ACORDE FOR TPC TESTStatus report
Top Modules
Bottom Modules
Electronic system
User Interface
Status
• All the 20 ACORDE modules, electronics cards and cables have been tested before the instalation on the structure.
• The top and bottom structures are inside the clean room.
• The 10 ACORDE modules on top have been tested inside the clean room.
• The ACORDE user interface has been finished.
• The last test with the top and bottom modules will be made next week.
• ACORDE will be ready for the TPC test on the 1st May.