Transcript of AJKWA Shoreline Protection-U1
-
8/19/2019 AJKWA Shoreline Protection-U1
1/3
P .F IT REEPORT NDONESIA Affiliate of Freeport - McMoran Copper & Gold
REFF. DWG. NO.:
GENSUPT ARC-CVLSTR-MECHAPPROVAL BY :
GENSUPT ELECT & INSTAPPROVAL BY :
GENSUPT FIRE SUP SYS ENGAPPROVAL BY :
DEPARTMENT HEADAPPROVAL BY :
DRAWING TITLE
GENERAL LOWLAND
AJKWA BRIDGE MP-34NEW BRIDGE PLATFORM &
EXISTING PIER PROTECTION
Project Engineer Approval : Surya Tanjung Date : August 15 - 2008
Designed
Drawn
Checked
Approved
: SDT
: SDT
: SDT / FS
: FS
Date : Aug 15 - 2008
Date
Date
Date
: Aug 15 - 2008
: Aug 15 - 2008
: Aug 15 - 2008
DRAWING NUMBER
SCALE : AS SHOWN
REV.
A3
CENTRAL SERVICES ENGINEERING
CSELast EditEdit DateFile Name
: BoE: August 15 - 2008:
Rev. No.
-
DATE
-
REVISION NOTES BY
SKETCH - 03
ISSUED FOR CONSTRUCTION
1 5 1 3 A 7 - X - 2 3 3 0 0 3
PIER-1
ABUTMENT-1
PIER-2 ABUTMENT-2
CONTAINERS
50 UNITS
BOULDERS
BOULDERS
CONTAINERS
36 UNITS
BOULDERS
ON EXISTING RIVER BEDSTACK BASED
CONTAINERS BASE
STACK BASED ON 2 METERS BELOW EXISTING RIVER BED
TOP OF CONTAINERSSHALL BE 1 METER ABOVE CAISSON CAP’S LEVEL
RIVER’S
SHORELINES
RIVER’S
SHORELINES
CONTAINERS
50 UNITSTOP OF CONTAINERSSHALL BE 1 METER ABOVE CAISSON CAP’S LEVEL
CONTAINER BASE
RIVER’S
SHORELINES
V I E W O F K K- S I D E V I E W O F T P R A- S I D E
P L A N V I E W
7 M E T E R S E X P A N S I O N
STACK BASED ON 2 METERS BELOW EXISTING RIVER BED
PHASE-1
EXISTING DAM
BY 30 CONTAINERS
PILES
STRENGTHENING
PHASE-1
STEEL PIER
DOWNSTREAM SIDE
UC-250
BRACED SUPPORT
PIERIMPROVEMENT
B
CONTAINERS
36 UNITS
( PEAK FLOW PLAN )
PHASE-2
PHASE-2
PLEAS E SEE SKETC H 04
FOR MORE OF CONTA INERSECTION & DETAIL
CONTAINERS NEEDFOR SHOREL INES :
PHAS E-1 = 56 Containers PHAS E-2 = 30 Contai ners
DEADMEN DEADMEN
-
8/19/2019 AJKWA Shoreline Protection-U1
2/3
P .F IT REEPORT NDONESIA Affiliate of Freeport - McMoran Copper & Gold
REFF. DWG. NO.:
GENSUPT ARC-CVLSTR-MECHAPPROVAL BY :
GENSUPT ELECT & INSTAPPROVAL BY :
GENSUPT FIRE SUP SYS ENGAPPROVAL BY :
DEPARTMENT HEADAPPROVAL BY :
DRAWING TITLE
GENERAL LOWLAND
AJKWA BRIDGE MP-34NEW BRIDGE
PLATFORM PROTECTION
Project Engineer Approval : Surya Tanjung Date :
Designed
Drawn
Checked
Approved
: SDT
: SDT
: SDT / FS
: FS
Date :
Date
Date
Date
:
:
:
DRAWING NUMBER
SCALE : AS SHOWN
REV.
A3
CENTRAL SERVICES ENGINEERING
CSELast EditEdit DateFile Name
: BoE::
Rev. No.
-
DATE
-
REVISION NOTES BY
SKETCH - 04
ISSUED FOR CONSTRUCTION
1 5 1 3 A 7 - X - 2 3 3 0 0 3
A
TYPICAL VIEWOF SHORELINE PROTECTION CONTAINERS
CONTAINERS BASE
BY RIVER'S EXISTING MATERIAL
A
RIVER BED
SOIL CUTTING SLOPE
450
SOIL BACKFILL
PLATFORM LEVEL
NORMALFLOW
PEAKFLOW
B
V IEW - A
SOIL CUTTING SLOPE
450
SOIL BACKFILL
BY EXISTING
PLATFORM LEVEL
NORMALFLOW
PEAKFLOW
SECTION - B SECTION - D
C
SECTION - C
D
BOULDERS
BOULDERS
MEDIUM SIZE
TOP COVER BY
REINFORCED CONCRETE
PLEAS E SEE SKETCH 05FOR CONSTRUCTION
SEQUENCE
REBARS 32 MM
Use Surplus Material
4EA-PIPE 4"-CS
SHEAR-LOCK
REBARS, 36MMUse Surplus Material,
3 EA on 1 Base Container
CONCRETE
SPREADER
4EA-PIPE 4"-CS
CONCRETE
SPREADER
BOULDERS
TO BE CONTAINEDBY LAYERS
500
10001250
DEADMEN
3000
1250
DEADMEN
3000
-
8/19/2019 AJKWA Shoreline Protection-U1
3/3
P .F IT REEPORT NDONESIA Affiliate of Freeport - McMoran Copper & Gold
REFF. DWG. NO.:
GENSUPT ARC-CVLSTR-MECHAPPROVAL BY :
GENSUPT ELECT & INSTAPPROVAL BY :
GENSUPT FIRE SUP SYS ENGAPPROVAL BY :
DEPARTMENT HEADAPPROVAL BY :
DRAWING TITLE
GENERAL LOWLAND
AJKWA BRIDGE MP-34NEW BRIDGE PLATFORM PROTECTION
- CONTAINER CONSTRUCTION SEQUENCE -
Project Engineer Approval : Surya Tanjung Date :
Designed
Drawn
Checked
Approved
: SDT
: SDT
: SDT / FS
: FS
Date :
Date
Date
Date
:
:
:
DRAWING NUMBER
SCALE : AS SHOWN
REV.
A3
CENTRAL SERVICES ENGINEERING
CSELast EditEdit DateFile Name
: BoE::
Rev. No.
-
DATE
-
REVISION NOTES BY
SKETCH - 05
ISSUED FOR CONSTRUCTION
1 5 1 3 A 7 - X - 2 3 3 0 0 3
A
S TE P - 1O R IG IN A L CO N TA IN E R 2 0 'AP R X . W E IGH T IS 8 0 0 Kg
S TE P - 2 R EMO VE CE I L IN G
S TE P - 3MAKE R E B AR S H O L E S
S TE P - 4INSTALL REBARS THROUGH
T H E H O L E S O N B O T T O M & W A L LS
9 H O L E S
5
H O L E S
S TE P - 5 P OUR CO NCR ETE O N B OTTO M
AP R X . W E IGH T IS 7 . 3 5 Tons
S TE P - 6I N STAL L UP - DR A IN P IP E
S TE P - 7 P UT BO ULDER SIN TO CO N TA IN ER
S TE P - 8INSTALL REBARS
TH R O UGH TH E H O L E SO N T O P
S TE P - 9 PO UR CON CR ETEU P T O T O P L E V E L
C O N C R E
T E
C O N C R E T E
S TE P - 1 0MO DIF IE D CO N TA IN ER
AP R X . W E IGH T IS 70 Tons
2 5 0
2 5 0
CORNER CONNECTION
F I L L W I T HCONCRETES TE E L P IN S
5EA-Ø32
STEEL PLATEEX-CONTA INER
T O B E F I T O N S I T E
CONTA INER 'SSHEAR-LOCK REBARS
T O P V I E W F R O N T V I E W
Ø3 2