Adding Accelerators to AcceleratorsAccelerator Safety Workshop 2018Ed Lessard, DCOO & Associate Chair for ESSHQCollider-Accelerator Department (C-AD)Brookhaven National LaboratoryAugust 21, 2018
![Page 2: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/2.jpg)
Inserting Electron Accelerators Into a Heavy Ion Collider
2
![Page 3: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/3.jpg)
The Challenges
Continue to operate RHIC programs and experiments; install two electron accelerators (CeC and LEReC) during shutdowns and maintenance days
Continue
Integrate C-AD work planning and control processes into new accelerator work planning and control for the electron accelerator projects
Integrate
Ensure safety bases documents are completed and approved for accelerators to operate jointly or operate alone
Ensure
Ensure USI documents and controls are completed for any exemptions during testing periodsEnsure
Ensure new engineered and administrative Credited Controls added to the RHIC ASE are fully operational and configuration managed for accelerators operating together or in stand-alone mode
Ensure
Ensure a comprehensive conduct of operations exists for all three accelerators (authorizations, procedures, emergency response, operator training)
Ensure
Ensure NEPA rules are followed prior to constructionEnsure
3
![Page 4: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/4.jpg)
RHIC 02:00 Intersecting Region (IR2)
• Large open area – former Brahms Experiment
4
![Page 5: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/5.jpg)
CeC Installation5
![Page 6: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/6.jpg)
Low Energy RHIC e- Cooling (LEReC)
6
![Page 7: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/7.jpg)
LEReC and CeC at IR2
7
![Page 8: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/8.jpg)
LEReC and CeC Testing Challenges
Challenge: continue testing critical equipment during RHIC operations, shutdown and maintenance periods• Laser beam delivery system (laser, laser
shaping, laser transport, laser pulse stability, etc.)
• Vacuum components with controls• Cathode manipulation systems• LEReC DC gun characterization (stability,
maximum operation voltage, electron beam quality) –needed Exempt Accelerator status for eGun in order to perform these tests
• Magnets and power supplies (run and test)• Beam instrumentation: charge and current
measurements, beam position (response matrix) measurements, beam loss monitor system, beam profile and halo measurements
• Controls systems (timing system, machine protection system, control of laser, gun power supply, magnets power supplies, beam instrumentation)
• Beam dump systems
8
![Page 9: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/9.jpg)
CeC and LEReC – eGun and RF Testing Challenges
9
![Page 10: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/10.jpg)
Standard Steps to Commissioning an Exempt Accelerator Facility at BNL
Step Responsible Party
Hazard Screening Accelerator Management (C-AD)
NEPA Review Accelerator Management
Design Review Questionnaire
Accelerator Management
Safety Analysis Accelerator Management
Readiness Plan and Schedule
Accelerator Management
Accelerator Systems Safety Committee Reviews
Accelerator Management
Radiation Safety Committee Reviews
Accelerator Management
Laboratory ESH Committee Review for Exempt Status
Laboratory Management (BNL)
Recommendation for Exempt Status
Laboratory Management
Approval for Exempt Status DOE Field Element (BHSO)
10
![Page 11: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/11.jpg)
Access Control System Changes
• RHIC ASE - During RF only operations, the relevant portion of the RHIC ACS must be functional
• Gates, and modes of operations needed to be changed
11 11
![Page 12: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/12.jpg)
Configuration Control Challenges for Shielding Calculations
• RHIC ASE - The LEReC electron kinetic energy shall be limited to 3 MeV
• RHIC ASE - The LEReC electron beam power to the electron beam dump shall not exceed 140 kW averaged over 1 hour
• Different calculations performed over time were not consistent with these ASE limits
• Dose and dose rate calculations needed to be gathered from several sources, correlated and compiled into a single document
![Page 13: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/13.jpg)
Challenges to Archival Drawing System
• RHIC ASE - Before beam or other radiation-producing operations (e.g., RF testing), the Collider and beam-line enclosures must have all shielding (e.g., berms, shield blocks, etc.) properly in place and configuration-controlled
• Few RHIC “as-built” drawings were available for shielding calculations; construction drawings were available
13
![Page 14: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/14.jpg)
Safety Analyses Challenges
New hazards had to be assessed for risks that could impact the existing operations (e.g., aiming electron beams into ion beams and recombination losses; electron beam loss impact on cryogenic magnets for heavy ions)
Shielding at penetrations to attenuate photons from low-energy electron-beam faults - RHIC penetrations were designed for high-energy ion-beam faults
Design needed to protect one machine from the other machine (e.g., cryostats for RHIC magnets from e- beam faults; low-energy e- beam from RHIC magnetic fields)
14
![Page 15: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/15.jpg)
ODH ChallengesCommissioning and testing for LEReC during RHIC shutdown period required cryogenics plant and ODH safety system to be available essentially year round
• ASE - For RHIC IR2 and Building 1002A when either the CeC or LEReC is operating with LHe: at least three ODH exhaust fans serving RHIC IR2 must be operational, and the ODH portion of the RHIC ACS must be operable; that is, when the oxygen concentration falls below 18% (nominal), the ODH fans serving RHIC IR2 must turn on and at least one Building 1002A ODH exhaust fan must be operational
15
![Page 16: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/16.jpg)
Challenges to Readiness to Operate
• One Control Room • One Chain of Command• One Training Plan
16
![Page 17: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/17.jpg)
17
Major Accelerator Thrust:Moving Forward with eRHIC
National Academies Assessment of Electron-Ion Collider Science:http://sites.nationalacademies.org/BPA/BPA_177106
![Page 18: Adding Accelerator to Accelerators...Aug 21, 2018 · RHIC ASE - Before beam or other radiation - producing operations (e.g., RF testing), the Collider and beam -line enclosures must](https://reader034.fdocuments.us/reader034/viewer/2022050114/5f4b2534c1b3b773a65eaabb/html5/thumbnails/18.jpg)
Questions?
18