BOZEMAN SOURDOUGH WATER TRANSMISSION MAIN - 2019 - ADDENDUM NO.1 PAGE 1 ADDENDUM NO. 1 BOZEMAN SOURDOUGH WATER TRANSMISSION MAIN - 2019 Date of Addendum: May 23 rd , 2019 Date of Bid Opening: June 4th, 2019 CONTRACT DOCUMENTS AND SPECIFICATIONS SPECIAL PROVISIONS 1. Section 6, Additional Insureds, change Applicable Landowners: Sarah Nash Zimmer to “Nancy Lee Nash Trust.” TECHNICAL SPECIFICATIONS 1. Section 15060-02, 2.1.A Pipe, change to “Centrifugally cast, Grade 60-42-10 iron, cement-lined and seal-coated, CL51, in accordance with AWWA C151, 250 psi working pressure and 350 psi surge pressure.” 2. Section 15060-02, 2.8.B Corrosion Protection, add “Bonded joints at each pipeline joint/fitting shall be bronze wedge or welded bond strap or approved equal.” 3. Section 15060-02, 2.8.C Corrosion Protection, add “Cathodic protection shall be sacrificial magnesium anode. Selected anode shall be packaged 48-pound high potential magnesium anode spaced every 90-ft with a minimum anode life of 22-years, with 3 test stations, and with Erico Products, Inc. accessories or approved equal.” 4. Section 15101, 2.5.B.g Butterfly Valves, change to “Butterfly valves shall be Mueller, M&H, ValMatic Series 2000 or Kennedy.” CITY OF BOZEMAN MODIFICATIONS TO MPWSS Section 02660, 2.8.B Butterfly Valves, change the first sentence to “Furnish Class 150B, 150 psi, rubber seated, butterfly valves for water distribution systems sized 24” and larger, meeting AWWA C504 requirements.” City of Bozeman Standard Drawing, No. 02660-3, Thrust Blocking for Water Main Valves, add the following “30” valves, 1 ½” anchor rod size, and “A” = 4’-6”, “B” = 4’-6”, “C” = 4’-6”. For 48” valves, 2” anchor rod size, and “A” = 6’-6”, “B” = 6’-6”, “C” = 6’-6”.” SHEET G-4 The waterline easement from 1917 across private property cannot be used for this project. Only the 30’-0” wide 1957 easement may be used for this project. Any other easements obtained

Transcript of ADDENDUM NO. 1 BOZEMAN SOURDOUGH WATER ... - rpa-hln.com · f:\admin\rpa standards\forms\prebid...

Page 1: ADDENDUM NO. 1 BOZEMAN SOURDOUGH WATER ... - rpa-hln.com · f:\admin\rpa standards\forms\prebid agenda.doc rev. 9/22 shall contact the Gallatin County Road Department to satisfy themselves

BOZEMAN SOURDOUGH WATER TRANSMISSION MAIN - 2019 - ADDENDUM NO.1 PAGE 1

ADDENDUM NO. 1 BOZEMAN SOURDOUGH WATER TRANSMISSION MAIN - 2019

Date of Addendum: May 23rd, 2019 Date of Bid Opening: June 4th, 2019 CONTRACT DOCUMENTS AND SPECIFICATIONS SPECIAL PROVISIONS

1. Section 6, Additional Insureds, change Applicable Landowners: Sarah Nash Zimmer to “Nancy Lee Nash Trust.”

TECHNICAL SPECIFICATIONS

1. Section 15060-02, 2.1.A Pipe, change to “Centrifugally cast, Grade 60-42-10 iron, cement-lined and seal-coated, CL51, in accordance with AWWA C151, 250 psi working pressure and 350 psi surge pressure.”

2. Section 15060-02, 2.8.B Corrosion Protection, add “Bonded joints at each pipeline joint/fitting shall be bronze wedge or welded bond strap or approved equal.”

3. Section 15060-02, 2.8.C Corrosion Protection, add “Cathodic protection shall be sacrificial magnesium anode. Selected anode shall be packaged 48-pound high potential magnesium anode spaced every 90-ft with a minimum anode life of 22-years, with 3 test stations, and with Erico Products, Inc. accessories or approved equal.”

4. Section 15101, 2.5.B.g Butterfly Valves, change to “Butterfly valves shall be Mueller, M&H, ValMatic Series 2000 or Kennedy.”

CITY OF BOZEMAN MODIFICATIONS TO MPWSS Section 02660, 2.8.B Butterfly Valves, change the first sentence to “Furnish Class 150B, 150 psi, rubber seated, butterfly valves for water distribution systems sized 24” and larger, meeting AWWA C504 requirements.” City of Bozeman Standard Drawing, No. 02660-3, Thrust Blocking for Water Main Valves, add the following “30” valves, 1 ½” anchor rod size, and “A” = 4’-6”, “B” = 4’-6”, “C” = 4’-6”. For 48” valves, 2” anchor rod size, and “A” = 6’-6”, “B” = 6’-6”, “C” = 6’-6”.” SHEET G-4 The waterline easement from 1917 across private property cannot be used for this project. Only the 30’-0” wide 1957 easement may be used for this project. Any other easements obtained

Page 2: ADDENDUM NO. 1 BOZEMAN SOURDOUGH WATER ... - rpa-hln.com · f:\admin\rpa standards\forms\prebid agenda.doc rev. 9/22 shall contact the Gallatin County Road Department to satisfy themselves

BOZEMAN SOURDOUGH WATER TRANSMISSION MAIN - 2019 - ADDENDUM NO.1 PAGE 2

For the northern private property owned by Nancy Lee Trust Property, contact James Kommers, attorney representing the trust, 406-587-7717, [email protected]. For the southern private property owned by Mike Nash, call 406-585-0251, [email protected]. SHEET C-5 Add to note 9, “Thrust block bearing area for 30” tee is 30 SF. Thrust block bearing area for 48” 22.5° bend is 49 SF.” SHEET C-6 Thrust block bearing area for the 48” 22.5° bend and tee is 64 SF. ATTACHMENTS Prebid Meeting Minutes and Sign-In Sheet Current Planholder’s List

END OF ADDENDUM NO. 1 ROBERT PECCIA AND ASSOCIATES

Chris Hayes, PE Project Manager

Page 3: ADDENDUM NO. 1 BOZEMAN SOURDOUGH WATER ... - rpa-hln.com · f:\admin\rpa standards\forms\prebid agenda.doc rev. 9/22 shall contact the Gallatin County Road Department to satisfy themselves

F:\ADMIN\RPA STANDARDS\FORMS\PREBID AGENDA.doc Rev. 9/22

MINUTES PREBID CONFERENCE

Project: Bozeman Sourdough Water Transmission Main - 2019

Date: May 22nd, 2019 Time: 11:00 am

Location: 20 East Olive Street, Bozeman Montana

Conducted by: Chris Hayes and Rick Bell with RPA and the City of Bozeman

Owner Representatives: Bob Murray – City Project Engineer, Eric Campbell – Water Plant Superintendent

Attendees: (Sign in on sheet)

Discussion Scope and Goals – Discuss Project Requirements Answer Questions Tour Site 2. Introduction / Project Scope The proposed work consists of construction of a new 48” DI water transmission main off of Sourdough Road and Nash Road. This project includes construction of approximately 2,813 feet of 48” and 52 feet of 30” buried DI water piping, water valves, 2 blow offs and related improvements. Instruction to Bidders Review

- Bid Opening is Tuesday, June 4th, 2019 and will be publicly opened and real aloud. Bids must be received by 2:00 pm by the City Clerk at the office at City Hall, 121

North Rouse Avenue, P.O. Box 1230, Bozeman, Montana 59771-1230. Bidders must purchase Official Bid Proposal for $50.00 to bid and in order to be

placed on official bidder’s list. Review bid proposal and instruction to bidders

- Bid Security 10% of the Total Bid, Must be Included in Bid - Official Bid Package – Acknowledge Receipt of Addendums - Non-Discrimination Affirmation Form, Must be Signed and Included in Bid - Addenda: None issued to date

Ductile Iron Pipe shall be CL51, Grade 60-42-10, AWWA C151, 250 psi working pressure, 350 psi surge pressure, encased with V-Bio Enhanced Polyethylene Encasement with bonded joints, and sacrificial magnesium anode cathodic protection.

Thrust block sizes for 30” and 48” butterfly valves Bearing areas for 30” and 48” horizontal fittings not already shown on plans Prebid Meeting Minutes Any other items from Prebid Meeting

- Method of Award Lowest Responsible Bidder whose total base bid (within the funds

available) is the lowest responsible Bidder. - Bid Items

Lump Sum for mobilization bonding and insurance Lump Sum for Traffic Control Liner Feet of each size of Pipe – 30” or 48”

Page 4: ADDENDUM NO. 1 BOZEMAN SOURDOUGH WATER ... - rpa-hln.com · f:\admin\rpa standards\forms\prebid agenda.doc rev. 9/22 shall contact the Gallatin County Road Department to satisfy themselves

F:\ADMIN\RPA STANDARDS\FORMS\PREBID AGENDA.doc Rev. 9/22

Each buried Valve – 30” or 48” Each Blow Off Lump Sum for Dewatering Lump Sum for Seeding, Fertilizer, and Mulch Square Yard for Asphalt Removal and Replacement Cubic Yard for Type 2 Bedding

- Montana Contractor’s Registration Number – List on Bid Proposal - Wage Rates – Current Montana Prevailing Wage Rates are required - Payment and Performance Bonds – both required - Gross Receipts Tax - 1% withheld from each payment request - Retainage - 5% withheld from each progress payment

Contract Time 75 calendar days Construction Start Date: June/July 2019

Contract Requirements - Insurance Requirements – Additional Insureds – City of Bozeman, RPA, SK Geotechnical,

and both Private Landowners

- Project is City funded. No AIS or buy American requirements

- Contractor's Supervision

- Liquidated Damages - $500 per calendar day + Engineering Expenses

- Permits and Fees Required by Contractor

Comply with County Permits and Insurance. Sign County Permits.

Dewatering of the site – Submit Dewatering Plan

Construction Stormwater Discharge Permit, SWPPP

Other MDT, state, local and federal as required.

City has applied for SPA 124 and Section 404 permits.

- Utilities

- Stay on public property or within easements shown on the drawings

- City Water – Contact Eric Campbell

- Safety Requirements – Contractor’s responsibility

- Field Office and Sanitary Facilities – No Field Office needed

- Special Provisions – Review measurement and Payment items closely

- Testing – Contractor’s Responsibility

- Chlorination, dechlorination, and test water disposal – Contractor’s responsibility

- 2 Year Warranty Period

- Technical Specifications

- Prevailing Wage Rages Apply

- Review Measurement and Payment items closely

- Review Technical Specifications

- Miscellaneous Forms in Appendix A

- Geotechnical Investigation – See Appendix B – Review

- City of Bozeman Discharge Permit – See Appendix C – Review

Project Overview

A. Bozeman Sourdough Water Transmission Main

a. All topsoil will need to be stripped from surface, stockpiled, and returned to existing

depths. All areas need to be restored to original condition and elevations.

Page 5: ADDENDUM NO. 1 BOZEMAN SOURDOUGH WATER ... - rpa-hln.com · f:\admin\rpa standards\forms\prebid agenda.doc rev. 9/22 shall contact the Gallatin County Road Department to satisfy themselves

F:\ADMIN\RPA STANDARDS\FORMS\PREBID AGENDA.doc Rev. 9/22

b. No rocks larger than 1 ½” left on the surface. Contractor required to reseed and

provide weed control for 2-year warranty period.

c. Fencing removal and replacement is required.

d. Traffic Control needs to be approved by Gallatin County.

e. Excavation/shoring/sheet piling/dewatering/creek bypass pumping for installation

of piping, valves, and blow offs.

f. Stay on public property or within 1957 easement (30’-0” wide) shown. The 1917

easement may not be used for this project. OSHA approved excavation is

required.

g. Existing 18” water mains shown are approximate in location. Any spoils or existing

piping or valves exposed during excavation will need to be removed and disposed

of by the contractor at no additional cost. There are two existing 18” lines in the

field currently which are abandoned on two separate easements. One of them is

on the same easement which the new 48” line will be placed, it is the contractor’s

responsibility to remove and dispose of any of the abandoned existing 18” which

conflicts with the installation of the new line. The existing 30” will remain in service

and it runs in Nash and Sourdough. Only the 1957 easement indicated on the

plans for placement of the new line is available for use. It was brought up by one of

the contractors that putting a 48” pipe in the middle of a 30’ wide easement is un-

constructible. The 30’ easement is all that is available from the city and if additional

work area is needed it is up to the contractor to work out his own deal with the

individual land owners.

h. Any bypass pumping of Nichols Creek around construction site is the contractor’s

responsibility. Pipe will be installed minimum of 5’-0” under creek. Line Nichols

Creek with bentonite soil mixture 2’-0” thick x width of trench per trench plug detail.

i. Megalug or approved restrained joint systems are required on all fittings. Concrete

thrust blocks shown must be installed in addition to restrained joints or megalugs.

j. Type II bedding is shown from Nichols Creek to the Sourdough tie-in per the

Geotech Report. Type I bedding is required under pipe to spring line.

k. Insulation is required on all pipe with less than 6’-6” of cover.

l. Trench plugs locations are shown on the drawings.

m. Utility markers are required at bends and valve in field and creek crossing. City to

supply markers and contractor will install.

n. Piping tie-ins to existing water at Nash & Sourdough is 30” Cement Coated/Lined

Steel Pipe. John Alston with the city shop said he has a pipe of the existing 30”

cement coated pipe in the yard if anyone would like to inspect it for size.

o. Maintenance of Flows, transmission main downtime without water, 8-hour max.

Eric said depending on the time of year more or less time may be available. If done

in the fall more time would probably be available.

p. Haul and dispose of native spoil material from site. Follow Gallatin County

requirements for hauling. Haul Roads - The Contractor must meet all City,

County, MDT, and Federal Regulations and Load requirements. During spring

thaw Nash Road and other county roads may not hold up to heavy haul trucks.

The County may impose stricter load restrictions during spring thaw or may not

allow any haul trucks to operate at all during the spring thaw time period. If Nash

Road or any other County road used as a haul route begins to fail, the contractor

will be responsible for all repair and project delay costs should they occur. Bidders

Page 6: ADDENDUM NO. 1 BOZEMAN SOURDOUGH WATER ... - rpa-hln.com · f:\admin\rpa standards\forms\prebid agenda.doc rev. 9/22 shall contact the Gallatin County Road Department to satisfy themselves

F:\ADMIN\RPA STANDARDS\FORMS\PREBID AGENDA.doc Rev. 9/22

shall contact the Gallatin County Road Department to satisfy themselves of any

constraints that may be placed on them that would affect the progress and cost of

the project. If needed the Contractor may apply for a project shut-down or later

start for the spring thaw time period. Chris said Bill Brownell is the contact for the

County.

q. Asphalt will be replaced in two 2” lifts.

Engineer's Cost Estimate - $2.1 Million

8. City of Bozeman Comments – Eric nor Bob and any comments.

Questions and Discussion

It was asked by one of the contractors – “Will flows be down in the fall, will that still be the case if

Pear is under construction”? Eric said yes and Limon will be down as well.

It was asked what cathodic protection we wanted? Chris said it will be answered in the addenda.

It was asked about the bonded joints in the piping, Does it need to be strap jumpered or wedges?

Chris said it either bonded straps or wedges could be used.

It was asked if fabricated tees for the blow offs would be accepted. Chris said they would be allowed

if done by an approved fitting supply company and they need to be submitted for approval in the

normal submittal process.

It was asked if the pipe was the same as that which was used on the last project by the treatment

plant. Yes, the pipe is the same.

It was asked if the new pipe could be offset in the easement to gain working room and Bob said no.

It was asked if the property owners were easy to work with – Bob said their dealings had been good

so far, the owner’s major concern was to get the restoration done correctly with not rocks left lying

around and no weeds. It was also asked if the spec for the reseeding was correct. Bob and Chris said

yes, they had a consultant review the seed spec.

It was asked if the hay would be cut before the project starts – Hay is normally cut in July and the

lead time for the pipe may be out past that. The city is responsible to pay the crop damage only on

the 30’ wide easement.

It was asked if there would be leniency on start time based on availability of materials – Yes.

Chris said that if the contractor puts together a deal with the property owners to use land outside the

easement they need to provide a copy of it in writing.

Chris will provide contact information in the addenda for the land owners.

Meeting was adjourned to the site for those who want to view it at 11:25.

10. Site Tour

Tie-in was discussed pointing out locate paint on pavement, existing valve box and blow-off.

One of the contractors asked if CDF (flowable fill) would be allowed for trench plugs. Flowable fill will

not me allowed in leu of bentonite trench plugs.

Page 7: ADDENDUM NO. 1 BOZEMAN SOURDOUGH WATER ... - rpa-hln.com · f:\admin\rpa standards\forms\prebid agenda.doc rev. 9/22 shall contact the Gallatin County Road Department to satisfy themselves
Page 8: ADDENDUM NO. 1 BOZEMAN SOURDOUGH WATER ... - rpa-hln.com · f:\admin\rpa standards\forms\prebid agenda.doc rev. 9/22 shall contact the Gallatin County Road Department to satisfy themselves
Page 9: ADDENDUM NO. 1 BOZEMAN SOURDOUGH WATER ... - rpa-hln.com · f:\admin\rpa standards\forms\prebid agenda.doc rev. 9/22 shall contact the Gallatin County Road Department to satisfy themselves

Bozeman Sourdough Water Transmission Main – 2019 PLAN HOLDERS LIST

Bid Date: June 4, 2019, 2:00 p.m. Revised as of: May 22, 2019

The following have received or requested plans and specs for the Bozeman Sourdough Water Transmission Main -2019. City of Bozeman Public Works Bob Murray 20 East Olive P.O. Box 1230 Bozeman, MT 59771 Ph: (406) 582-2269 City of Bozeman Eric Campbell 7024 Sourdogh Canyon Road Bozeman, MT 59715 Ph: (406) 994-0501 Robert Peccia and Associates Chris Hayes 3147 Saddle Drive P.O. Box 5653 Helena, MT 59601 Ph: (406) 447-5000 Fax: (406) 447-5036 [email protected] Robert Peccia and Associates Brad Koenig 3147 Saddle Drive P.O. Box 5653 Helena, MT 59601 Ph: (406) 447-5000 Fax: (406) 447-5036 [email protected] Robert Peccia and Associates Rick Bell 3147 Saddle Drive P.O. Box 5653 Helena, MT 59601 Ph: (406) 447-5000 [email protected] Core and Main Ben Tolley 5240 Jackrabbit Lane Belgrade, MT 59714 Ph: (406) 388-5980 [email protected]

White’s Civil Contracting LLC Mitch White 307 1st Ave E Num 11 Kalispell, MT 59901 Ph: (406) 270-1886 [email protected] COP Construction Ed Allen PO Box 20913 Billings MT 59104 Ph: (406) 656-4632 Western Municipal Kirk Hogan 2066 Stadium Dr Suite 103 Bozeman MT 59715 Ph: (406) 600-4040 [email protected] Central Excavation Joe Dolan 437 Floss Flats Rd Belgrade MT 59714 (406) 388-1000 [email protected]