Evaluation of Leakage Current Measurement for Site Pollution ...
Actual Site Measurement
4
Actual S Location : Bugsukan, Butuan City Date Conducted : Station Covered Ca Name of Project : Concreting of Bugsuk
-
Upload
gelbert-silot -
Category
Documents
-
view
219 -
download
6
description
site measurement
Transcript of Actual Site Measurement
![Page 1: Actual Site Measurement](https://reader035.fdocuments.us/reader035/viewer/2022080314/577c77a91a28abe0548cfbd8/html5/thumbnails/1.jpg)
Actual Site Measurement
Location : Bugsukan, Butuan City
Date Conducted :
Station CoveredCanal Dimension
Name of Project : Concreting of Bugsukan Road (Phase- 1)
![Page 2: Actual Site Measurement](https://reader035.fdocuments.us/reader035/viewer/2022080314/577c77a91a28abe0548cfbd8/html5/thumbnails/2.jpg)
Prepared by:
![Page 3: Actual Site Measurement](https://reader035.fdocuments.us/reader035/viewer/2022080314/577c77a91a28abe0548cfbd8/html5/thumbnails/3.jpg)
Actual Site Measurement
Date Conducted :
Canal DimensionRemarks
Concreting of Bugsukan Road (Phase- 1)
![Page 4: Actual Site Measurement](https://reader035.fdocuments.us/reader035/viewer/2022080314/577c77a91a28abe0548cfbd8/html5/thumbnails/4.jpg)
Concurred by:
Witnessed by: