Etienne CARLIER on behalf of the AB/BT Group
Thanks to Jan BORBURGH, Tony FOWLER and Jan SCHIPPER
Outline
• Motivation• Strategy• Initial Conditions• Work Packages• Concerns and Issues• Summary
Accelerator Complex Controls Renovation Workshop, LHC excluded – Beam Transfer Etienne CARLIER – 03-12-2009
PS
PSB
AD
LINACs
CTF3
LEIR
ISOLDEEast Hall
cvKicker
Electro-static septa
Electro-magnetic septa
Accelerator Complex Controls Renovation Workshop, LHC excluded – Beam Transfer Etienne CARLIER – 03-12-2009
TI 2
TI 8
Kicker
Electro-static septa
Electro-magnetic septa
Extraction Protection devices
LHCSPS
Accelerator Complex Controls Renovation Workshop, LHC excluded – Beam Transfer Etienne CARLIER – 03-12-2009
Motivation
• Clear indication of – AB/CO FEC performance limitation (RIO2) for BT equipment controls,– Decrease of reliability (end of bath curve) for equipment level hardware
under BT or CO responsibility.
• Good opportunity for – Eradication of obsolete of hardware,– Regain of expertise in low-level equipment controls (hardware &
software) and in integration of equipment controls in accelerator controls,
– Clarification of equipment controls responsibility between groups,– Homogenization of controls solutions (hardware & Software) within the
BT group.
Accelerator Complex Controls Renovation Workshop, LHC excluded – Beam Transfer Etienne CARLIER – 03-12-2009
Strategy
• Renovation strategy for consolidation of BT equipment controls will be based on the responsibility sharing agreements between CO and equipment groups defined in the CO3 (so called “co-operative model”).
• Clear separation between the renovation of – “Accelerator Complex Controls” CO responsibility,– “Equipment low-level controls” BT responsibility.
• Renovation based 3 independent phases– Phase1: Identification with OP of missing operational functionality for the
control of BT equipment,– Phase2: Renovation of CO controls infrastructure and update to FESA of GM
classes on the basis of actual low-level hardware,– Phase3: Consolidation of low level hardware.
Accelerator Complex Controls Renovation Workshop, LHC excluded – Beam Transfer Etienne CARLIER – 03-12-2009
Initial Conditions
Front-End Hardware
New FEC[CPU + OS]
Front-EndTiming
CTRx + LTIM
Front-End Software
FESA 2.10
Equipment Level Control
ConsolidationStatus
PS–Complex – Kickers 30% 20% 40% 50%
PS–Complex – Septa 10% 10% 10%
SPS – Kickers 10% 100% 100% 70%
SPS – Septa 50% 100% 100%
• FEC hardware situation– 21 VME – 18 RIO2 & 4 RIO3– 3 PC
• Migration to FESA 2.10 started• SL-EQUIP eradicated• MACSy eradicated• GM in progress
• Low-level control consolidation ongoing
Accelerator Complex Controls Renovation Workshop, LHC excluded – Beam Transfer Etienne CARLIER – 03-12-2009
Work Packages
• Two different categories of work packages:– Category 1: Work packages induced by the “Accelerator Complex Controls
Renovation”,– Category 2: Work packages where renovation of equipment level controls
has no link with “Accelerator Complex Controls Renovation” or is planned to be done in accordance with “co-operative model”.
• For Category 1 work packages, no resources, manpower & budget, actually planned within BT. Some manpower resources can be retrieved from exploitation.
• For Category 2 work packages, resources, manpower & budget (including additional CO support) are planned within BT.
Accelerator Complex Controls Renovation Workshop, LHC excluded – Beam Transfer Etienne CARLIER – 03-12-2009
Work PackagesCategory 1
Status Description Manpower
[FTE]
Cost
[kCHF]Draft In-source from AB/CO and consolidate PS-Complex
septa motion and slow control4 125
Draft In-source from AB/PO and consolidate PS-Complex electrostatic septa HV generator control
1 20
Draft Rationalise FECs used for control PS-Complex Septa system
0.5 10
Draft Migrate of GM classes to FESA for PS-Complex septa system
1.5 0
Draft Migrate from LynxOS to LINUX of existing FESA classes and FEC low level software
3 0
Accelerator Complex Controls Renovation Workshop, LHC excluded – Beam Transfer Etienne CARLIER – 03-12-2009
Planning to be in tune with CO
Work PackagesCategory 2
Status Description Manpower
[FTE]
Cost
[kCHF]Active Migrate GM classes to FESA for PS-Complex kicker
system3 0
Active Consolidate PS-Complex kicker oil systems 4 150*Active Consolidate SPS LSS2 extraction electronics (end 2009) 4 300Active Consolidate AD Horn pulser electronics (Phase 1) 1.5 75
Planned Provide electronics for new SPS MKDV generators 4 250*Draft Consolidate SPS Kicker Timing Systems 2 150
* : Electronics & Controls part
Accelerator Complex Controls Renovation Workshop, LHC excluded – Beam Transfer Etienne CARLIER – 03-12-2009
Open Issues / Concerns
• Responsibility clarification for – PS Complex Electro-static septa control (shared for the moment between AB/PO,
AB/CO & AB/BT),– Implementation of the “co-operative model” for slow & fast timing for kicker systems
across the injector chain.– Equipment control through generic classes.
• FEC sharing between different equipment group• Definition of FESA standard properties• Low-level controls homogeneity across the complete accelerator
complex (LHC included)– Same equipment level hardware and software used on 2 different platforms with 2
different operating systems,– Resources needed at equipment group level to maintain two different environments.
• OASIS
Accelerator Complex Controls Renovation Workshop, LHC excluded – Beam Transfer Etienne CARLIER – 03-12-2009
Summary
• BT will follow the “Accelerator Complex Controls Renovation” as set up by the CO group.
• Expertise and manpower (from exploitation) available to perform the migration of GM classes to FESA.
• Ready to in-source some specific control functionalities only used by BT, but resources (funding and manpower) to be found.
• Some specific BT “non-blocking” technical issues still to be clarified with CO.
• Some concerns about resources needed to maintain a homogeneity at the low level across the complete accelerator chain.