Agenda Bandung 2014
-
Upload
suro-wijoyo -
Category
Documents
-
view
225 -
download
0
description
Transcript of Agenda Bandung 2014
-
Agenda Training Bandung 2014
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
1 Boiler: Principles, Operation, Maintenance andTroubleshooting 6-9 10-13 10-13 7-10 6-9 3-6 1-4 12-15 8-11 6-9 4-7 2-5 8.500.000
2 AC & REFRIGERATION : PRINCIPLES, OPERATION ANDTROUBLESHOOTING 3-6 3-6 1-4 2-82-530-3 11-14
1-429-2 3-6 1-4 7.950.000
3 AC/DC Electrical Motor Control 6-9 3-6 3-6 1-4 5-8 2-530-3 11-141-429-2 3-6 1-4 7.950.000
4 ACCOUNT OFFICER 2-4 3-5 3-5 1-3 5-7 2-430-2 11-131-329-1 3-5 1-3 5.950.000
5 ACCOUNT RECEIVABLE MANAGEMENT 27-28 24-25 24-25 21-22 22-23 23-24 15-16 27-28 22-23 27-28 25-26 23-24 3.950.0006 Accounting Information Systems 15-17 17-19 17-19 15-17 12-14 16-18 9-11 20-22 15-17 14-16 17-19 15-17 5.950.0007 ACHIEVEMENT MOTIVATION 8-9 10-11 10-11 8-9 12-13 9-10 3-4 14-1 8-9 7-8 10-11 8-9 3.950.000
8 Achievement Motivation: Motivasi Berprestasi 6-9 3-6 3-6 1-4 5-8 2-530-3 11-141-429-2 3-6 1-4 7.950.000
9 ACTIVITY BASED MANAGEMENT 22-24 19-21 19-21 14-16 12-14 18-20 9-11 20-22 17-19 22-24 19-21 17-19 5.950.000
10 ADVANCE COURSE ON LIGHTNING PROTECTION ANDGROUNDING SYSTEM 20-24 17-21 17-21 21-25 19-23 16-20 14-18 25-29 15-19 13-17 17-21 15-19 9.500.000
11 ADVANCE PROCESS CONTROL, INSTRUMENTATION ANDMETERING 6-9 3-6 3-6 1-4 5-82-530-3 11-14
1-429-2 3-6 1-4 8.500.000
12 ADVANCED CONTROL FOUNDATION 6-9 3-6 3-6 1-4 5-8 2-530-3 11-14 1-4 6-9 3-6 1-4 7.950.00013 ADVANCED FLOW MEASUREMENT 21-24 18-21 18-21 14-17 19-22 17-20 14-17 27-30 24-27 21-24 18-21 15-18 8.500.00014 ADVANCED MAINTENANCE MANAGEMENT 7-10 24-27 8-11 3-6 12-15 29-2 10-13 7.950.000
MAIRODI MANDIRI SEJAHTERATRAINING, CONSULTING & ENGINEERING SERVICES
Alamat: Gedung Dapenpos Lt.2, Jl. PH.H. Mustofa No.35 , Bandung, Indonesia, 40124Telp/Fax: +62-22- 721 5416 / 721 5668 Homepage: www.mairodi-training.com
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
15 ADVANCED MAINTENANCE MANAGEMENT 3-6 3-6 1-4 5-8 2-530-3 11-141-429-2 3-6 1-4 7.950.000
16 Advanced Oil and Gas Production System 20-23 17-20 17-20 14-17 19-22 16-19 7-10 19-22 15-18 14-17 17-20 8-11 8.750.000
17 ADVANCED PID CONTROLLER 6-9 3-6 3-6 1-4 5-8 2-530-3 12-15 9-12 6-9 3-6 1-4 8.500.00018 ADVANCED PLC PROGRAMMING AND IMPLEMENTATION 27-30 24-27 24-27 21-24 21-24 23-26 14-17 27-30 22-25 20-23 24-27 15-18 8.500.000
19 ADVANCED VIBRATION MONITORING TECHNIQUE 3-6 3-6 1-4 5-8 2-530-5 11-141-429-2 3-6 1-4 7.950.000
20 AIR COMPRESSOR 15-17 17-19 18-20 15-17 12-14 16-18 8-10 20-22 16-18 15-17 18-20 15-17 5.950.00021 AIR CONDITIONING AND HVAC 3-7 17-21 5-9 19-20 18-22 29-3 10-14 9.500.000
22 ALAT PENUKAR KALOR (HEAT EXCHANGER): OPERASIDAN PERAWATAN 3-6 18-21 12-15 30-3 8-11 21-24 2-5 7.950.000
23 ALIGNMENT AND BALANCING IN ROTATING EQUIPMENT 2-4 3-5 3-5 1-3 5-7 2-430-2 11-131-329-1 3-5 1-3 6.500.000
24 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 6-9 3-9 3-6 1-4 5-8 2-530-3 11-141-429-2 3-6 1-4 7.950.000
25 ALIGNMENT, LEVELLING,AND ROTOR BALANCING 20-22 17-19 17-19 14-16 12-14 16-18 14-16 25-27 15-17 13-15 17-19 15-17 5.950.000
26 AMDAL ( Environmental and Social Impact Assessment)For Executive 6-9 3-6 3-6 7-10 5-8 2-5 7-10 18-21 8-11 13-16 3-6 1-4 7.950.000
27 AMDAL (ENVIRONMENTAL IMPACT ASSESMENT) FOREXECUTIVES 6-8 10-12 10-12 8-10 5-7 3-5 3-5 18-20 11-13 6-8 3-5 1-3 6.500.000
28ANALISIS DAN PENGUKURAN GETARANMEKANIK(ANALYSIS AND MEASURING OF VIBRATIONMACHINERY)
15-18 25-28 14-17 9-12 18-21 30-3 17-20 7.950.000
29 ANALISIS GETARAN DALAM PERAWATAN ROTARYEQUIPMENT 6-9 3-6 3-6 1-4 5-82-530-3 11-14
1-429-2 3-6 1-4 7.950.000
30 ANALITYCAL HIERARCHY PROCESS (AHP) 2-3 3-4 3-4 1-2 2-330-1 11-12 1-2 2-3 3-4 1-2 3.950.000
31 APPLICATION STATISTIC IN ENGINEERING INDUSTRY 27-30 17-20 6-9 24-27 2-5 20-23 1-4 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
32 ARC WELDING 6-9 3-6 5-8 7-10 22-25 17-20 8.500.000
33 ASME PTC 4 1 6-9 4-7 4-7 2-5 6-9 3-6 1-4 12-15 2-530-3 4-7 2-5 7.950.000
34ASPEK TKDN (PEDOMAN TEKNIS PENGGUNAAN PRODUKDALAM NEGERI) DALAM MANAJEMEN PENGADAANBARANG DAN JASA
15-16 17-18 17-18 14-15 12-13 16-17 7-7 18-19 15-16 13-14 17-18 8-9 3.950.000
35 ASSERTIVE TRAINING 2-4 4-6 4-6 2-4 6-8 3-5 1-3 12-14 3-5 1-3 5-7 3-5 5.950.00036 ASSET MANAGEMENT 27-29 25-27 25-27 21-23 26-28 23-25 16-18 27-29 23-25 27-29 26-28 29-31 5.950.00037 AUDITING SDM 2-4 5-7 5-7 1-3 7-9 4-6 2-4 13-15 3-5 1-3 5-7 3-5 5.950.000
38 AUTOCAD COSTUMIZATION 3-6 3-6 1-4 5-8 2-530-3 11-141-429-2 3-6 1-4 7.950.000
39 AUTOMATIC VOLTAGE REGULATOR(AVR): OPERATIONAND MAINTENANCE 3-6 3-6 1-4 5-82-530-3 11-14
1-430-3 3-6 1-4 7.950.000
40 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 15-18 10-13 10-13 8-11 12-15 9-12 7-10 18-21 8-11 6-9 10-13 8-11 7.950.00041 Bahagia dan Produktif Saat Purna Bakti 20-24 10-14 10-14 21-25 19-23 9-13 7-11 18-22 8-12 13-17 10-14 8-12 8.950.00042 Balanced Scorecard (BSC) Concept and Implementation 8-9 10-11 6-7 7-8 7-8 9-10 3-4 13-14 8-9 6-7 5-6 8-9 3.950.00043 BASIC ACCOUNTING 15-17 12-14 12-14 14-16 12-14 16-18 7-9 19-21 10-12 13-15 12-14 10-12 5.950.00044 BASIC CIVIL 3-6 3-6 1-4 5-8 2-530-3 11-14
1-430-3 3-6 1-4 7.950.000
45 Basic CNC 6-8 13-18 3-5 1-3 5-7 2-4 18-20 8-10 1-3 3-5 1-3 7.500.000
46 BASIC DRILLING ENGINEERING AND HEALTH, SAFETY &ENVIRONMENTAL CONSIDERATION 6-9 3-6 3-6 1-4 5-82-530-3 11-14
1-429-2 3-6 1-4 8.750.000
47 BASIC ELECTRICAL 2-4 12-14 12-14 2-4 14-16 11-13 8-10 20-22 10-12 13-15 12-14 29-31 5.950.000
48 BASIC ELECTRICAL FOR NON ELECTRICIAN 7-10 4-7 4-7 2-5 6-9 3-630-3 11-142-530-3 3-6 1-4 7.950.000
49 BASIC GAS ENGINE 6-9 3-6 3-6 1-4 5-8 2-530-3 11-141-429-2 3-6 1-4 7.950.000
50 BASIC OF SUPPLY CHAIN MANAGEMENT (FOR BEGINEER) 6-7 5-6 5-6 2-3 6-7 3-4 1-2 12-13 2-3 1-2 4-5 2-3 3.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
51 BASIC OF SURFACE OPERATION AND MAINTENANCE FOROIL AND GAS INDUSTRIES 3-6 3-6 1-4 5-82-530-3 11-14
1-430-3 3-6 1-4 7.950.000
52 Basic Petroleum Engineering 21-24 18-21 18-21 14-17 20-23 17-20 8-11 25-28 16-19 20-23 18-21 9-12 8.750.00053 BASIC PROCUREMENT & PURCHASING 28-30 25-27 25-27 23-25 26-28 24-26 16-18 27-29 23-25 27-29 25-27 22-24 5.950.00054 Basic Reservoir Engineering for Non Petroleum Engineer 15-18 10-13 10-13 7-10 12-15 9-12 1-4 18-21 8-11 7-10 10-13 2-5 8.750.00055 BASIC SUPERVISORY SKILLS 5-6 24-25 2-3 10-11 13-14 24-25 5-6 17-18 3.950.00056 BASIC SURFACE SAFETY SYSTEM 21-24 18-21 18-21 14-17 20-23 17-20 14-17 25-28 16-19 21-24 18-21 15-18 8.750.000
57 BASIC TELECOMMUNICATION PABX 2-4 3-5 3-5 1-3 5-7 2-430-2 11-131-329-1 3-5 1-3 5.950.000
58 BASIC VSAT SYSTEM 6-8 4-6 4-6 2-4 6-8 3-5 1-3 12-14 2-4 1-3 4-6 2-4 5.950.00059 BASIC WELDING 24-28 21-25 30-4 15-19 10-14 8.950.000
60 Batubara 20-22 17-19 17-19 14-17 19-21 16-18 14-16 1-329-1 27-29 24-26 22-24 6.500.000
61 BEARING AND OIL LUBRICATION FOR MACHINERY 10-13 25-28 19-22 7-10 15-18 28-31 9-12 7.950.00062 BEARING AND OIL LUBRICATIONFOR MACHINERY 15-17 3-5 3-5 1-3 5-7 2-4 1-3 13-15 3-5 1-3 3-5 1-3 5.950.00063 BEARING LUBRICATION TECHNOLOGY 7-10 10-13 10-13 7-10 19-22 9-12 1-4 19-22 9-12 7-10 10-13 8-11 7.950.000
64 BEARING TECHNOLOGY AND LUBRICATION SYSTEM 4-7 4-7 1-4 5-8 2-530-3 11-141-430-3 3-6 1-4 7.950.000
65 BELT CONVEYOR : OPERATION & MAINTENANCE 20-23 17-20 17-20 14-17 12-15 12-15 7-10 25-28 15-18 13-16 17-20 9-12 7.950.000
66 Belt Conveyor : technology, Design Cacilation andTroubleshooting 21-24 24-27 24-27 21-24 20-23 23-26 14-17 25-28 22-25 20-23 24-27 15-18 7.950.000
67 BENGKEL ALAT BERAT 6-9 3-6 3-6 1-4 5-8 2-530-3 11-141-429-2 3-6 1-4 7.950.000
68 BOILER (KETEL UAP) DAN TURBIN UAP: OPERASI,PERAWATAN DAN TROUBLESHOOTING 27-30 25-28 25-28 22-25 26-29 24-27 15-18 26-29 23-26 27-30 25-28 16-19 7.950.000
69 BOILER CONTROL SYSTEMS ENGINEERING 15-18 10-13 10-13 7-10 12-15 9-12 2-5 18-21 8-11 10-13 3-6 7.950.00070 BOILER WATER TREATMENT 6-9 3-6 3-6 1-4 5-8 2-5 11-14 1-4 3-6 1-4 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
30-3 30-371 BOILER: OPERATION & MAINTENANCE 20-23 17-20 17-20 14-17 19-22 16-19 8-11 19-22 15-18 13-16 17-20 9-12 7.950.00072 BOOST YOUR CREATIVITY IN THINKING: MIND MAP 7-8 10-11 10-11 8-9 12-13 9-10 2-3 18-19 8-9 7-8 10-11 8-9 3.950.00073 BRAIN POWER 6-8 5-7 5-7 7-9 7-9 4-6 2-4 13-15 3-5 6-8 4-6 8-10 5.950.000
74 BRAIN DEVELOPMENT FOR PERSONAL ASSISTANT &SECRETARY 20-22 18-20 18-20 21-23 26-28 18-20 8-10 25-27 17-19 15-17 18-20 16-18 5.950.000
75 BREATHING ARTS FOR CREATIVE THINKING 17-19 5-7 14-16 9-11 15-17 5.950.00076 Budget : Planning, Controlling & Analysing 7-9 5-7 4-6 7-9 7-9 4-6 2-4 13-15 3-5 6-8 5-7 3-5 5.950.00077 BUDGETING AND PROJECT COST CONTROL 20-22 18-20 18-20 28-30 19-21 16-18 8-10 20-22 16-18 15-17 18-20 16-18 5.950.000
78 BUILDING A TEAM 2-3 3-4 3-4 1-2 5-6 2-3 30-1 11-12 1-230-1 3-4 1-2 3.950.000
79 BUSINESS STRATEGY FOR MANAGERS 6-8 10-12 10-12 7-9 7-9 9-11 1-3 13-15 8-10 6-8 10-12 8-10 5.950.00080 BUSINESS PROCESS REENGINEERING (BPR) 2-3 10-11 10-11 7-8 5-6 9-10 1-2 11-12 8-9 6-7 10-11 1-2 3.950.000
81 CAD BIDANG TEKNIK MESIN (CAD FOR MECHANICAL:AUTOCAD OR CATIA) 6-9 18-21 7-10 2-5 11-14 23-26 10-13 7.950.000
82 CALLIBRATION OF MEASURING TOOL 27-30 11-14 5-8 23-26 1-4 14-17 1-4 7.950.000
83 CAPACITY BUILDING(MEMBANGUN KAPASITAS DANKEMAMPUAN) 7-9 10-12 10-12 7-9 12-14 1-11 1-3 13-15 8-10 6-8 10-12 8-10 5.950.000
84 CAREER MANAGEMENT 21-23 24-26 24-26 28-30 26-28 23-25 15-17 27-29 22-24 22-24 24-26 22-24 5.950.00085 CAREER PLANNING SYSTEM 3-4 4-5 4-5 2-3 5-6 3-4 1-2 12-13 2-3 1-2 4-5 2-3 3.950.000
86 CARTOGRAFI 4-7 4-7 4-7 5-8 2-530-3 11-14 2-5 1-4 4-7 1-4 7.950.000
87 CASH MANAGEMENT 15-16 12-13 12-13 14-15 13-14 11-12 8-9 20-21 10-11 13-14 12-13 11-12 3.950.000
88CATERING & ACCOMMODATION MANAGEMENT FORFOOD SERVICE, CATERING & ACCOMMODATION IN OIL &MINE INDUSTR
27-29 24-26 24-26 28-30 12-14 23-25 14-16 25-27 22-24 20-22 24-26 29-31 6.500.000
89 CATERING SERVICE, HYGIENE & SANITATION 2-4 3-5 3-5 1-3 5-7 2-4 11-13 1-3 1-3 3-5 1-3 6.500.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
30-2
90 CATHODIC PROTECTION CORROSION CONTROL ANDPREVENTION 4-7 4-7 2-5 6-93-630-3 12-15 2-5 1-4 4-7 1-4 7.950.000
91 CATHODIC PROTECTION FOR MINE STEEL STRUCTUREAND MINING SUPPORTING FACILITIES 6-9 3-6 3-6 1-4 5-82-530-3 11-14
1-429-2 3-6 1-4 8.750.000
92 Cathodic Protection for Onshore and Offshore Structure 20-23 17-20 17-20 8-11 12-15 16-19 7-10 19-22 15-18 13-16 11-14 9-12 8.750.00093 CCTV: INSTALASI, PEMROGRAMAN DAN PERAWATAN 23-25 19-21 19-21 21-23 21-23 18-20 14-16 26-28 17-19 20-22 19-21 17-19 5.950.00094 CENTRIFUGAL COMPRESSOR 20-23 17-20 17-20 14-17 12-15 16-19 8-11 19-22 15-18 14-17 17-20 9-12 7.950.000
95 CENTRIFUGAL COMPRESSOR & STEAM TURBINEPERFORMANCE 7-10 4-7 4-7 1-4 5-83-630-3 11-14
2-530-3 4-7 1-4 7.950.000
96 CENTRIFUGAL GAS COMPRESSOR Anti Surge Control 4-7 4-7 2-5 6-9 3-6 1-4 12-15 2-9 6-9 4-7 1-4 7.950.000
97 CENTRIFUGAL GAS COMPRESSOR: OPERATION &MAINTENANCE 4-7 4-7 2-5 6-9 3-6 1-4 12-15 2-5 6-9 4-7 2-5 7.950.000
98 CENTRIFUGAL PUMP : OPERATION AND MAINTENANCE 4-7 4-7 2-5 6-9 3-6 1-4 12-15 2-5 6-9 4-7 2-5 7.950.000
99 CENTRIFUGAL PUMP : Selection, Operation, andMaintenance 6-10 17-21 1-5 19-23 23-27 25-29 6-10 17-21 9.500.000
100 CENTRIFUGAL PUMP AND SEAL 7-10 10-13 10-13 7-10 6-9 3-6 1-4 12-15 8-11 6-9 4-7 2-5 7.950.000
101 CHANGE & CONFLICT MANAGEMENT AND DEALINGWITH DIFFICULT PEOPLE 6-7 5-6 5-6 3-4 6-7 4-5 1-2 13-14 3-4 2-3 5-6 3-4 3.950.000
102 CHANGE & CONFLICT MANAGEMENT AND DEALINGWITH DIFFICULT PEOPLE 6-7 4-5 4-5 2-3 6-7 3-4 1-2 12-13 2-3 1-2 4-5 2-3 3.950.000
103 CHEMICAL ENGINEERING FUNDAMENTALS FOR NONENGINEER 15-18 10-13 10-13 7-10 12-15 9-12 1-4 18-21 8-11 6-9 10-13 2-5 7.950.000
104 CHEMICAL HAZARD SAFETY IN MINING AND WORKPLACE 7-10 3-6 3-6 1-4 5-8 2-530-3 11-141-430-3 3-6 1-4 8.750.000
105 Chiller and Cooling Tower: Design and Operation 2-4 17-19 1-3 26-28 1-3 1-3 13-15 24-26 6.500.000
106 CHOKE AND CONTROL VALVE 6-9 3-6 3-6 1-4 6-9 3-6 1-4 12-15 2-530-3 4-7 2-5 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
107 CIVIL CONSTRUCTION: OBSERVATION OF EXECUTIONBUILDING 5-8 5-8 2-5 6-9 3-6 1-4 12-15 3-6 6-9 5-8 2-5 7.950.000
108 CIVIL CONSTRUCTION: PENGAWASAN PELAKSANAANBANGUNAN 5-8 5-8 2-5 7-10 4-7 1-4 12-15 3-6 6-9 5-8 2-5 7.950.000
109 COACHING & CONSELING DI PERUSAHAAN 7-9 11-13 11-13 9-11 12-14 10-12 7-9 18-20 9-11 8-10 11-13 9-11 5.950.000
110 COACHING AND COUNSELING ( MONITORING) 2-4 3-5 3-5 1-3 12-14 2-430-13 11-131-329-1 3-5 1-3 5.950.000
111 COAL EXPLORATION (EKSPLORASI BATUBARA) 15-18 10-13 10-13 1-4 12-15 9-12 7-10 25-28 22-25 20-23 17-20 15-18 7.950.000112 COATING SYSTEM AND PROTECTION CORROSION 21-24 10-13 22-25 17-20 26-29 13-16 24-27 7.950.000
113 COLD STORAGE: PRINCIPLE, OPERATION &TROUBLESHOOTING 5-8 5-8 7-10 7-10 4-7 1-4 13-16 3-6 6-9 5-8 2-5 7.950.000
114 COMERCIAL CONTRACT DRAFTING AND MANAGEMENT 28-30 26-28 26-28 28-30 28-30 25-27 16-18 28-30 24-26 28-30 26-28 29-31 5.950.000115 Communication Skill 22-23 19-20 19-20 28-29 20-21 18-19 14-15 25-26 17-18 21-22 19-20 18-19 3.950.000
116 COMMUNICATION, ASSERTIVENESS AND CONFLICTMANAGEMENT 7-8 5-6 5-6 7-8 7-8 4-5 2-3 13-14 4-5 6-7 5-6 3-4 3.950.000
117 COMPENSATION SYSTEM DEVELOPMENT 7-8 6-7 6-7 7-8 7-8 5-6 2-3 13-14 4-5 6-7 6-7 4-5 3.950.000
118 COMPETENCY-BASED HUMAN RESOURCESMANAGEMENT 8-9 10-11 10-11 8-9 8-9 9-10 3-4 14-15 8-9 7-8 10-11 8-9 3.950.000
119 COMPETITIVE MAINTENANCE & SPARE PARTSMANAGEMENT 6-9 10-13 10-13 7-10 6-9 9-12 1-4 12-15 8-11 7-10 10-13 8-11 7.950.000
120 COMPREHENSIVE TRAINING MANAGEMENT SYSTEM 27-29 25-27 25-27 28-30 26-28 24-2 16-18 26-28 23-25 23-29 25-27 29-31 5.950.000
121 COMPRESSOR : Operation, Maintenance andTroubleshooting 15-17 4-6 4-6 2-4 5-72-430-2 11-13 2-4 1-3 3-5 1-3 6.750.000
122 COMPRESSOR AND PRIME MOVER OPERATION &MAINTENANCE 6-8 5-7 5-7 7-9 6-8 4-6 2-4 18-20 8-10 6-8 5-7 3-5 6.500.000
123COMPRESSOR: OPERATION, MAINTENANCE,TROUBLESHOOTING AND DIAGNOSTIC OF FAILUREANALYSIS
6-9 3-6 3-6 7-10 5-8 2-5 1-4 11-14 1-4 6-9 3-6 1-4 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
124 CONDITIONS BASE INSPECTION AND MAINTENANCE 11-14 1-4 20-23 8-11 16-19 3-6 15-18 7.950.000
125 CONSTRUCTIVE ANGER MANAGEMENT 2-4 3-5 3-5 1-3 5-7 2-430-2 11-131-330-2 3-5 1-3 5.950.000
126 CONTEMPORARY COMMUNICATION & LEADERSHIP 2-4 17-19 5-7 1-3 6-8 5.950.000127 CONTEMPORARY LEADERSHIP 13-15 28-30 10-12 6-8 11-13 5.950.000128 CONTRACT MANAGEMENT 16-18 17-19 17-19 14-16 14-16 12-14 8-10 20-22 15-17 15-17 13-15 10-12 5.950.000129 Contract Management ~ 6-9 3-6 3-6 7-10 5-8 2-5 1-4 12-15 1-4 6-9 3-6 1-4 7.750.000130 CONTRACTOR SAFETY MANAGEMENT SYSTEM_(CSMS) 20-23 10-13 21-24 2-5 14-17 15-18 27-30 8-11 7.950.000131 CONTROL AND CHOKE VALVES 7-10 4-7 4-7 2-5 6-9 3-6 1-4 18-21 10-13 7-10 4-7 2-5 8.500.000132 CONTROL SYSTEM FUNDAMENTALS 8-11 5-8 5-8 7-10 7-10 4-7 2-5 18-21 15-18 8-11 5-8 2-5 8.500.000133 CONTROL VALVE AND VALVE: OPERATION AND SIZING 5-8 5-8 7-10 7-10 4-7 1-4 13-16 3-6 7-10 5-8 2-5 7.950.000
134 CONTROL VALVE: OPERATION, MAINTENANCE, ANDTROUBLESHOOTING 17-20 2-5 26-29 14-17 22-25 4-7 16-19 7.950.000
135 CONVEYOR: OPERASI DAN PERAWATAN 4-7 24-27 12-15 1-4 9-12 27-30 8-11 7.950.000
136 CORPORATE BUILIDNG DALAM MEMBANGUN KULTURDAN ETIKA INTERNAL ORGANISASI 6-9 4-7 4-7 1-4 5-8 3-6 1-4 12-152-530-3 4-7 2-5 7.950.000
137 CORROSION AND CATHODIC PROTECTION 15-18 10-13 10-13 7-10 6-9 9-12 1-4 12-15 8-11 6-9 10-13 2-5 7.950.000138 Corrosion and Scaling Prevention 27-30 24-27 24-27 21-24 20-23 23-26 14-17 26-29 22-25 21-24 24-27 16-19 8.750.000
139 CORROSION ENGINEERING FOR NON CORROSIONENGINEERS 6-9 4-7 4-7 2-5 6-9 3-6 1-4 12-152-530-3 4-7 2-5 8.750.000
140 Cost Control 27-29 25-27 25-27 28-30 27-29 24-26 16-18 27-29 24-26 27-29 25-27 22-24 5.950.000141 COST CONTROL AND ESTIMATING 10-13 10-13 7-10 7-10 9-12 1-4 13-16 8-11 7-10 10-13 2-5 7.950.000142 Cost Management 15-17 10-12 10-12 14-16 12-14 9-11 7-9 18-20 8-10 13-15 10-12 8-10 5.950.000143 COSTUMER SERVICE (CS) 15-17 12-14 12-14 8-10 12-14 10-12 7-9 18-20 10-12 7-9 12-14 10-12 5.950.000
144 CREATIVE PROBLEM SOLVING : DEVELOPING SKILL FORDECISION MAKING AND INNOVATION 20-23 18-21 18-21 14-17 19-22 16-19 8-11 20-23 16-19 15-18 17-20 15-18 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
145 Crisis Management 20-22 17-19 17-19 14-16 19-21 16-18 7-9 25-27 15-17 13-15 17-19 8-10 5.950.000
146 CULTURE CHANGE FOR MAINTENANCE AND RELIABILITYIMPROVEMENT 23-25 20-22 20-22 28-30 26-28 19-21 14-16 25-27 18-20 20-22 20-22 22-24 6.500.000
147 Custom Facility, Shipping Documents & Export ImportProcedure 7-8 6-7 5-6 3-4 6-7 3-4 2-3 12-13 3-4 1-2 4-5 3-4 3.950.000
148 CUSTOMER RELATIONSHIP MANAGEMENT (CRM) 7-10 4-7 4-7 1-4 5-8 3-6 1-4 12-15 2-5 7-10 4-7 2-5 7.950.000
149 Customer Relation Management (CRM) 2-4 4-6 4-6 1-3 5-7 2-4 1-3 11-13 1-329-1 3-5 1-3 5.950.000
150 Customer Service Excellence Strategy 7-10 4-7 4-7 7-10 6-9 3-6 1-4 12-15 2-5 6-9 4-7 2-5 7.950.000151 CUSTOMER SERVICE IN CREDIT UNION 20-22 3-5 19-21 15-17 20-22 5.950.000152 DASAR-DASAR PERBENDAHARAAN 20-23 17-20 17-20 21-24 19-22 16-19 14-17 25-28 15-18 20-23 17-20 15-18 7.750.000
153 DESIGN OF EXPRIMENTS (DOE): FUNDAMENTALCONCEPT AND APPLICATION 6-9 3-6 3-6 7-10 5-8 2-5 7-10 18-21 8-11 13-16 3-6 1-4 8.500.000
154 DESIGN OF HEATING, VENTILATION AND AIRCONDITIONING SYSTEM 6-10 24-28 7-11 19-23 7-11 8-12 20-24 1-5 9.500.000
155 DEVELOPING HIGH PERFORMANCE TEAMS 15-16 12-13 12-13 9-10 13-14 11-12 7-8 18-19 9-10 8-9 11-12 9-10 3.950.000156 DIESEL ENGINE: OPERATION AND MAINTENANCE 15-18 11-14 11-14 8-11 12-15 10-13 7-10 18-21 9-12 7-10 11-14 8-11 7.950.000157 DIESEL ENGINES: OPERATION AND MAINTENANCE 10-13 10-13 7-10 12-15 9-12 2-5 13-16 8-11 7-7 10-13 3-6 7.950.000158 DIESEL GUNSET: OPERATION AND MAINTENANCE 27-30 25-28 25-28 22-25 26-29 24-27 15-18 26-29 23-26 27-30 25-28 16-19 7.950.000
159 DISAIN ALAT BANTU CEKAM DAN PEGANG(DESIGN OFJIGS AND FIXTURES) 7-10 24-27 8-11 8-6 12-15 29-2 11-14 7.950.000
160 DISAIN ALAT PENEKAN DAN PEMBENTUK(DESIGN OFPRESS AND FORMING TOOL) 27-30 17-20 6-9 24-27 2-5 20-23 1-4 7.950.000
161DISAIN KONSTRUKSI MESIN DAN PERALATANINDUSTRI(DESIGN OF MACHINE CONSTRUCTION ANDINDUSTRIAL EQUIPM
3-6 18-21 12-15 30-3 8-11 21-24 8-11 7.950.000
162 DISTRIBUTED CONTROL SYSTEM (DCS): PRINCIPLES,MAINTENANCE, OPERATION, PROGRAMMING & 27-30 25-28 25-28 22-22 26-29 24-27 11-142-530-3 28-31 25-28 17-20 8.500.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
TROUBLESHOOTING163 DISTRIBUTED CONTROL SYSTEMS (DCS) FUNDAMENTAL 21-24 17-20 17-20 14-17 19-22 16-19 14-17 26-29 23-26 20-23 17-20 9-12 8.500.000
164 DISTRIBUTION SYSTEM PROTECTION 7-10 4-7 4-7 1-4 6-9 3-6 1-4 12-15 2-530-3 4-7 2-5 7.950.000
165 DOCUMENTING AND IMPLEMENTING OF ISO 9001:2008FOR SERVICE INDUSTRIES 2-3 3-4 3-4 7-8 2-32-330-1 11-12 1-2 6-7 3-4 1-2 3.950.000
166 DOKUMEN KONTROL 10-13 10-13 7-10 12-15 9-12 2-5 13-16 8-11 7-10 10-13 3-6 7.950.000
167 DRILLING OPERATIONS FOR OPERATOR IN OIL AND GASINDUSTRIES 20-23 11-14 11-14 12-15 10-13 7-10 19-22 9-12 13-16 11-14 8-11 8.500.000
168 Dynamic Interpersonal & Communication Skills 2-3 3-4 3-4 1-2 5-6 2-330-1 11-121-230-1 3-4 1-2 3.950.000
169 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 9-10 11-12 11-12 9-10 12-13 10-11 7-8 18-19 9-10 9-10 11-12 9-10 3.950.000170 DYNAMIC OF MACHINE TOOLS 11-14 1-4 20-23 8-11 16-19 3-6 15-18 7.950.000
171 E-PROCUREMENT (E-Proc) 2-4 3-5 3-5 1-3 5-7 2-430-2 11-131-330-2 3-5 1-3 5.950.000
172 EFFECTIVE BUSINESS LETTERS WRITING 22-24 20-22 20-22 21-23 21-23 18-20 14-16 25-27 18-20 21-23 19-21 17-19 5.950.000
173 Effective Communication Skill 7-10 10-13 10-13 7-10 19-22 9-1230-3 13-15 8-11 6-9 10-13 2-5 7.950.000
174 EFFECTIVE COMPETENCY MODELLING & REPORTING 28-30 26-28 26-28 28-30 26-28 25-27 16-18 27-29 24-26 29-31 26-28 29-31 5.950.000175 EFFECTIVE EXECUTIVE SECRETARY 6-7 4-5 4-5 2-3 6-7 3-4 1-2 12-13 2-3 2-3 4-5 2-3 3.950.000
176 Effective Inventory Management and ModernWarehousing for Support Personal 6-9 4-7 4-7 2-5 6-9 3-6 1-4 12-152-530-3 3-6 2-5 7.950.000
177 EFFECTIVE LINE BALANCING 8-9 10-11 10-11 9-10 12-13 9-10 3-4 18-19 8-9 7-8 10-11 8-9 3.950.000
178 EFFECTIVE MASTER OF CEREMONY (MC) 6-8 5-710-12 5-7 2-4 7-9 4-6 2-4 3-5 1-3 5-7 3-5 5.950.000
179 EFFECTIVE PERFORMANCE APPRAISAL 15-16 12-13 12-13 10-11 13-14 11-12 7-8 18-19 10-11 13-14 12-13 10-11 3.950.000180 EFFECTIVE PRESENTATION & NEGOTIATION SKILLS 21-22 18-19 18-19 28-29 19-20 17-18 8-9 21-22 16-17 20-21 18-19 17-18 3.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
181 EFFECTIVE PRESENTATION AND REPORT WRITING 7-9 4-6 4-6 2-4 6-8 4-6 2-4 13-15 3-5 6-8 5-7 3-5 5.950.000182 Effective Presentation Skills 15-17 17-19 17-19 15-17 26-28 16-18 9-11 19-21 16-18 14-16 17-19 15-17 5.950.000183 Effective Public Speaking and Business Presentation 7-8 4-5 5-6 3-4 7-8 4-5 2-3 13-14 3-4 6-7 5-6 3-4 3.950.000184 EFFECTIVE STRATEGY TO CONTROL STRESS 6-8 20-22 9-11 4-6 10-12 5.950.000185 EFFECTIVE TIME MANAGEMENT 27-29 24-26 24-26 23-25 26-28 23-25 15-17 27-29 22-24 22-24 24-26 22-24 5.950.000186 EFFECTIVE TRAINING MANAGEMENT 15-17 12-14 12-14 14-16 12-14 11-13 8-10 19-21 10-12 14-16 12-14 10-12 5.950.000
187 EFFECTIVENESS DESIGN OF MAINTENANCEORGANIZATION AND ADMINISTRATION 10-12 24-26 7-9 2-4 8-10 5.950.000
188 EFFLUENT PRODUCED WASTE WATER 20-23 17-20 17-20 14-17 19-20 16-19 7-10 25-28 15-18 13-16 17-20 8-11 7.950.000
189 ELECTRIC CHARGING SYSTEM AND STARTING SYSTEM OFHEAVY DUTY EQUIPMENT 6-9 3-6 3-6 1-4 5-82-530-3 11-13
1-429-2 3-6 1-4 7.950.000
190 Electric Installation in Hazardous Area 20-23 19-22 19-22 14-17 20-23 17-20 14-17 25-28 16-19 20-23 18-21 15-18 7.950.000
191 ELECTRIC MOTOR: OPERATION, MAINTENANCE &TROUBLESHOOTING 10-13 10-13 7-10 12-15 9-12 2-5 18-21 8-11 7-10 10-13 3-6 7.950.000
192ELECTRIC SUBMERSIBLE PUMP : PRINCIPLES,INSTALLATION, OPERATION, MAINTENANCE ANDTROUBLESHOOTING
11-14 11-14 8-11 12-15 10-13 7-10 18-21 9-12 13-16 11-14 8-11 8.750.000
193 ELECTRICAL CALIBRATION 2-4 5-7 5-7 2-4 7-9 4-6 2-4 13-15 3-5 1-3 5-7 22-24 5.950.000
194 Electrical Control Wiring 6-9 3-6 3-6 1-4 5-8 2-530-3 12-15 8-11 6-9 3-6 1-4 8.500.000
195 Electrical Equipment System and Maintenance 8-11 10-13 10-13 7-10 12-15 9-12 2-5 12-15 8-11 6-9 10-13 2-5 7.950.000
196 ELECTRICAL POWER GENERATOR : OPERATION,PROTECTION AND MAINTANANCE 6-10 3-7 3-7 7-11 5-9 2-6 1-5 12-16 1-5 6-10 3-7 2-6 8.950.000
197 Electrical Power System Analysis 6-9 3-6 3-6 1-4 5-8 2-530-3 11-141-429-2 3-6 1-4 7.950.000
198 ELECTRICAL POWER SYSTEM ANALYSIS USING ETAP 15-1815-15 10-13 10-13 8-11 12-15 9-12 1-4 18-21 8-11 6-9 10-13 2-5 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
199 Electrical Power System Protection 15-18 11-1425-28 11-14 8-11 13-16 10-13 7-10 18-21 9-12 7-10 11-14 8-11 7.950.000
200 ELECTRICAL SAFETY 26-28 8-10 22-22 1-3 2-4 14-16 26-28 6.500.000
201 ELECTRO-PNEUMATICS SYSTEM : PRINCIPLES ANDAPPLICATION 27-30 25-2825-2828-1 20-23 24-27 15-18 26-29 23-26 28-31 25-28 16-19 7.950.000
202 ELECTRONIC FILING SYSTEM MANAGEMENT 20-23 10-13 10-13 7-10 5-8 2-5 1-4 18-21 8-11 6-9 3-6 1-4 7.750.000203 ELECTRONIC SHUTDOWN AND LOGIC SYSTEM 15-18 17-20 17-20 14-17 19-22 16-19 8-11 20-23 15-18 13-16 17-20 9-12 7.950.000204 ELECTROPLATING 6-9 3-6 3-6 1-4 5-8 2-5 1-4 11-14 3-6 6-9 3-6 1-4 9.250.000
205 EMERGENCY PREPAREDNESSmenghadapi keadaandarurat 27-29 27-1 27-29 28-30 26-28 23-25 11-134-629-1 20-22 22-24 6.500.000
206 Emotional Quetients 2-4 10-12 10-12 8-10 12-14 9-11 2-4 18-20 8-10 7-9 10-12 8-10 5.950.000207 Energy Audit and Application 6-9 3-6 3-6 7-10 5-8 2-5 7-10 18-21 8-11 13-16 3-6 1-4 8.500.000
208 ENGINEERING MATERIAL KNOWLEDGEFOR WAREHOUSEPEOPLE 6-8 3-5 3-5 1-3 5-72-430-1 13-15 1-3 1-3 3-5 1-3 6.500.000
209 ENGLISH REPORT WRITING 21-23 18-20 18-20 15-17 15-17 17-19 9-11 20-22 16-18 15-17 18-20 16-18 5.950.000
210 ENVIRONMENTAL LEGISLATION (ANTICIPATINGCONFLICS) 9-11 13-15 13-15 10-12 12-14 9-11 7-9 21-23 15-17 9-11 6-8 4-6 6.500.000
211 ENVIRONMENTAL MONITORINGKEY TO POLUTION FREE 9-11 24-26 24-26 24-26 22-24 19-21 17-19 1-3 25-27 20-22 17-19 15-17 6.500.000212 ESQ FOR PEAK PERFORMANCE 20-22 8-10 17-19 13-15 18-20 5.950.000
213 ESSENTIAL SKILL FOR SECRETARY AND ADMINISTRATIONPROFESSIONAL 20-23 10-13 10-13 7-10 8-8 2-5 1-4 18-21 8-11 6-9 3-6 1-4 7.750.000
214 EXCELLENT MOTIVATION AND TEAM WORK (OUTBOUNDTRAINING) 17-18 21-22 28-29 2-3 13-14 15-16 12-13 10-11 14-15 19-20 3.250.000
215 EXCELLENT SUPERVISORY 22-25 24-27 24-27 22-25 21-24 18-21 14-17 26-29 22-25 21-24 19-22 17-20 7.950.000216 Export Import 8-10 10-12 10-12 8-10 12-14 9-11 1-3 12-14 8-10 7-9 10-12 8-10 5.950.000217 FAILURE ANALYSIS METHODS AND CASES 20-23 10-13 10-13 7-10 12-15 9-12 7-10 18-21 8-11 13-16 10-13 8-11 7.950.000218 FAULT FINDING SKILLS/TECHNICAL TROUBLESHOOTING 16-18 18-20 19-21 21-23 12-14 17-19 9-11 25-27 17-19 20-22 18-20 16-18 5.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
219 FEASIBILITY STUDY & PROJECT EVALUATION 10-13 10-13 7-10 12-15 9-12 2-5 18-21 8-11 8-10 10-13 3-6 7.950.000
220 FIBER OPTIC SYSTEM 27-29 24-26 24-26 23-25 26-28 23-25 15-17 26-28 22-24 22-24 22-2424-26 6.500.000
221 FIELDBUS AND INDUSTRIAL DATA COMMUNICATION 15-18 10-13 10-13 7-10 12-15 9-12 7-10 19-22 15-18 13-16 10-13 3-6 8.500.000
222FILING MANAGEMENT FOR SECRETARY ANDADMINISTRATION STAFF (USING MICROSOFT WORD,MICROSOFT EXCEL, &
8-10 11-13 11-13 9-11 12-14 9-11 2-4 18-20 8-10 7-9 10-12 8-10 5.950.000
223 FILING SYSTEM FOR SECRETARY 6-8 4-6 4-6 2-4 6-8 3-5 1-3 12-14 2-4 1-3 4-6 2-4 5.950.000224 FINANCE FOR NON FINANCE FOR OIL & GAS INDUSTRY 22-24 24-26 24-26 28-30 21-23 23-25 14-16 26-28 22-24 22-24 24-26 22-24 5.950.000225 FINANCE FOR NON FINANCE MANAGER 28-30 26-28 25-27 22-24 26-28 24-26 15-17 26-28 23-25 28-30 26-28 29-31 5.950.000226 Financial Planning and Budgeting for Banking 28-30 26-28 26-28 22-24 26-28 24-26 16-18 27-29 24-26 28-30 25-27 29-31 5.950.000227 FINANCING CONDOTEL/HOTEL OPERATION 21-24 18-21 18-21 15-18 19-22 17-20 8-11 25-28 16-19 21-24 18-21 15-18 7.950.000228 FINITE ELEMENT METHODS (FEM) 10-13 25-28 19-22 7-10 15-18 28-31 9-12 7.950.000229 FIRE ALARM & PROTECTION 10-13 10-13 8-11 12-15 9-12 2-5 18-21 8-11 8-11 10-13 3-6 7.950.000230 FIRST RESPONDER AWARENESS LEVEL 7-10 17-20 1-4 12-15 23-26 25-28 6-2 17-20 7.950.000231 FIRST RESPONDER OPERATIONS LEVEL 21-24 3-6 14-17 20-23 7-10 8-11 20-23 1-4 7.950.000232 FISCAL AND CUSTODY METERING 15-18 11-14 11-14 8-11 13-16 10-13 7-10 20-23 16-19 14-17 11-14 8-11 8.500.000233 FLOW ASSURANCE IN PIPING SYSTEMS 20-23 12-15 12-15 14-17 14-17 11-14 8-11 25-28 22-25 15-18 12-15 9-12 8.500.000234 FLOW MEASUREMENT AND CONTROL ELEMENT 17-20 2-5 26-29 14-17 22-25 4-7 16-19 7.950.000235 FLOWMETERING AND CUSTODY TRANSFER 20-23 17-20 17-20 14-17 19-22 16-10 20-23 15-18 20-23 17-20 8-11 7.950.000
236 FLUID FLOW GAS METERING AND CUSTODY TRANSFER 6-10 3-7 3-7 7-11 5-9 2-630-4 12-16 8-12 6-10 3-7 1-5 9.500.000
237 FLUID FLOW MEASUREMENT AND METER PROVING INOIL AND GAS INDUSTRY 15-18 10-13 10-13 7-10 6-9 9-12 7-10 18-21 8-11 7-10 10-13 8-11 7.950.000
238 FORMATION DAMAGE AND WELL STIMULATION 27-30 24-27 24-27 21-27 26-29 23-26 14-17 25-28 22-25 27-30 24-27 15-18 8.750.000239 FRAUD MANAGEMENT IN TELECOMMUNICATION 15-17 12-14 12-14 9-11 12-14 10-12 7-9 19-21 10-12 13-15 12-14 9-11 5.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
BUSINESS240 FUZZY LOGIC CONTROL 10-13 10-13 8-11 12-15 9-12 7-10 18-21 8-11 8-11 10-13 8-11 7.950.000241 GAS AND LIQUID FLOW MEASUREMENT 11-14 11-14 8-11 12-15 9-12 7-10 18-21 8-11 8-11 10-13 8-11 7.950.000
242 GAS AND STEAM TURBINE : Operation, Maintenance AndTroubleshooting 27-30 25-28 25-28 22-25 26-29 24-27 15-18 26-29 23-26 28-31 25-28 16-19 8.500.000
243 Gas Compressor: Operation, Maintenance &Troubleshooting 15-18 10-13 24-27 5-8 16-19 30-3 10-13 8.500.000
244 Gas Dehydration and Glycol Regeneration 27-30 25-28 25-28 22-25 26-29 24-27 15-18 26-29 23-26 27-30 24-27 16-19 8.750.000245 GAS DISPERSION ANALYSIS 15-17 12-17 12-14 9-11 12-14 11-13 8-10 19-21 10-12 13-15 12-14 10-12 6.950.000
246 GAS HANDLING, CONDITIONING, AND PROCESSINGFACILITIES 6-9 3-6 3-6 1-4 5-82-530-3 11-14
1-429-2 3-6 1-4 7.950.000
247 GAS METAL ARC WELDING (LAS MIG/MAG) 10-13 10-10 16-19 1-4 27-30 8.500.000248 GAS PROCESSING AND EQUIPMENT 14-17 11-14 18-21 8-11 13-16 10-13 1-4 26-29 16-19 7-10 11-14 2-5 8.500.000
249 GAS SWEETENING: H2S AND CO2 REMOVAL INCHEMICAL, OIL AND GAS 21-24 17-20 17-20 14-17 19-22 16-19 8-11 19-22 15-18 13-16 17-20 9-12 8.750.000
250 GAS TUNGSTEN ARC WELDING (LAS TIG) 17-20 14-17 23-26 8-11 3-6 8.500.000
251 GAS TURBINE : PRINCIPLES, INSPECTION, OPERATION,MAINTENANCE AND TROUBLESHOOTING 15-18 17-20 17-20 8-11 12-15 10-13 7-10 19-22 15-18 13-16 11-14 8-11 8.500.000
252 GAS TURBINE OPERATION & MAINTENANCE 20-23 11-14 11-14 8-11 20-23 10-13 7-10 18-21 8-11 13-16 11-14 9-12 7.950.000
253 GAS TURBINE: OPERATION, MAINTENANCE ANDTROUBLESHOOTING 27-30 24-27 24-27 21-24 20-23 23-26 15-18 26-29 22-25 21-24 24-27 16-19 7.950.000
254 GAS TURBINE: OPERATION, PERFORMANCE &TROUBLESHOOTING 11-14 11-14 8-11 12-15 10-11 7-10 18-21 9-12 13-16 10-13 8-11 7.950.000
255 Gas, Oil and Water Pipeline Design and Maintenance 21-24 24-27 24-27 21-24 20-23 23-26 14-17 25-28 22-25 20-23 18-21 15-18 8.750.000
256 GENERATOR: OPERATION, MAINTENANCE &TROUBLESHOOTING 11-14 11-14 8-11 12-15 10-13 7-10 18-21 9-12 13-16 11-14 8-11 7.950.000
257 GENSET: TEKNOLOGI, PERAWATAN DAN OPERASI 15-18 11-14 11-14 8-11 12-15 10-13 7-10 19-22 9-12 7-10 11-14 8-11 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
258 GEOLOGY FOR NON GEOLOGIST 27-30 24-27 24-27 23-26 26-29 23-26 11-14 8-11 6-9 3-6 1-4 7.950.000259 Good Corporate Governance 6-9 11-14 11-14 8-11 20-23 10-13 7-10 18-21 9-12 7-10 11-14 8-11 7.950.000
260GPS (GLOBAL POSITIONING SYSTEM) FOR MINING ANDPETROLEUM: PRINCIPLES, EQUIPMENT, DATACOLLECTING, DATA PROCESSING, AND APPLICATION
6-9 3-6 3-6 7-10 5-8 2-5 7-10 18-21 8-11 13-16 3-6 1-4 8.500.000
261 GROUNDING SYSTEM AND LIGHTNING PROTECTION 20-24 10-14 10-14 7-11 12-16 9-13 7-11 18-22 8-12 13-17 11-15 8-12 8.950.000262 H2S AWARENESS 27-30 24-27 24-27 21-24 20-23 23-26 14-17 26-29 22-25 20-23 24-27 15-18 7.950.000263 HAND TOOL UTILIZATION 15-18 3-6 14-17 10-13 19-22 6-9 18-21 7.950.000264 HANDLING CONFLICT AND COMPLAINT EFFECTIVELY 6-8 5-7 5-7 2-4 7-9 4-6 13-15 2-4 1-3 4-6 3-5 5.950.000265 HANDLING OF DANGEROUS GOODS IN AIR TRANSPORT 6-8 3-5 3-5 7-9 5-7 2-4 1-3 18-20 8-10 13-15 3-5 1-3 5.950.000266 HAZARD AND OPERABILITY STUDIES (HAZOPS) 7-9 19-21 2-4 12-14 23-25 25-27 6-8 17-19 29-31 5.950.000
267 HAZARD AND OPERABILITY STUDY ( HAZOPS ) 6-9 3-6 3-6 1-4 5-8 2-530-3 11-141-429-2 3-6 1-4 8.500.000
268 HAZARDOUS MATERIAL HANDLING 7-10 4-7 4-7 7-10 6-9 3-6 1-4 12-15 2-530-3 4-7 2-5 7.950.000
269 HAZARDOUS MATERIAL HANDLING 11-14 11-14 9-12 13-16 10-13 7-10 18-21 9-12 13-16 11-14 8-11 7.950.000
270 HAZARDOUS MATERIALS SAFE HANDLING 7-10 4-7 4-7 7-10 6-9 3-6 1-4 12-15 2-530-3 4-7 2-5 8.500.000
271 HAZWOPER (THE HAZARDOUS WASTE OPERATIONS ANDEMERGENCY RESPONSE STANDARD) 3-7 17-21 21-25 9-13 11-15 22-25 3-7 15-19 9.250.000
272HAZWOPER (THE HAZARDOUS WASTE OPERATIONS ANDEMERGENCY RESPONSE STANDARD) FIRST RESPONDER -TECHNICIAN LEVEL
28-30 11-13 26-28 14-16 15-17 27-29 8-10 6.500.000
273 HEAT EXCHANGERS: Operation, maintenance andtroubleshooting 7-10 10-13 10-13 7-10 12-15 9-12 1-4 18-21 8-11 7-10 10-13 2-5 8.500.000
274 HEAVY DUTY EQUIPMENT 20-23 4-7 21-24 16-19 7-10 24-27 7.950.000275 HEAVY EQUIPMENT MANAGEMENT 20-23 17-20 17-20 14-17 19-22 16-19 8-11 19-22 15-18 14-17 17-20 9-12 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
276 HIGH PRESSURE PUMP (HPP): OPERATION,MAINTENANCE AND TROUBLESHOOTING 20-23 17-20 17-20 14-17 19-22 16-19 8-11 19-22 15-18 14-17 17-20 9-12 8.500.000
277 Holistic CSR and Sustainable Community Development(Strategi Memperkuat Reputasi dan Ketahanan Perus 23-24 20-21 18-19 29-30 21-22 19-20 14-15 26-27 18-19 21-22 20-21 22-23 3.950.000
278 HOLISTIC INFORMATION SECURITY 6-8 3-5 3-5 1-3 5-7 2-430-2 11-13 1-3 1-3 3-5 1-3 5.950.000
279 HOT WORKS 2-4 5-7 5-7 2-4 5-7 3-5 1-3 12-14 2-4 1-3 4-6 1-3 6.500.000280 HOW TO HANDLE CRITICISM AND COMPLAIN 20-21 17-18 17-18 15-16 13-14 16-17 8-9 20-21 15-16 14-15 17-18 15-16 3.950.000281 How To Improve Business Performance 15-17 12-14 12-14 14-16 12-14 11-13 8-10 20-22 15-17 13-15 12-14 10-12 5.950.000
282 HR BASED ON COMPETENCY FOR RECRUITMENT 2-3 3-4 3-4 1-2 5-6 2-330-1 11-121-230-1 3-4 1-2 3.950.000
283 HR MANAGEMENT 2-3 3-4 3-4 1-2 5-6 2-330-1 11-12 1-2 1-2 3-4 1-2 3.950.000
284 HR MANAGEMENT OF CHANGE 27-29 24-26 24-26 23-25 26-28 23-25 15-17 26-28 22-24 22-24 24-26 22-24 5.950.000
285 HSE AUDIT TECHNIQUES 2-4 3-5 3-5 1-3 5-7 2-430-2 14-16 8-102-430-1 24-26 6.500.000
286 HSE MANAGEMENT SYSTEM INTERNAL AUDITOR 6-9 3-6 3-6 1-4 5-8 2-530-3 11-141-429-2 3-6 1-4 8.500.000
287 HUMAN MACHINE INTERFACE (HMI) 7-10 4-7 4-7 1-4 6-9 3-6 1-4 18-21 9-12 7-10 4-7 2-5 8.500.000288 HUMAN PERFORMANCE AND LIMITATION 27-1 15-17 14-16 20-22 29-31 5.950.000289 HUMAN QUOTIENS (IQ, EQ, AQ, SQ) 15-17 11-13 11-13 14-16 12-14 11-13 7-9 18-20 9-11 13-15 12-14 10-12 5.950.000290 HUMAN RELIABILITY ASSSESSMENT & ANALISYS 6-9 3-6 3-6 7-10 5-8 2-5 1-4 11-14 1-4 6-9 3-6 1-4 7.950.000291 Human Resource Planning and Productivity 10-12 17-19 14-16 26-28 3-5 4-6 9-11 13-15 18-20 6.500.000
292 HUMAN RESOURCES MANAGEMENT FOR NON-HRMANAGER 16-17 17-18 17-18 15-16 16-17 16-17 9-10 20-21 15-16 16-17 17-18 15-16 3.950.000
293 HVAC SYSTEM : Operation & Maintenance 15-18 10-13 24-27 12-15 23-26 25-28 6-9 17-20 8.500.000294 HYDRAULIC CONTROL SYSTEM 27-3027-30 17-20 6-9 24-27 2-5 20-23 1-4 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
295 HYDRAULIC/PNEUMATIC & ELECTRIC CONTROL SYSTEM 15-18 11-14 11-14 8-11 12-15 9-12 7-10 18-21 9-12 7-10 10-13 8-11 7.950.000
296 Hydraulics Power System 20-24 24-28 7-11 2-630-4 1-5 13-17 24-28 9.500.000
297 HYDRAULICS SYSTEMS: MAINTENANCE &TROUBLESHOOTING 12-15 12-15 14-17 13-16 10-13 7-10 18-21 9-12 13-16 11-14 8-11 7.950.000
298 HYDRAULICS SYSTEMSEngineering Applications 11-14 11-14 9-12 13-16 10-13 7-10 18-21 9-12 13-14 8-11 8-11 7.950.000
299 HYPNO-PRESENTATION SKILL: UNLOCKING YOURPOTENTIAL POWER 15-17 12-14 12-14 9-11 12-14 11-13 8-10 19-21 10-12 8-10 12-14 10-12 5.950.000
300 ICE BREAKER FOR EFFECTIVE TRAINING DELIVERY 15-17 17-19 17-19 14-16 19-21 17-19 9-11 20-22 16-18 14-16 17-19 15-17 5.950.000301 Ice Breaking and Energizers 27-29 24-26 24-26 28-30 26-28 23-25 14-16 26-28 22-24 27-29 24-26 22-24 5.950.000
302 IMPLEMENTASI BALANCED SCORE CARD (BSC) SEBAGAIALAT UKUR PERFORMANSI KARYAWAN 6-8 5-7 5-7 3-5 8-10 4-6 1-3 12-143-529-1 5-7 3-5 5.950.000
303 IMPLEMENTASI DSP (DIGITAL SIGNAL PROCESSING)DALAM SISTEM KOMUNIKASI 6-9 3-6 3-6 7-10 5-8 2-5 7-10 18-21 8-11 13-16 3-6 1-4 7.950.000
304 IMPROVING PERSONAL SKILL FOR SECRETARY &ADMINISTRATIVE ASSISTANT 2-4 4-6 4-6 2-4 6-8 3-5 1-3 12-142-430-2 4-6 2-4 5.950.000
305 INDIVIDUAL DEVELOPMENT (SERVICE PRODUCT) 15-17 17-19 17-19 14-16 12-14 16-18 8-10 19-21 15-17 13-15 17-19 15-17 5.950.000306 INDUSTRIAL COMBUSTION AND BURNER 6-9 3-6 3-6 7-10 5-8 2-5 7-10 18-21 8-11 13-16 3-6 1-4 8.500.000307 INDUSTRIAL HYGIENE (HIGIENE INDUSTRI) 6-8 3-5 3-5 7-9 5-7 2-4 7-9 18-20 8-10 13-15 3-5 1-3 6.950.000308 INDUSTRIAL METROLOGY 27-30 11-14 5-8 23-26 1-4 14-17 25-28 7.950.000309 INDUSTRIAL POLLUTION CONTROL 12-15 12-15 14-17 13-16 11-14 7-10 19-22 10-13 13-16 12-15 8-11 7.950.000
310 INDUSTRIAL ROBOTICS: SENSING, PLANNING, ANDCONTROL 6-9 3-6 3-6 7-10 5-8 2-5 7-10 18-21 8-11 13-16 3-6 1-4 7.950.000
311 INDUSTRIAL TOXICOLOGY & HYGIENE MONIRORING(BASIC PRINCIPLES IN OCCUPATIONAL HYGIENE) 6-10 10-14 24-28 5-9 16-20 18-22 29-3 10-14 9.250.000
312 INFORMATION SECURITY SYSTEM 15-17 10-12 10-12 10-12 12-14 9-11 7-9 18-20 11-13 9-11 10-12 8-10 5.950.000313 INFORMATION SYSTEMS AND INFORMATION 15-17 12-14 12-14 9-11 12-14 10-12 7-9 19-21 9-11 8-10 11-13 9-11 5.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
TECHNOLOGIES FOR SUPPLY CHAIN MANAGEMENT314 INFORMATION TECHNOLOGY & TELECOMUNICATION 12-15 12-15 14-17 14-17 11-14 7-10 19-22 10-13 14-17 12-15 8-11 7.950.000
315 INFORMATION TECHNOLOGY INFRASTRUCTURELIBRARY(I T I L) VERSION 3.1 6-9 4-7 4-7 7-10 5-8 3-6 1-4 12-15 2-5 6-9 4-7 2-5 7.950.000
316 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 6-9 3-6 3-6 1-4 5-8 2-530-3 11-141-429-2 3-6 1-4 7.950.000
317 INSPEKSI DAN KOROSI 10-13 25-28 19-22 7-10 15-18 28-31 9-12 7.950.000318 INSPEKSI RIG 23-26 15-18 8.500.000319 Instrumentation And Control System 7-10 10-13 10-13 7-10 6-9 9-12 1-4 12-15 8-11 6-9 10-13 2-5 7.950.000320 Integrated and Effective Logistic Management 15-18 11-14 11-14 8-11 13-16 10-13 7-10 18-21 9-12 7-10 11-14 9-12 7.950.000321 INTEGRATED DOCUMENT & ELECTRONIC FILING SYSTEM 27-28 24-25 24-25 23-24 26-27 23-24 15-16 26-27 22-23 27-28 24-25 22-23 3.950.000322 INTEGRATED HUMAN RESOURCES MANAGEMENT 15-18 17-20 17-20 14-17 19-22 16-19 8-11 19-22 15-18 13-16 11-14 9-12 7.750.000323 INTEGRATED PROCUREMENT MANAGEMENT 20-21 24-25 24-25 21-22 26-27 23-24 14-15 24-25 22-23 27-28 24-25 22-23 3.950.000
324 INTEGRATED QHSE MANAGEMENT SYSTEM 8-11 5-8 5-8 1-4 7-10 4-7 1-4 12-15 3-629-2 5-8 3-6 7.950.000
325 INTERMEDIATE ACCOUNTING 27-29 25-27 26-28 23-25 26-28 25-28 14-16 26-28 24-26 29-31 25-27 29-31 5.950.000
326 INTERNAL AND EXTERNAL CORROSION CONTROL ANDMONITORING FOR PIPELINE AND SURFACE FACILITY 20-23 18-21 18-21 14-17 19-22 17-2 8-11 25-28 16-19 14-17 17-20 15-18 8.750.000
327 INTERNAL AUDIT HSE 6-7 10-11 10-11 9-10 5-6 9-10 4-5 15-16 8-9 8-9 10-11 8-9 3.950.000328 INTERNAL QUALITY AUDIT BASED ON ISO 19011:2002 15-16 12-13 12-13 11-12 12-13 11-12 7-8 18-19 10-11 13-14 12-13 10-11 3.950.000
329 INTERNATIONAL SHIP AND PORT FACILITY SECURITY(ISPS)CODE 12-14 12-14 14-16 14-16 11-13 7-9 19-21 10-12 13-15 12-14 8-10 5.950.000
330 INTERNETWORKING DENGAN TCP/IP 8-10 5-7 5-7 7-9 7-9 4-6 2-4 13-15 3-5 6-8 5-7 3-5 5.950.000
331 INTERPERSONAL COMMUNICATION FOR SELFDEVELOPMENT 17-18 3.950.000
332 INTERPERSONAL COMMUNICATION SKILL 15-16 12-13 14-15 19-20 11-12 8-9 20-21 10-11 13-14 12-13 9-10 3.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
333 INTERPRETING & DOCUMENTING OF ISO 14001:2004 22-23 20-21 19-22 21-22 19-20 20-21 11-12 25-26 19-20 22-23 19-20 19-20 3.950.000
334INTERPRETING & DOCUMENTING OF ISO 9001 WITHIWA-2 (GUIDELINES FOR THE APPLICATION OF QMS ISO9001 IN EDUCATION)
17-18 14-15 14-15 14-15 14-15 16-17 8-9 20-21 15-16 15-16 14-15 15-16 3.950.000
335INTERPRETING & DOCUMENTING OF ISO 9001 WITHIWA-4 (GUIDELINES FOR THE APPLICATION OF QMS ISO9001 IN LOCAL GOVERNMENT)
20-21 17-18 17-18 16-17 16-17 18-19 10-11 22-23 17-18 20-21 17-18 17-18 3.950.000
336 INTERPRETING & DOCUMENTING OF OHSAS 18001:2007 24-25 24-25 24-25 23-24 21-22 23-24 14-15 27-28 22-23 27-28 24-25 22-23 3.950.000337 INTERPRETING AND DOCUMENTING OF ISO 9001:2008 27-28 26-27 27-28 28-29 23-24 26-27 17-18 29-30 25-26 30-31 27-28 29-30 3.950.000338 INTERPRETING OF ISO 9001:2008 29-29 19-19 26-26 30-30 26-26 25-25 16-16 26-26 24-24 29-29 26-26 31-31 2.250.000339 INTERVIEWING SKILL FOR RECRUITMENT/PROMOTION 27-29 24-26 24-26 21-23 26-28 23-25 14-16 28-30 22-24 20-22 24-26 15-17 5.950.000
340 INVENTORY MANAGEMENT AND COST INVESTMENTRECOVERY 20-23 17-20 17-20 14-17 20-23 16-19 8-11 19-22 15-18 14-17 17-20 15-18 7.950.000
341 INVENTORY MANAGEMENT FOR RAW MATERIAL 20-22 19-21 19-21 14-16 19-21 18-20 14-16 25-27 16-18 20-22 18-20 15-17 5.950.000342 Inventory ManagementManufacturing Industry 11-14 1-4 20-23 8-11 16-19 3-6 15-18 7.950.000343 IPTV - TEKNOLOGI, PELUANG BISNIS DAN REGULASI 20-22 17-19 17-19 14-16 19-21 11-13 8-10 20-22 15-17 14-16 17-19 10-12 5.950.000
344 IT AUDIT PRACTICES 2-4 5-7 5-7 2-4 5-7 2-430-2 11-13 2-4 1-3 3-5 1-3 5.950.000
345 IT HELPDESK 27-29 26-28 26-28 28-30 26-28 24-26 16-18 27-29 23-25 28-30 25-27 22-24 5.950.000346 JOB COMPETENCY PROFILING 20-21 18-19 18-19 16-17 19-20 17-18 10-11 21-22 16-17 20-21 18-19 16-17 3.950.000
347 JOB DESCRIPTION ANALYSIS, DEVELOPMENT, ANDDESIGN3-4
27-28 1-2 16-17 23-24 18-19 22-23 27-28 1-2 3.950.000
348 JOB SAFETY ANALYSIS (JSA) 2-3 11-12 25-26 5-6 16-17 18-19 1-2 10-11 22-23 3.950.000349 JOB SAFETY ANALYSIS TRAINING 17-20 17-20 14-17 14-17 10-13 7-10 18-19 15-18 14-17 17-20 8-11 7.950.000
350 KEPEMIMPINAN (LEADERSHIP FOR HIGH LEVELMANAGER) 20-24 24-28 24-28 21-25 19-23 23-27 14-18 25-29 22-26 27-31 24-28 15-19 8.950.000
351 KEPEMIMPINAN (LEADERSHIP FOR LOWER LEVEL 2-4 3-5 3-5 1-3 5-7 2-4 11-13 1-3 3-5 1-3 5.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
MANAGER) 30-2 29-1
352 KEPEMIMPINAN (LEADERSHIP FOR MIDDLE LEVELMANAGER) 15-18 11-14 11-14 14-17 19-22 10-13 7-10 19-22 9-12 13-16 11-14 15-18 7.950.000
353 KEWIRANIAGAAN (SALESMANSHIP) 15-17 17-19 17-19 15-17 19-21 16-18 8-10 19-21 15-17 14-16 17-19 15-17 5.950.000354 KEWIRAUSAHAAN / ENTERPRENEURSHIP 6-8 3-5 3-5 7-9 5-7 2-4 1-3 18-20 8-10 13-15 3-5 1-3 5.950.000355 KEWIRAUSAHAAN PRA PURNA BAKTI 10-13 19-22 25-28 27-30 8.500.000356 KEY ACCOUNT MANAGEMENT 27-28 24-25 24-25 29-30 22-23 23-24 15-16 26-27 22-23 22-23 24-25 22-23 3.950.000
357 KINEMATIKA DAN DINAMIKA MESIN(KINEMATICS ANDDYNAMICS OF MACHINERIES) 15-18 3-6 14-17 10-13 19-22 6-9 18-21 7.950.000
358 KOMPRESOR SENTRIFUGAL:OPERASI, PEMELIHARAAN,DAN TROUBLESHOOTING 27-30 3-6 14-17 12-15 7-10 8-11 20-23 1-4 8.500.000
359 KOMPUTERISASI PERGUDANGAN 7-8 5-6 5-6 8-9 8-9 4-5 2-3 13-14 3-4 6-7 4-5 3-4 3.950.000360 KONTROL ELEKTRIK 15-18 11-14 11-14 8-11 12-15 10-13 7-10 18-21 9-12 13-16 11-14 8-11 7.950.000
361 LAPORAN KEUANGAN: PEMAHAMAN DANPENGGUNAANNYA 15-17 11-13 11-13 14-16 12-14 11-13 7-9 19-21 10-12 13-15 12-14 10-12 5.950.000
362 LEADERSHIP AND EFFECTIVE SUPERVISORY 6-9 4-7 4-7 7-10 6-9 3-6 1-4 12-15 2-5 6-9 4-7 2-5 7.750.000363 Leadership Skill : How Become a More Effective Leader 15-17 11-13 11-13 9-11 14-16 11-13 7-9 19-21 9-11 14-16 12-14 9-11 5.950.000364 Life Cycle Costing (LCC) 20-22 17-19 17-19 14-16 15-17 16-18 10-12 21-23 15-17 13-15 17-19 11-13 6.500.000
365 Lightning Protection and Grounding System for Oil & GasRefinery and Petrochemical Installation 6-8 3-5 3-5 1-3 5-7 2-4 1-3 13-15 3-5 1-3 3-5 1-3 6.950.000
366LIGHTNING PROTECTION AND GROUNDING SYSTEM FORPOWER PLANT, TRANSMISSION, DISTRIBUTION ANDLARGE INDUSTRY
15-17 10-12 10-12 7-9 12-14 9-11 7-9 18-20 8-10 6-8 10-12 8-10 6.950.000
367 LINGKUNGAN KERJA YANG BERSIH DAN AMAN PADAINDUSTRI KIMIA 17-20 17-20 14-17 16-22 16-19 7-10 19-22 15-18 14-17 17-20 9-12 7.950.000
368 LOCKOUT/TAGOUT (LOTO) 7-8 17-18 1-2 6-7 19-20 20-21 1-2 12-13 23-24 3.500.000369 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 21-24 18-21 18-21 21-24 19-22 17-20 8-11 26-29 22-25 20-23 18-21 15-18 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
370 Logistic Management 22-23 20-21 20-21 22-23 21-22 18-19 14-15 25-26 18-1 21-22 19-20 18-19 3.950.000
371 LOGISTIC MANAGEMENT & SUPPLY CHAINMANAGEMENT 8-10 10-12 10-12 7-9 12-14 9-11 2-4 13-15 8-10 6-8 10-12 8-10 5.950.000
372 LOGISTICS AND SUPPLY CHAIN MANAGEMENT:CONCEPT, STRATEGY AND IMPLEMENTATION 21-24 11-14 11-14 8-11 19-22 10-13 8-11 19-22 9-12 14-17 11-14 9-12 7.950.000
373 Lubrication and Bearing Technology 20-23 18-21 18-21 14-17 19-22 17-20 8-11 25-28 16-19 20-23 18-21 9-12 8.500.000
374 LUBRIKASI : Prinsip Dasar dan Aplikasi 2-4 3-5 3-5 1-3 5-7 2-430-2 11-131-330-2 3-5 1-3 6.500.000
375 LV AND MV GENERATOR (Operation, Protection andMaintanance) 15-18 11-14 11-14 8-11 13-16 10-13 7-10 19-22 9-12 7-10 11-14 8-11 7.950.000
376 LV Switchgear Maintenance and Coordination 27-30 25-28 25-28 22-25 26-29 23-26 15-18 26-29 22-25 27-30 24-27 16-19 7.950.000
377 MACHINERY CONDITION MONITORING FOR PREDICTIVEAND PREVENTIVE MAINTENANCE 17-20 17-20 14-17 19-22 16-19 8-11 19-22 15-18 14-17 17-20 9-12 7.950.000
378 MACHINERY DIAGNOSTIC 21-24 18-21 18-21 22-25 19-22 17-20 8-11 25-28 16-19 20-23 18-21 16-19 7.950.000379 MACHINERY FLUID MECHANICS 20-23 10-13 10-13 14-17 7-10 9-12 7-10 18-21 8-11 13-16 10-13 8-11 7.950.000380 MACHINERY NOISE AND PROBLEM SOLVING 4-7 24-27 12-15 1-4 9-12 27-30 8-11 7.950.000381 MAINTENANCE AND SPARE PART MANAGEMENT 20-23 10-13 10-13 14-17 12-15 9-12 7-10 18-21 8-11 13-16 10-13 8-11 7.950.000382 MAINTENANCE CONTROL AND MONITORING 16-18 27-29 16-18 11-13 17-19 6.500.000
383 MAINTENANCE MANAGEMENT (FOR MANUFACTUREAND OIL & GAS COMPANY) 22-24 19-21 19-21 22-24 21-23 18-20 14-16 26-28 17-19 20-22 19-21 17-19 7.500.000
384 MAINTENANCE MANAGEMENT *) 27-30 11-14 5-8 23-26 1-4 14-17 1-4 7.950.000
385 MAINTENANCE MANAGEMENT SYSTEM FORSUPERVISOR 6-9 3-6 3-6 1-4 5-82-530-3 12-15 1-4 3-6 1-4 7.950.000
386 MAINTENANCE OF MACHINE COMPONENTS 21-24 10-13 22-25 17-20 26-29 13-16 24-27 7.950.000387 MAINTENANCE OF MACHINE TOOLS 6-9 10-13 10-13 7-10 19-22 9-12 7-10 18-21 8-11 6-9 10-13 8-11 7.950.000
388 Maintenance Planning and Scheduling 6-8 3-5 3-5 1-3 5-7 2-430-2 11-13 1-3 1-3 3-5 1-3 6.500.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
389 MAINTENANCE PLANNING SCHEDULING ANDCOORDINATING 17-20 17-20 14-17 19-22 16-1 8-11 19-22 15-18 15-18 17-20 9-12 7.950.000
390 MAINTENANCE STRATEGIC PLANNING 20-23 18-21 18-21 21-24 20-23 17-20 14-17 25-28 16-19 21-24 18-21 16-19 7.950.000391 MAINTENANCE SYSTEM AND DOCUMENTATION 7-10 10-13 10-13 8-11 12-15 9-12 7-10 18-21 8-11 7-10 10-13 8-11 7.950.000392 MAINTENANCE: SYSTEM AND COST 27-30 17-20 6-9 24-27 2-5 20-23 1-4 7.950.000393 MAN POWER PLANNING 28-30 26-28 26-28 28-30 26-28 25-27 16-18 27-29 24-26 29-31 26-28 29-31 5.950.000394 MANAGEMENT OF CHANGE 27-29 4-6 14-16 26-28 7-9 8-10 20-22 1-3 5.950.000
395 MANAGEMENT OF OUTSOURCE STAFF HOUSING ANDCATERING SERVICES 27-30 25-28 25-28 21-24 20-23 24-27 15-18 26-29 23-26 27-30 25-28 16-19 7.950.000
396 MANAGEMENT PROJECT : STRATEGI DAN IMPLEMENTASI 15-18 17-20 17-20 14-17 19-22 16-19 8-11 19-22 15-18 14-17 17-20 9-12 7.950.000397 MANAGING CONTRACTOR SAFETY 2-4 12-14 12-14 9-11 12-14 10-12 7-9 18-20 9-11 8-10 11-13 8-10 6.500.000398 MANAGING ISSUE AND RESPONDING TO CRISIS 15-16 10-11 10-11 7-8 12-13 9-10 2-3 18-19 8-9 6-7 10-11 8-9 3.950.000399 MANAGING MAINTENANCE RESOURCES 7-10 11-14 11-14 8-11 12-15 10-13 7-10 18-21 9-18 13-16 10-13 8-11 7.950.000400 MANAGING SAFE WORK 6-9 10-13 24-27 5-8 16-19 18-21 29-2 10-13 7.950.000401 MANAGING THE INTEGRITY OF GAS PIPELINE SYSTEM 7-9 10-12 10-12 8-10 7-9 9-11 1-3 19-21 9-11 7-9 10-12 8-10 6.500.000402 Manajemen Operasi Produksi 21-23 18-20 18-20 28-30 26-28 17-19 8-10 25-27 17-19 20-22 18-20 15-17 5.950.000403 MANAJEMEN PERUBAHAN (CHANGE MANAGEMENT) 15-17 17-17 17-19 15-17 19-21 16-18 8-10 20-22 15-17 15-17 17-19 22-24 5.950.000404 MANAJEMEN SDM (PERSONALIA/TENAGA KERJA) 6-10 10-14 10-14 7-11 5-9 9-13 7-11 18-22 8-12 6-10 10-14 1-5 8.950.000405 MANAJEMEN BENGKEL 7-10 4-7 4-7 7-10 6-9 3-6 1-4 18-21 8-11 6-9 4-7 2-5 7.950.000
406 MANAJEMEN KEUANGAN UNTUK NON MANAJERKEUANGAN 20-21 10-11 10-11 14-15 12-13 9-10 1-2 18-19 8-9 6-7 10-11 8-9 3.950.000
407 MANAJEMEN LINGKUNGAN 20-23 10-13 10-13 7-10 5-8 2-5 1-4 18-21 8-11 6-9 3-6 1-4 7.950.000408 MANAJEMEN LOGISTIK 8-10 12-14 12-14 9-11 20-22 11-13 9-11 19-21 10-12 8-10 12-14 22-24 5.950.000409 MANAJEMEN MATERIAL 7-10 4-7 4-7 7-10 6-9 3-6 1-4 18-21 8-11 6-9 4-7 2-5 7.950.000410 MANAJEMEN PENGEMBANGAN PRODUK 22-24 18-20 18-20 23-25 22-24 19-21 10-12 21-23 18-20 20-22 20-22 29-31 5.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
411 MANAJEMEN PERBENGKELAN 15-18 10-13 10-13 8-11 7-10 9-12 2-5 19-22 9-12 7-10 10-13 8-13 7.950.000412 MANAJEMEN PERGUDANGAN DAN PERSEDIAAN 20-21 24-25 24-25 21-22 13-14 23-24 15-16 26-27 22-23 27-28 24-25 15-16 3.950.000
413MANAJEMEN PERILAKU DALAMORGANISASI(MANAGEMENT OF ORGANIZATIONBEHAVIOR)
6-9 3-6 3-6 1-4 5-8 2-530-3 11-141-430-3 3-6 1-4 7.950.000
414 MANAJEMEN PERPUSTAKAAN 20-23 10-13 10-13 7-10 5-8 2-5 1-4 18-21 8-11 6-9 3-6 1-4 7.750.000
415 MANAJEMEN POST WELD HEAT TREATMENT:TEORI,STANDARD PROSEDUR DAN APLIKASI 15-17 10-12 10-12 14-16 12-14 9-11 7-9 21-23 8-10 13-15 10-12 8-10 6.500.000
416 MANAJEMEN PRODUKSI DAN OPERASI (MPO) 7-10 4-7 4-7 1-4 6-9 3-6 1-4 12-15 2-530-3 4-1 2-5 7.950.000
417 MANAJEMEN PROYEK 27-28 25-26 25-26 18-19 19-20 25-26 17-18 28-29 24-25 29-30 26-27 17-18 3.950.000418 MANAJEMEN RISIKO INVESTASI 6-9 3-6 3-6 7-10 5-8 2-5 1-4 12-15 1-4 6-9 3-6 1-4 7.750.000
419 MANAJEMEN STRATEGI 6-10 3-7 3-7 1-5 5-9 2-630-4 11-151-529-3 3-7 1-5 8.950.000
420 MANAJEMEN STRATEGI 7-9 5-7 5-7 2-4 6-8 4-630-2 13-15 3-5 1-3 5-7 3-5 5.950.000
421 MANUAL METAL ARC WELDING (LAS LISTRIK) 3-6 1-4 9-12 25-28 20-23 15-18 8.500.000422 Manufacturing Process to Use CNC Machining 20-23 4-7 21-24 16-19 25-28 7-10 24-27 7.950.000423 MANUFACTURING PROCESSESTO USE CASTING 15-18 25-28 14-17 9-12 18-21 30-3 17-20 7.950.000424 MANUFACTURING PROCESSESTO USE METAL FORMING 15-18 25-28 14-17 9-12 18-21 30-3 17-20 7.950.000425 MANUSIA DALAM KERJA (MEN IN WORK) 2-3 4-5 4-5 2-3 5-6 3-4 1-2 12-13 2-3 1-2 4-5 2-3 3.950.000
426 MARINE CORROSION AND PREVENTIONFOR OFFSHORESTRUCTURE 9-11 6-8 6-8 7-9 8-10 5-7 3-5 18-20 4-6 6-8 6-8 4-6 6.500.000
427 MARKETING MANAGEMENT 20-23 10-13 10-13 7-10 5-8 2-5 1-4 18-21 8-11 6-9 3-6 1-4 7.750.000428 MASTERING MICROSOFT EXCEL 2007 28-29 26-27 26-27 28-29 26-27 24-25 16-17 27-28 24-25 27-28 26-27 29-30 3.950.000429 MATERIAL ATTITUDE USES AND PROBLEMS 17-20 17-20 14-17 19-22 16-19 8-11 19-22 15-18 15-18 17-20 9-12 7.950.000430 MATERIAL CERTIFICATION REQUIREMENT FOR OIL AND 20-22 17-19 17-19 21-23 19-21 16-18 10-12 25-27 15-17 20-22 17-19 15-17 6.500.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
GAS INDUSTRY431 MATERIAL HANDLING & PACKAGING 20-23 10-13 10-13 7-10 5-8 2-5 1-4 18-21 8-11 6-9 3-5 1-4 7.950.000432 MATERIAL IDENTIFICATION 17-20 17-20 14-17 19-22 16-19 8-11 20-23 15-18 15-18 17-20 9-12 7.950.000433 MATERIAL MANAGEMENT 17-20 17-20 14-17 19-22 16-19 8-11 20-23 15-18 20-23 17-20 9-12 7.950.000434 MATERIAL MANAGEMENT FOR PROJECT 15-18 11-14 11-14 8-11 19-22 10-13 7-10 18-21 9-12 7-10 11-14 9-12 7.950.000435 MC (MASTER OF CEREMONY) 15-17 10-12 10-12 14-16 12-16 9-11 7-9 18-20 8-10 13-15 10-12 8-10 5.950.000436 MEASUREMENT SYSTEM ANALYSIS 15-18 3-6 14-17 10-17 19-22 6-9 17-20 7.950.000
437 MEASUREMENT TECHNIQUE FOR MAINTENANCE ANDOPERATION LATHE MACHINE 17-20 2-5 26-29 14-17 22-25 4-7 15-18 7.950.000
438 MEASURING TRAINING IMPACT 21-22 19-20 19-20 21-22 20-21 18-19 14-15 25-26 17-18 21-22 19-20 17-18 3.950.000439 MECHATRONICS APPLICATION IN INDUSTRY 20-23 17-20 17-20 14-17 12-15 16-19 7-10 19-22 15-18 14-17 17-20 8-11 7.950.000440 MEKATRONIKA 6-9 4-7 4-7 1-4 5-8 3-630-3 11-14
2-530-3 4-7 1-4 7.950.000
441 MEMBEDAH PROFESI SEKRETARIS PROFESSIONAL 20-23 17-20 17-20 21-24 19-22 16-19 14-17 25-28 15-18 20-23 17-20 15-18 7.750.000
442 MENGGALI POTENSI DIRI UNTUK MENCAPAI PRIBADIYANG UNGGUL 14-15 23-24 29-30 30-1 3.950.000
443 MENINGKATKAN EFEKTIVITAS FUNGSI SUPERVISOR(SUPERVISORY MANAGEMENT) 20-23 18-21 18-21 21-24 20-23 16-19 8-11 19-22 16-19 20-23 18-21 16-19 7.950.000
444 MENINGKATKAN EFEKTIVITAS FUNGSISUPERVISOR(SUPERVISORY MANAGEMENT) 28-29 26-27 26-27 28-29 27-28 24-25 16-17 27-28 23-24 28-29 26-27 29-30 3.950.000
445 Menjadi Pribadi yang Asertif 15-17 12-14 12-14 9-11 13-15 11-13 7-9 19-21 10-12 13-15 12-14 10-12 5.950.000446 MENJADI PRIBADI YANG BERPENGARUH 21-23 19-21 19-21 15-17 20-22 17-19 9-11 21-23 17-19 20-22 18-20 16-18 5.950.000447 METALLURGY FOR NON METALLURGIST 18-21 18-21 14-17 19-22 16-19 8-11 20-23 15-18 20-23 17-20 9-12 7.950.000
448 METODE PENYUSUNAN SPESIFIKASI & HARGAPERKIRAAN SENDIRI /OWNER ESTIMATE 28-30 25-27 15-17 5.950.000
449 MODEL PEMBINAAN ANGGOTA YANG EXCELLENTDALAM DUNIA KERJA 6-8 2-4 21-23 3-5 5.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
450 MODERN MAINTENANCE MANAGEMENT 20-23 4-7 21-24 16-19 25-28 7-10 24-27 7.950.000451 MODERN OFFICE ADMINISTRATION AND FILING SYSTEM 27-30 25-28 25-28 23-26 26-29 23-26 15-18 26-29 23-26 27-30 24-27 17-20 7.950.000452 Modern Safety and Loss Control Management 15-18 18-21 18-21 14-17 20-23 17-20 7-10 19-22 16-19 13-16 18-21 15-18 8.500.000453 MODERN SAFETY MANAGEMENT (MSM) 21-24 11-14 21-24 2-5 14-17 15-18 27-30 8-11 7.950.000454 MOSSAD STRATEGY ON BUSINESS 23-25 7-9 23-25 18-20 24-26 5.950.000455 MOTIVATING STAFF FOR EXCELLENT PERFORMANCE 9-11 10-12 10-12 8-10 12-14 9-11 2-4 18-20 8-10 7-9 10-12 8-10 5.950.000
456 MOTOR CONTROL CENTER: OPERATION &MAINTENANCE 18-21 18-21 14-17 19-22 17-20 8-11 20-23 16-19 20-23 18-21 10-13 7.950.000
457 MOTOR DIESEL: PRINSIP DASAR, OPERASI DANPERAWATAN 6-9 3-6 3-6 1-4 5-82-530-3 11-14
1-430-3 3-6 1-4 7.950.000
458 NATURAL GAS PROCESSING - FRACTINATION ANDREFREGERATION 7-10 4-7 4-7 1-4 5-82-530-3 12-15
2-530-3 3-6 1-4 8.500.000
459 NATURAL GAS RESERVOIR, PROCESSING ANDECONOMICS ASPECTS 27-30 25-28 25-28 22-25 26-29 24-27 15-18 26-29 23-26 28-31 25-28 16-19 8.750.000
460 NEGOTIATION : IMPROVE YOUR NEGOTIATING SKILLSAND MAKE YOU MORE EFFECTIVE NEGOTIATOR 8-9 10-11 10-11 7-8 9-10 9-10 4-5 15-16 8-9 13-14 10-11 8-9 3.950.000
461 NEGOTIATION SKILL FOR PURCHASING STAFF 15-17 12-14 12-14 14-16 19-21 11-13 8-10 20-22 10-12 13-15 12-14 10-12 5.950.000462 NEGOTIATION SKILLS FOR PROCUREMENT 28-29 10-11 3.950.000
463 NETWORK MANAGEMENT AND OPERATIONS SUPPORTSYSTEM 22-24 18-20 18-20 15-17 20-22 16-18 9-11 25-27 16-18 15-17 18-20 15-17 5.950.000
464 NON DESTRUCTIVE TEST 15-18 25-28 14-17 9-12 18-21 30-3 17-20 7.950.000465 NON DESTRUCTIVE TEST(NDT) 6-9 11-14 3-6 7-10 5-8 2-5 1-4 18-21 8-11 13-16 3-6 1-4 7.950.000466 NON DESTRUCTIVE TESTING (NDT) 15-18 11-14 11-14 8-11 12-15 10-13 7-10 18-21 9-12 13-16 11-14 8-11 7.950.000467 NUMERICAL CONTROL AND ROBOTIC 6-9 3-6 3-6 7-10 5-8 2-5 7-10 18-21 8-11 13-16 3-6 1-4 7.950.000
468 OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENT(HSE) AUDITING 20-24 10-14 10-14 21-25 19-23 9-13 7-11 18-22 8-12 13-17 10-14 8-12 9.250.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
469 Occupational Health, Safety and Environment (HSE) onPaper and Pulp Industry 7-10 10-13 10-13 8-11 6-99-1230-3 12-15 8-11 6-9 10-13 2-5 8.500.000
470 OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENTALIN THE OIL & GAS INDUSTRY 15-17 17-19 17-19 14-16 15-17 12-14 10-12 25-27 18-20 13-15 10-12 8-10 6.500.000
471 Office Automation 27-28 26-27 26-27 28-29 26-27 25-26 16-17 27-28 24-25 28-29 26-27 22-23 3.950.000472 OFFICE COMMUNICATION AND BEHAVIOR ETHIC 9-11 24-26 12-14 8-10 13-15 5.950.000473 OFFICE MANAGEMENT AND FILING SYSTEM 18-21 18-21 14-17 19-22 17-20 8-11 20-23 16-19 20-23 18-21 10-13 7.950.000474 OHSAS 18001:2007 AUDITOR 3-7 10-14 21-25 2-6 14-18 15-19 27-31 8-12 9.250.000475 Oil & Gas Production System 15-18 10-13 10-13 7-10 12-15 9-12 1-4 12-15 8-11 6-9 10-13 2-5 8.750.000476 OIL & GAS: MEASUREMENT AND CALCULATION 7-10 4-7 4-7 1-4 6-9 3-6 1-4 12-15 2-5 6-9 4-7 2-5 8.750.000477 OIL AND GAS HANDLING FACILITIES 15-18 11-14 11-14 8-11 12-15 10-13 7-10 18-21 9-12 13-16 11-14 8-11 8.750.000478 OIL AND GAS HANDLING FACILITIES~ 20-23 11-14 11-14 14-17 12-15 10-13 7-10 19-22 9-12 13-16 11-14 8-11 7.950.000
479 OIL AND GAS WELLS STIMULATION BY ACIDIZING ANDHYDRAULIC FRACTURING 15-18 10-13 10-13 7-10 12-15 9-12 7-10 18-21 8-11 7-10 10-13 8-11 8.750.000
480OIL FIELD AND 100 METHODS TO MAINTAIN ANDINCREASE PRODUCTION(Strategi PeningkatanProduktivitas Lapangan Minyak)
20-23 17-20 17-20 14-17 19-22 16-19 8-11 19-22 15-18 14-17 17-20 9-12 8.750.000
481 OIL FILM BEARING (JOURNAL DAN THRUST BEARING /HYDRODYNAMIC BEARINGS) 27-30 25-28 25-28 22-25 26-29 24-27 15-18 26-29 23-26 27-30 25-28 16-19 8.500.000
482 OIL SPILL - OIL BOOM AND ENVIRONMENTALMANAGEMENT 7-10 10-13 10-13 7-10 6-9 9-12 1-4 12-15 8-11 6-9 4-7 2-5 8.750.000
483 OIL TRANSPORTATION PIPING 21-24 10-13 22-25 17-20 26-29 13-18 24-27 7.950.000
484 OLE FOR PROCESS CONTROL (OPC) & DISTRIBUTEDCOMPONENT OBJECT MODEL (DCOM) 8-11 5-8 5-8 7-10 7-10 4-7 2-5 18-21 8-11 6-9 5-8 3-6 8.500.000
485 Onshore Drilling Safety Operation/HSE Aspect in OnshoreDrilling Operation 15-18 17-20 17-20 14-17 12-15 16-19 8-11 19-22 15-18 14-17 17-20 9-12 8.500.000
486 ONSHORE DRILLING SAFETY OPERATIONS / HSE ASPECTSIN ONSHORE DRILLING OPERATIONS FOR MANAGERS 28-30 25-27 25-27 28-30 26-28 25-27 16-18 27-29 24-26 29-31 26-28 29-31 6.500.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
AND SUP
487 OPC (OPEN PROCESS CONTROL) 27-30 24-27 21-24 21-24 21-24 23-26 16-19 1-429-2 27-30 24-27 16-19 8.500.000
488 OPERASI DAN PEMELIHARAAN TURBIN GAS DANGENERATOR 20-23 11-14 11-14 8-11 12-15 10-13 7-10 18-21 9-12 13-16 11-14 8-11 7.950.000
489 OPERATING AND MAINTENANCE OF HEAVY DUTYEQUIPMENTS 11-14 11-14 9-12 13-16 10-13 1-1 18-21 9-12 13-16 11-14 8-11 7.950.000
490 OPERATING SYSTEMS TECHNOLOGIES ANDINSTALLATION PROCEDURES 28-30 26-28 26-28 28-30 26-28 25-27 16-18 27-29 24-26 28-30 26-28 29-31 5.950.000
491 OPERATION AND MAINTENANCE OF HEAVY DUTYEQUIPMENT 6-9 3-6 3-6 7-10 5-8 2-5 7-10 18-21 8-11 13-16 3-6 1-4 7.950.000
492 OPERATION MANAGEMENT 9-10 10-11 10-11 7-8 5-6 9-10 4-5 15-16 8-9 6-7 10-11 8-9 3.950.000493 OPTIMALISASI CYBER PUBLIC RELATION 23-25 20-22 20-22 21-23 22-24 19-21 14-16 25-27 18-20 20-22 20-22 15-17 5.950.000494 OPTIMIZATION FOR PRODUCTION SYSTEM 21-24 10-13 25-28 19-22 7-10 15-18 28-31 9-12 7.950.000495 OVERVIEW OF PROCESS SAFETY MANAGEMENT 3-4 3-4 14-15 21-22 2-3 3-4 25-26 3.950.000496 OXY ACETYLENE WELDING 21-24 10-13 22-25 17-20 26-29 13-16 25-28 8.500.000497 OXY ACETYLENE WELDING 26-1 26-29 28-1 27-30 25-30 16-19 27-30 24-27 29-1 26-29 17-20 7.950.000498 OXY ACETYLENE WELDING (LAS ASETILIN) 27-30 24-27 2-5 18-21 13-16 8-11 8.500.000499 PAJAK DAN PROSEDUR IMPLEMENTASI 20-23 17-20 17-20 21-24 19-22 16-19 14-17 25-28 15-18 20-23 17-20 15-18 7.750.000
500 PANITIA PEMBINA KESELAMATAN DAN KESEHATANKERJA (P2K3) 10-13 18-21 22-25 9-12 12-15 23-26 4-7 16-19 7.950.000
501 PELAKSANAAN DAN PERMASALAHAN PENGADAANTANAH/ PEMBEBASAN LAHAN 20-22 10-12 10-12 7-9 5-7 2-4 1-3 8-10 6-8 3-5 1-3 5.950.000
502 Pelatihan Kemadyaan 20-24 24-28 24-28 21-25 19-23 23-27 14-18 25-29 22-26 20-24 24-28 15-19 8.950.000503 Pelumas dan Sistem Pelumasan 27-30 17-20 17-20 21-24 19-22 16-19 14-17 25-28 15-18 20-23 17-20 15-18 7.950.000504 PELUMASAN MESIN 20-23 17-20 17-20 14-17 13-16 16-19 8-11 19-22 15-18 13-16 17-20 9-12 7.950.000505 PEMBANGKIT UAP (BOILER) 15-18 10-13 10-13 8-11 12-15 9-12 7-10 18-21 9-12 7-10 10-13 8-11 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
506 PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL(OIL FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK 27-30 24-27 24-27 21-24 20-23 23-26 14-17 26-29 22-25 20-23 24-27 15-18 7.950.000
507 PEMBORAN DAN PELEDAKAN UNTUK PERTAMBANGAN 23-25 20-22 20-22 21-23 22-24 19-21 17-19 4-6 2-430-1 27-29 29-31 6.500.000
508 PEMILIHAN MATERIAL KOMPONEN MESIN(MATERIALSELECTION) 3-6 18-21 12-15 30-3 8-11 21-24 2-5 7.950.000
509 PEMINDAHAN TANAH MEKANIS 6-8 3-5 3-5 7-9 5-7 2-430-2 18-20 15-17 13-15 10-12 8-10 5.950.000
510 PENERAPAN EKONOMI TEKNIK DALAM PROSESPENGAMBILAN KEPUTUSAN BISNIS 21-24 18-21 18-21 22-25 20-23 17-20 14-17 26-29 16-19 20-23 18-21 16-19 7.750.000
511 Penerapan Hazard Analysis Critical Control Point (HACCP)pada Pengelolaan Makanan 6-8 10-12 10-12 7-9 7-9 9-11 2-4 18-20 8-10 6-8 10-12 8-10 6.500.000
512 PENERAPAN PENGENDALIAN BISING TERPADU DITEMPATKERJA(Applied noise control at work place) 3-5 17-19 28-30 3-5 16-18 17-19 29-31 10-12 6.500.000
513 PENERAPAN SMK3 PASCA PENERBITAN PP NO. 50/2012DAN TEKNIK-TEKNIK DALAM MENGHADAPI AUDIT SMK3 13-13 20-20 3-3 13-13 24-24 26-26 7-7 18-18 29-29 2.250.000
514 PENGANTAR KONSEP MANAJEMEN (INTRODUCTION TOMANAGEMENT 21-24 24-27 24-27 22-25 20-23 23-26 15-18 26-29 22-25 27-30 24-27 16-19 7.950.000
515 PENGELOLAAN BAHAN KIMIA BERBAHAYA 15-17 24-26 7-9 12-14 25-27 27-29 8-10 19-21 29-31 5.950.000516 PENGEMBANGAN KONTEN SITUS WEB PERUSAHAAN 20-22 17-19 17-19 14-16 19-21 16-18 10-12 21-23 15-17 13-15 17-19 11-13 5.950.000517 PENGEMBANGAN SITUS WEB 20-22 10-12 10-12 7-9 5-7 2-4 1-3 18-20 8-10 6-8 3-5 1-3 5.950.000518 PENGEMBANGAN TEKNOLOGI DAN STANDAR MATERIAL 17-20 2-5 26-29 14-17 22-25 4-7 16-19 7.950.000519 PENGENDALIAN MOTOR LISTRIK SECARA ELEKTRONIK 18-21 18-21 14-17 19-22 17-20 9-12 25-28 16-19 20-23 18-21 10-13 7.950.000
520 PENGETAHUAN MATERIAL HANDLING & APLIKASI 6-9 3-6 3-6 1-4 5-8 2-530-3 12-151-429-2 3-6 1-4 7.950.000
521 PENGETAHUAN TEKNIK PERMINYAKAN UNTUKMANAJERIAL 18-21 18-21 21-24 20-23 17-20 9-12 25-28 16-19 20-23 18-21 10-13 7.950.000
522 PENGGERAK MULA (PRIME MOVER) 21-24 18-21 18-21 21-24 19-22 17-20 14-17 25-28 16-19 20-23 18-21 15-18 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
523 PENGUJIAN MATERIAL BERSIFAT MERUSAK(DESTRUCTIVE TEST) 7-10 24-27 8-11 3-6 12-15 29-2 11-14 7.950.000
524 PENINGKATAN MOTIVASI BERPRESTASI (ACHIEVEMENTMOTIVATION TRAINING) 20-22 18-20 18-20 21-23 20-22 18-20 9-11 25-27 16-18 20-22 18-20 22-24 5.950.000
525 PEOPLE SKILL 20-24 17-21 17-21 21-25 19-23 16-20 14-18 25-29 15-19 20-24 17-21 15-19 8.950.000526 PERANCANGAN TATA LETAK PABRIK (PLANT LAYOUT) 4-7 24-27 12-15 1-4 9-12 27-30 8-11 7.950.000
527 Perawatan Belt Conveyor 2-4 3-5 3-5 1-3 5-7 2-430-2 11-131-329-1 3-5 1-3 5.950.000
528PERENCANAAN DAN PENJADWALANPERAWATAN(MAINTENANCE PLANNING ANDSCHEDULING)
6-9 18-21 7-10 2-5 11-14 23-26 10-13 7.950.000
529 PERFORMANCE ANALISYS AND MAINTENANCE OFELECTRICAL DISTRIBUTION NETWORKS FOR SUPERVISOR 15-18 10-13 10-13 8-11 12-15 9-12 7-10 19-22 9-12 13-16 10-13 8-11 7.950.000
530 PERFORMANCE ANALISYS AND OPERATING OFGENERATOR SET FOR SENIOR OPERATOR AND ENGINEER 20-23 17-20 17-20 14-17 19-22 16-19 8-11 25-28 15-18 20-23 17-20 9-12 8.500.000
531PERFORMANCE ANALISYS AND OPERATING OFINDUCTION MOTOR FOR SENIOR OPERATOR ANDJUNIOR SUPERVISOR
27-30 24-27 24-27 21-24 20-23 23-26 14-17 26-29 22-25 27-30 24-27 15-18 8.500.000
532 PERFORMANCE BASED PAY 23-24 20-21 20-21 22-23 21-23 19-20 14-15 25-26 18-19 23-24 20-21 18-19 3.950.000533 PERFORMANCE COACHING FOR MANAGER 6-7 3-4 3-4 7-8 5-6 2-3 7-8 18-19 8-9 13-14 3-4 1-2 3.950.000534 Performance Management 28-30 25-27 25-27 28-30 26-28 24-26 15-17 26-28 23-25 28-30 25-27 29-31 5.950.000535 PERFORMANCE, BEHAVIOR AND STRESS MANAGEMENT 27-29 10-12 26-28 22-24 27-29 5.950.000
536 PERHITUNGAN KETIDAKPASTIAN HASIL PENGUKURANDAN PENGUJIAN 15-17 17-19 17-19 14-16 19-21 9-11 7-9 25-27 15-17 20-22 10-12 8-10 5.950.000
537 PERLAKUAN PANAS LOGAM(HEAT TREATMENT FORMETAL) 20-23 4-7 21-24 16-19 25-28 7-10 18-21 7.950.000
538 PERLINDUNGAN LINGKUNGAN DAN PENGELOLAANLIMBAH BAHAN BERBAHAYA BERACUN (B3) 15-18 24-27 7-10 12-15 24-27 26-29 7-10 18-21 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
539 PERMIT TO WORK (PTW) 4-5 18-19 29-30 9-11 11-12 22-23 3-4 15-16 3.950.000
540 PERSONALITY DEVELOPMENT BERBASIS EMOTIONALAND SPRITUAL QUETIENTS 6-9 3-6 3-6 7-10 5-8 2-5 1-4 12-15 1-4 6-9 3-6 1-4 7.750.000
541 PERSUASIVE MARKETING 3-5 14-16 30-2 25-27 1-3 5.950.000
542 PETROLEUM ENGINEERING FOR NON PETROLEUMEMPLOYEE 15-18 10-13 10-13 7-10 6-9 3-6 1-4 18-21 8-11 6-9 4-7 2-5 8.500.000
543 PETROLEUM ENGINEERING FOR NON PETROLEUMENGINEERS 6-9 3-6 3-6 1-4 5-82-530-3 11-14
1-429-2 3-6 1-4 8.750.000
544 PETROLEUM FINANCE, COST CONTROL & RESERVOIRMANAJEMEN(Petroleum Economics) 21-24 17-20 17-20 14-17 19-22 16-19 7-10 19-22 15-18 14-17 17-20 9-12 8.500.000
545 PETROLEUM INDUSTRIAL REFRIGERATION: OPERATIONAND MAINTENANCE 27-30 10-13 21-24 9-12 11-14 22-25 3-6 15-18 8.500.000
546 PETROLEUM PLANT & PIPELINE SECURITY MANAGEMENT 20-22 17-19 17-19 14-16 19-21 16-18 9-11 20-22 15-17 15-17 17-19 9-11 6.950.000547 PETTY CASH MANAGEMENT & ADMINISTRATION 9-10 12-13 11-12 9-10 12-13 11-13 7-8 19-20 10-11 9-10 12-13 10-11 3.950.000548 PIPELINE : Design, Testing, Inspection And Maintenance 21-24 24-27 24-27 21-24 20-23 23-26 14-17 25-28 22-25 21-24 24-27 15-18 8.500.000
549 PIPELINE INTERNAL CORROSION CONTROL ANDMONITORING 15-18 10-13 10-13 7-10 12-15 9-12 1-4 18-21 8-11 6-9 10-13 8-11 8.750.000
550 PIPELINE PIGGING OPERATIONS AND EQUIPMENT 20-22 19-21 24-26 22-24 13-15 18-20 14-16 26-28 22-24 22-24 24-26 17-19 5.950.000
551 PIPELINE RISK & INTEGRITY MANAGEMENT 6-8 3-5 3-5 1-3 5-7 2-430-2 11-13 1-3 1-3 3-5 1-3 6.950.000
552 Piping & Pipeline System: Design, Specification,Installation & Maintenance 7-10 4-7 4-7 1-4 6-9 3-6 1-4 12-15 2-5 6-9 4-7 2-5 8.500.000
553 PIPING SYSTEM MATERIAL DESIGN AND MAINTENANCE 18-21 18-21 21-24 20-23 17-20 9-12 25-28 16-19 20-23 18-21 15-18 7.950.000
554 PLAN LAY OUT OFFICE ( PERENCANAAN TATA LETAKPERKANTORAN ) 22-24 19-21 19-21 21-23 21-23 18-20 14-16 25-27 17-19 20-1 19-21 17-19 5.950.000
555 PLANNING AND MANAGING INVENTORIES IN A SUPPLYCHAIN 20-22 18-20 18-20 15-17 20-22 16-18 9-11 19-21 15-17 15-17 17-19 15-17 5.950.000
556 PLANNING AND ORGANIZE TRAINING 2-4 3-5 3-5 1-3 5-7 2-4 11-13 1-3 3-5 1-3 5.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
30-2 23-1557 PLANNING DEMAND AND SUPPLY IN A SUPPLY CHAIN 22-24 24-26 24-26 22-24 21-23 23-25 14-16 26-28 22-24 21-23 24-26 22-24 5.950.000
558 PLANT LIFE MANAGEMENT THROUGH RELIABILITY BASEDINSPECTION 20-24 20-24 24-28 21-25 19-23 23-27 14-18 25-29 22-26 27-31 24-28 15-19 9.500.000
559 PLC (ROGRAMMABLE LOGIC CONTROLLER): PRINCIPLES,OPERATION AND PROGRAMMING 6-9 3-6 3-6 1-4 5-82-530-3 11-14
1-429-2 3-6 1-4 8.500.000
560 PLC (TINGKAT MAHIR) 19-22 19-22 21-24 20-23 18-21 14-17 25-28 17-20 21-24 19-22 15-18 7.950.000561 PLC COMMUNICATION AND LAN 15-18 10-13 10-13 10-13 8-11 12-15 9-12 19-22 16-19 13-16 10-13 8-11 8.500.000562 PLC INTEGRATION TO LOCAL AREA NETWORK (LAN) 15-18 10-13 10-13 7-10 12-15 9-12 2-5 18-21 8-11 6-9 10-13 3-6 8.500.000
563 PLC OPERATION, PROGRAMMING, TROUBLESHOOTINGAND MAINTENANCE 27-30 24-27 24-27 21-24 20-23 23-26 15-181-429-2 27-30 24-27 15-18 8.500.000
564 PNEUMATIC CONTROL SYSTEM 7-10 24-27 8-11 3-6 12-15 29-2 11-14 7.950.000565 PNEUMATIC SYSTEM AND APPLICATION 20-23 18-21 18-21 14-17 19-22 16-19 8-11 25-28 16-19 20-23 17-20 9-12 7.950.000
566 POMPA DAN KOMPRESOR: OPERASI, PERAWATAN DANTROUBLESHOOTING 20-23 17-20 17-20 14-17 19-22 16-19 8-11 25-28 15-18 13-16 17-20 9-12 7.950.000
567 POMPA: OPERASI DAN PERAWATAN 27-30 24-27 24-27 21-24 19-22 23-26 14-17 25-28 22-25 21-24 24-27 15-18 7.950.000568 PORT MANAGEMENT 3-6 7.950.000569 POWER ELECTRICAL INSTALLATION SYSTEM 22-25 25-28 25-28 22-25 26-29 24-27 15-18 27-30 23-26 27-30 25-28 16-19 7.950.000570 POWER ELECTRONICS : CONVERTERS AND DESIGN 15-18 17-20 17-20 14-17 19-22 16-19 8-11 20-23 15-18 14-17 17-20 9-12 7.950.000571 POWER FACTOR IMPROVEMENT 19-22 19-22 21-24 20-23 18-21 14-17 25-28 17-20 21-24 19-22 15-18 7.950.000572 POWER LINE CARRIER 28-30 26-28 26-28 2-30 26-28 25-27 16-18 27-29 24-26 27-29 26-28 29-31 5.950.000573 Power Transformer 15-18 18-21 18-21 14-17 19-22 16-19 9-12 19-22 16-19 14-17 17-20 10-13 7.950.000574 PRACTICAL AND ADVANCED COURSE ON HVAC SYSTEMS 20-23 3-6 14-17 1-1 2-5 14-17 15-18 27-30 8-11 8.500.000
575 PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FORPETROLEUM PRODUCTION SYSTEM 27-30 24-27 24-27 21-24 20-23 23-26 14-17 25-28 22-25 21-24 24-27 15-18 8.500.000
576 PRACTICAL PROCESS CONTROL 27-30 24-27 24-27 21-24 26-29 23-29 14-17 25-28 22-25 27-30 24-27 15-18 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
577 PRACTICAL WELDING 19-22 19-22 21-24 20-23 18-21 14-17 25-28 17-20 21-24 19-22 15-18 7.950.000578 PRACTICE CONSIDERATIONS OF ARC WELDING 24-27 24-27 21-24 21-24 23-26 14-17 25-28 22-25 21-24 21-24 24-27 7.950.000579 PREDICTIVE MAINTENANCE 15-18 3-6 14-17 10-13 19-22 6-9 17-20 7.950.000
580 PRESENTATION SKILL FOR PUBLIC RELATIONS &MARKETING STAFF (USING MICROSOFT POWER POINT) 21-22 19-20 19-20 21-22 20-22 17-18 9-1025-2625-27
16-1717-19
15-1620-22
18-1919-21
16-1717-19 3.950.000
581 PRESENTATION SKILL FOR THE BEGINNERS 20-22 17-19 17-19 14-16 19-21 16-18 14-16 25-27 15-17 13-15 17-19 15-17 5.950.000582 PRESSURE SAFETY VALVE : SELECTION AND SIZING 6-8 3-5 3-5 7-9 5-7 2-4 7-9 18-20 8-10 13-15 3-5 1-3 6.500.000
583 Pressure Vessel : Calculation, Codes, Production,Operation, Control & Safeties 20-23 18-21 18-21 14-17 19-22 16-19 8-11 19-22 16-19 14-17 17-20 9-12 8.500.000
584 PREVENTIVE & PREDICTIVE MAINTENANCE (PPM) 27-30 24-27 24-27 21-24 19-22 19-22 23-26 27-30 22-25 27-30 24-27 15-18 8.500.000585 PREVENTIVE MAINTENANCE 21-24 17-20 17-20 14-17 19-22 16-19 8-11 19-22 15-18 20-23 17-20 9-12 7.950.000
586 PREVENTIVE MAINTENANCE (SCHEDULE & PREDICTIVEMAINTENANCE) 20-23 17-20 17-20 14-17 19-22 16-19 8-11 19-22 15-18 13-16 17-20 9-12 7.950.000
587 PREVENTIVE MAINTENANCE GENERATOR 7-10 4-7 4-7 1-4 6-9 3-6 1-4 12-15 2-5 6-9 4-7 2-5 7.950.000588 PRIBADI EFEKTIF 20-21 17-18 17-18 15-16 19-20 16-17 9-10 20-21 15-16 15-16 18-19 22-23 3.950.000
589 PRINSIP DASAR DAN PROSEDUR PENGADAAN BARANG &JASA (Global Trend In Purchasing Management And 15-17 11-13 10-12 9-11 12-14 10-12 2-4 18-20 9-11 8-10 10-12 9-11 5.950.000
590 PROBLEM SOLVING & DECISION MAKING 2-4 4-6 4-6 7-9 4-6 1-3 12-14 3-5 6-8 5-7 2-4 5.950.000591 Problem Solving and Decision Making 7-10 10-13 10-13 8-11 6-9 9-12 1-4 12-15 8-11 6-13 10-13 8-11 7.950.000592 PROCESS CONTROL AND INSTRUMENTATION 15-18 10-13 10-13 14-17 12-15 9-12 7-10 20-23 10-13 13-16 10-13 8-11 8.500.000
593 PROCESS CONTROL SYSTEMS: APPLICATION, DESIGN,AND TUNING 24-27 24-27 24-27 21-24 23-26 14-17 25-28 22-25 21-24 24-27 15-18 7.950.000
594 PROCUREMENT CONTRACT MANAGEMENT 27-28 3-4 4-5 3.950.000
595 PROCUREMENT MANAGEMENT 2-3 3-4 3-4 1-2 5-6 2-330-1 11-12 1-2 6-7 3-4 1-2 3.950.000596 PROCUREMENT MANAGEMENT 2-3 3.500.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
597 PROCUREMENT PLAN & PPIC 27-28 18-19 3.950.000598 PROCUREMENT STRATEGY 15-16 12-13 12-13 9-10 19-20 11-12 7-8 18-19 10-11 15-16 12-13 10-11 3.950.000
599 PRODUCED WATER TREATMENT FOR RE-INJECTION 6-9 3-6 3-6 1-4 5-8 2-530-3 11-141-430-3 3-6 1-4 7.950.000
600 PRODUCTION AND OPERATION MANAGEMENT 4-7 24-27 12-15 1-4 9-12 27-30 8-11 7.950.000601 PRODUCTION AND PLANNING CONTROL 10-13 25-28 19-22 7-10 15-18 28-31 9-12 7.950.000602 Production Downhole and Subsurface Equipment 20-23 17-20 17-20 14-17 19-22 16-19 8-11 19-22 15-18 20-23 17-20 9-12 8.750.000603 Production Handling Separationand Measurement 11-14 1-4 20-23 8-11 16-19 3-6 15-18 7.950.000604 PRODUCTION LOGGING 27-30 18-21 18-21 14-17 19-22 17-20 8-11 25-28 16-19 20-23 18-21 15-18 8.500.000605 PRODUCTION OF HELICAL GEAR 20-23 4-7 21-24 16-19 25-28 7-10 18-21 7.950.000
606 PRODUCTION OPERATION MANAGEMENT FORMANAGERS 27-30 24-27 24-27 21-24 26-29 23-26 15-18 26-29 22-25 27-30 24-27 16-19 8.750.000
607 PRODUCTION OPTIMIZATION AND MINIMIZE DOWNTIME 21-23 24-26 25-27 23-25 21-23 23-25 15-17 26-28 23-25 27-29 25-27 22-24 6.500.000
608 PRODUCTION PLANNING AND INVENTORY CONTROL(PPIC) 28-30 26-28 26-28 28-30 28-30 25-27 17-19 28-30 25-27 29-31 26-28 29-31 5.950.000
609 PRODUCTION SAFETY SYSTEM 27-30 25-28 25-28 22-25 20-23 24-27 15-18 26-28 23-26 28-31 25-28 16-19 7.950.000610 Production Safety System 17-21 17-21 21-25 19-23 16-20 14-15 25-29 15-19 20-24 17-21 15-19 9.250.000611 PRODUCTION SYSTEM SAFETY 17-20 2-5 26-29 14-17 22-25 4-7 16-19 7.950.000612 PROFESSIONAL ACCIDENT / INCIDENT INVESTIGATION 21-23 24-26 24-26 28-30 26-28 23-25 14-16 25-27 22-24 21-23 24-26 22-24 6.500.000
613 PROFIT PLANNING: COST - VOLUME - PROFITRELATIONSHIP ANALYSIS 15-17 11-13 12-14 15-17 12-14 11-13 8-10 20-22 10-12 14-16 12-14 15-17 5.950.000
614 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4-7 24-27 12-15 1-4 9-12 27-30 8-11 7.950.000615 PROGRAMMABLE LOGIC CONTROLLER (PLC) 27-30 24-27 24-27 22-25 20-23 23-26 14-17 26-29 22-25 27-30 24-27 15-18 7.950.000
616 PROGRAMMABLE LOGIC CONTROLLER (PLC) TINGKATDASAR 19-22 19-22 21-24 20-23 17-20 9-11 1-1 17-12 20-23 19-22 15-18 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
617 PROGRAMMABLE LOGIC CONTROLLER (PLC)_ 20-23 18-21 18-21 14-17 20-23 17-20 9-12 25-28 16-19 20-23 18-21 10-13 7.950.000618 Project Cost Estimation & Cost Control 15-17 12-14 11-13 9-11 12-14 10-12 7-9 18-20 9-11 8-10 11-13 9-11 5.950.000619 PROJECT HSE MANAGEMENT 28-30 10-12 15-17 26-28 9-11 10-12 22-24 3-5 6.500.000620 PROJECT MANAGEMENT 27-30 24-27 24-27 22-25 20-23 23-26 14-17 27-30 23-26 27-30 24-27 16-19 7.950.000621 Project Management (3 Hr) 2-4 13-15 20-22 28-30 16-18 11-13 15-17 13-15 24-26 22-24 6.500.000622 Project Management (5 Hr) 20-24 10-14 21-25 2-6 7-11 25-29 29-3 3-7 8-12 9.500.000
623 PROJECT MANAGEMENT (PM) : DARI KONSEPTUALSAMPAI OPERASIONAL 21-24 18-21 18-21 21-24 20-23 17-20 9-12 25-28 17-20 20-23 18-21 16-19 7.950.000
624 PROJECT MANAGEMENT (USING WIN QSB & MICROSOFTPROJECT) 21-23 19-21 19-21 21-23 20-22 18-20 8-10 25-27 17-19 20-22 19-21 17-19 5.950.000
625 PROJECT MANAGEMENT WITH MICROSOFT PROJECTAPPLICATION,Win QSB & MONTE CARLO SIMULATION 15-17 19-21 19-21 15-17 12-14 17-19 9-11 20-22 17-19 20-22 18-20 15-17 5.950.000
626 PROJECT MANAGEMENT(PM) WITH PRIMAVERA V6 2-4 3-5 3-5 1-3 5-7 2-430-2 11-131-329-1 3-5 1-3 5.950.000
627 PROJECT PROCUREMENT MANAGEMENT 20-22 25-27 5.950.000628 PROSES PEMESINAN (MACHINING) 6-9 18-21 7-10 2-5 11-14 23-26 10-13 7.950.000
629 PROSES PENGERJAAN AKHIR DENGAN PELAPIS LOGAM(ELECTROPLATING) 27-30 17-20 17-20 14-17 19-22 16-19 14-17 25-28 15-18 20-23 17-20 15-18 8.750.000
630 PROTECTIVE COATING TECHNOLOGY FOR CORROSIONCONTROL 27-29 24-26 24-26 22-24 22-24 23-25 14-16 28-30 22-24 27-29 24-26 22-24 6.500.000
631 PROTEKSI TERHADAP GANGGUAN SAMBARAN PETIR 24-27 24-27 21-24 21-24 23-26 14-17 25-28 22-25 21-24 24-27 15-18 7.950.000632 PSYCHO-SPIRITUALITY IN ENTREPRENEURSHIP 6-8 21-23 3-5 29-1 4-6 5.950.000
633 PUMP : OPERATION, MAINTENANCE ANDTROUBLESHOOTING 6-9 3-6 3-6 1-4 5-82-530-3 11-14
1-429-2 3-6 1-4 8.500.000
634 Pump : Operation, Maintenance & Troubleshooting 7-10 4-7 4-7 7-10 6-9 3-6 1-4 12-15 2-530-3 4-7 2-5 7.950.000
635 PUMP AND COMPRESSOR : OPERATION, MAINTENANCE 21-24 24-27 24-27 14-17 20-23 17-20 14-17 25-28 22-25 20-23 18-21 15-18 8.500.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
AND TROUBLESHOOTING
636 PUMP AND COMPRESSOR: OPERATION, MAINTENANCE& TROUBLESHOOTING 3-7 17-21 21-25 9-13 11-15 22-26 3-7 15-19 9.500.000
637 PUMP SELECTION, DESIGN AND OPERATION FOR OILAND GAS SURFACE PRODUCTION FACILITIES 27-30 24-27 24-27 21-24 26-29 23-27 14-17 25-28 22-25 21-24 24-27 15-18 8.750.000
638 PUMP: OPERATION AND MAINTENANCE 21-24 10-13 22-25 17-20 26-29 13-16 25-28 7.950.000639 QA & QC INSPECTION PROGRAM 27-29 25-27 25-27 28-30 26-28 24-26 15-17 27-29 23-25 28-30 25-27 22-24 6.500.000640 QUALITY CONTROL OF PRODUCT 27-30 17-20 6-9 24-27 2-5 20-23 2-5 7.950.000
641 QUALITY MANAGEMENT SYSTEM ISO 9001 : 2008STANDARD (SISTEM MANAJEMEN MUTU) 6-8 3-5 3-5 1-3 5-72-430-2 13-15 1-3 1-3 3-5 1-3 5.950.000
642 QUALITY SYSTEM ENGINEERING 3-6 18-21 12-15 30-3 8-11 21-24 7.950.000643 RAPAT YANG PRODUKTIF (PRODUCTIVE MEETING) 8-9 10-11 10-11 8-9 12-13 9-10 2-3 18-19 8-9 7-8 10-11 9-10 3.950.000644 Refractory and Heat Insulation 7-10 11-14 11-14 7-10 12-15 9-12 7-10 18-21 9-12 7-10 10-13 8-11 8.500.000
645 REFRIGERATION : OPERATION, MAINTENANCE ANDTROUBLESHOOTING 15-18 11-14 11-14 8-11 12-15 10-13 7-10 18-21 9-12 13-16 11-14 8-11 8.500.000
646 Rekayasa Elektro Hidrolik and Aplikasi 21-24 24-27 24-27 21-24 19-22 17-20 14-17 25-28 22-25 21-24 18-21 15-18 7.950.000647 REKAYASA HIDROLIK AND APLIKASI 15-18 10-13 10-13 7-10 6-9 9-12 1-4 18-21 8-11 7-10 10-13 2-5 7.950.000
648 RELIABILITY CENTERED MAINTENANCE & RISK BASEDINSPECTION 20-24 10-14 10-14 21-25 19-23 9-13 7-11 18-22 8-12 13-17 10-14 8-12 8.950.000
649 RELIABILITY CENTERED MAINTENANCE (RCM) 2-4 4-6 4-6 2-4 5-7 3-5 1-3 12-14 2-430-2 4-6 1-3 6.500.000
650 Reliability Centered Maintenance (RCM) 15-17 10-12 10-12 10-12 12-14 9-11 7-9 18-20 11-13 9-11 10-12 8-10 6.500.000651 RELIABILITY CENTERED MAINTENANCE (RCM) 27-30 11-14 5-8 23-26 1-4 14-17 25-28 7.950.000
652 RELIABILITY CENTERED MAINTENANCE (RCM) IncreasingSafety & Reliability in Gas Pipeline System 15-17 11-13 17-19 14-16 12-14 11-13 7-9 19-21 15-17 14-16 17-19 10-12 6.500.000
653 RELIABILITY ENGINEERING (TEKNIK KEANDALAN) 15-16 17-18 17-18 14-15 6-7 16-17 7-8 18-19 15-16 13-14 17-18 10-11 3.950.000654 RELIABILITY, AVAILABILITY & MAINTAINABILITY ANALYSIS 27-29 19-21 19-21 28-30 26-28 18-20 14-16 25-27 17-19 20-22 19-21 15-17 6.950.000
Hello DimasHighlight
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
655 RESTITUSI PAJAK, PEMERIKSAAN PAJAK, KEBERATAN,BANDING DAN GUGATAN 6-8 3-5 3-5 7-9 5-7 2-4 1-3 18-20 8-10 13-15 3-5 1-3 5.950.000
656 Risk Based Inspection (RBI) 15-17 10-12 10-12 7-9 12-14 9-11 7-9 18-20 8-10 8-10 10-12 8-10 6.950.000657 RISK-BASED MANAGEMENT 8-10 10-12 10-12 7-9 7-9 9-11 2-4 18-20 8-10 8-10 10-12 8-10 5.950.000658 ROOT CAUSE ANALYSIS 15-18 17-20 17-20 14-17 19-22 10-13 7-10 19-22 15-18 14-17 11-14 9-12 7.950.000659 ROOT CAUSE FAILURE ANALYSIS (RCFA) 20-23 17-20 17-20 14-17 14-17 16-19 9-12 25-28 22-25 20-23 17-20 9-12 8.500.000660 ROTATING EQUIPMENTS 9-11 6-8 6-8 7-9 8-10 5-7 3-5 14-16 8-10 6-8 6-8 4-6 6.500.000661 ROTATING EQUIPMENTS 21-24 18-21 18-21 14-17 19-22 17-20 14-17 25-28 16-19 20-23 18-21 15-18 7.950.000
662 ROTATING EQUIPMENTS: OPERATION, MAINTENANCE,TROUBLE SHOOTING AND ANALYSIS 27-30 24-27 24-27 21-24 26-29 23-26 14-17 26-29 22-25 27-30 24-27 15-18 8.500.000
663 ROTOR BALANCING AND SHAFT ALIGNMENT 24-27 24-27 22-25 21-24 23-26 14-17 25-28 22-25 21-24 24-27 15-18 7.950.000664 SAFETY AUDITS AND SITE INSPECTION 27-29 5-7 15-17 26-28 8-10 9-11 21-23 2-4 5.950.000665 Safety Instrumented System (SIS) and Control 20-23 17-20 17-20 21-24 19-22 16-19 9-12 25-28 15-18 20-23 17-20 10-13 8.500.000666 SAFETY INSTRUMENTED SYSTEM AND CONTROL 27-30 25-28 25-28 22-25 20-23 24-27 15-18 26-29 23-26 28-31 25-28 16-19 7.950.000667 SAFETY INSTRUMENTED SYSTEMS (SIS): ISA, IEC 27-30 25-28 25-28 22-25 26-27 24-27 11-14 2-530-3 28-31 25-28 16-19 8.500.000
668 SAFETY OFFICER DEVELOPMENT PROGRAMPELATIHANSAFETY UNTUK PEMULA (NOL PENGALAMAN) 20-24 3-7 7-11 19-23 30-4 1-5 13-17 24-28 9.250.000
669 SAFETY RELIEF VALVE: FUNDAMENTAL CONCEPTS, SIZINGAND SELECTION 27-30 24-27 24-27 23-26 21-24 23-26 14-17 27-30 22-25 27-30 24-27 15-18 8.500.000
670SCADA (SUPERVISORY CONTROL AND DATAACQUISITION): PRINCIPLES, HARDWARE SYSTEM,OPERATION & PROGRAMMING
20-23 17-20 17-20 14-17 19-22 16-19 7-10 25-28 15-18 13-16 17-20 8-11 8.500.000
671 SCADA SYSTEMS 15-18 11-14 11-14 9-12 13-16 10-13 8-11 25-28 17-20 14-17 11-14 8-11 8.500.000672 SCALE IN OILFIELD WATER 20-23 17-20 17-20 14-17 12-15 16-19 8-11 19-22 15-18 14-17 17-20 9-12 7.950.000673 SECURITY MANAGEMENT SYSTEM 15-17 10-12 10-12 7-9 12-14 9-11 3-5 18-20 8-10 6-8 10-12 4-6 5.950.000674 SELF-EFFECTIVENESS & DEVELOPMENT 27-28 24-25 24-25 24-25 22-23 23-24 15-16 26-27 22-23 27-28 24-25 22-23 3.950.000
Hello DimasHighlight
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
675 SENSITIVITY TRAINING (TURNING POINT/NEW BORN) 21-23 18-20 18-20 22-24 21-23 17-19 14-16 25-27 17-19 21-23 18-20 22-24 5.950.000676 SERVICE EXCELLENT 22-23 19-20 19-20 21-22 20-21 17-18 9-10 21-22 16-17 20-21 18-19 16-17 3.950.000
677 SERVICE RECOVERY: CREATE LOYAL CUSTOMERS FORLIFE 15-17 17-19 17-19 14-16 12-14 16-18 7-9 18-20 15-17 13-15 17-19 22-24 5.950.000
678 SIMULASI PROSES TEKNIK KIMIA MENGGUNAKAN HYSYS 27-30 25-28 25-28 22-25 20-23 24-27 15-18 26-29 23-26 28-31 25-28 16-19 7.950.000679 SISTEM HIDROLIK DAN PNEUMATIK 2-4 10-12 28-30 26-28 14-16 15-17 27-29 8-10 6.500.000
680 SISTEM INSTALASI DAN PROTEKSI JARINGAN TENAGALISTRIK 24-27 24-27 23-26 26-29 23-26 14-17 26-29 22-25 27-30 24-27 16-19 7.950.000
681 SISTEM INSTALASI TENAGA LISTRIK 24-27 24-27 23-26 26-29 23-26 15-18 26-29 22-25 27-30 24-27 16-19 7.950.000682 SISTEM KONTROL MOTOR LISTRIK 21-24 18-21 18-21 14-17 19-22 17-20 14-17 25-28 16-19 21-24 18-21 15-18 7.950.000683 SISTEM PEMIPAAN (PIPING) 6-9 18-21 7-10 2-5 11-14 23-26 10-13 7.950.000684 Six Sigma Champions 21-24 18-21 18-21 21-24 20-23 17-20 14-17 25-28 16-19 20-23 18-21 16-19 7.950.000
685 SOSIALISASI UULH NO 32 TAHUN 2009: PENGELOLAANB3 DAN LIMBAH B3 2-4 17-19 1-3 7-9 17-19 20-22 1-3 12-14 22-24 5.950.000
686 SPARE PARTS MANAGEMENT 21-24 24-27 24-27 22-25 20-23 23-26 14-17 25-28 22-25 27-30 24-27 16-19 7.950.000687 SPEED AND INNOVATION 27-29 24-26 24-26 28-30 26-28 23-25 14-16 25-27 22-24 22-24 24-26 22-24 5.950.000
688 STANDARD OPERATIONAL PROCEDURE, ACCOUNTING &FINANCE 28-30 26-28 25-27 23-25 26-28 25-27 16-18 27-29 23-25 29-31 26-28 29-31 5.950.000
689 STATISTIK INDUSTRI 20-23 17-20 17-20 14-17 19-22 9-12 7-10 25-28 15-18 20-23 10-13 8-11 7.950.000
690 STEAM GENERATOR AND TURBINE: OPERATION ANDMAINTENANCE 15-18 10-13 10-13 7-10 12-15 9-12 7-10 18-21 8-11 6-9 10-13 8-11 7.950.000
691 STEAM TURBINE: OPERATION, MAINTENANCE ANDTROUBLESHOOTING 6-9 4-7 4-7 1-4 6-9 3-6 1-4 12-15 2-5 6-9 4-7 2-5 8.500.000
692 STRATEGI BERKOMUNIKASI DENGAN LEMBAGAPEMERINTAHAN 6-7 3-4 3-4 7-8 5-6 2-3 1-2 18-19 8-9 6-7 3-4 1-2 3.950.000
693 STRATEGI PENGEMBANGAN BISNIS 27-29 25-27 25-27 23-25 19-21 18-20 15-17 26-28 23-25 25-27 19-21 17-19 5.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
694 STRATEGI SISTEM INFORMASI KESEHATAN DI RUMAHSAKIT 2-4 4-6 4-6 2-4 5-72-430-2 11-13 1-3 1-3 3-5 1-3 5.950.000
695 STRATEGIC AND SYSTEMATIC THINKING 28-29 25-26 25-26 21-22 21-22 24-25 16-17 28-29 23-24 27-28 25-26 22-23 3.950.000696 STRATEGIC HUMAN RESOURCE MANAGEMENT 6-8 10-12 22-24 30-2 1-3 6-8 10-12 6.500.000
697 STRATEGIC HUMAN RESOURCE MANAGEMENT ANDORGANIZATION DEVELOPMENT 27-29 3-5 7-9 19-21 25-27 20-22 24-26 29-31 3-5 6.500.000
698 STRATEGIC HUMAN RESOURCES MANAGEMENT FORGLOBAL COMPETITIVE ADVANTAGE 28-29 25-26 25-26 28-29 26-27 24-25 16-17 27-28 23-24 28-29 25-26 23-24 3.950.000
699 STRATEGIC MANAGEMENT 27-29 24-26 24-26 28-30 21-23 23-25 16-18 27-29 22-24 27-29 24-26 22-24 5.950.000700 Strategic Performance Management 15-17 24-26 3-5 12-14 19-21 14-16 18-20 16-18 27-29 29-31 6.500.000701 Strategic Planning 6-10 17-21 24-27 5-9 9-13 14-18 8-12 20-24 17-21 9.500.000702 STRATEGIC PLANNING FOR INFORMATION SYSTEMS 6-8 10-12 10-12 7-9 6-8 3-5 2-4 13-15 8-9 6-8 4-6 3-5 5.950.000703 STRATEGIC PROCUREMENT MANAGEMENT 13-14 14-15 3.950.000704 Strategic Time Management 8-10 6-8 6-8 7-9 8-10 5-7 3-5 14-16 3-5 7-9 5-7 4-6 5.950.000705 STRESS & CONFLICT MANAGEMENT 27-29 24-26 24-26 28-30 26-28 23-25 14-16 25-27 22-24 22-24 24-26 29-31 5.950.000706 Stress Management Strategies 20-22 18-20 18-20 14-16 19-21 16-18 8-10 20-22 15-17 15-17 17-19 15-17 5.950.000707 STRUCTURE CABLING SYSTEM BY SYSTIMAX 6-8 3-5 3-5 7-9 5-7 2-4 1-3 18-20 8-10 13-15 3-5 1-3 6.250.000
708 STUDI KELAYAKAN INVESTASI MENGGUNAKAN APLIKASIMICROSOFT EXCEL 27-29 25-27 25-27 23-25 26-28 23-25 15-17 27-29 22-24 27-29 24-26 22-24 5.950.000
709 STUDY KELAYAKAN BISNIS 27-28 17-18 17-18 21-22 19-20 16-17 7-8 25-26 15-16 13-14 17-18 15-16 3.950.000
710 SUCKER ROD PUMP: DESIGN, OPERATION ANDTROUBLESHOOTING 27-30 25-28 25-28 22-25 26-29 24-27 15-18 26-29 23-26 28-31 25-28 16-19 8.750.000
711 SUPERVISORY CONTROL AND DATA ACQUISITION(SCADA) 24-27 24-27 22-25 26-29 23-26 14-17 26-29 22-25 27-30 24-27 15-18 7.950.000
712 SUPERVISORY LEADERSHIP AND DECISSION MAKING 15-17 12-14 12-14 9-11 12-14 11-13 8-10 19-21 9-11 13-15 12-14 10-12 5.950.000713 SUPPLIER MANAGEMENT 6-7 5-6 5-6 3-4 7-8 4-5 2-3 13-14 3-4 8-9 5-6 3-4 3.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
714 Supply Chain Management (SCM) 6-8 3-5 3-5 1-3 5-7 2-430-2 12-141-329-1 3-5 2-4 5.950.000
715 SUPPLY CHAIN MANAGEMENT (SCM) 20-21 17-18 17-18 21-22 26-27 16-17 14-15 25-26 15-16 20-21 17-18 15-16 3.950.000716 SUPPLY MARKET ANALYSIS 15-18 17-20 17-20 14-17 12-15 16-19 8-11 19-22 15-18 20-23 17-20 15-18 7.950.000
717 SURFACE PRODUCTION OPERATION & EQUIPMENT 6-9 3-6 3-6 1-4 5-8 2-530-3 11-141-430-3 3-6 1-4 8.750.000
718 SURVEY & MAPPING 25-28 25-28 23-26 26-29 23-26 15-18 26-29 22-25 27-30 24-27 16-19 7.950.000
719 SUSTAINABLE PROCUREMENT IN RELATION WITHQUALITY ASSURANCE 20-23 11-14 11-14 8-11 19-22 10-13 7-10 19-22 9-12 14-17 11-14 9-12 7.750.000
720 SYSTEM AND COST PRODUCTION 6-9 18-21 7-10 2-5 11-14 23-26 10-13 7.950.000721 SYSTEM SAFETY ENGINEERING AND MANAGEMENT 27-30 17-20 17-20 21-24 19-22 16-19 14-17 25-28 15-18 20-23 17-20 15-18 7.950.000722 TALENT MANAGEMENT 27-30 25-28 25-28 21-24 19-22 24-27 15-18 26-29 23-26 28-31 25-28 16-19 7.750.000
723 TANGGUNG JAWAB SOSIAL PERUSAHAAN (CORPORATESOCIAL RESPONSIBILITY) 29-30 27-28 27-28 29-30 26-27 26-27 18-19 29-30 26-27 31-1 28-29 19-20 3.950.000
724 TAX ACCOUNTING 15-17 17-19 17-19 14-16 19-21 9-11 7-9 25-27 15-17 20-22 10-12 8-10 5.950.000725 Tax and Financial Control 15-17 10-12 10-12 14-16 12-14 9-11 7-9 18-20 8-10 13-15 10-12 8-10 5.950.000726 TEAM DEVELOPMENT 27-29 24-26 24-26 28-30 26-28 23-25 15-14 26-28 22-24 27-29 24-26 29-31 5.950.000
727 TEAMWORK : Cara Menyenangkan Membangun TimImpian 7-10 10-13 10-13 7-10 12-15 9-12 2-5 13-16 8-11 7-10 10-13 8-11 7.950.000
728 TEKNIK NEGOSIASI 28-30 25-27 25-27 28-30 26-28 24-26 16-18 26-28 23-25 27-20 25-29 29-31 5.950.000
729TEKNIK DAN METODE PENYUSUNAN HPS/OE (HARGAPERKIRAAN SENDIRI) ATAS PENGADAAN BARANG DANJASA
28-30 26-28 26-28 28-30 21-23 25-27 16-18 27-29 24-26 29-31 26-28 29-31 5.950.000
730 TEKNIK DESAIN GRAFIS PADA WEB 9-11 6-8 6-8 7-9 8-10 5-7 3-5 14-16 8-10 6-8 6-8 4-6 5.950.000731 TEKNIK DESAIN WEB 27-29 24-26 24-26 28-30 26-28 23-25 17-19 28-30 22-24 27-29 24-26 22-24 5.950.000732 TEKNIK HARGA PERHITUNGAN SENDIRI (HPS) 22-24 24-26 24-26 22-24 20-22 23-25 15-17 26-28 22-24 27-29 24-26 16-18 5.950.000733 TEKNIK KONSERVASI ENERGI MELALUI AUDIT ENERGI 21-24 18-21 18-21 21-24 20-23 17-20 14-17 25-28 16-19 14-17 18-21 15-18 7.950.000
-
No Topic 1 2 3 4 5 6 7 8 9 10 11 12 Harga
PADA BANGUNAN GEDUNG
734 TEKNIK PEMELIHARAAN KENDARAAN (PREVENTIVEMAINTENANCE UNTUK KENDARAAN) 6-9 3-6 3-6 1-4 5-82-530-3 11-14
1-429-2 3-6 1-4 7.950.000
735 TEKNIK PERAWATAN MEKANIK 7-10 10-13 10-13 7-10 6-9 9-12 1-4 18-21 8-11 6-9 10-13 2-5 7.950.000736 TEKNIK PRESENTASI 28-29 26-27 26-27 28-29 26-27 25-26 16-17 27-28 24-25 28-29 26-27 29-30 3.950.000737 TEKNOLOGI CAD/CAM 7-10 24-27 8-11 3-6 12-15 29-2 11-14 7.950.000738 TEKNOLOGI DAN BISNIS DI WIMAX DAN SUB WIMAX 15-17 10-12 10-12 8-10 12-14 9-11 2-4 18-20 8-10 8-10 10-12 8-10 5.950.000739 TEKNOLOGI PERAWATAN MESIN 15-18 25-28 14-17 9-12 18-21 30-3 11-14 7.950.000740 TESTING OF MACHINE TOOLS 3-6 18-21 12-15 30-3 8-11 21-24 2-5 7.950.000741 THE ECONOMICS OF MAINTENANCE MANAGEMENT 24-26 12-14 11-13 16-18 22-24 5.950.000742 THE FUNDAMENTALS OF OCCUPATIONAL HYGIENE 4-7 17-20 22-25 3-6 11-14 22-25 3-6 15-18 7.950.000743 THE LEADERSHIP CHALLENGE 23-24 20-21 19-30 29-30 21-22 18-19 14-15 25-26 18-19 21-22 19-20 18-19 3.950.000744 THERMAL SPRAY COATING 20-22 17-20 10-13 14-17 19-22 9-12 7-10 25-28 15-18 20-23 10-13 8-11 8.500.000745 TIG AND MIG WELDING 15-18 10-13 12-15 14-17 29-2 24-27 8.500.000746 TOTAL COST OF OWNERSHIP ANALYSIS 15-17 17-19 17-19 14-16 12-14 16-18 8-10 19-21 15-17