAPPROVAL BY :

    DEPARTMENT HEADAPPROVAL BY :

    DRAWING TITLE

    GENERAL LOWLAND

     AJKWA BRIDGE MP-34NEW BRIDGE

    PLATFORM PROTECTION

    Project Engineer Approval :   Surya Tanjung   Date :

    Designed

    Drawn

    Checked

    Approved

    : SDT

    : SDT

    : SDT / FS

    : FS

    Date :

    Date

    Date

    Date

    :

    :

    :

    DRAWING NUMBER

    SCALE : AS SHOWN

    REV.

     A3

    CENTRAL SERVICES ENGINEERING

    CSELast EditEdit DateFile Name

    : BoE::

    Rev. No.

    -

    DATE

    -

    REVISION NOTES BY

    SKETCH - 04

    ISSUED FOR CONSTRUCTION

    1 5 1 3 A 7 - X - 2 3 3 0 0 3

    A

    TYPICAL VIEWOF SHORELINE PROTECTION CONTAINERS

    CONTAINERS BASE

    BY RIVER'S EXISTING MATERIAL

    A

    RIVER BED

    SOIL CUTTING SLOPE

    450

    SOIL BACKFILL

    PLATFORM LEVEL

    NORMALFLOW

    PEAKFLOW

    B

    V IEW - A

    SOIL CUTTING SLOPE

    450

    SOIL BACKFILL

    BY EXISTING

    PLATFORM LEVEL

    NORMALFLOW

    PEAKFLOW

    SECTION - B SECTION - D

    C

    SECTION - C

    D

    BOULDERS

    BOULDERS

    MEDIUM SIZE

    TOP COVER BY

    REINFORCED CONCRETE

     PLEAS E SEE SKETCH 05FOR CONSTRUCTION

    SEQUENCE

    REBARS 32 MM

    Use Surplus Material 

    4EA-PIPE 4"-CS

    SHEAR-LOCK

    REBARS, 36MMUse Surplus Material,

    3 EA on 1 Base Container 

    CONCRETE

    SPREADER

    4EA-PIPE 4"-CS

    CONCRETE

    SPREADER

    BOULDERS

    TO BE CONTAINEDBY LAYERS

    500

    10001250

    DEADMEN

    3000

    1250

    DEADMEN

    3000

  • 8/19/2019 AJKWA Shoreline Protection-U1

    3/3

    P .F IT REEPORT NDONESIA Affiliate of Freeport - McMoran Copper & Gold 

    REFF. DWG. NO.: 

    GENSUPT ARC-CVLSTR-MECHAPPROVAL BY :

    GENSUPT ELECT & INSTAPPROVAL BY :

    GENSUPT FIRE SUP SYS ENGAPPROVAL BY :

    DEPARTMENT HEADAPPROVAL BY :

    DRAWING TITLE

    GENERAL LOWLAND

     AJKWA BRIDGE MP-34NEW BRIDGE PLATFORM PROTECTION

    - CONTAINER CONSTRUCTION SEQUENCE -

    Project Engineer Approval :   Surya Tanjung   Date :

    Designed

    Drawn

    Checked

    Approved

    : SDT

    : SDT

    : SDT / FS

    : FS

    Date :

    Date

    Date

    Date

    :

    :

    :

    DRAWING NUMBER

    SCALE : AS SHOWN

    REV.

     A3

    CENTRAL SERVICES ENGINEERING

    CSELast EditEdit DateFile Name

    : BoE::

    Rev. No.

    -

    DATE

    -

    REVISION NOTES BY

    SKETCH - 05

    ISSUED FOR CONSTRUCTION

    1 5 1 3 A 7 - X - 2 3 3 0 0 3

    A

    S TE P - 1O R IG IN A L CO N TA IN E R 2 0 'AP R X . W E IGH T IS 8 0 0 Kg

    S TE P - 2 R EMO VE CE I L IN G

    S TE P - 3MAKE R E B AR S H O L E S

    S TE P - 4INSTALL REBARS THROUGH

    T H E H O L E S O N B O T T O M & W A L LS

     9   H O L E S

    5  

    H   O   L  E  S  

    S TE P - 5 P OUR CO NCR ETE O N B OTTO M

    AP R X . W E IGH T IS 7 . 3 5 Tons

    S TE P - 6I N STAL L UP - DR A IN P IP E

    S TE P - 7 P UT BO ULDER SIN TO CO N TA IN ER

    S TE P - 8INSTALL REBARS

    TH R O UGH TH E H O L E SO N T O P

    S TE P - 9 PO UR CON CR ETEU P T O T O P L E V E L

     C O N C  R E

     T E

     C O N C  R E T E

    S TE P - 1 0MO DIF IE D CO N TA IN ER

    AP R X . W E IGH T IS 70 Tons

           2      5      0

           2      5      0

    CORNER CONNECTION

    F I L L W I T HCONCRETES TE E L P IN S

    5EA-Ø32

    STEEL PLATEEX-CONTA INER

    T O B E F I T O N S I T E

    CONTA INER 'SSHEAR-LOCK REBARS

    T O P V I E W   F R O N T V I E W

    Ø3 2