Accelerator Physics and Integrated Detectors

38
Accelerator Physics and Integrated Detectors Status Report Kurt Aulenbacher, Winfried Barth Session of the HIM Scientific Council 2015, April 21

Transcript of Accelerator Physics and Integrated Detectors

Page 1: Accelerator Physics and Integrated Detectors

Accelerator Physics and Integrated

Detectors

Status Report

Kurt Aulenbacher, Winfried Barth

Session of the HIM Scientific Council

2015, April 21

Page 2: Accelerator Physics and Integrated Detectors

Accelerator Physics and Integrated

OUTLINE

• THE INFRASTRUCTURE, THE PROJECTS

AND THE TEAMS

• SHE-LINAC PROJECT

• HESR-COOLER PROJECT

Page 3: Accelerator Physics and Integrated Detectors

Accelerator Physics and Integrated Detectors

Infrastructure, SHE-LINAC, HESR-research & more

ACID-HESR (Cooler):

Head: Kurt Aulenbacher

Staff: Andre Hofmann (Post-Doc)

Mirko Schwartz (Technician)

Jürgen Dietrich (consultant)

Students: T. Weilbach (PhD ~ 2014)

M. Bruker (PhD ~ 2015)

J. Friedrich (Ma-Sc 2013)

(Ba-Sc 2011 )

T. Stengler (Ma 2014)

(Ba 2012)

Acid Section Head:

JGU Prof W3 Kurt Aulenbacher

Co-Section Head

GSI Section leader Winfried Barth

ACID-SHE Linac:

Head: Winfried Barth

Staff: V. Gettmann (Eng)

S. Jacke (Post-Doc)(open

position)

Students: M. Amberg (PhD ~ 2014)

U.Ratzinger GUF

H. Podlech GUF

D. Bänsch GUF

F. Dziuba GUF

S. Mickat

project coordinatorGSI

W. Barth GSI

W. Vinzenz GSI

H. Mueller GSI

C. Schroeder GSI

Objective 2018:

Solve open issues for

8MV HESR cooler

Objective 2018:

From demonstrator to working

multi cavity system

Lq. He transfer

(from KpH) g He transfer

(to KpH)

KÜHLER-

MAGNET-LAB

(HESR-cooler

&more

BUNKER-LAB

SHE-LINAC

(SRF)

Common-infrastructure:

REINRAUM

Page 4: Accelerator Physics and Integrated Detectors

Accelerator Physics and Integrated Detectors

Infrastructure, SHE-LINAC, HESR-research&more

ACID-HESR (Cooler):

Head: Kurt Aulenbacher

Staff: Andre Hofmann (Post-Doc)

Mirko Schwartz (Technician)

Jürgen Dietrich (consultant)

Students: T. Weilbach (PhD ~ 2014)

M. Bruker (PhD ~ 2015)

J. Friedrich (Ma-Sc 2013)

(Ba-Sc 2011 )

T. Stengler (Ma 2014)

(Ba 2012)

Acid Section Head:

JGU Prof W3 Kurt Aulenbacher

Co-Section Head

GSI Section leader Winfried Barth

ACID-SHE Linac:

Head: Winfried Barth

Staff: V. Gettmann (Eng)

S. Jacke (Post-Doc)(open

position)

Students: M. Amberg (PhD ~ 2014)

U.Ratzinger GUF

H. Podlech GUF

D. Bänsch GUF

F. Dziuba GUF

S. Mickat

project coordinatorGSI

W. Barth GSI

W. Vinzenz GSI

H. Mueller GSI

C. Schroeder GSI

Objective 2018:

Solve open issues for

8MV HESR cooler

Objective 2018:

From demonstrator to working

multi cavity system

Lq. He transfer

(from KpH) g He transfer

(to KpH)

BUNKER-LAB Main topic: SHE-LINAC

Leader: W. Barth

Post-Docs/Scientists:

S. Mickat

M. Busch (7/2015)

PhD:

M. Amberg

Engineers/Technicians

V. Gettmann

Collaborators:

Group of H. Podlech

U-Frankfurt

COOLER/MAGNET-LAB Main topic: HESR-COOLER

Leader: K. Aulenbacher

Post-Docs/Scientists:

A. Hoffmann

P. Bartholome (5/2015)

PhD:

M. Bruker

T. Weilbach

Engineers/Technicians

M. Schwartz

Collaborators:

V. Kamerzhev, FZJ

(+HESR-group)

Page 5: Accelerator Physics and Integrated Detectors

nc-CH-cavity

sc-prototype, 360 MHz

sc-325 MHz

UNILAC-booster cavity

rt-325 MHz Alvarez

HSI 36 MHz@gsi

HLI 108 MHz@gsi

IH 216 MHz@HIT/Heidelberg

Wideröe

Accelerator Physics and Integrated Detectors

Infrastructure, SHE-LINAC, HESR-research

Page 6: Accelerator Physics and Integrated Detectors

Infrastucture for she: present & future

• LHe volume 750 l

• Magnetic field shielding

• 4 K and 2 K operation

• high pressure rinsing

• rf testing (warm & cold cavities)

• cleanroom environment

• optional: setup for BCP

IAP @ Uni Frankfurt Planned infrastructure @ HIM

Page 7: Accelerator Physics and Integrated Detectors

High charge

state

injector@GSI

GSI-

UNILACcw-LINAC

Beam Intensity (particles/sec)

(S. Hofmann et al, EXON 2004)3 *1012 6 *1013

Beam on target 10 weeks 4 days

GSI-

UNILACcw-LINAC

Beam Intensity (particles/sec)

(S. Hofmann et al, EXON 2004)3 *1012 6 *1013

Beam on target 10 weeks 4 days

GSI/HIM-SHE-progr.

Superconducting cw-linac layout

Super Heavy community High duty factor, 7.5 MeV/u, variable beam energy, heavy ion linac

Page 8: Accelerator Physics and Integrated Detectors

Superconducting CW-LINAC Layout

HLI

injector@GSI

• Multigap CH-cavities

• Small number of rf cavities and short cavity lengths (up to 1m)

• acc. gradient of 5 MV/m compact linac design

• Several cavities, solenoids per cryostat

• Small transverse cavity dimension

Step 0

Step 1

Step 2

demonstrator (1 cavity)

demonstrator (2 cavities)

advanced demonstrator (5 cavities)

2016 2019 2015

Page 9: Accelerator Physics and Integrated Detectors

Step 0: CW-LINAC Demonstrator @ GSI

High Charge State Injector (existing)

Beam line (ready)

delivery

@summer 2015

LHe infrastructure

(partially ready)

sc solenoids (9.3 T)

CH cavity

cryostat

delivery

@summer 2015

Page 10: Accelerator Physics and Integrated Detectors

Step 1&2: Advanced Demonstrator @ GSI

Step 1

(2016)

Step 2

(2019)

• Test of combination of two cavities

• Advanced demonstrator allows first experiment at coulomb barrier

Page 11: Accelerator Physics and Integrated Detectors

Quality Factor Q vs Ea

for CH-Prototype@325MHz

• Ea =14 MV/m @ 2K, design value Ea =5 MV/m

• Annealing @800 K against Hydrogen contamination is

planned

• Design parameters are achieved. Proof of principle!

b 0.155

Frequency (MHz) 325.224

Cells 7

Length bl-def (mm) 505

Diameter (mm) 350

Ea (MV/m) 5

Ep/Ea 5.1

Bp/Ea [mT/(MV/m)] 13

Page 12: Accelerator Physics and Integrated Detectors

CH-Cavity for Demonstrator @ 216.8 MHz

b 0.059

Frequency 216.816 MHz

Cells 15

Length bl-def (mm) 691

Diameter (mm) 409

Cell length 40.82

Ea (MV/m) 5.1

Bp/ Ea 5.2

Helium vessel

Helium in

Tuner flange Helium out

Dynamic

bellow

tuner

Production @ RI

delivery summer 2015

• Lower b lower frequency 2 x 108.408 MHz =216.816 MHz

• R&D on cavity, RF-couplers, bellow tuners

Page 13: Accelerator Physics and Integrated Detectors

Cavity Production@RI (Bergisch Gladbach)

cavity inside rf-coupler flanges

bellow tuner cavity with end caps

Page 14: Accelerator Physics and Integrated Detectors

Summary and Outlook II

HLI

Advanced Demonstrator Design

CH1 CH2 CH3 CH4 CH5

1 cryomodul

rebuncher

High Charge State-

Injektor

1.4 AMeV

Optimized Demonstrator Design

HLI

CH0 CH1 CH2 CH3 CH4 CH5 CH6 rebuncher CH7 CH8 CH9 CH10

CH

Demonstrators 1.4 AMeV 6 AMeV (heavy ions)

6 cryomodules High Charge State-

Injektor

Page 15: Accelerator Physics and Integrated Detectors

Accelerator Physics and Integrated Detectors

Infrastructure, SHE-LINAC, HESR-research&MORE

Page 16: Accelerator Physics and Integrated Detectors

Critical issues for HESR cooler

Critical and unresolved issues for 4.5-8MV and 1-3 A

- Power generation on terminal/solenoids in HV region

- Beam diagnostics and control

- Recuperation efficiency

Design work from Uppsala University (2009) based on

Research by Budker Institute for nuclear physics,

Novosibirsk (BINP)

HIM ACID adresses these issues by

- Cooler test stand

- R&D concerning power generation

Page 17: Accelerator Physics and Integrated Detectors

Investigation of critical cooler issues at HIM/KPH:

2m

Collector

(+5kV, 1A)

Solenoid

with integ.

Wien filter

Solenoids

Beamline

(+26KV)

Gun (0KV)

Page 18: Accelerator Physics and Integrated Detectors

Accelerator Physics and Integrated Detectors

Cooler R&D Highlights-I : Collector efficiency

HIM PhD student Max Bruker

with „his“ Cooler Test-stand

located in improvised laboratory in KPH

Selected results

-long term stable operation with

magnetized beam and decelleration

to very low collector potentials

- Demonstration of effective capture

of backstreaming electrons from collector,

- Very high capture efficiency leading

to ultra-low effective collector losses

(<10-6) for HESR cooler can be expected

- and will be demostrated in the near future

- Thesis can be finished in 2015

Page 19: Accelerator Physics and Integrated Detectors

Accelerator Physics and Integrated Detectors

Cooler R&D Highlights-II: Thomson diagnostics

Thomson Laser experiment:

(PhD work Tobias Weilbach)

- Experiment now ready for data taking

- 300kW (peak) laser superimposed with 30mA (peak) electron beam

20ns pulse length, 100 kHz reprate

- Measured Laser background on PMT in 20cm distance from

primary beam (almost 1021 photons/s, 3*1014 e/s) is only 600 Hz . Expected signal 30Hz.

- Many orders of magnitude better S/N possible at real cooler

-PhD thesis can be completed 2015

Page 20: Accelerator Physics and Integrated Detectors

Accelerator Physics and Integrated Detectors

Cooler R&D Highlights-III: Turbine powering

~40cm

Turbine runs as foreseen (5kW to load, enough to power 1/5

of all soelnoids of HESR cooler)

(but teething problems: first attempt stopped after 80 hours

Fabrication Quality control problem, not considered severe

air bearing turbine development ordered (1/2015)

SF6 optimized turbine ordered (1/2015)

ORC development project with U-Bayreuth started in 1/2015

Page 21: Accelerator Physics and Integrated Detectors

2014: BINP Prototype for 700kV Stage

- BINP will make study for this device and its

possible extensions

- Protoype device in existing pressure vessel at BINP

- 5kW turbogen will be supplied by HIM

- Turbogen drives CT

- ± 30kV generated by CT stages + power on stage

- 12 Stages

- Reliability and perfomance tests of turbogen.

also at HIM

We believe that this scheme

is scalable Drawing: V. Reva, BINP

Page 22: Accelerator Physics and Integrated Detectors

• Accelerator Physics and Integrated

Detectors: SUMMARY Projects up& running with promising first

results

• Will become far more productive as soon as

infrastructure becomes available in 2016

Page 23: Accelerator Physics and Integrated Detectors

• Accelerator Physics and Integrated

Detectors

THANK YOU FOR YOUR ATTENTION!

Page 24: Accelerator Physics and Integrated Detectors

Backup

Page 25: Accelerator Physics and Integrated Detectors

Accelerator Physics and Integrated Detectors

Personal, Infrastructure, Projects, & Roadmaps to 2018

ACID-HESR (Cooler):

Acid Section Head:

JGU Prof W3 Kurt Aulenbacher

Co-Section Head

GSI Section leader Winfried Barth

ACID-SHE Linac:

Objective 2018:

Solve open issues for

8MV HESR cooler

Objective 2018:

From demonstrator to working

multi cavity system

Page 26: Accelerator Physics and Integrated Detectors

28 GHz-ECR ion source

RF injection

side

Beam extraction

side

GOAL:

- Higher Charge State higher energy gain

- Higher Charge State higher beam intensity without stripping

- Higher heavy ion beam intensity cw-/ pulse-mode operation

- Compact accelerator lower cost

ECR-projects/developments for heavy ion application:

- VENUS (LBNL)

- SERSE (INFN)

- SUSI (NSCL/MSU) -> FRIB (U33+/34+)

- MS-ECRIS@RIKEN (U35+)

- SECRAL (IMP-HIRFL) (U41+)

Page 27: Accelerator Physics and Integrated Detectors

Bead pull measurements of the Field Profile

• Field profile is flat within 5% except the end gaps

Page 28: Accelerator Physics and Integrated Detectors

Measured frequency changes

(1) Cavity without static tuners and tentative attached end caps

(2) Static tuners #1, #4, #6, #7 welded into the cavity

at 56 mm tuner height

(3) Left end cap welded to the cavity

(4) Static tuners #2, #8, #9 welded into the cavity

at 65 mm tuner height

(5) Right end cap welded to the cavity

(6) 50 µm BCP treatment

(7) Static tuners #3, #5 welded into the cavity

at 68 mm tuner height

(8) 25 µm BCP treatment

(9) 25 µm BCP treatment (optional)

(10) HPR

• Cold tests of the cavity @ IAP Frankfurt is

planned on April 2015

• Next step: welding of the He-vessel

Page 29: Accelerator Physics and Integrated Detectors

Support Frame@CRYOGENIC (U.K.)

sc solenoid I

sc solenoid II

CH cavity

warm-cold-

transitionI

cold-warm-transitionI

Page 30: Accelerator Physics and Integrated Detectors

Summary and Outlook

• Prototype of superconducting CH-cavity@325 MHz achieves design values

• Delivery of working CH-cavity @ 217 MHz is scheduled at 3 quarter of 2015

• Infrastructure @ GSI is almost ready

• Design of “short” CH-cavity

• Advantage:

simpler geometry without the girder lower production cost

simpler beam dynamics

• Disadvantage: poor field flatness lower energy gain

• Call for tender is ended, planned delivery @ end of 2016

Page 31: Accelerator Physics and Integrated Detectors

• During the filling with LN2 occurred vacuum leakage due to temporary sealing

• Not whole cavity was covered with LN2

• The measured frequency shift is comparable to expectation

• The measurement allows extrapolation of resonance frequency @ 4K

Thermal shrinkage tested with LN2: Results

Temperature during the cool down Measured frequency shift

Page 32: Accelerator Physics and Integrated Detectors

Thermal shrinkage tested with LN2@RI

• Frequency measurement @77K before welding of 2 last static tuners

Page 33: Accelerator Physics and Integrated Detectors

2015-2018 Planned investments

Year Partner/purpose Amount k€

2015/16 Bayreuth:

ORC layout

180

2015-2017 BINP

600kV turbine

driven test-stage

~300

2015-2016 Air bearing

turbine

SF-6 optimized

300

2017-2018 Test stage with 3A

beam

200

Page 34: Accelerator Physics and Integrated Detectors

Advanced R&D inside Accelerator Research&Development (HGF Program)

ARD-Folie

Page 35: Accelerator Physics and Integrated Detectors

The power-problem: The 2MV device at Jülich

Each section contains;

- high-voltage power supply +/- 30 kV;

- power supply of the coils of the

magnetic field (2.5 A, 500 G);

- section of the cascade transformer for

powering of all electronic components;

33 high-voltage section V. V. Parchomchuk:

For higher voltages the Cascade transformer

will become inconvenient-unsuitable (Lossy&bulky)

Initially, a different solution was foreseen

Page 36: Accelerator Physics and Integrated Detectors

Turbines as solution to the power-problem

Up to 2009: Different concept:

Power generation by gas-turbines

Abandoned due to unreliable turbines…..

Industrialiszation required. But:

Commercial market for small scale

turbogenerators was non-existent at that

time

Page 37: Accelerator Physics and Integrated Detectors

12*700 kV device….(Drawing by V. Reva)

Open issue: industrialization of turbogens, SF6 operation and energy consumption (1MW for real cooler), enormous

space required for compressor Will be addressed by the ORC (Organic Rankine Cycle) project

Goal. 2015-2018 turbine powered multi MV generator

5kW Turbine Compressor for 5kW Turbine

Some important facts:

-Full concept will need ~1MW el.

Energy to generate 150kW floating power

- oper ation with SF6 desirable (required?)

- DEPRAG/ FH Amberg (summer 2013) :

Further R&D is interesting only

if related to “Energiewende issues”

Page 38: Accelerator Physics and Integrated Detectors

2015-2016 The ORC study

-ORC is a method to gain electrical energy from

low temperature heat ( low Carnot efficiency)

- SF6 is a suitable ORC medium

- Low temperature heat 80-90 C is potentially

available at FAIR (exhaust Cryocompressors!)

ORC test stand at U-Bayreuth with 15kW DEPRAG turbogenerator

(heat generator order of magnitude smaller than compressor)

Strategic advantages:

- Promises dramatically reduced power requirement from HESR cooler

- Turbine competence from DEPRAG & FH Amberg may stay attached to our project

HIM prepares MOU with U-Bayreuth.

Bayreuth will investigate & plan the components and system layout

for a SF6 based ORC process at the turbine cooler