ADDENDUM NO.: DATE: BID Due Date: New Date** …

33
MT. DIABLO UNIFIED SCHOOL DISTRICT ADDENDUM #2 Bid 1829 Prop 39 Energy Management System 1 Mt. Diablo Unified School District Purchasing Department 2326 Bisso Lane Concord, CA 94520 (925) 825-7440, ext. 3740 (925) 687-5044 fax ADDENDUM NO.: 2 DATE: March 19, 2019 PROJECT: Prop 39 Energy Management System BID # 1829 BID Due Date: **New Date** 03/22/2019 at 10:00 a.m. NOTICE TO ALL CONTRACTORS SUBMITTING BIDS FOR THIS WORK AND TO ALL PLAN HOLDERS: You are hereby notified of the following changes, clarifications or modifications to the original Contract Documents, Project Manual, Drawings, Specifications and subsequent Addenda. This Addendum shall supersede the original Contract Documents, and previous Addenda wherein it contradicts the same and shall take precedence over anything to the contrary therein. All other conditions remain unchanged. It is the responsibility of the Contractor to notify all sub-contractors from who he accepts bids for all changes in the drawings and specifications covering this project. Receipt of this addendum shall be acknowledged by inserting the addendum number and its date on the bid form. CONFORMANCE WITH CONTRACT DOCUMENTS, PROJECT MANUAL DRAWINGS AND SPECIFICATIONS: All addenda work shall be in strict conformance with the Contract Documents, Project Manual, Drawings and Specifications as they pertain to work of a similar nature. REVISIONS/CLARIFICATIONS TO THE BID DOCUMENTS AND SPECIFICATIONS Q #1 FDD (Fault Detection and Diagnostics) are mentioned throughout the spec (Part 1 J). However, during the pre-bid meeting it was mentioned that this would not be a requirement. Please confirm and remove all mentions of FDD if not required. A #1 FDD Delete References to FDD, Fault Detection, and Analytics from the Specifications Section 23 09 23. This functionality is not required. Q #2 Package 1 vs Package 2 Licensing: Separate licensing costs apply for JACEs versus Front End Supervisory software. Please provide complete details on each software license required, particularly which package contractor is required to provide each type of license, and what duration of SUSP A #2 Each package contractor is responsible for the JACE licensing costs in their package. The package contractor shall purchase the appropriate license(s) based on devices/points. The Package 1 contractor shall be responsible for costs related to the Front End Supervisory software. The costs for Package 1 and Package 2 must be separate for reporting purposes to the state. This means that the Package 1 contractor must report the costs for licensing Front End Supervisory software for the Package 2 schools as a separate line item.

Transcript of ADDENDUM NO.: DATE: BID Due Date: New Date** …

Page 1: ADDENDUM NO.: DATE: BID Due Date: New Date** …

MT. DIABLO UNIFIED SCHOOL DISTRICT ADDENDUM #2

Bid 1829 Prop 39 Energy Management System 1

Mt. Diablo Unified School District

Purchasing Department

2326 Bisso Lane

Concord, CA 94520

(925) 825-7440, ext. 3740

(925) 687-5044 fax

ADDENDUM NO.: 2

DATE: March 19, 2019

PROJECT: Prop 39 Energy Management System

BID # 1829

BID Due Date: **New Date** 03/22/2019 at 10:00 a.m.

NOTICE TO ALL CONTRACTORS SUBMITTING BIDS FOR THIS WORK AND TO ALL PLAN

HOLDERS:

You are hereby notified of the following changes, clarifications or modifications to the original Contract Documents,

Project Manual, Drawings, Specifications and subsequent Addenda. This Addendum shall supersede the original

Contract Documents, and previous Addenda wherein it contradicts the same and shall take precedence over anything

to the contrary therein. All other conditions remain unchanged. It is the responsibility of the Contractor to notify all

sub-contractors from who he accepts bids for all changes in the drawings and specifications covering this project.

Receipt of this addendum shall be acknowledged by inserting the addendum number and its date on the bid form.

CONFORMANCE WITH CONTRACT DOCUMENTS, PROJECT MANUAL DRAWINGS AND

SPECIFICATIONS:

All addenda work shall be in strict conformance with the Contract Documents, Project Manual, Drawings and

Specifications as they pertain to work of a similar nature.

REVISIONS/CLARIFICATIONS TO THE BID DOCUMENTS AND SPECIFICATIONS

Q #1

FDD (Fault Detection and Diagnostics) are

mentioned throughout the spec (Part 1

J). However, during the pre-bid meeting it

was mentioned that this would not be a

requirement. Please confirm and remove all

mentions of FDD if not required.

A #1

FDD – Delete References to FDD, Fault

Detection, and Analytics from the Specifications

Section 23 09 23. This functionality is not

required.

Q #2

Package 1 vs Package 2 Licensing: Separate

licensing costs apply for JACEs versus

Front End Supervisory software. Please

provide complete details on each software

license required, particularly which package

contractor is required to provide each type

of license, and what duration of SUSP

A #2

Each package contractor is responsible for the

JACE licensing costs in their package. The

package contractor shall purchase the appropriate

license(s) based on devices/points.

The Package 1 contractor shall be responsible for

costs related to the Front End Supervisory

software.

The costs for Package 1 and Package 2 must be

separate for reporting purposes to the state. This

means that the Package 1 contractor must report

the costs for licensing Front End Supervisory

software for the Package 2 schools as a separate

line item.

Page 2: ADDENDUM NO.: DATE: BID Due Date: New Date** …

MT. DIABLO UNIFIED SCHOOL DISTRICT ADDENDUM #2

Bid 1829 Prop 39 Energy Management System 2

Licensing cost shall include 3 year software

maintenance package.

Q #3 Schedule Conflicts in the documentation

exists, please clarify: 00 71 00 states the

following: 2.1.1. Provide for completion of

Package 1 by May 1, 2020. However, 00 01

15 states project closeout as October 19

2019.

A #3 State requirement is that Package 1 be complete

by June 2020. I reported the completion date to

be May 2020. MDUSD to update their October

reference.

Q #4 Please provide missing drawings for the

following:

Package 1:

Pleasant Hill Education Center - All

Drawings

Prospect HS - All Drawings

Pleasant Hill MS - All Drawings

Riverview MS - Missing Drwg M1.11 (2

buildings not shown)

Sequoia ES - Missing Drwg M1.3 (4

buildings not shown)

Package 2:

Crossroads HS - All Drawings

Holbrook ES - All Drawings

Robert Shearer Preschool - All Drawings

A-#4

Missing Drawings:

Package 1

i. Sheet T-0, reference to Pleasant Hill

Education Center is removed. This center is

NOT a stand-alone campus, it’s part of

another school campus.

ii. Sheet T-0, reference to Prospect HS

removed. This center is NOT a stand-alone

campus, it’s part of another school campus.

iii. Drawings for Pleasant Hill MS provided in

Add 1.

iv. Riverview MS – M1.11 – There is NO sheet

M1.11. Sheet M1.0 is hereby amended such

that all references to M1.11 are corrected to

sheet M1.9. The Boys Locker, Gym, and

Girl’s Locker are all shown on M1.9. The

only scope of work in this area is the MS

device shown on M1.9 in Room 712.

v. Sequoia ES – M1.3 – this sheet provided in

Add 1.

Package 2

i. Crossroads HS – Reference to Crossroads

HS is removed from sheet T-0. These

buildings are part of Olympic HS Package 1.

ii. Holbrook ES – Drawings for Holbrook ES

provided in Addendum 1

iii. Reference to Robert Shearer Preschool is

removed from sheet T-0. The work for these

buildings is shown as part of Glenbrook ES –

Package 2.

Page 3: ADDENDUM NO.: DATE: BID Due Date: New Date** …

MT. DIABLO UNIFIED SCHOOL DISTRICT ADDENDUM #2

Bid 1829 Prop 39 Energy Management System 3

Q #5

Fair Oaks Elementary School M1.2: Mini

split system: Not in working condition

according to on site staff. Please confirm

that any mechanical equipment currently

not in working condition is to be removed

from the controls scope.

A #5

The scope of work is as stated and shown on the

drawings. It is a controls scope. Repair of HVAC

equipment beyond thermostats is NOT included

in the project. Abandoned equipment is not

included in the scope.

The equipment referenced by this RFI it is NOT

automatically excluded from the scope. It may be

repaired by the district and put back into service

and should be included in the bid price.

Q #6

00 21 13 Reference is made to a "Notice to

Bidders" document, please confirm if this

exists.

A #6 The Notice of Bidders is also known as the

Invitation to Bid on page 4 of Volume 1.

Q #7

00 21 13 Reference of a "Site Visit

Certification" is mentioned. Please confirm

if this is required and provide the form if

required.

A #7 The Site-Visit Certification, 00 45 01, is required

and is located on page 27 of Volume 1.

R #1 Index of Addendum #2 items Attached to this Addendum as Exhibit “A”

R #2 Package/Plans #2 All documents attached as Package/Plans #2 are

supplied with this bid for reference only, and are

not to be included in the scope of bid #1829.

The scope of work involved in Package/Plans #2

will be issued as a separate bid project.

Elizabeth McClanahan

Director of Purchasing and Warehouse

END OF ADDENDUM 2

Page 4: ADDENDUM NO.: DATE: BID Due Date: New Date** …

EXHIBIT “A” Page | 1

Addendum 2 Items Index

BID #1829 PROP 39 ENERGY MANAGEMENT SYSTEM

1. Example FPT provided. This shows the level of testing that will be required during the Cx phase.

2. References to “Test and Balance” and TAB from Cx Section 01 91 23 and 01 91 13 are hereby removed.

Test and Balance is not required per the contract documents. References to Test and Balance work, Test

and Balance Contractor, and TAB shall be removed.

3. Delete JC device shown on 2/M1.5. JC is already provided for on 1/M1.1

4. Revised Sheet T-2 Package 1, fixed sheet index to show correct schools per pkg. See provided drawing.

5. Add Sheet M6.2 “Points List and Sequence of Operations” to both Package 1 and Package 2. See provided

drawing.

6. Specification Section 230923 Part 3 is amended to add the following “Start Up Tool” as follows:

1. Startup Tool

a. The Package 1 contractor shall program the Startup Tool as described below.

b. The Package 1 contractor shall free issue the Startup Tool to the Package 2 contractor for

installation on Site Supervisory Controllers.

c. The Startup Tool shall be used by the respective package contractor to Startup the site

equipment as described elsewhere in this section.

d. Minimum Functionality – Contractor shall provide programming such that the Site

Supervisory controller will serve a web page, formatted for iPhone, Android phone, or tablet

devices, with the following functionality:

1) Site Interface – Alarm notification to an email address or text phone number

2) Wireless Thermostat Interface

a) Programming and Display

b) Name of Controlled Device

c) Schedule – min. 7 day schedule. Allow connection to schedule from a pre built

library

d) Fan Override – on/off

e) Cooling Setpoint Override

f) Heating Setpoint Override

g) Display Only

h) Room Temperature

Page 5: ADDENDUM NO.: DATE: BID Due Date: New Date** …

EXHIBIT “A” Page | 2

i) Alarm (device name + alarm message)

3) Wireless Power Control Module (WPCM)

a) Programming and Display

b) Name of Controlled Device

c) Schedule – min. 7 day schedule. Allow connection to schedule from a pre built

library

d) System Override – on/off

e) Display Only

f) System Status (on/off)

g) Alarm (device name + alarm message)

4) Wireless Mini-Split Power Control Module (MS)

a) Programming and Display

b) Name of Controlled Device

c) Schedule – min. 7 day schedule. Allow connection to schedule from a pre built

library

d) System Override – on/off

e) Display Only

f) System Status (on/off)

g) Alarm (device name + alarm message)

5) Variable Refrigerant Flow (VRF) System

a) Programming and Display

b) Name of Controlled System

c) Schedule – min. 7 day schedule. Allow connection to schedule from a pre built

library

d) System Override – on/off

e) Display Only

f) System Status (on/off)

g) Alarm (device name + alarm message)

Page 6: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Project: XXX

Building: X

System: Split Heat Pump Systems

Revision: 1

11020 Sun Center Drive, Suite 100 | Rancho Cordova, CA 95670

Office: 916.851.3500 | Fax: 916.631.4424 | [email protected] | www.capital-engineering.com

L:\2017\170823.00\1900 Sustainability\1905 Commissioning\MDUSD Prop 39-FPT-WT System.docm

Page 1 of 5

3/15/19

COMMISSIONING FUNCTIONAL PERFORMANCE TESTS

TEST ATTENDEES Date: __________

Discipline Company Name

OWNER

CXA

CC

EXECUTION OF FUNCTIONAL TESTS

Prior to execution of functional tests, the CxA has provided a copy of the primary equipment tests to the installing subcontractor (via the GC)

who has reviewed the tests for feasibility, safety, warranty and equipment protection. The CxA oversees, witnesses, and documents the

functional testing of all equipment and systems. The subcontractors execute the tests.

PREREQUISITE DOCUMENTS

Startup Report

Page 7: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Project: XXX

Building: X

Test: Split Heat Pump Systems

Revision: 1

11020 Sun Center Drive, Suite 100 | Rancho Cordova, CA 95670

Office: 916.851.3500 | Fax: 916.631.4424 | [email protected] | www.capital-engineering.com

L:\2017\170823.00\1900 Sustainability\1905 Commissioning\MDUSD Prop 39-FPT-WT System.docm Page 2 of 5 3/15/19

CONTROL POINTS CHECK

Point Related Equip/ Area

Point Type

Trending Required

Recorded

Interval

Control Graphics

Setpoint / Alarm

Point Verified: Setting/ Operation

Y/N Y/N V V V

Zone Temperature

HVAC System

AI Y 15 mins Y

Page 8: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Project: XXX

Building: X

Test: Split Heat Pump Systems

Revision: 1

11020 Sun Center Drive, Suite 100 | Rancho Cordova, CA 95670

Office: 916.851.3500 | Fax: 916.631.4424 | [email protected] | www.capital-engineering.com

L:\2017\170823.00\1900 Sustainability\1905 Commissioning\MDUSD Prop 39-FPT-WT System.docm Page 3 of 5 3/15/19

FUNCTIONAL TESTS

Test No. 001

Test Type Installation Verification

Sequence of Operation N/A

Test Description and Expectations

Test 0: Equipment Label installed Test 1: Installation is Aesthetically acceptable Test 2: Label/Name matches room number Test 2: Jace/BMS Label/Name matches local

Test Notes

Issues

Pass/Fail

Page 9: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Project: XXX

Building: X

Test: Split Heat Pump Systems

Revision: 1

11020 Sun Center Drive, Suite 100 | Rancho Cordova, CA 95670

Office: 916.851.3500 | Fax: 916.631.4424 | [email protected] | www.capital-engineering.com

L:\2017\170823.00\1900 Sustainability\1905 Commissioning\MDUSD Prop 39-FPT-WT System.docm Page 4 of 5 3/15/19

Test No. 002

Test Type Heating/Cooling Control

Sequence of Operation The system fan operates to provide ventilation during all occupied hours. Heating/Cooling is provided to meet room setpoint. The system communicates to the (N) campus JACE for scheduling and alarms.

Test Description and Expectations

Test 1: Raise local setpoint to trigger a heating call. Test 2: Lower local setpoint to trigger a cooling call. Test 3: Change local setpoint to equal current temperature. Test 4: Switch Unit operation between occupied and unoccupied modes.

Issues

Pass/Fail

Page 10: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Project: XXX

Building: X

Test: Split Heat Pump Systems

Revision: 1

11020 Sun Center Drive, Suite 100 | Rancho Cordova, CA 95670

Office: 916.851.3500 | Fax: 916.631.4424 | [email protected] | www.capital-engineering.com

L:\2017\170823.00\1900 Sustainability\1905 Commissioning\MDUSD Prop 39-FPT-WT System.docm Page 5 of 5 3/15/19

Test No. 003

Test Type Alarm & Communication

Sequence of Operation Alarm shall be issues when setpoint is not met for 30o mins (adj)

Test Description and Expectations

Test 1: Confirm that local unit correctly communicates to campus JACE. Confirm device name, scheduling, Fan Override, Heat/Cool setpoint overrides and limits. Test 2: Simulate room temperature above setpoint for more than 30 mins. (Alarm timing may be adjusted to speed up testing) Test 3: Release all overridden parameters.

Test Notes

Issues

Pass/Fail

Page 11: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

- --

12/XX/2018

Revisions

No. Description Date

PA

CK

AG

E 1

- --

POINTS

LIST &

SOO

M6.2

Page 12: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

PLE

AS

AN

T

HIL

L M

IDD

LE S

CH

OO

L

1 S

AN

TA

BA

RB

AR

A R

D.

PLE

AS

AN

T H

ILL, C

A 9

45

23

PA

CK

AG

E 1

SITE

PLAN

M1.0

Page 13: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

PLE

AS

AN

T

HIL

L M

IDD

LE S

CH

OO

L

1 S

AN

TA

BA

RB

AR

A R

D.

PLE

AS

AN

T H

ILL, C

A 9

45

23

PA

CK

AG

E 1

BUILDING

PLANS

M1.1

Page 14: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

PLE

AS

AN

T

HIL

L M

IDD

LE S

CH

OO

L

1 S

AN

TA

BA

RB

AR

A R

D.

PLE

AS

AN

T H

ILL, C

A 9

45

23

PA

CK

AG

E 1

BUILDING

PLANS

M1.2

Page 15: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

PLE

AS

AN

T

HIL

L M

IDD

LE S

CH

OO

L

1 S

AN

TA

BA

RB

AR

A R

D.

PLE

AS

AN

T H

ILL, C

A 9

45

23

PA

CK

AG

E 1

BUILDING

PLANS

M1.3

Page 16: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

PLE

AS

AN

T

HIL

L M

IDD

LE S

CH

OO

L

1 S

AN

TA

BA

RB

AR

A R

D.

PLE

AS

AN

T H

ILL, C

A 9

45

23

PA

CK

AG

E 1

BUILDING

PLAN

M1.4

Page 17: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

PLE

AS

AN

T

HIL

L M

IDD

LE S

CH

OO

L

1 S

AN

TA

BA

RB

AR

A R

D.

PLE

AS

AN

T H

ILL, C

A 9

45

23

PA

CK

AG

E 1

BUILDING

PLANS

M1.5

Page 18: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

PLE

AS

AN

T

HIL

L M

IDD

LE S

CH

OO

L

1 S

AN

TA

BA

RB

AR

A R

D.

PLE

AS

AN

T H

ILL, C

A 9

45

23

PA

CK

AG

E 1

BUILDING

PLANS

M1.6

Page 19: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

PLE

AS

AN

T

HIL

L M

IDD

LE S

CH

OO

L

1 S

AN

TA

BA

RB

AR

A R

D.

PLE

AS

AN

T H

ILL, C

A 9

45

23

PA

CK

AG

E 1

BUILDING

PLANS

M1.7

Page 20: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

PLE

AS

AN

T

HIL

L M

IDD

LE S

CH

OO

L

1 S

AN

TA

BA

RB

AR

A R

D.

PLE

AS

AN

T H

ILL, C

A 9

45

23

PA

CK

AG

E 1

BUILDING

PLANS

M1.8

Page 21: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

PLE

AS

AN

T

HIL

L M

IDD

LE S

CH

OO

L

1 S

AN

TA

BA

RB

AR

A R

D.

PLE

AS

AN

T H

ILL, C

A 9

45

23

PA

CK

AG

E 1

BUILDING

PLAN

M1.9

Page 22: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

PLE

AS

AN

T

HIL

L M

IDD

LE S

CH

OO

L

1 S

AN

TA

BA

RB

AR

A R

D.

PLE

AS

AN

T H

ILL, C

A 9

45

23

PA

CK

AG

E 1

BUILDING

PLANS

M1.10

Page 23: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

PLE

AS

AN

T

HIL

L M

IDD

LE S

CH

OO

L

1 S

AN

TA

BA

RB

AR

A R

D.

PLE

AS

AN

T H

ILL, C

A 9

45

23

PA

CK

AG

E 1

BUILDING

PLAN

M1.11

Page 24: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

PLE

AS

AN

T

HIL

L M

IDD

LE S

CH

OO

L

1 S

AN

TA

BA

RB

AR

A R

D.

PLE

AS

AN

T H

ILL, C

A 9

45

23

PA

CK

AG

E 1

BUILDING

PLAN

M1.12

Page 25: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

PLE

AS

AN

T

HIL

L M

IDD

LE S

CH

OO

L

1 S

AN

TA

BA

RB

AR

A R

D.

PLE

AS

AN

T H

ILL, C

A 9

45

23

PA

CK

AG

E 1

BUILDING

PLANS

M1.13

Page 26: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

27

7 B

OY

D R

D

PLE

AS

AN

T H

ILL,

CA

94

52

3

SE

QU

OIA

ELE

ME

NT

AR

Y S

CH

OO

L

12/XX/2018

Revisions

No. Description Date

PA

CK

AG

E 1

BUILDING

PLANS

M1.3

Page 27: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 1

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

- --

12/XX/2018

Revisions

No. Description Date

PA

CK

AG

E 1

SHEET

INDEX

T-2

Page 28: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 2

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

33

33

Ro

na

ld W

ay,

CO

NC

OR

D,

CA

9

45

19

Ho

lbro

ok E

lem

en

tary

Sch

oo

lP

AC

KA

GE

2

33

33

Ro

na

ld W

ay,

Co

nco

rd,

CA

94

51

9

Ho

lbro

ok E

lem

en

tary

Sch

oo

l

SITE PLAN

M1.0

mcclanahane
Text Box
FOR REFERENCE ONLY
Page 29: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 2

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

33

33

Ro

na

ld W

ay,

CO

NC

OR

D,

CA

9

45

19

Ho

lbro

ok E

lem

en

tary

Sch

oo

lP

AC

KA

GE

2

33

33

Ro

na

ld W

ay,

Co

nco

rd,

CA

94

51

9

Ho

lbro

ok E

lem

en

tary

Sch

oo

l

FLOOR

PLANS

M1.1

Page 30: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 2

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

33

33

Ro

na

ld W

ay,

CO

NC

OR

D,

CA

9

45

19

Ho

lbro

ok E

lem

en

tary

Sch

oo

lP

AC

KA

GE

2

33

33

Ro

na

ld W

ay,

Co

nco

rd,

CA

94

51

9

Ho

lbro

ok E

lem

en

tary

Sch

oo

l

FLOOR

PLANS

M1.2

Page 31: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 2

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

12/XX/2018

Revisions

No. Description Date

33

33

Ro

na

ld W

ay,

CO

NC

OR

D,

CA

9

45

19

Ho

lbro

ok E

lem

en

tary

Sch

oo

lP

AC

KA

GE

2

33

33

Ro

na

ld W

ay,

Co

nco

rd,

CA

94

51

9

Ho

lbro

ok E

lem

en

tary

Sch

oo

l

FLOOR

PLANS

M1.3

Page 32: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 2

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

- --

12/XX/2018

Revisions

No. Description Date

PA

CK

AG

E 2

- --

POINTS

LIST &

SOO

M6.2

mcclanahane
Text Box
FOR REFERENCE ONLY
Page 33: ADDENDUM NO.: DATE: BID Due Date: New Date** …

Job No: 170823.00

Date:

Scale: As Shown

MO

UN

T D

IAB

LO

US

D

PK

G 2

PR

OP

39

CO

NT

RO

LS

IM

PLE

ME

NT

AT

ION

Drawing Title

Drawing No.

- --

12/XX/2018

Revisions

No. Description Date

PA

CK

AG

E 2

- --

POINTS

LIST &

SOO

M6.2

mcclanahane
Text Box
FOR REFERENCE ONLY