Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.
-
Upload
reynard-long -
Category
Documents
-
view
220 -
download
0
description
Transcript of Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.
![Page 1: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/1.jpg)
Air Resources BoardJanuary 2001
Staff PresentationStaff Presentation
January 25, 2001 ZEV HearingJanuary 25, 2001 ZEV Hearing
![Page 2: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/2.jpg)
OverviewOverview
September 2000 Board MeetingStaff proposed regulatory changesIssuesSupporting Activities
![Page 3: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/3.jpg)
September 2000 Board MeetingSeptember 2000 Board MeetingReaffirmed commitment to the ZEV
requirementsAsked staff to address challenges
– Near-term vehicle availability– Market stability– Public education– Cost
Result--sustainable market for ZEVs
![Page 4: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/4.jpg)
Staff ActivitiesStaff ActivitiesMeetings with interested partiesOctober workshopStaff proposalOngoing discussionsAdditional proposed changesInvestigation of incentives,
infrastructure and outreach issues
![Page 5: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/5.jpg)
Proposed Regulatory ChangesProposed Regulatory Changes
Staff rationaleKey elements of staff proposalEffect of staff proposal on vehicle
numbers, cost, emissionsDetail of proposed changes
![Page 6: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/6.jpg)
Staff RationaleStaff Rationale
Key conclusionsPolicy implicationsResulting recommendations
![Page 7: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/7.jpg)
Conclusion--Volume Alone Not Conclusion--Volume Alone Not the Answer for ZEVs Today the Answer for ZEVs Today
Policy implications– Force ongoing technology improvement– Avoid over-investment in near-term
technologiesRecommendation
– Maintain mandate, but at reduced level
![Page 8: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/8.jpg)
Conclusion--Gasoline SULEV Conclusion--Gasoline SULEV PZEVs Will Entirely Fill 6 Percent PZEVs Will Entirely Fill 6 Percent
Policy implications– Additional incentive needed for
advanced technology vehicles– Higher credit for AT PZEVs within 6
percent will reduce number of ICE gasoline PZEVs
Recommendation– Allow offset against ZEV requirement
![Page 9: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/9.jpg)
Conclusion--Conclusion--Must Eliminate UncertaintyMust Eliminate Uncertainty
Policy implications– Reduce initial risk– Look for some degree of manufacturer
supportRecommendation
– Provide sustainable ramp
![Page 10: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/10.jpg)
Key Elements of Staff ProposalKey Elements of Staff Proposal
Maintain core technology-forcing mandatePhase in ZEV and PZEV requirementsAllow further ZEV reduction if offset with
advanced technology PZEVsGradually increase future ZEV requirementNo multiple credits unless vehicle placed
in service
![Page 11: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/11.jpg)
Overview of Vehicle CategoriesOverview of Vehicle Categories
0
2
4
6
8
10
12
ZEVAT PZEVPZEV
Battery EVH2 Fuel Cell
Grid-Connect HEV
HEV, CNGReformer Fuel CellDM Fuel Cell (?)
Gasoline ICE PZEV
Current Regulation Staff Proposal
![Page 12: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/12.jpg)
Effect of Proposed ChangesEffect of Proposed Changes
Number of vehiclesCostEmissions
![Page 13: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/13.jpg)
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Current Regulation Staff Proposal
Number of PZEVsNumber of PZEVs
![Page 14: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/14.jpg)
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Current Regulation Staff Proposal (without AT offset) Staff Proposal (with AT Offset)
Number of ZEVs--Full FunctionNumber of ZEVs--Full Function
![Page 15: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/15.jpg)
Number of ZEVs--Mixed Number of ZEVs--Mixed
0
5000
10000
15000
20000
25000
30000
35000
2003 2004 2005
Current Regulation Staff Proposal (without AT Offset)Staff Proposal (with AT Offset)
![Page 16: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/16.jpg)
Annual ZEV PlacementsAnnual ZEV Placements
0
1000
2000
3000
4000
5000
6000
7000
8000
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Annual Placements
![Page 17: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/17.jpg)
Cumulative ZEV PlacementsCumulative ZEV Placements
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Cumulative Placements
![Page 18: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/18.jpg)
0
20,000
40,000
60,000
80,000
100,000
120,000
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Current Regulation--ZEVs Staff Proposal--ZEVs plus AT PZEVs
Number of ZEVs plus AT PZEVsNumber of ZEVs plus AT PZEVs
![Page 19: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/19.jpg)
Cumulative Total, Mandate VehiclesCumulative Total, Mandate Vehicles
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000Current Regulation Staff Proposal
![Page 20: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/20.jpg)
Effect of Proposed ChangesEffect of Proposed Changes
Reduced cost, per Board directive– 2003 savings of $130 M to $400 M
(depending on compliance strategy)– Savings decline in future years as PZEV
numbers increaseEmissions neutrality
![Page 21: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/21.jpg)
Detail of Proposed ChangesDetail of Proposed Changes
![Page 22: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/22.jpg)
Phase in PZEV IntroductionPhase in PZEV Introduction
2003 2004 2005 2006PZEV Requirement 25% 50% 75% 100%
![Page 23: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/23.jpg)
Phase in ZEV IntroductionPhase in ZEV Introduction
2000-2002 2003-2005 2006+Multiplier 4.00 1.25 1.00
![Page 24: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/24.jpg)
Reduce Future NEV CreditsReduce Future NEV Credits
0
50000
100000
150000
200000
250000
300000
2003 2004 2005 2006 20070
0.2
0.4
0.6
0.8
1
1.2
1.4Current Regulation Staff Proposal @ 2% NEV Credit
![Page 25: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/25.jpg)
Increase ZEV Percentage Increase ZEV Percentage
0
2
4
6
8
10
12
14
16
18
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Model Year
Req
uire
d ZE
V Pe
rcen
tage
![Page 26: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/26.jpg)
Modify Vehicle CategoriesModify Vehicle Categories
Allow hybrid electric vehicles with an all electric range of 20 miles or more to be counted as ZEVs
Allow other advanced technologies that are not ZEVs to satisfy part of the ZEV requirement
(Vehicles with PZEV score of 0.4 or more)
![Page 27: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/27.jpg)
Reward Extra PZEVsReward Extra PZEVs
Give manufacturers that achieve double the PZEV phase-in level in 2003 and 2004 extra time to take advantage of the advanced technology option
![Page 28: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/28.jpg)
0
2
4
6
8
10
12
14
0 50 100 150 200 250 300
Current Regulation (2003) Staff Proposal (2003)
Modify the ZEV Range CreditModify the ZEV Range Credit
![Page 29: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/29.jpg)
No Fast Refuel Credit After 2008 No Fast Refuel Credit After 2008
0
2000
4000
6000
8000
10000
12000
14000
16000FCV in 2010, Revised Staff ProposalAll FFEVFCV in 2010, Original Staff Proposal
![Page 30: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/30.jpg)
Warranty CreditsWarranty Credits
Provide in-service credits for ZEVs and zero-emission VMT vehicles that have an extended battery or fuel cell stack warranty, and remain in service in California
(0.1 x original credit per year after 3 years)
![Page 31: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/31.jpg)
Advanced ZEV Componentry Advanced ZEV Componentry
Earned by vehicles equipped with advanced ZEV componentry
– Current regulation: 0.1– Staff proposal: 0.25
– PZEV HEV will earn 0.45 (not counting efficiency)
![Page 32: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/32.jpg)
Efficiency Multiplier (Revised)Efficiency Multiplier (Revised)
Calculate “California Miles Per Equivalent Gallon” Assign vehicle to class (subcompact, compact, etc.) Baseline = Sales weighted average fuel economy for class Efficiency score = Vehicle efficiency / 1.5 x baseline
For ZEVs, multiplier phased up as range multiplier phases down, beginning in 2005
For PZEVs, multiplier fully in force beginning in 2005
![Page 33: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/33.jpg)
Demonstration Programs and Demonstration Programs and Transportation SystemsTransportation Systems
Allow credits for vehicles placed in an approved demonstration program– (Need not be “offered for sale”)
Allow additional credits for vehicles placed as part of a “transportation system” approach– (Station car, car sharing)
![Page 34: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/34.jpg)
Vehicles Placed in ServiceVehicles Placed in Service
Require that vehicles be placed in service to earn multiple credits– (Can’t sit on dealer lot)
![Page 35: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/35.jpg)
Determining ZEV ObligationDetermining ZEV Obligation
Provide certainty regarding the sales volume number used to determine the ZEV obligation– Current regulation: 2003 obligation based
on 2003 sales– Staff proposal: 2003 obligation based on
average sales for 1997-1999
![Page 36: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/36.jpg)
Manufacturer CategoriesManufacturer Categories
Increase the volume threshold for large manufacturers– Current regulation: 35,000– Staff proposal: 60,000
![Page 37: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/37.jpg)
Manufacturer CategoriesManufacturer Categories
Phase in ZEV compliance for intermediate manufacturers that transition to large
Exempt independent low volume manufacturers from the ZEV percentage requirements
![Page 38: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/38.jpg)
IssuesIssues
Number of vehicles, near and long termTreatment of various vehicle types
– Grid connect hybrid electric vehicles– Neighborhood electric vehicles
Fair Market TestElectricity demand
![Page 39: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/39.jpg)
Fair Market TestFair Market Test
Significant staff concerns– Premature decision on long term cost– Intrudes on Board authority– PZEV suspended even though feasible– Perpetuates uncertainty
![Page 40: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/40.jpg)
Electricity DemandElectricity Demand
Most charging is off-peakMinimal impact
– Today (2,300 vehicles)• Energy use: 0.005% of statewide total• Peak power demand: 0.004% of statewide total
– 2010 (77,060 vehicles) • Energy use: 0.136% of statewide total• Peak power demand: 0.118% of statewide total
![Page 41: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/41.jpg)
Supporting ActivitiesSupporting Activities
IncentivesInfrastructureOutreach
![Page 42: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/42.jpg)
ZEV IncentivesZEV IncentivesFew local $5,000 vehicle buy-downs
remainNew $18 million program (AB 2061)
– about 2,000 grants now through 2002 (up to $9,000 per ZEV)
Governor’s $50 million budget initiative– about 10,000 grants through 2004 (up
to $5,000 per ZEV)
![Page 43: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/43.jpg)
ZEV Incentives--continuedZEV Incentives--continued
Staff’s proposes expanded stakeholder working group – Coordinate state and local incentives– Assess need for new incentives– Identify feasible new programs, if
needed– Support Federal incentive programs
![Page 44: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/44.jpg)
InfrastructureInfrastructure
Key recommendation--standardize charging systems
Staff proposes that ARB adopt regulations June 2001
![Page 45: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/45.jpg)
Infrastructure--continuedInfrastructure--continued
Create stakeholder group to solicit input on:– Standardization– Maintaining and expanding public
charging– Developing incentives for infrastructure
Particular focus needed on incentives to support workplace charging
![Page 46: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/46.jpg)
OutreachOutreach
Expand current public education and outreach efforts
Create collaborative relationship with stakeholders to develop and implement an outreach plan
![Page 47: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/47.jpg)
Outreach--continuedOutreach--continued
Build upon current and past stakeholder efforts– Expand web page - www.Zevinfo.Com– Build on CalETC’s draft “EV consumer
awareness campaign”Hold public workshop in late February
![Page 48: Air Resources Board January 2001 Staff Presentation January 25, 2001 ZEV Hearing.](https://reader036.fdocuments.us/reader036/viewer/2022062317/5a4d1b897f8b9ab0599be169/html5/thumbnails/48.jpg)
ConclusionConclusion
Staff proposal addresses issues– Availability: Early introduction credits– Stability: Remove uncertainty Smooth ramp– Education: Expanded effort – Cost: Phase in ZEVs and PZEVs
Result--sustainable market for ZEVs