TPC Status

12
TB 07.11.06 Peter Glässel, Heidelberg 1 TPC Status

description

TPC Status. Pre-Commissioning. Phase 1 results see Oct Forum Phase 2 (till Nov 19): ‘endurance test’ for sectors, 2 days, 2 at a time Finalized cabling Better known gas composition Full DCS functionality: monitoring and storing of parameters (i.e. FEE temperatures) - PowerPoint PPT Presentation

Transcript of TPC Status

Page 1: TPC Status

TB 07.11.06 Peter Glässel, Heidelberg 1

TPC Status

Page 2: TPC Status

TB 07.11.06 Peter Glässel, Heidelberg 2

Pre-Commissioning

Phase 1 results see Oct Forum

Phase 2 (till Nov 19):‘endurance test’ for sectors, 2 days, 2 at a time

Finalized cabling

Better known gas composition

Full DCS functionality: monitoring and storing of parameters (i.e. FEE temperatures)

ISEG HV: monitoring currents

Prepare sectors for transport

2/3 done

Sector covers (cooled)

Page 3: TPC Status

TB 07.11.06 Peter Glässel, Heidelberg 3

Main results in phase 2

FEE life: no single failure

Gain curves, gain margin A-side

HV trips:Only seen with ISEG: fast hardware trip

Mainly seen for OROCs

regardless of trip current settings

No clear correlation with HV, time (conditioning?)

Modify time constant: with 15 M series resistor only one trip since 5 days on C-side

Gain spikes (high gain on a pad row): go away with time

Page 4: TPC Status

TB 07.11.06 Peter Glässel, Heidelberg 4

Summary – IROC S/N

1390

1400

1410

1420

1430

1440

1450

1460

A00 A01 A02 A03 A04 A05 A06 A07 A08 A09 A10 A11 A12 A13 A14 A15 A16 A17

V n

om

(V

olt

)

IROCs Vnom

Mea

sure

men

ts n

ot

avai

lab

le

Page 5: TPC Status

TB 07.11.06 Peter Glässel, Heidelberg 5

Summary – IROC S/N

0

10

20

30

40

50

60

70

80

90

100

A00 A01 A02 A03 A04 A05 A06 A07 A08 A09 A10 A11 A12 A13 A14 A15 A16 A17

S/N

(A

DC

co

un

t)

IROCs S/N (Max measured)

Mea

sure

men

ts n

ot

avai

lab

le

Page 6: TPC Status

TB 07.11.06 Peter Glässel, Heidelberg 6

Summary – OROC S/N

1680

1690

1700

1710

1720

1730

A00 A01 A02 A03 A04 A05 A06 A07 A08 A09 A10 A11 A12 A13 A14 A15 A16 A17

V n

om

(V

olt

)

OROC's Vnom

Mea

sure

men

ts n

ot

avai

lab

le

Page 7: TPC Status

TB 07.11.06 Peter Glässel, Heidelberg 7

Summary – OROC S/N

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

A00 A01 A02 A03 A04 A05 A06 A07 A08 A09 A10 A11 A12 A13 A14 A15 A16 A17

S/N

(A

DC

co

un

t)

OROCs S/N (Max measured)

Mea

sure

men

ts n

ot

avai

lab

le

Page 8: TPC Status

TB 07.11.06 Peter Glässel, Heidelberg 8

A00 - GainSECTOR A00 gain curves

Page 9: TPC Status

TB 07.11.06 Peter Glässel, Heidelberg 9

OROC A00 exchange

Wire broken

150 V below max HV tested

Decision to exchange OROCPreparations in parallel to phase 2 commissioning C-side: remove electronics (1 sector only), cabling, FEE frames

Yellow platform in non-standard asymmetric fashion (keep I-bars on A-side)

Re-test spare OROC before exchange

Time schedule till end Nov: 10 days delay

Page 10: TPC Status

TB 07.11.06 Peter Glässel, Heidelberg 10

TPC transport to UX2

Technical questions for transport resolvedTransport document http://www.physi.uni-heidelberg.de/~glassel/TPC/TPC-transport/TPC-transport.pdf

Except maybe weather: T < 10 deg?

Preparations start late Nov, actual transport 4.12.?

Last minute technical problem for installation:Connection rails are incompatible with BSF

need to be modified, redesign done, calculations pending

Critical part taking large forces (5.5 t vertical)

Load test needed

Have to be in place before transport: time schedule risk

Page 11: TPC Status

TB 07.11.06 Peter Glässel, Heidelberg 11

Spares, reference

Complete A-side phase 2 summary under https://webh06.cern.ch/alice-tpc-commissioning/documents/TPC_2nd_phase_summaryAside.ppt

Page 12: TPC Status

TB 07.11.06 Peter Glässel, Heidelberg 12

A00 / OROC with broken wire(s)

Signal injected into cathode wires

4 FECs had several channels damaged

OROC A00 pulser readout after wire broke