AHMANSON RANCH WELL No. 1
32
AHMANSON RANCH WELL No. 1 Photo Documentation of Sampling Procedure June 17, 2003
description
AHMANSON RANCH WELL No. 1. Photo Documentation of Sampling Procedure June 17, 2003. Ahmanson Well 1. Artesian Flow from Corroded Well. Assembling the Sampler. Single Sampler Assembled. Two Samplers Assembled in Tandem. Vacuum Line Attached. Wire Line Attached. Samplers Lowered by Wire. - PowerPoint PPT Presentation
Transcript of AHMANSON RANCH WELL No. 1
AHMANSON RANCH WELL No. 1
Photo Documentation of Sampling Procedure
June 17, 2003
Ahmanson Well 1
Artesian Flow from Corroded Well
Assembling the Sampler
Single Sampler Assembled
Two Samplers Assembled in Tandem
Vacuum Line Attached
Wire Line Attached
Samplers Lowered by Wire
Van Containing Wire Line Equipment
Controlling & Monitoring Equipment
Depth Readout on Monitor
Retrieving Samplers
Retrieving Samplers
Presubsampling Decon Rinse
Lower Sampler Valve
Opening Lower Sampler Valve
Opening Upper Sampling Valve
Collecting Subsamples
Disassembly for Decon
Disassembly for Decon
Deconning Sampler Parts
Filling for Equipment Blank
Collecting Deeper Sample
Lower & Upper Depth Samples