ADDENDUM NUMBER FOUR BID S-6-21 · From: City of Cheyenne, Purchasing Manager, TJ Barttelbort Date:...
Transcript of ADDENDUM NUMBER FOUR BID S-6-21 · From: City of Cheyenne, Purchasing Manager, TJ Barttelbort Date:...
ADDENDUM NUMBER FOUR
BID S-6-21
To: All Prospective Bidders and all others concerned
From: City of Cheyenne, Purchasing Manager, TJ Barttelbort
Date: October 5, 2020
Subject: Addendum Number Four to Bid S-6-21 for the Happy Jack Landfill Phase 2,
Cells 1 and 2 Construction and Cell 3 Excavation Earthworks project
The changes, clarifications, omissions, additions, and/or alterations in, on, and to the bid
information and specifications shall apply to the Invitation For Bid submitted for and to the project
indicated above. Except as modified by this Addendum Number Four, all of the terms and
provisions of the Invitation for Bid for the above listed project remain in full force and effect. This
Addendum Number Four supersedes all previous instructions pertaining to the items listed:
Revised Bid Submission Deadline:
1. The revised bid submission deadline is updated to Friday, October 09, 2020, 02:00 PM
in in Room 309 of the Municipal Building at 2101 O’Neil Avenue, Cheyenne, WY 82001.
Clarifications:
C1: Three (3) revised drawings are provided via this Addendum Four, to clarify liner
requirements in the sumps and the components of the Leachate Collection System.
Drawings titled “LEACHATE COLLECTION SYSTEM DETAILS (SHEET 1 OF 2)”
“LEACHATE COLLECTION SYSTEM P&ID,” & “LEACHATE COLLECTION
SYSTEM CELL DISCHARGE PIPE SYSTEM SECTIONS AND DETAILS” are
included.
Questions & Responses:
Q1: Please confirm that the Survey used for final payment quantities of the installed
geosynthetic materials will be based on actual surface area (3D) and include materials
buried in the anchor trenches. We assume the double layer (rubsheets) of HDPE liner and
GCL placed in the sump and slope risers will be considered incidental and not part of the
final payment area.
City of Cheyenne - Purchasing
2101 O’Neil Avenue, Room 309
Cheyenne, WY 82001
307-773-1045
Addendum Four / Bid S-6-21 / Page 1 of 6
A1: Final payment of installed geosynthetics will be based on neat line 3D surface area of
materials installed. Material installed in the anchor trenches will be added to neat line
surveyed quantity per Detail 3 on Sheet 7. The HDPE liner and GCL in the sump area and
side slope risers will be surveyed and included as part of final payment area.
Q2: Scope of work clarification:
The measurement and payment for Earthworks, Item 5 – Prepare Cell Subgrade (Finish
Grading), states “including but not limited to: protection and maintenance of the subgrade;
drying and/or moisture-conditioning for roller compaction, as required; excavating,
hauling, and satisfactorily disposing of and replacing all unsuitable subgrade material; and
proof-rolling as directed by the CQA MANAGER.”
The measure and payment for Installation, Item 2 – Installation of GCL states “including
but not limited to: subgrade maintenance, acceptance, and protection; protection of
installed GCL; repair of damaged installed GCL as necessary; and field quality control.”
Please confirm that ALL subgrade maintenance (including surface/stormwater removal)
during geosynthetic installation is the responsibility of the Earthwork contractor.
A2: The Earthworks Contractor will be responsible for all subgrade maintenance during
geosynthetics installation including but not limited to: protection and maintenance of the
subgrade; drying and/or moisture-conditioning for roller compaction, as required;
excavating, hauling, and satisfactorily disposing of and replacing all unsuitable subgrade
material; and proof-rolling as directed by the CQA MANAGER. The Earthworks
Contractor will also need to maintain subgrade moisture content to the specified moisture
content; and, provide equipment and operators during liner deployment to repair areas of
the subgrade which require repair due to deployment operations. The Geosynthetics
Installer can disregard the subgrade maintenance reference under Item 2 in Section 01 22
13.
Q3: Should the Geosynthetic Procurement bid include sales tax and cost for payment bonds?
A3: The cost of all Performance & Payment Bonds shall be included in the cost of the submitted
bid. If a supplier is providing the geosynthetics materials directly to the City of Cheyenne,
then sales tax is not applicable. However, if the geosynthetics are provided by an installer
or party other than the manufacturer, sales tax needs to be included.
Q4: Can the 5% retainage be waived from the Geosynthetic Procurement payment since the
scope is supply only and the contract is complete upon material delivery?
A4: No, the 5% retainage will not be waived.
Q5: Please confirm the Geosynthetic Procurement bid form quantities for the HDPE and GCL
include the extra materials for the double layer (rubsheets) in the sumps and slope risers.
Our calculations show these two bid items may be 30,000 SF short each.
A5: See revised Drawing 8 “LEACHATE COLLECTION SYSTEM DETAILS (SHEET 1 OF
2) for geosynthetic placement requirements in leachate collection sumps. Geosynthetic
Addendum Four / Bid S-6-21 / Page 2 of 6
suppliers shall bid the quantities provided on the bid form and provide a quantity takeoff
within 10 days of the notice of award to aid the City in ordering the required quantity of
materials form the geosynthetics supplier. The geosynthetics installer will be responsible
for providing additional materials, pre-construction testing, and conformance testing of
additional materials in the event they did not accurately estimate geosynthetics quantities
when preparing quantity takeoff.
ADDENDUM FOUR ACKNOWLEDGED:
BY_____________________________ TITLE_____________________________
(Addendum must be signed and returned with bid or receipt of the addendum must be
acknowledged on the Invitation to Bid).
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
Addendum Four / Bid S-6-21 / Page 3 of 6
3
1
2
1
5 ft
1 ft
2 ft
2 ft
15 ft
1 ft
GEOSYNTHETIC CLAY LINER (GSE BENTOLINER NWL OR ENGINEER APPROVED EQUIVALENT)
PRIMARY GEOMEMBRANE LINER (60-
MIL DOUBLE-SIDED TEXTURED HDPE)
GEOTEXTILE (12 OZ/SY NON-WOVEN)
GEOTEXTILE
(12 OZ/SY NON-WOVEN)
LCRS
GRAVEL
LCRS RISER PIPE
(18 in DIA SOLID HDPE SDR-17)
LCRS COLLECTION PIPE
(6 in DIA PERFORATED
HDPE SDR-17)
LDS RISER PIPE
(12 in DIA SOLID HDPE SDR-17)
SECONDARY GEOMEMBRANE LINER
(60-MIL DOUBLE-SIDED TEXTURED HDPE)
EXTRUSION WELD
SECONDARY GEOMEMBRANE
TO PRIMARY GEOMEMBRANE
LCRS RISER PIPE
(18 in DIA PERFORATED HDPE SDR-17, 5 ft MIN)
LDS RISER PIPE
(12 in DIA PERFORATED HDPE SDR-17)
SAND
DRAINAGE
LAYER
GEOTEXTILE
(16 OZ/SY NON-WOVEN)
B
8
A
8
GEOSYNTHETIC CLAY LINER (GSE BENTOLINER NWL OR ENGINEER
APPROVED EQUIVALENT)
1 ft
15 ft
6 in (MIN)
2 ft
2
1
1 ft
15 ft
20 ft (MIN)
2 ft
2.25 ft
1 ft
1 ft
1 ft
2 ft
LCRS COLLECTION PIPE (6 IN DIA
PERFORATED HDPE SDR-17)
LDS RISER PIPE
(12 in DIA PERFORATED
HDPE SDR-17)
GEOTEXTILE
(16 OZ/SY NON-WOVEN)
LCRS RISER PIPE
(18 in DIA PERFORATED
HDPE SDR-17)
GEOSYNTHETIC CLAY LINER (GSE BENTOLINER NWL
OR ENGINEER APPROVED EQUIVALENT)
PRIMARY GEOMEMBRANE LINER (60-MIL
DOUBLE-SIDED TEXTURED HDPE)
SECONDARY GEOMEMBRANE LINER (60-MIL
DOUBLE-SIDED TEXTURED HDPE)
EXTRUSION WELD
SECONDARY GEOMEMBRANE
TO PRIMARY GEOMEMBRANE
SAND
DRAINAGE
LAYER
LCRS
GRAVEL
GEOTEXTILE (12 OZ/SY NON-WOVEN)
EXTRUSION WELD
SECONDARY GEOMEMBRANE
TO PRIMARY GEOMEMBRANE
2
1
1 ft
5 ft
1 ft1 ft
1 ft
2 ft (MIN)
6 in MIN
PIPE COVER
15 ft
15 ft
1
1
GEOTEXTILE
(16 OZ/SY NON-WOVEN)
SECONDARY GEOMEMBRANE LINER
(60-MIL DOUBLE-SIDED TEXTURED HDPE)
GEOSYNTHETIC CLAY LINER (GSE
BENTOLINER NWL OR ENGINEER
APPROVED EQUIVALENT)
PRIMARY GEOMEMBRANE LINER (60-MIL
DOUBLE-SIDED TEXTURED HDPE)
LDS RISER PIPE
(12 in DIA SOLID
HDPE SDR-17)
LCRS RISER PIPE
(18 in DIA SOLID
HDPE SDR-17)
LCRS COLLECTION PIPE CLEANOUT
(6 in DIA SOLID HDPE SDR-17)
SAND
DRAINAGE
LAYER
EXTRUSION WELD
SECONDARY GEOMEMBRANE
TO PRIMARY GEOMEMBRANE
EXTRUSION WELD
SECONDARY GEOMEMBRANE
TO PRIMARY GEOMEMBRANE
GEOTEXTILE (12 OZ/SY NON-WOVEN)
2.25 ft2 ft
CLASS B
PIPE BEDDING
GEOTEXTILE (16 OZ/SY NON-WOVEN)
GEOSYNTHETIC CLAY LINER (GSE
BENTOLINER NWL OR ENGINEER
APPROVED EQUIVALENT)
60°
4 in (TYP)
2 in (TYP)
60°
1/4 in (MAX) DIA
HOLES DRILLED ON
4 in CENTERS.
INSTALL WITH
HOLES ON BOTTOM
END CAP
2:1
2:1
2:1
3:1 (TYP.)
3:1 (TYP)
LCRS COLLECTION PIPE
CLEANOUT (6 in DIA SOLID
HDPE SDR-17)
LCRS RISER PIPE
(18 in DIA SOLID HDPE SDR-17)
15 ft
15 ft
5 ft
EXTENT OF SECONDARY
LINER
5 ft SECTION OF LDS RISER PIPE
(18 in DIA PERFORATED HDPE
SDR-17, 5 FT MIN.)
5 ft SECTION OF LDS RISER PIPE
(12 in DIA PERFORATED HDPE
SDR-17)
LCRS RISER PIPE
(12 in DIA SOLID HDPE SDR-17)
1 ft
1 ft
2.25 ft
2 ft
5 ft
LCRS COLLECTION
PIPE (6 in DIA HDPE
PERFORATED
PIPE)
B
8
A
8
3
8
3
8
3
8
www.golder.com
01 in
123-81971
CONTROL
H008
SHEET
8
1
GOLDER ASSOCIATES INC.
7245 W ALASKA DRIVE, SUITE 200
LAKEWOOD, COLORADO
UNITED STATES
[+1] (303) 980 05400 2020-05-20 ISSUED FOR BID AAAA JR TE
1 2020-10-02 ISSUED FOR ADDENDUM 4 VSAA JR TE
8 12
HAPPY JACK LANDFILL
PHASE 2, CELLS 1 AND 2 CONSTRUCTION PLANS
CHEYENNE, WYOMING
CITY OF CHEYENNE
PUBLIC WORKS DEPARTMENT
HAPPY JACK LANDFILL
LEACHATE COLLECTION SYSTEM DETAILS
TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
Path: \\D
enver\acad\12\123-81971\_H
P
hase 2 C
ells 1 and 2\B
id P
ackage\ | F
ile N
am
e: 123-81971H
008.dw
g | Last E
dited B
y: dvsm
ith D
ate: 2020-09-21
T
im
e:5:57:48 P
M | P
rinted B
y: D
VS
mith D
ate: 2020-09-21
T
im
e:5:59:18 P
M
REV. DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED
SEAL
of
IF
T
HIS
M
EA
SU
RE
ME
NT
D
OE
S N
OT
M
AT
CH
W
HA
T IS
S
HO
WN
, T
HE
S
HE
ET
S
IZ
E H
AS
B
EE
N M
OD
IF
IE
D F
RO
M: A
NS
I D
1
8
SCALE N.T.S TYPICAL SUMP CROSS-SECTION
A
8
SCALE N.T.S TYPICAL SUMP DETAIL
B
8
SCALE N.T.S LCRS RISER PIPES TRENCH ON SLOPE
2
8
SCALE N.T.S TYPICAL SUMP PLAN VIEW
3
8
SCALE N.T.S
LCRS AND LDS COLLECTION AND RISER PIPE
PERFORATIONS DETAIL
Addendum Four / Bid S-6-21 / Page 4 of 6
M
PI
200
LPD
FE
200
FI
200
FQI
200
M
PI
100
LPD
FE
100
FI
100
FQI
100
CELL 4
(FUTURE)
P-100P-200
CELL 3
(FUTURE)
CELL 1
CELL 2
FORCEMAIN
HEADER
HEADER
V
V
LEACHATE
COLLECTION POND
1 1/2" x 2"
2"-ICET
2"-ICET
P80 HDPE
P80 HDPE
2"-ICET
1 1/2" HDPE SDR 17
1 1/2" x 2"
2"-ICET
P80 HDPE
P80 HDPE
A/G U/G
A/G U/G
A/G U/G
A/G U/G
INSIDE RISER PIPE OUTSIDE
INSIDE RISER PIPE OUTSIDE
S40 P80
S40 P80
D.C.
1 1/4" x 1 1/2"
1 1/4" x 1 1/2"
1 1/2" HDPE SDR 17
www.golder.com
01 in
123-81971
CONTROL
H010
SHEET
10
1
GOLDER ASSOCIATES INC.
7245 W ALASKA DRIVE, SUITE 200
LAKEWOOD, COLORADO
UNITED STATES
[+1] (303) 980 05400 2020-05-20 ISSUED FOR BID JS CB JR TE
1 2020-10-02 ISSUED FOR ADDENDUM 4 JS CB JR TE
10 12
HAPPY JACK LANDFILL
PHASE 2, CELLS 1 AND 2 CONSTRUCTION PLANS
CHEYENNE, WYOMING
CITY OF CHEYENNE
PUBLIC WORKS DEPARTMENT
HAPPY JACK LANDFILL
LEACHATE COLLECTION SYSTEM P&ID
TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
Path: \\Denver\acad\12\123-81971\DESIGN\Happy Jack Piping\PID DWG\ | File Name: 12381971-002-PID-10.dwg
REV. DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED
SEAL
of
IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI D
LEGEND
XXX
100
LPD
BALL VALVE FLANGED ENDS
SWING CHECK VALVE FLANGED ENDS
DIAPHRAGM SEAL
M
V
LOW POINT DRAIN W/ PLUGGED END
BALL VALVE SOC WELD ENDS NORMALLY CLOSED
GAUGE VALVE W/ BLEED VALVE
MAG FLOW METER
1" x 2"
CONCENTRIC REDUCER
AIR / VACUUM VALVE
SUBMERSIBLE PUMP
FLANGE
P = PRESSURE
F = FLOW
I = INDICATE
Q = TOTALIZER
E = ELEMENT
BALL VALVE THREADED ENDS NORMALLY CLOSED
FIELD LOCATED INSTRUMENT
2"-ICET
INSULATION AND HEAT TRACE
2" THICKNESS AND IC = INSULATE AGAINST COLD
ET = ELECTRIC TRACE
A/G U/G
A/G = ABOVEGROUND
U/G = UNDERGROUND
P80 HDPE
SPEC BREAK
P80 = SCHEDULE 80 PVC
HDPE = PE4710 SDR17
S40 = 316 STAINLESS STEEL
D.C.DOUBLE CONTAINED PIPE
Addendum Four / Bid S-6-21 / Page 5 of 6
www.golder.com
01
in
123-81971CONTROLH011
SHEET
111
GOLDER ASSOCIATES INC.7245 W ALASKA DRIVE, SUITE 200LAKEWOOD, COLORADOUNITED STATES[+1] (303) 980 05400 2020-05-20 ISSUED FOR BID JS CB JR TE
1 2020-10-02 ISSUED FOR ADDENDUM 4 JS CB JR TE
11 12
HAPPY JACK LANDFILLPHASE 2, CELLS 1 AND 2 CONSTRUCTION PLANSCHEYENNE, WYOMING
CITY OF CHEYENNEPUBLIC WORKS DEPARTMENTHAPPY JACK LANDFILL
LEACHATE COLLECTION SYSTEMCELL DISCHARGE PIPE SYSTEM SECTIONS AND DETAILS
TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
Path
: \\D
enve
r\aca
d\12
\123
-819
71\D
ESIG
N\H
appy
Jac
k Pi
ping
\Orth
os\D
WG
s\ |
File
Nam
e: 1
2381
971-
002-
D-1
01.d
wg
REV. DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED
SEAL
of
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: A
NSI
D
18"Ø LCRS RISER PIPE SEE DETAIL SHEETS 8 & 9
18"Ø LCRS RISER PIPE SEE DETAIL SHEETS 8 & 9
18"Ø LCRS RISER PIPE SEE DETAIL SHEETS 8 & 9
SEE DETAIL
SEE DETAIL 1
NOTESKEYED NOTE
1 EPG MODEL NW1.5SS-C 316SS DISCONNECT ADAPTER
2 EPG WSDPT 2-5 SUREPUMP, 1/2 HP 230 VAC 3-PHASE MOTOR WITH CP JACKETEDMOTOR LEAD, 0-5 PSI SUBMERSIBLE SENSOR W/LEAD AND 3/8" STAINLESS STEELSUSPENSION CABLE W/ CLAMPS. SIZED FOR 5.5GPM @ 100ft HEAD
3 EPG 316 STAINLESS STEEL CAM COUPLER-PART A
4 EPG 316 STAINLESS STEEL CAM COUPLER-PART C
5 1.5" SDR 17 HDPE PIPE, CUT TO LENGTH
6 EPG 316 STAINLESS STEEL CAM COUPLER-PART F
7 EPG 2" MODEL 4415 AIR/VAC VALVE
8 1 1/2" ROSEMOUNT 8705 FLANGED MAGNETIC FLOW METER
9 3/8" 316 STAINLESS STEEL SUSPENSION CABLE
10 PI-100 ASHCROFT PRESSURE INDICATOR W/ GAUGE VALVE
11 1 1/2" x 1 1/2" SS TO PVC TRANSITION CONNECTOR
12 2" PVC TRU-UNION BALL VALVE
13 2" PVC FLANGED SWING CHECK VALVE
14 2" PVC TRU-UNION BALL VALVE LOW POINT DRAIN
15 2" DISCHARGE PVC PIPE SCH 80
16 1 1/2" x 2" CONCENTRIC REDUCER
17 CONCRETE CONTAINMENT W/ RAISED CURB FOR SECONDARY CONTAINMENT
18 EPG "L" SERIES L925PT PUMPMASTER W/ WINDOWED DOOR FOR PUMP MOTOR CONTROL
19 1.5" PVC TRU-UNION BALL VALVE
20 1.5" HDPE TO MALE NPT 316SS TRANSITION FITTING
21 1.25" NIPPLE, MNPT, 316SS
22 1.25" x 1.5" REDUCER, FNPT, 316SS
NOTES1. ALL MATERIALS SHALL BE AS SPECIFIED OR ENGINEER APPROVED EQUIVALENT.2. CONTRACTOR SHALL PROVIDE 316 STAINLESS STEEL CAM COUPLERS FOR
DISCHARGE HOSE SEGMENT CONNECTIONS.3. FREEZE PROTECTION IS REQUIRED FOR ABOVE GROUND PIPING. ELECTRIC HEAT
TRACE, INSULATION AND CLADDING AS REQUIRED.4. ALL PIPING OUTSIDE OR BELOW THE CONCRETE CONTAINMENT SHALL BE DUAL
WALL SECONDARY CONTAINMENT PIPE 4" x 2".5. PROVIDE MINIMUM 5 PIPE DIAMETERS UPSTREAM AND 2 DIAMETERS DOWNSTREAM
OF FLOW METER.
5
9
2
7
15
1
6
4
2021 222
12
52
9
7
10
19
13
8
11
2
59
87 10
12
14
19 13
15
15
6' MIN
GRADEBURIALDEPTH
GRADE
NOTE 3
SEE NOTE 3
16
SEENOTE 3
16
17
17
NOTE 4
17
SEENOTE 4
NOTE 4
NOTE 4
LINK SEAL
18
SEE DETAIL 3
2" HDPE FLANGEADAPTER
2" VAN STONE PVC2 PIECE FLANGE
A11
A11NTS
SECTION
B11NTS
SECTION
111NTS
DETAIL 211NTS
DETAIL311NTS
DETAIL
-11NTS
PLAN VIEW
B 11
111 2
11
311
SEENOTE 5
203 4
5
Addendum Four / Bid S-6-21 / Page 6 of 6